CN103161480A - Method for actively supporting lane side filling gob-side entry retaining - Google Patents

Method for actively supporting lane side filling gob-side entry retaining Download PDF

Info

Publication number
CN103161480A
CN103161480A CN2013100807158A CN201310080715A CN103161480A CN 103161480 A CN103161480 A CN 103161480A CN 2013100807158 A CN2013100807158 A CN 2013100807158A CN 201310080715 A CN201310080715 A CN 201310080715A CN 103161480 A CN103161480 A CN 103161480A
Authority
CN
China
Prior art keywords
lane
filling
entry retaining
gob
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100807158A
Other languages
Chinese (zh)
Other versions
CN103161480B (en
Inventor
杨培举
刘长友
鲁岩
张宁波
郭卫彬
路鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201310080715.8A priority Critical patent/CN103161480B/en
Publication of CN103161480A publication Critical patent/CN103161480A/en
Application granted granted Critical
Publication of CN103161480B publication Critical patent/CN103161480B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention discloses a method for actively supporting a lane side filling gob-side entry retraining. Firstly, a lane interior support and an enforcing support are built on a reserved lane according to a sounding rock condition and a working face. On the back of the working face, nogs, gangues or blockworks and the like are adopted to build a lane side filling wall along the edge of a gob. High-strength and sealed filling bags are paved on the filling wall, and high-expanding materials or cement coagulation serous fluid added with a rapid hardening early strength agent is filled into the filling bags through a grouting pump. The enforcing support is dismounted after a top plate behind the working face is movably stabilized, the high-strength and sealed filling bags are enabled to be contacted tightly with the top plate, and active support force is formed to be exerted on the top plate. By means of the active support force provided for the lane side filing wall, the top cutting capacity of a lane side filling body is enhanced, initial deflection of the entry retaining top plate is reduced, the stability of the top plate is improved, the quality of the gob-side entry retaining is improved, and repair rate of the gob-side entry retaining is reduced. The method is simple, convenient to operate and good in effect.

