CN201809932U - Construction system of polyvinyl chloride (PVC) floor - Google Patents

Construction system of polyvinyl chloride (PVC) floor Download PDF

Info

Publication number
CN201809932U
CN201809932U CN2010205764841U CN201020576484U CN201809932U CN 201809932 U CN201809932 U CN 201809932U CN 2010205764841 U CN2010205764841 U CN 2010205764841U CN 201020576484 U CN201020576484 U CN 201020576484U CN 201809932 U CN201809932 U CN 201809932U
Authority
CN
China
Prior art keywords
pvc
floor
layer
construction system
pvc floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205764841U
Other languages
Chinese (zh)
Inventor
吴书明
李强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA UNION CENTURY BUILDING GROUP Co Ltd
Original Assignee
CHINA UNION CENTURY BUILDING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA UNION CENTURY BUILDING GROUP Co Ltd filed Critical CHINA UNION CENTURY BUILDING GROUP Co Ltd
Priority to CN2010205764841U priority Critical patent/CN201809932U/en
Application granted granted Critical
Publication of CN201809932U publication Critical patent/CN201809932U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a construction system of a polyvinyl chloride (PVC) floor, which comprises a concrete floor slab. The construction system of the PVC floor is characterized in that a fine gravel concrete basal layer is arranged on the concrete floor slab, an artesian leveling layer is arranged on the fine gravel concrete basal layer, and a PVC floor is arranged on the artesian leveling layer. The artesian leveling layer is an artesian leveling cement layer. The PVC floor is bonded with the artesian leveling layer by glue. The adjacent plate materials of the PVC floor are welded by using bonding wires. A base coat layer is coated on the fine gravel concrete basal layer in a rolling way, and then the artesian leveling layer is arranged on the base coat layer. The positions of the PVC skirting lines of the joints of the concrete floor slab and wall corners are provided with battens. The construction system of the PVC floor uses an exclusive bonding technology, so that the ground is integrated, and the defects of other ground materials are effectively avoided.

