CN201835869U - Gob-side retained entry reinforcing fill structure - Google Patents

Gob-side retained entry reinforcing fill structure Download PDF

Info

Publication number
CN201835869U
CN201835869U CN2010205300781U CN201020530078U CN201835869U CN 201835869 U CN201835869 U CN 201835869U CN 2010205300781 U CN2010205300781 U CN 2010205300781U CN 201020530078 U CN201020530078 U CN 201020530078U CN 201835869 U CN201835869 U CN 201835869U
Authority
CN
China
Prior art keywords
filling
filling bag
bag
gob
obturation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205300781U
Other languages
Chinese (zh)
Inventor
柏建彪
陈勇
夏军武
王襄禹
徐营
慧功领
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN2010205300781U priority Critical patent/CN201835869U/en
Application granted granted Critical
Publication of CN201835869U publication Critical patent/CN201835869U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

A gob-side retained entry reinforcing fill structure comprises a filling bag, a plurality of small top bags are arranged at intervals on the top edge of the filling bag, a plurality of small lateral bags are symmetrically arranged at intervals on two lateral sides of the filling bag along the filling direction, counter-pulled anchor bolts penetrate through the small lateral bags, a plurality of hooks are arranged at intervals on the top and the periphery of the filling bag, and a form protective reinforcement fabric fixed by steel wires is arranged around the filling bag. Before filling, the counter-pulled anchor bolts penetrates into the small lateral bags which are bound with iron wires, nuts are fastened after trays are set, the filling bag is inflated fully for roof contact by the aid of grout outlet pressure of a filling pump during filling, anchoring force of the anchor bolts is screwed to a preset value after certain strength of a fill is achieved, and thereby filling and fill reinforcement are realized at one step. The gob-side retained entry reinforcing fill structure is simple in structure and convenient in construction.