Description

Initiatively support the method for roadside packing gob side entry retaining
Technical field
The present invention relates to the Coal Mining Technology field, particularly relate to and a kind ofly can provide the initiatively method of the roadside packing gob side entry retaining of supporting role.
Background technology
Gob side entry retaining is reasonably to develop a kind of effective way of existing coal resources, raising coal resources recovery ratio as a kind of non chain pillar entryprotection technology.According to existing analysis without the coal pillar mining system, gob side entry retaining generally can make the mine rate of extraction improve more than 10%, and tunnelling rate and road maintenance expense can reduce by 30% left and right, and some mine reduces amplitude up to more than 40%.Edge air gallery technology can significantly reduce mine laneway driving amount, the alleviation digging is taken over anxiety, shortens the face moving time, prevented from getting angry, and extends mine service-life etc.This technology is provided convenience and possibility for the gas control that solves highly gassy mine simultaneously, and the safety that has improved pit mining has obvious technology and economic benefit, is a major reform of coal mining and stope drift active workings support technology.Its shortcoming is that gob side entry retaining will stand mining influence twice, and its ore deposit is pressed and manifested and roadway maintenance more complicated all, and the maintenance difficulties in tunnel is also large.The research and extension of edge air gallery technology has positive and important meaning to the development of China coal industry on the whole, no matter still in the future now, this technology is all the important development direction of coal resources in China exploitation.
Up to the present, do a large amount of work aspect the gob side entry retaining basic research both at home and abroad, analyzing more all sidedly gob side entry retaining surrouding rock stress state and " supporting one country rock " interaction relationship.Application facet at edge air gallery technology has also been carried out many-sided exploration, has accumulated rich experience, and from the girdle to the high seam, from the gently inclined seam to the half-edge coal seam, all oneself has the application experience of gob side entry retaining.But roadside support is but never solved in China well as a difficult point of gob side entry retaining.The success of edge air gallery technology should be supporting and the symphyogenetic result of roadside support in the lane, wherein roadside support is the key of gob-side entry retaining support technology, the key of edge air gallery technology success or failure is roof moves regulations that can roadside support adapt to gob side entry, effectively controls the deformation failure that country rock is stayed in the lane.
At home and abroad in the development of edge air gallery technology, use wider roadside support and mainly contain: grillage roadside support, close standing props roadside support, waste pack roadside support, artificial building block roadside support and pumping filling roadside support technology etc.One of common feature of existing roadside support is exactly all to belong to passive stressed, progressively produces in crushing and improves support force, thereby stoping further sinking and the deformation failure of top board.According to the basic principle that face roof is controlled, the active enabling capabilities (setting load) of support is the tool important function in roof stability is controlled, and the setting load that improves support is the important content of work plane management always.For the force analysis of gob side entry retaining as can be known, support action and the force piece of roadside packing body are similar, therefore adopt the roadside support with certain setting load for improving the gob side entry retaining quality, reduce repair rate and have important function.
Summary of the invention
Technical problem: the objective of the invention is to overcome the deficiency in prior art, a kind of roadside packing gob-side entry retaining method that initiatively supports is provided, by strengthening the top ability of cutting of roadside packing body, and reduce to stay the initial deflection of lane top board, thereby improve the stability of top board.
Technical scheme: the method that initiatively supports the roadside packing gob side entry retaining of the present invention comprises the steps:
On the basis of a, supporting in original lane, adopt hydraulic prop to add the articulated roof beam group in the reservation tunnel in coal-face the place ahead and add strong supporting;
B, close in the goaf at coal-face rear portion and keep tunnel one side, that adopts grillage, spoil or blockwork to construct to close on the top board height stays lane filling wall, then lays pressure-bearing between the top board height greater than the high-strength sealing filling bag of 10MPar staying lane filling wall to close on;
C, inject in the high-strength sealing filling bag by grouting pump and be added with the solidifying slurries of accelerated cement, make high-strength sealing filling bag and top board close contact, formation applies initiatively support force to top board, adds the articulated roof beam group until the stable rear hydraulic prop of removing of coal-face rear portion roof movement.
The height of described high-strength sealing filling bag is not less than 1/10 of filling wall height.
Beneficial effect: the roadside packing gob-side entry retaining method that initiatively supports of the present invention, by roadside packing wall setting load is provided, strengthen the top ability of cutting of roadside packing body, and reduce to stay the initial deflection of lane top board, improve the stability of top board, improve the gob side entry retaining quality, reduce to keep the repair rate in tunnel.Carry out lane in supporting in stope the place ahead to keeping the tunnel according to wall rock condition, at the work plane rear portion, follow the advance of the face and carry out roadside support.In described lane, support pattern can adopt the trapezoidal rigid metal support of i iron, the trapezoidal Yieldable steel support of i iron, U-shaped steel Yieldable steel support, bolt support, the supporting of anchor rete cord, perhaps with the associating of above-mentioned two or more form; Described roadside support coordinates the first support arrangement of high pressure to be formed by the roadside packing wall; At first adopt grillage, spoil or blockwork etc. to build up described roadside packing wall, then lay just support arrangement of high pressure on the filling wall, described high pressure just support arrangement adopts the high-strength sealing filling bag to make, annotate in it and fill the solidifying slurries of the cement that adds fast coagulating early strength agent, by strengthening the top ability of cutting of roadside packing body, reduced to stay the initial deflection of lane top board, thereby improved the stability of top board, improve the gob side entry retaining quality, reduced to keep the repair rate in tunnel.Roadside packing also can adopt pumping rapid hardening bulging material to build the filling wall or other high setting load filling wall substitutes.By initiatively supporting the roadside packing gob side entry retaining, be conducive to improve the result of use of edge air gallery technology.Its method is simple, and is easy to operate, effective, has practicality widely.
Description of drawings
Fig. 1 is gob side entry retaining work plane floor map of the present invention;
Fig. 2 is gob side entry retaining of the present invention tunnel cross-sectional view;
Fig. 3 is high pressure sealing filling bag structure chart of the present invention.
In figure: 1 coal-face, 2 goafs, 3 roadside packing bands, 4 hydraulic props add the articulated roof beam group, and 5 keep the tunnel, supporting in 6 lanes, 7 anchor cables, 8 stay the lane roof strata, 9 anchor poles, 10 canopies, 11 stay lane filling wall, and 12 high-strength sealing filling bag, 13 filling bag are annotated and are filled interface.
The specific embodiment
Below in conjunction with accompanying drawing, one embodiment of the present of invention are further described:
The roadside packing gob-side entry retaining method that initiatively supports of the present invention comprises three aspects: keep in the lane, tunnel supporting and add strong supporting, construct the filling wall that keeps the tunnel and the reservation back is applied setting load.Concrete operation step is as follows:
A, at first according to staying the condition of lane roof strata 8, and the Rule of roof movement of coal in goaf 2 is taked supporting 6 in the lane will keep in the tunnel, can adopt frame canopy 10 or anchor pole 9 to carry out supporting in the lane, can adopt the support pattern of both combinations for breaking roof.Adopt according to a conventional method supporting 6 in the lane that frame canopy 10,9 pairs of roadway workfaces of anchor pole carry out, shed shoring 10 comprises any in the trapezoidal rigid metal support of i iron, the trapezoidal Yieldable steel support of i iron, U-shaped steel Yieldable steel support; Bolt support 9 can be equipped with anchor cable 7 and wire lath carries out supporting; Namely in original lane on the basis of supporting, add articulated roof beam group 4 at the reservation tunnel in coal-face 1 the place ahead 5 interior employing hydraulic props and add strong supporting, in the work progress that keeps tunnel 5, coal-face 1 adds strong supporting in advance, and crossover distance should be greater than leading bearing pressure influence basin; Coal-face 1 rear keeps the length that adds strong supporting and is not less than 50m, and when roof movement hysteresis scope was larger, reservation added the strong supporting segment length and should surpass the roof movement delay distance;
After b, coal-face 1 advance 1~2 circulation, within adding strong supporting and lane under the protection of supporting 6, close in the goaf 2 at coal-face 1 rear portion and keep tunnel 5 one sides and construct the filling wall that keeps the tunnel, adopt grillage, spoil or blockwork roadside packing band 3 construct close on the top board height stay lane filling wall 11, then lay pressure-bearing between the top board height greater than the high-strength sealing filling bag 12 of 10MPar staying lane filling wall 11 to close on; Stay of lane filling wall 11 to build by laying bricks or stones after circulation finishes, laying high pressure sealing filling bag 12 in the space of 8 of filling wall 11 and roof stratas;
C, adopt grouting pump to annotate by filling bag to fill interface 13 and be added with accelerated cement to the interior injection of high-strength sealing filling bag 12 and coagulate slurries, top board is applied setting load, annotate pressurising power and be not less than 1MPa, after enriching, the filling bag height is not less than 1/10 of filling wall 11 height, after in filling bag, slurries solidify, form overall tightness body of wall preferably, top board is formed active support; Remove after coal-face 1 rear portion roof movement is stable with hydraulic prop and add the strong supporting that adds that articulated roof beam group 4 carries out.