Description

PVC floor construction system
Technical field
The utility model relates to a kind of PVC floor construction system.
Background technology
The floor that is applied to facilities such as hospital, school, stadiums, office premises, kindergarten, airport at present is generally materials such as compoiste wood floor, ceramic tile, and such floor function singleness wastes time and energy during laying.
The utility model content
Technical problem to be solved in the utility model provides a kind of PVC floor construction system, has solved the problem of above-mentioned existence.
Technical problem to be solved in the utility model is achieved through the following technical solutions:
A kind of PVC floor construction system comprises concrete floor, and it is characterized in that: described concrete floor is provided with pea gravel concreten basic unit, and pea gravel concreten basic unit is provided with the gravity flow leveling layer, and the gravity flow leveling layer is provided with the PVC floor.
Described gravity flow leveling layer is the self-leveling mud layer.
Described PVC floor is bonding with the gravity flow leveling layer by glue.
Weld with bonding wire between the adjacent sheet metal of described PVC floor.
Oil reservoir at the bottom of the roller coating is established the gravity flow leveling layer again in the described pea gravel concreten basic unit on the end oil reservoir.
The PVC skirting place of described concrete floor and corner handing-over is provided with press strip.
The utlity model has following advantage:
The utility model PVC floor construction system is used proprietary adhesive technology, makes the ground integration, has avoided the shortcoming of other earth material effectively, and real be the selection of the best in the earth material now; Other incomparable excellent performance of material are traditionally arranged, it integrate sound-absorbing, wear-resisting, shoulder bacterium, mildew-resistant, anti-skidding, no seam, antistatic, anti-chemical contamination, be widely used in facilities such as hospital, school, stadiums, office premises, kindergarten, airport.
Description of drawings
Fig. 1 is a structural representation of the present utility model
Among the figure: 1-concrete floor, 2-pea gravel concreten basic unit, the 3-leveling layer that flows automatically, 4-PVC floor, 5-press strip.
The specific embodiment
The utility model is described in further detail below in conjunction with Figure of description.
As shown in Figure 1, a kind of PVC floor construction system comprises concrete floor, and it is characterized in that: described concrete floor is provided with pea gravel concreten basic unit, and pea gravel concreten basic unit is provided with the gravity flow leveling layer, and the gravity flow leveling layer is provided with the PVC floor.
Described gravity flow leveling layer is the self-leveling mud layer.
Described PVC floor is bonding with the gravity flow leveling layer by glue.
Weld with bonding wire between the adjacent sheet metal of described PVC floor.
Oil reservoir at the bottom of the roller coating is established the gravity flow leveling layer again in the described pea gravel concreten basic unit on the end oil reservoir.
The PVC skirting place of described concrete floor and corner handing-over is provided with press strip.
Concrete technological process is: concrete floor is provided with pea gravel concreten basic unit, pea gravel concreten basic unit, and planeness is smaller or equal to 4mm; Concrete surface must not have the crack greater than 1mm; Cut a stroke surface with the quick intersection of sharp chisel, infall is difficult for having breaking; The surface must not be too coarse, and too much space must not be arranged, and to slight dusting, cure process should be made in ground; The basic unit ground residual substances such as greasy dirt, wax, lacquer, coating that do not have; The pea gravel concreten strength grade is suitable 〉=C30; The strength of cement mortar grade is suitable 〉=M15.
The gravity flow leveling layer is selected the high-quality self-leveling cement for use, and match ratio is: self-leveling cement: water=25: 6-6.5; Earlier clear water is poured in the proper container, poured into self-leveling cement then, stir with electric mixer limit bevelling, up to the uniform mixture that forms no particle fluidised form; To pour construction area equably into from the levelling slurry, arrange exhibits evenly, gravity flow leveling layer thickness 2mm with instrument.
During the PVC floor construction, flooring material should be put 24 hours to field ground earlier, be allowed material and ground and interior temperature be consistent, on one side coiled material is a plain edge, Yi Bian be burr.The overlapping 3cm of plain edge and burr during laying cuts along plain edge 1cm place, the actual 2cm that cuts away of burr.It is disconnected to lancinate with 2 meters long push broach one during cutting, keeps smooth smooth the coincideing of floor incision.The floor according to landform cut out cut after, half is rolled with civilian dust catcher cleaning floor, brushing glue again in one at coiled material interval.The glue flash-off time is with the wire drawing sense to get final product laying floor with finger touch slightly.The floor is put into uniformly on the ground of brushing glue, the edge fit with 2 blocks of plates during paving coincide, and carries out compacting, venting with large pressuring roller and cork slab earlier.Compress seam crossing with the hand push air bells removing roll then, to keep smooth airtight, outstanding seamless spliced effect.In time clear up the residual glue in ground.Weld with bonding wire between the two boards material: utilizing " V " font groover, is that the center begins to dig 2/3 of ground plate thickness with the connecting line, is as the criterion with seam crossing length, cuts away welding rod; Connect power supply, the preheating bonding machine is to 200-220 ℃; Beginning evenly the 3mm solder bar to be welded with the pressure of 0.2MPa from the seam crossing top in the solder bar insertion bonding machine, the solder bar ledge is that benchmark carries out same horizontal resection with the floor surface with the construction cutter after cooling off fully then.The welding back is the part on excision bonding wire eminence floor in time, and polishes flat.

Claims (6)

1. a PVC floor construction system comprises concrete floor, and it is characterized in that: described concrete floor is provided with pea gravel concreten basic unit, and pea gravel concreten basic unit is provided with the gravity flow leveling layer, and the gravity flow leveling layer is provided with the PVC floor.
2. PVC floor construction system as claimed in claim 1 is characterized in that: described gravity flow leveling layer is the self-leveling mud layer.
3. PVC floor construction system as claimed in claim 1 is characterized in that: described PVC floor is bonding with the gravity flow leveling layer by glue.
4. PVC floor construction system as claimed in claim 2 is characterized in that: weld with bonding wire between the adjacent sheet metal of described PVC floor.
5. PVC floor construction system as claimed in claim 1 is characterized in that: oil reservoir at the bottom of the roller coating in the described pea gravel concreten basic unit, establish the gravity flow leveling layer on the end oil reservoir again.
6. PVC floor construction system as claimed in claim 1 is characterized in that: the PVC skirting place of described concrete floor and corner handing-over is provided with press strip.
CN2010205764841U 2010-10-26 2010-10-26 Construction system of polyvinyl chloride (PVC) floor Expired - Fee Related CN201809932U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205764841U CN201809932U (en) 2010-10-26 2010-10-26 Construction system of polyvinyl chloride (PVC) floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205764841U CN201809932U (en) 2010-10-26 2010-10-26 Construction system of polyvinyl chloride (PVC) floor