Description

A kind of gob side entry retaining is reinforced the obturation structure
Technical field
The utility model relates to down-hole mechanicalization and constructs roadside packing body technique field, and especially a kind of gob side entry retaining of the heavily stressed mine in deep that is applicable to is reinforced the obturation structure.
Background technology
Gob side entry retaining is that twice utilization done in a tunnel, greatly improves resource recovery, alleviate digging and take over anxiety, and be a major reform of coal mining and stope drift active workings placement technique.After entering deep mining, the ore deposit is pressed and to be manifested aggravation, directly contracts obviously in the tunnel, the large deformation of gob side entry retaining obturation, carrying occur and loses efficacy increasingly, and the obturation destruction that does not particularly connect the top is even more serious.Therefore, to connect top effect and supporting filling body be crucial to the gob side entry retaining roadside packing.The common way of mechanization filling in the past is: 1, beat firm individual prop supporting filling space in the periphery, filling space earlier, install filling template again, then suitable filling bag is put into template, hang up filling bag, make the filling bag bottom be shaped the turn on pump filling; 2, in stowing operation, every filling certain altitude, on carry the primary filling bag, avoid filling bag tenesmus to crumple.During filling, add a template or wooden adjusting template again when increasing near the template upper end gradually etc. slip in the filling bag, the said process that so circulates, up to filling bag be full of connect the top till; 3, treat that obturation is solidified after, pull down template, then on obturation jewel hole, linked network, install drawing anchor pole to reinforce obturation.
The shortcoming or the need improvements that use this mode to exist be: 1, because mining face under mine top board complicated condition, after work plane is adopted, situations such as top board injustice (or face upward tiltedly or bow tiltedly), inbreak and the string bag are comparatively common, connect the top weak effect when adopting the filling bag of open type, often only there is fraction filling physical efficiency to connect the top, the mode such as chock buttress of just having to after waiting obturation to solidify at an upper portion thereof connects the top, wastes raw material such as timber on the one hand; Make on the other hand and stay the lane top board under action of underground, slowly to touch obturation, the bearing pressure peak value of coal group side is shifted to coal seam depth, can not bring into play powerful feature morning of filler, easily cause the gob side entry retaining failure; 2, filling and reinforcing obturation are implemented in two steps, operation is cumbersome, can when filling, implant anchor pole in advance by reinforcing the obturation requirement, treat to tighten anchor-holding force of anchor bolt again to preset value after obturation reaches certain intensity, so just reduced operations such as setting up, tear open imperial template, linked network and boring skyhook, realized filling and reinforce obturation settling at one go.
Summary of the invention
The purpose of this utility model is the weak point that overcomes in the prior art, provides a kind of gob side entry retaining simple in structure, that operations such as imperial template, linked network and boring skyhook are set up, torn open in minimizing to reinforce the obturation structure.
Gob side entry retaining of the present utility model is reinforced the obturation structure, comprise filling bag, the top of described filling bag is interval with several top pouch, filling bag is arranged with several side pouch at interval along filling direction two sides, and be provided with pass the side pouch to drawing anchor pole, the top of filling bag and peripheral intervals are provided with some hooks, be provided with around the filling bag with iron wire fixing protect the mould steel mesh reinforcement.
Beneficial effect: the utility model is made the rectangular-shaped of sealing with filling bag, make several pouch in the filling bag top with along filling direction two sides same position (by reinforcing the obturation requirement), top pouch is for the usefulness of filling charging and exhaust, and the side pouch is put on drawing anchor pole to make to reinforce the usefulness of obturation; Again in filling bag top center zone with on lateral side wire around the spacing distance of filling bag top, sew on the hook of certain density, hook is hung over filling space top board or all around, use steel mesh reinforcement allow obturation moulding and oppose and draw the usefulness of bolt anchorage obturation wall supporting as filling template.Changed the operation that gob side entry retaining is implemented filling and reinforcing obturation in two steps, it is simple in structure, easy to operate, the construction of favourable down-hole, the mechanization pumping is constructed fast reinforce obturation when gob side entry retaining obturation structure is closely knit to connect the top, realize the closely knit supporting that connects the top and reinforce obturation.Compared with prior art, at first be to make the closely knit top that connects of casting resin, realize the early stage bearer properties of filler, prevent absciss layer, cut off the goaf and directly push up; The 2nd, construct and reinforce obturation when obturation is closely knit to connect the top, reduce and set up, tear open operations such as imperial template, linked network and boring skyhook; The 3rd, do not destroy the integrality of obturation, reduce adopt the sky side protect the top width degree temporarily, more help gob side entry retaining; The 4th, simple to operate, good reliability reduces filling cost, has practicality widely in the present technique field.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is the I-I section structure schematic diagram of Fig. 1.
Fig. 3 is the partial enlarged drawing of Fig. 2.
Among the figure: the 1-filling bag, 2-protects the mould steel mesh reinforcement, the 3-iron wire, the 4-hook, 5-is to drawing anchor pole, 6-top pouch, 7-nut, 8-pallet, 9-side pouch.
The specific embodiment
Below in conjunction with accompanying drawing an embodiment of the present utility model is further described:
Shown in the accompanying drawing, gob side entry retaining of the present utility model is reinforced the obturation structure, comprise the rectangular-shaped filling bag 1 of making sealing, the top of filling bag 1 is interval with several top pouch 6 for the usefulness of filling charging and exhaust, filling bag 1 is arranged with several at interval and wears drawing the side pouch 9 of anchor pole 5 along filling direction two sides, to drawing anchor pole 5 to pass side pouch 9, its two ends is equipped with pallet 8 and nut 7 respectively, the top of filling bag 1 and peripheral intervals are provided with some hooks 4, are provided with around the filling bag 1 with what iron wire 3 was fixed and protect mould steel mesh reinforcement 2.Before filling, put in the pouch from the side drawing anchor pole, bind side pouch 9, first-class pallet 8, tightening nuts 7 with iron wire 3; Utilize the grout outlet pressure of filling pump during filling, filling bag is heaved fully touched face roof coal or rock stratum; Treat to be screwed to preset value to drawing anchor-holding force of anchor bolt after obturation reaches certain intensity, filling and one step of reinforcing obturation are realized.

Claims (1)

1. a gob side entry retaining is reinforced the obturation structure, comprise filling bag (1), it is characterized in that: the top of described filling bag (1) is interval with several top pouch (6), filling bag (1) is arranged with several side pouch (9) at interval along filling direction two sides, and be provided with pass side pouch (9) to drawing anchor pole (5), the top of filling bag (1) and peripheral intervals are provided with some hooks (4), are provided with around the filling bag (1) with what iron wire (3) was fixed and protect mould steel mesh reinforcement (2).
CN2010205300781U 2010-09-09 2010-09-09 Gob-side retained entry reinforcing fill structure Expired - Fee Related CN201835869U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205300781U CN201835869U (en) 2010-09-09 2010-09-09 Gob-side retained entry reinforcing fill structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205300781U CN201835869U (en) 2010-09-09 2010-09-09 Gob-side retained entry reinforcing fill structure

Publications (1)

Publication Number Publication Date
CN201835869U true CN201835869U (en) 2011-05-18

Family

ID=44005975

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205300781U Expired - Fee Related CN201835869U (en) 2010-09-09 2010-09-09 Gob-side retained entry reinforcing fill structure

Country Status (1)