Claims (2)

1. a method that initiatively supports the roadside packing gob side entry retaining, is characterized in that, comprises the steps:
On the basis of a, supporting in original lane (6), adopt hydraulic prop to add articulated roof beam group (4) in the reservation tunnel (5) in coal-face (1) the place ahead and add strong supporting;
B, close in the goaf (2) at coal-face (1) rear portion and keep tunnel (5) one sides, that adopts grillage, spoil or blockwork to construct to close on the top board height stays lane filling wall (11), then lays pressure-bearing between the top board height greater than the high-strength sealing filling bag (12) of 10MPar staying lane filling wall (11) to close on;
C, inject in the high-strength sealing filling bag (12) by grouting pump and be added with the solidifying slurries of accelerated cement, make high-strength sealing filling bag (12) and top board close contact, formation applies initiatively support force to top board, adds articulated roof beam group (4) until the stable rear hydraulic prop of removing of coal-face (1) rear portion roof movement.
2. the method for high setting load roadside packing gob side entry retaining described according to right 1, it is characterized in that: the height of described high-strength sealing filling bag (12) is not less than 1/10 of filling wall height.
CN201310080715.8A 2013-03-14 2013-03-14 Initiatively support the method for roadside packing gob side entry retaining Expired - Fee Related CN103161480B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310080715.8A CN103161480B (en) 2013-03-14 2013-03-14 Initiatively support the method for roadside packing gob side entry retaining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310080715.8A CN103161480B (en) 2013-03-14 2013-03-14 Initiatively support the method for roadside packing gob side entry retaining

