CN201809932U - Construction system of polyvinyl chloride (PVC) floor - Google Patents
Construction system of polyvinyl chloride (PVC) floor Download PDFInfo
- Publication number
- CN201809932U CN201809932U CN2010205764841U CN201020576484U CN201809932U CN 201809932 U CN201809932 U CN 201809932U CN 2010205764841 U CN2010205764841 U CN 2010205764841U CN 201020576484 U CN201020576484 U CN 201020576484U CN 201809932 U CN201809932 U CN 201809932U
- Authority
- CN
- China
- Prior art keywords
- pvc
- floor
- layer
- construction system
- pvc floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a construction system of a polyvinyl chloride (PVC) floor, which comprises a concrete floor slab. The construction system of the PVC floor is characterized in that a fine gravel concrete basal layer is arranged on the concrete floor slab, an artesian leveling layer is arranged on the fine gravel concrete basal layer, and a PVC floor is arranged on the artesian leveling layer. The artesian leveling layer is an artesian leveling cement layer. The PVC floor is bonded with the artesian leveling layer by glue. The adjacent plate materials of the PVC floor are welded by using bonding wires. A base coat layer is coated on the fine gravel concrete basal layer in a rolling way, and then the artesian leveling layer is arranged on the base coat layer. The positions of the PVC skirting lines of the joints of the concrete floor slab and wall corners are provided with battens. The construction system of the PVC floor uses an exclusive bonding technology, so that the ground is integrated, and the defects of other ground materials are effectively avoided.
Description
Technical field
The utility model relates to a kind of PVC floor construction system.
Background technology
The floor that is applied to facilities such as hospital, school, stadiums, office premises, kindergarten, airport at present is generally materials such as compoiste wood floor, ceramic tile, and such floor function singleness wastes time and energy during laying.
The utility model content
Technical problem to be solved in the utility model provides a kind of PVC floor construction system, has solved the problem of above-mentioned existence.
Technical problem to be solved in the utility model is achieved through the following technical solutions:
A kind of PVC floor construction system comprises concrete floor, and it is characterized in that: described concrete floor is provided with pea gravel concreten basic unit, and pea gravel concreten basic unit is provided with the gravity flow leveling layer, and the gravity flow leveling layer is provided with the PVC floor.
Described gravity flow leveling layer is the self-leveling mud layer.
Described PVC floor is bonding with the gravity flow leveling layer by glue.
Weld with bonding wire between the adjacent sheet metal of described PVC floor.
Oil reservoir at the bottom of the roller coating is established the gravity flow leveling layer again in the described pea gravel concreten basic unit on the end oil reservoir.
The PVC skirting place of described concrete floor and corner handing-over is provided with press strip.
The utlity model has following advantage:
The utility model PVC floor construction system is used proprietary adhesive technology, makes the ground integration, has avoided the shortcoming of other earth material effectively, and real be the selection of the best in the earth material now; Other incomparable excellent performance of material are traditionally arranged, it integrate sound-absorbing, wear-resisting, shoulder bacterium, mildew-resistant, anti-skidding, no seam, antistatic, anti-chemical contamination, be widely used in facilities such as hospital, school, stadiums, office premises, kindergarten, airport.
Description of drawings
Fig. 1 is a structural representation of the present utility model
Among the figure: 1-concrete floor, 2-pea gravel concreten basic unit, the 3-leveling layer that flows automatically, 4-PVC floor, 5-press strip.
The specific embodiment
The utility model is described in further detail below in conjunction with Figure of description.
As shown in Figure 1, a kind of PVC floor construction system comprises concrete floor, and it is characterized in that: described concrete floor is provided with pea gravel concreten basic unit, and pea gravel concreten basic unit is provided with the gravity flow leveling layer, and the gravity flow leveling layer is provided with the PVC floor.
Described gravity flow leveling layer is the self-leveling mud layer.
Described PVC floor is bonding with the gravity flow leveling layer by glue.
Weld with bonding wire between the adjacent sheet metal of described PVC floor.
Oil reservoir at the bottom of the roller coating is established the gravity flow leveling layer again in the described pea gravel concreten basic unit on the end oil reservoir.