Country Link
CN (1) CN201835869U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101975085A (en) * 2010-09-09 2011-02-16 中国矿业大学 Gob-side entry retaining reinforcing filling body structure and construction method thereof
CN103089279A (en) * 2013-01-15 2013-05-08 河南理工大学 Multi-lane along-groove inter-lane thin coal pillar reinforcing method
CN106089237A (en) * 2016-07-06 2016-11-09 冀中能源邯郸矿业集团有限公司 A kind of high-water material thin wall composite support gob-side entry retaining method
CN106194250A (en) * 2016-06-22 2016-12-07 西安科技大学 A kind of gob-side entry retaining concrete filling wall annular air-pocket template
CN103850709B (en) * 2014-01-15 2020-06-12 夏军武 Structural filling method in underground mining
CN111963236A (en) * 2020-08-12 2020-11-20 平顶山天安煤业股份有限公司 Grouting, filling and supporting device for gob-side entry retaining of coal face

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101975085A (en) * 2010-09-09 2011-02-16 中国矿业大学 Gob-side entry retaining reinforcing filling body structure and construction method thereof
CN101975085B (en) * 2010-09-09 2013-07-03 中国矿业大学 Gob-side entry retaining reinforcing filling body structure construction method
CN103089279A (en) * 2013-01-15 2013-05-08 河南理工大学 Multi-lane along-groove inter-lane thin coal pillar reinforcing method
CN103089279B (en) * 2013-01-15 2016-01-20 河南理工大学 The method that between crossheading lane, a kind of many lanes, bog-head coal post is reinforced
CN103850709B (en) * 2014-01-15 2020-06-12 夏军武 Structural filling method in underground mining
CN106194250A (en) * 2016-06-22 2016-12-07 西安科技大学 A kind of gob-side entry retaining concrete filling wall annular air-pocket template
CN106194250B (en) * 2016-06-22 2018-08-03 西安科技大学 A kind of gob-side entry retaining concrete filling wall annular air-pocket template
CN106089237A (en) * 2016-07-06 2016-11-09 冀中能源邯郸矿业集团有限公司 A kind of high-water material thin wall composite support gob-side entry retaining method
CN106089237B (en) * 2016-07-06 2018-07-24 冀中能源邯郸矿业集团有限公司 A kind of thin wall composite support gob-side entry retaining method of high-water material
CN111963236A (en) * 2020-08-12 2020-11-20 平顶山天安煤业股份有限公司 Grouting, filling and supporting device for gob-side entry retaining of coal face

Similar Documents

Publication Publication Date Title
CN101975085B (en) Gob-side entry retaining reinforcing filling body structure construction method
CN201835869U (en) Gob-side retained entry reinforcing fill structure
US10612378B2 (en) Method for recovering room-mining coal pillars by solid filling in synergy with artificial pillars
CN104533482B (en) A kind of reinforcement means improving gob side entry driving fender stability
CN103147793B (en) Girdle roadside packing non chain pillar entryprotection method
CN103161480A (en) Method for actively supporting lane side filling gob-side entry retaining
CN102661169A (en) Gob-side entry retaining method for anchor bolt network gangue bag wall body for coal mining without pillars
CN203742612U (en) Rapid construction supporting system for deep coal mine roadway with weak and broken surrounding rock
CN105937407A (en) Gob-side entry retaining concrete filled wall annular air bag construction method
CN103388481A (en) Combined prefabricated slab for governing floor heave and method for governing floor heave
CN110925017B (en) Reserving and supporting method for long-wall mining special-shaped gob-side roadway in large-dip-angle medium-thickness coal seam trend
CN103061764A (en) Goaf waste rock filling coal mining method of flexible shield support in half-edge coal seam
CN103758529A (en) Coal mine gob-side entry retaining side supporting method
CN102720498A (en) Gob-side entry retaining mining process for coal face
CN106050282B (en) A kind of anchor structure and reinforcement means of gob side entry retaining thin coal pillar
CN101975074B (en) Soft rock roadway anchored concrete filled steel tube anti-floor heave device and construction method thereof
CN204691803U (en) A kind of coal body flexibility reinforces Bolt
CN106194250B (en) A kind of gob-side entry retaining concrete filling wall annular air-pocket template
CN102587942A (en) Preliminary supporting bag cast isolation wall and placing method thereof
CN102852532B (en) Grouting method for preventing rib walk caving
CN105507929B (en) A kind of method that repetition applies prestressed cable bolting
CN206785400U (en) A kind of buffer-type high intensity mine support system
CN102979572B (en) Active reinforced filling wall and construction method
CN210948737U (en) Efficient and rapid tunneling roadway support facility for inclined small-section half-coal-rock roadway with thin coal seam
CN205743941U (en) A kind of colliery tunnel support plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110518

Termination date: 20130909