Publications (2)

Publication Number Publication Date
CN103161480A true CN103161480A (en) 2013-06-19
CN103161480B CN103161480B (en) 2015-12-09

Family

ID=48584975

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310080715.8A Expired - Fee Related CN103161480B (en) 2013-03-14 2013-03-14 Initiatively support the method for roadside packing gob side entry retaining

Country Status (1)

Country Link
CN (1) CN103161480B (en)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485820A (en) * 2013-10-09 2014-01-01 山东科技大学 Filling wall body capable of protecting laneway through soft yielding in non-chain-pillar filling mining and construction method thereof
CN104213920A (en) * 2014-08-25 2014-12-17 中国矿业大学 Bag type filling method for suspension brackets
CN104265295A (en) * 2014-09-11 2015-01-07 四川达竹煤电(集团)有限责任公司铁山南煤矿 Non-artificial roadway filling and non-coal-pillar gob-side entry retaining method for inclined medium-thickness coal seam
CN104405436A (en) * 2014-09-25 2015-03-11 白银有色集团股份有限公司 Method for improving orebody rate of supporting pit roof
CN105370307A (en) * 2015-10-08 2016-03-02 山西晋城无烟煤矿业集团有限责任公司 Support technology for coal face to pass through superelevation section
CN105673039A (en) * 2016-02-02 2016-06-15 安徽理工大学 Gob-side entryretaining roadway-side flexible and high-strength material bearing construction structure and construction method thereof
CN105735995A (en) * 2016-02-02 2016-07-06 山东科技大学 Gob-side roadway retaining method based on roof cutting of soft roof plate
CN106353199A (en) * 2016-10-20 2017-01-25 山东科技大学 Method for field real-time monitoring of creep type rock burst risk
CN108678769A (en) * 2018-05-16 2018-10-19 山东科技大学 Deep Gateway anchor note cuts top master control and stays lane method
CN109209495A (en) * 2018-09-13 2019-01-15 天地科技股份有限公司 The stopping of a kind of fully-mechanized mining working cutting top unloading pressure protection method on the face of adopting
CN109653778A (en) * 2018-07-20 2019-04-19 天地科技股份有限公司 A kind of working face return channel high strength support system and method
CN109779652A (en) * 2018-12-03 2019-05-21 李洪彪 A kind of expansion of coal-mine soft-rock tailentry is repaired and method for protecting support
CN111255514A (en) * 2020-03-29 2020-06-09 新汶矿业集团有限责任公司 Deep non-roadside filling gob-side entry retaining supporting structure and supporting method
CN111550283A (en) * 2020-07-06 2020-08-18 西安科技大学 Method for reducing damage by alternately laying gangue filling and bag grouting combined support
CN111734482A (en) * 2020-07-06 2020-10-02 西安科技大学 Method for reducing damage by utilizing gangue cementation and bag grouting combined support
CN112610218A (en) * 2020-12-02 2021-04-06 中国矿业大学(北京) Thick coal seam fully-mechanized top-tunneling top-cutting pressure relief automatic roadway forming method
CN112796757A (en) * 2021-01-26 2021-05-14 扬州中矿建筑新材料科技有限公司 Method for high-water filling material roadside filling gob-side entry retaining
CN113309520A (en) * 2021-07-14 2021-08-27 辽宁工程技术大学 Reconstructed surrounding rock for advanced pre-splitting roof cutting gob-side entry retaining and construction method
CN113550763A (en) * 2021-08-24 2021-10-26 西安科技大学 Support structure for quickly constructing gob-side entry retaining and construction method thereof
CN113638751A (en) * 2021-09-03 2021-11-12 中煤能源研究院有限责任公司 Prefabricated pier stud reinforced roadway support method
CN113685209A (en) * 2021-09-30 2021-11-23 太原理工大学 Mining bottom plate deformation self-adaptive type multi-stage high-strength filling column cylinder and using method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8257477B1 (en) * 2009-09-08 2012-09-04 Hart Scott A Dust control system
CN102705002A (en) * 2012-05-12 2012-10-03 山东科技大学 Roadside proper yielding unequal combined filling structure of gob-side entry retaining and construction method
CN102865102A (en) * 2012-09-26 2013-01-09 山西焦煤集团有限责任公司 Self-flowing concrete convex and concave self-connection filling method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8257477B1 (en) * 2009-09-08 2012-09-04 Hart Scott A Dust control system
CN102705002A (en) * 2012-05-12 2012-10-03 山东科技大学 Roadside proper yielding unequal combined filling structure of gob-side entry retaining and construction method
CN102865102A (en) * 2012-09-26 2013-01-09 山西焦煤集团有限责任公司 Self-flowing concrete convex and concave self-connection filling method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
华心祝: "巷旁充填沿空留巷技术在我国煤矿的应用", 《煤》 *
李永平,欧阳广斌: "高水速凝水泥材料巷旁充填技术的应用", 《煤矿开采》 *