Publications (1)

Publication Number Publication Date
CN201809932U true CN201809932U (en) 2011-04-27

Family

ID=43892873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205764841U Expired - Fee Related CN201809932U (en) 2010-10-26 2010-10-26 Construction system of polyvinyl chloride (PVC) floor

Country Status (1)

Country Link
CN (1) CN201809932U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105822037A (en) * 2016-05-25 2016-08-03 北京城建六建设集团有限公司 Clean operating room ground decoration constructing system and constructing method thereof
CN108166719A (en) * 2017-12-26 2018-06-15 南通远洋船舶配套有限公司 PVC floor directly lays processing mounting process of the upper wall as skirting from ground
CN109441059A (en) * 2018-10-30 2019-03-08 安徽智恒信科技有限公司 A kind of plastic floor laying structure and its construction method
CN110528823A (en) * 2019-09-06 2019-12-03 成都建工第一建筑工程有限公司 Self-leveling and PVC plastic floor construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105822037A (en) * 2016-05-25 2016-08-03 北京城建六建设集团有限公司 Clean operating room ground decoration constructing system and constructing method thereof
CN105822037B (en) * 2016-05-25 2017-10-13 北京城建六建设集团有限公司 A kind of construction method of clean operating room ground surface finishing construction system
CN108166719A (en) * 2017-12-26 2018-06-15 南通远洋船舶配套有限公司 PVC floor directly lays processing mounting process of the upper wall as skirting from ground
CN109441059A (en) * 2018-10-30 2019-03-08 安徽智恒信科技有限公司 A kind of plastic floor laying structure and its construction method
CN110528823A (en) * 2019-09-06 2019-12-03 成都建工第一建筑工程有限公司 Self-leveling and PVC plastic floor construction method

Similar Documents

Publication Publication Date Title
CN100575642C (en) Special fine sand high-strength high-performance concrete ultra-high pumping construction method
CN206346503U (en) The horizontal mortar laying apparatus of concrete block masonry
CN201809932U (en) Construction system of polyvinyl chloride (PVC) floor
CN108643230B (en) Outer waterproof structure of underground comprehensive pipe rack and construction method
CN102815964A (en) Construction waste recycling and reusing process
CN107143111A (en) A kind of construction method of abrasion-proof terrace
CN210659122U (en) Cracking-proof structure of epoxy millstone terrace
CN108222304A (en) Block of glass wool heat insulating and sound insulating system and its construction method
CN107489250A (en) Wall basic unit plastering construction engineering method
US20200130258A1 (en) Method and device for producing a paving area
CN104831926B (en) A kind of tenon joint type bulk surface layer flooring method for paving
CN210195143U (en) Large-area integral seamless epoxy grindstone artistic floor anti-cracking paving structure
US7600991B1 (en) Plastic rock making machine
CN108947464B (en) Ground surface layer based on phosphorus-magnesium material and construction process thereof
CN101892729A (en) Finished heat-insulating decorative plate with invisible latch and installation method thereof
CN112627535A (en) Flatness control method for large-area carborundum wear-resistant terrace
CN206205443U (en) Concrete short-limb wall and the aluminum alloy mould plate attachment structure of masonry junction
CN212405769U (en) Anti-slip large-gradient decorative surface layer structure
CN214169786U (en) Terrazzo floor used in shopping center
CN211949245U (en) Roof stone flashing structure
CN208533945U (en) A kind of flexible assembly floor tile
CN211597609U (en) Gap plugging device for building decoration
CN106150020A (en) A kind of construction technology utilizing flowing mortar adhesively face brick
CN207092368U (en) A kind of building ring flat-plate brick with soundproof effect
CN109868955A (en) The construction method of wall is used for after various plane materiels and cellular board are compound

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110427

Termination date: 20181026

CF01 Termination of patent right due to non-payment of annual fee