The PVC skirting place of described concrete floor and corner handing-over is provided with press strip.
Concrete technological process is: concrete floor is provided with pea gravel concreten basic unit, pea gravel concreten basic unit, and planeness is smaller or equal to 4mm; Concrete surface must not have the crack greater than 1mm; Cut a stroke surface with the quick intersection of sharp chisel, infall is difficult for having breaking; The surface must not be too coarse, and too much space must not be arranged, and to slight dusting, cure process should be made in ground; The basic unit ground residual substances such as greasy dirt, wax, lacquer, coating that do not have; The pea gravel concreten strength grade is suitable 〉=C30; The strength of cement mortar grade is suitable 〉=M15.
The gravity flow leveling layer is selected the high-quality self-leveling cement for use, and match ratio is: self-leveling cement: water=25: 6-6.5; Earlier clear water is poured in the proper container, poured into self-leveling cement then, stir with electric mixer limit bevelling, up to the uniform mixture that forms no particle fluidised form; To pour construction area equably into from the levelling slurry, arrange exhibits evenly, gravity flow leveling layer thickness 2mm with instrument.
During the PVC floor construction, flooring material should be put 24 hours to field ground earlier, be allowed material and ground and interior temperature be consistent, on one side coiled material is a plain edge, Yi Bian be burr.The overlapping 3cm of plain edge and burr during laying cuts along plain edge 1cm place, the actual 2cm that cuts away of burr.It is disconnected to lancinate with 2 meters long push broach one during cutting, keeps smooth smooth the coincideing of floor incision.The floor according to landform cut out cut after, half is rolled with civilian dust catcher cleaning floor, brushing glue again in one at coiled material interval.The glue flash-off time is with the wire drawing sense to get final product laying floor with finger touch slightly.The floor is put into uniformly on the ground of brushing glue, the edge fit with 2 blocks of plates during paving coincide, and carries out compacting, venting with large pressuring roller and cork slab earlier.Compress seam crossing with the hand push air bells removing roll then, to keep smooth airtight, outstanding seamless spliced effect.In time clear up the residual glue in ground.Weld with bonding wire between the two boards material: utilizing " V " font groover, is that the center begins to dig 2/3 of ground plate thickness with the connecting line, is as the criterion with seam crossing length, cuts away welding rod; Connect power supply, the preheating bonding machine is to 200-220 ℃; Beginning evenly the 3mm solder bar to be welded with the pressure of 0.2MPa from the seam crossing top in the solder bar insertion bonding machine, the solder bar ledge is that benchmark carries out same horizontal resection with the floor surface with the construction cutter after cooling off fully then.The welding back is the part on excision bonding wire eminence floor in time, and polishes flat.
Claims (6)
1. a PVC floor construction system comprises concrete floor, and it is characterized in that: described concrete floor is provided with pea gravel concreten basic unit, and pea gravel concreten basic unit is provided with the gravity flow leveling layer, and the gravity flow leveling layer is provided with the PVC floor.
2. PVC floor construction system as claimed in claim 1 is characterized in that: described gravity flow leveling layer is the self-leveling mud layer.
3. PVC floor construction system as claimed in claim 1 is characterized in that: described PVC floor is bonding with the gravity flow leveling layer by glue.
4. PVC floor construction system as claimed in claim 2 is characterized in that: weld with bonding wire between the adjacent sheet metal of described PVC floor.
5. PVC floor construction system as claimed in claim 1 is characterized in that: oil reservoir at the bottom of the roller coating in the described pea gravel concreten basic unit, establish the gravity flow leveling layer on the end oil reservoir again.