Cited By (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485820B (en) * 2013-10-09 2016-03-30 山东科技大学 Ya Hu lane filled wall and construction method thereof is allowed without coal column filling mining flexibility
CN103485820A (en) * 2013-10-09 2014-01-01 山东科技大学 Filling wall body capable of protecting laneway through soft yielding in non-chain-pillar filling mining and construction method thereof
CN104213920A (en) * 2014-08-25 2014-12-17 中国矿业大学 Bag type filling method for suspension brackets
CN104265295A (en) * 2014-09-11 2015-01-07 四川达竹煤电(集团)有限责任公司铁山南煤矿 Non-artificial roadway filling and non-coal-pillar gob-side entry retaining method for inclined medium-thickness coal seam
CN104405436B (en) * 2014-09-25 2016-08-24 白银有色集团股份有限公司 A kind of method improving ore body Tight filling rate
CN104405436A (en) * 2014-09-25 2015-03-11 白银有色集团股份有限公司 Method for improving orebody rate of supporting pit roof
CN105370307A (en) * 2015-10-08 2016-03-02 山西晋城无烟煤矿业集团有限责任公司 Support technology for coal face to pass through superelevation section
CN105370307B (en) * 2015-10-08 2018-12-11 山西晋城无烟煤矿业集团有限责任公司 Coal working face crosses freeboard section support process
CN105673039A (en) * 2016-02-02 2016-06-15 安徽理工大学 Gob-side entryretaining roadway-side flexible and high-strength material bearing construction structure and construction method thereof
CN105735995B (en) * 2016-02-02 2017-11-14 山东科技大学 A kind of loose roof cuts the gob-side entry retaining method under top
CN105735995A (en) * 2016-02-02 2016-07-06 山东科技大学 Gob-side roadway retaining method based on roof cutting of soft roof plate
CN106353199A (en) * 2016-10-20 2017-01-25 山东科技大学 Method for field real-time monitoring of creep type rock burst risk
CN108678769A (en) * 2018-05-16 2018-10-19 山东科技大学 Deep Gateway anchor note cuts top master control and stays lane method
CN109653778A (en) * 2018-07-20 2019-04-19 天地科技股份有限公司 A kind of working face return channel high strength support system and method
CN109653778B (en) * 2018-07-20 2021-03-02 天地科技股份有限公司 High-strength support system and method for working face retraction channel
CN109209495A (en) * 2018-09-13 2019-01-15 天地科技股份有限公司 The stopping of a kind of fully-mechanized mining working cutting top unloading pressure protection method on the face of adopting
CN109779652A (en) * 2018-12-03 2019-05-21 李洪彪 A kind of expansion of coal-mine soft-rock tailentry is repaired and method for protecting support
CN109779652B (en) * 2018-12-03 2021-02-02 李洪彪 Method for expanding, repairing and supporting air return roadway of soft rock working face of coal mine
CN111255514B (en) * 2020-03-29 2021-09-28 新汶矿业集团有限责任公司 Deep non-roadside filling gob-side entry retaining supporting structure and supporting method
CN111255514A (en) * 2020-03-29 2020-06-09 新汶矿业集团有限责任公司 Deep non-roadside filling gob-side entry retaining supporting structure and supporting method
CN111550283A (en) * 2020-07-06 2020-08-18 西安科技大学 Method for reducing damage by alternately laying gangue filling and bag grouting combined support
CN111734482A (en) * 2020-07-06 2020-10-02 西安科技大学 Method for reducing damage by utilizing gangue cementation and bag grouting combined support
CN112610218A (en) * 2020-12-02 2021-04-06 中国矿业大学(北京) Thick coal seam fully-mechanized top-tunneling top-cutting pressure relief automatic roadway forming method
CN112610218B (en) * 2020-12-02 2022-05-13 中国矿业大学(北京) Thick coal seam fully-mechanized top-tunneling top-cutting pressure relief automatic roadway forming method
CN112796757A (en) * 2021-01-26 2021-05-14 扬州中矿建筑新材料科技有限公司 Method for high-water filling material roadside filling gob-side entry retaining
CN113309520A (en) * 2021-07-14 2021-08-27 辽宁工程技术大学 Reconstructed surrounding rock for advanced pre-splitting roof cutting gob-side entry retaining and construction method
CN113550763A (en) * 2021-08-24 2021-10-26 西安科技大学 Support structure for quickly constructing gob-side entry retaining and construction method thereof
CN113550763B (en) * 2021-08-24 2023-05-02 西安科技大学 Supporting structure for quickly constructing gob-side entry retaining and construction method thereof
CN113638751A (en) * 2021-09-03 2021-11-12 中煤能源研究院有限责任公司 Prefabricated pier stud reinforced roadway support method
CN113685209A (en) * 2021-09-30 2021-11-23 太原理工大学 Mining bottom plate deformation self-adaptive type multi-stage high-strength filling column cylinder and using method thereof
CN113685209B (en) * 2021-09-30 2024-01-30 太原理工大学 Mining bottom plate deformation self-adaptive multi-stage high-strength filling column cylinder and use method thereof