6. PVC floor construction system as claimed in claim 1 is characterized in that: the PVC skirting place of described concrete floor and corner handing-over is provided with press strip.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205764841U CN201809932U (en) | 2010-10-26 | 2010-10-26 | Construction system of polyvinyl chloride (PVC) floor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205764841U CN201809932U (en) | 2010-10-26 | 2010-10-26 | Construction system of polyvinyl chloride (PVC) floor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201809932U true CN201809932U (en) | 2011-04-27 |
Family
ID=43892873
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010205764841U Expired - Fee Related CN201809932U (en) | 2010-10-26 | 2010-10-26 | Construction system of polyvinyl chloride (PVC) floor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201809932U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105822037A (en) * | 2016-05-25 | 2016-08-03 | 北京城建六建设集团有限公司 | Clean operating room ground decoration constructing system and constructing method thereof |
CN108166719A (en) * | 2017-12-26 | 2018-06-15 | 南通远洋船舶配套有限公司 | PVC floor directly lays processing mounting process of the upper wall as skirting from ground |
CN109441059A (en) * | 2018-10-30 | 2019-03-08 | 安徽智恒信科技有限公司 | A kind of plastic floor laying structure and its construction method |
CN110528823A (en) * | 2019-09-06 | 2019-12-03 | 成都建工第一建筑工程有限公司 | Self-leveling and PVC plastic floor construction method |
-
2010
- 2010-10-26 CN CN2010205764841U patent/CN201809932U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105822037A (en) * | 2016-05-25 | 2016-08-03 | 北京城建六建设集团有限公司 | Clean operating room ground decoration constructing system and constructing method thereof |
CN105822037B (en) * | 2016-05-25 | 2017-10-13 | 北京城建六建设集团有限公司 | A kind of construction method of clean operating room ground surface finishing construction system |
CN108166719A (en) * | 2017-12-26 | 2018-06-15 | 南通远洋船舶配套有限公司 | PVC floor directly lays processing mounting process of the upper wall as skirting from ground |
CN109441059A (en) * | 2018-10-30 | 2019-03-08 | 安徽智恒信科技有限公司 | A kind of plastic floor laying structure and its construction method |
CN110528823A (en) * | 2019-09-06 | 2019-12-03 | 成都建工第一建筑工程有限公司 | Self-leveling and PVC plastic floor construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100575642C (en) | Special fine sand high-strength high-performance concrete ultra-high pumping construction method | |
CN206346503U (en) | The horizontal mortar laying apparatus of concrete block masonry | |
CN201809932U (en) | Construction system of polyvinyl chloride (PVC) floor | |
CN108643230B (en) | Outer waterproof structure of underground comprehensive pipe rack and construction method | |
CN102815964A (en) | Construction waste recycling and reusing process | |
CN107143111A (en) | A kind of construction method of abrasion-proof terrace | |
CN210659122U (en) | Cracking-proof structure of epoxy millstone terrace | |
CN108222304A (en) | Block of glass wool heat insulating and sound insulating system and its construction method | |
CN107489250A (en) | Wall basic unit plastering construction engineering method | |
US20200130258A1 (en) | Method and device for producing a paving area | |
CN104831926B (en) | A kind of tenon joint type bulk surface layer flooring method for paving | |
CN210195143U (en) | Large-area integral seamless epoxy grindstone artistic floor anti-cracking paving structure | |
US7600991B1 (en) | Plastic rock making machine | |
CN108947464B (en) | Ground surface layer based on phosphorus-magnesium material and construction process thereof | |
CN101892729A (en) | Finished heat-insulating decorative plate with invisible latch and installation method thereof | |
CN112627535A (en) | Flatness control method for large-area carborundum wear-resistant terrace | |
CN206205443U (en) | Concrete short-limb wall and the aluminum alloy mould plate attachment structure of masonry junction | |
CN212405769U (en) | Anti-slip large-gradient decorative surface layer structure | |
CN214169786U (en) | Terrazzo floor used in shopping center | |
CN211949245U (en) | Roof stone flashing structure | |
CN208533945U (en) | A kind of flexible assembly floor tile | |
CN211597609U (en) | Gap plugging device for building decoration | |
CN106150020A (en) | A kind of construction technology utilizing flowing mortar adhesively face brick | |
CN207092368U (en) | A kind of building ring flat-plate brick with soundproof effect | |
CN109868955A (en) | The construction method of wall is used for after various plane materiels and cellular board are compound |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110427 Termination date: 20181026 |
|
CF01 | Termination of patent right due to non-payment of annual fee |