Also Published As

Publication number Publication date
CN103161480B (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN103161480B (en) Initiatively support the method for roadside packing gob side entry retaining
CN104533482B (en) A kind of reinforcement means improving gob side entry driving fender stability
CN107339104B (en) Security personnel's curtain wall recovery method
CN100577986C (en) Goaf surrounding rock around gob-side supporting method under three soft geological condition
CN102661169B (en) Gob-side entry retaining method for anchor bolt network gangue bag wall body for coal mining without pillars
CN104763434B (en) A kind of without coal column double lanes driving method
AU2015387618B2 (en) Method for fracturing filler wall left behind in adjacent coal-mining face
CN109098714A (en) A kind of soft extremely irregularcoal seam fully mechanized coal face gob-side entry retaining method of high methane three
CN107091091A (en) A kind of steeply-inclined seam mining gob-side entry retaining method of prefabricated arc support
CN212296427U (en) Double-lane arrangement working face outer lane narrow coal pillar stable supporting structure
CN104594926A (en) Rapid composite roof roadway support method for high-stress water guiding karst cave group
CN103397905A (en) System and method for achieving natural striding, falling and filling of coal beds, flexible roadway protection and complete gob-side entry retaining
CN101922292A (en) Coal mine gob-side entry retaining roadside segment bearing unequal strength support principle and application
CN104775819A (en) Deep inclined coal seam mining roadway mine pressure control mining method
CN101749020A (en) Forward coal mining by filling method
CN106907177B (en) A kind of girdle gob side entry retaining roadside packing method for protecting support
CN105756702A (en) Roadway-side mesh cage filling supporting gob-side entry retaining method
CN102852551A (en) Gob-side entry retaining method using high-water material filling columns
CN104100271A (en) Side-supporting roadway forming method by pre-digging guide cavern and filling with artificial side wall for secondary use
CN102966359A (en) Working face ventilation oxidization zone roof control method
CN104533419B (en) Method for partial recovery of residual coal from wide coal pillar
CN107355223A (en) A kind of stope drift active workings gob-side entry retaining method suitable for easy inbreak top plate
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN108049896A (en) A kind of fully mechanized coal face gob-side entry retaining method
CN110130978A (en) A kind of small kiln destruction area high seam break up coal side method for blocking of filling second mining

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151209

Termination date: 20170314

CF01 Termination of patent right due to non-payment of annual fee