CN201794283U - Movable operating platform and fixture supporting integrated support - Google Patents

Movable operating platform and fixture supporting integrated support Download PDF

Info

Publication number
CN201794283U
CN201794283U CN201020266569XU CN201020266569U CN201794283U CN 201794283 U CN201794283 U CN 201794283U CN 201020266569X U CN201020266569X U CN 201020266569XU CN 201020266569 U CN201020266569 U CN 201020266569U CN 201794283 U CN201794283 U CN 201794283U
Authority
CN
China
Prior art keywords
support
mold
operating platform
shelf
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201020266569XU
Other languages
Chinese (zh)
Inventor
徐超
张晓宁
夏春
黎耀南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201020266569XU priority Critical patent/CN201794283U/en
Application granted granted Critical
Publication of CN201794283U publication Critical patent/CN201794283U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a movable operating platform and fixture supporting integrated support, which consists of fixture adjusting supporters (6), an operating platform (7) and a movable support, wherein the movable support is provided with casters (11), and the fixture adjusting supporters (6) and the operating platform (7) are mounted on the upper portion of the movable support. Elevation of a fixture can be controlled easily due to the fixture adjusting supporters arranged on the upper portion of the movable support. The movable support adopts the casters and support adjusting supporters are arranged on the lower portion of the movable support, so that the operating platform can be moved conveniently and higher in bearing capacity. By the aid of the operating platform and the movable support which are convenient in moving, the integrated support can not only meet requirements of construction but realize reasonable distribution of labor force. The movable support is simple in structure and made of general materials, has the advantages of economical effect, practicability and convenience in operation, and is easy to be popularized.

Description

Movable operation platform, mold support integral support
Technical field
The utility model relates to flue, particularly relates to a kind of movable operation platform, mold that is used for building vault lining of flue and supports integral support.
Background technology
When flue was remained silent (flue vault concrete is built and finished) construction, the construction of vault had limited construction speed because refractory brick closes the construction technology of door, toward the sequence of construction on both sides, also needed the engineering time of several months in the middle of adopting.Installing of mold often relies on the method for reserving bracket on the walling of flue apart from the place of four layers of arch springings, spacing 1500mm is as supporting point, above four layers of brick push down bracket, the two-layer standard brick of plain cushion on bracket, put the horizontal lumps of wood on the fragment of brick, so that mold installs in the above, the length of mold is 700mm, wherein 100mm is and the part of building the vault overlap joint that finishes by laying bricks or stones, avoid the faulting of slab ends of brick and brick, 600mm is that new vault is built part by laying bricks or stones, is constructor's proficiency brachium substantially, be convenient to operation, the absolute altitude control of mold is regulated with timber wedge.Need to put refractory material on constructor's the operating desk, the dead weight of platform with suitable supporting capacity needs 8 people to move freely, and like this, each construction distance is 600mm, and personnel need 8 people, have work holdup phenomenon.
Summary of the invention
Technical problem to be solved in the utility model is: at the problems referred to above, provide a kind of energy to satisfy the construction needs, movable operation platform, the mold of building vault lining of flue of being used for that again can the reasonable disposition labour supports integral support.
The technical scheme that its technical problem that solves the utility model adopts is: regulate support, operating platform and traversing carriage by mold and form, traversing carriage is equipped with castor, and mold adjusting support and operating platform are contained in the top at traversing carriage.
The beneficial effects of the utility model mainly are:
1. regulate support owing to be provided with mold, thereby make the absolute altitude control of mold simple on traversing carriage top.
2. because traversing carriage has adopted castor, the bottom is provided with bracket adjustment and supports, and so not only make the operating platform conveniently moving, and bearing capacity is stronger.
3. owing to adopted the operating platform and the traversing carriage of conveniently moving, thereby can satisfy the construction needs, again can the reasonable disposition labour.
4. traversing carriage is simple in structure, is made by common material, has characteristics economic, practical, easy and simple to handle, is easy to promote.
Description of drawings
Fig. 1 supports the schematic diagram that integral support is constructed for using movable operation platform, mold.
Fig. 2 is the structural perspective of the utility model traversing carriage.
Among the figure: 1. coke oven flue; 2. refractory brick; 3. the very useful mold of masonry arch; 4. guardrail; 5. the horizontal lumps of wood; 6. mold is regulated and is supported; 7. operating platform; 8. steel pipe frame; 9. cat ladder; 10. bracket adjustment supports; 11. castor.
The specific embodiment
Below in conjunction with embodiment and accompanying drawing the utility model is described further, so that understand the utility model better.
The movable operation platform that the utility model provides, mold support integral support, its structure as depicted in figs. 1 and 2: mainly by traversing carriage, mold regulate support 6 and operating platform 7 forms, this mold is regulated support and operating platform 7 is set up on traversing carriage.
Described traversing carriage is mainly regulated support 6, steel pipe frame 8, cat ladder 9 and bracket adjustment support 10 by guardrail 4, mold and is formed.
Described steel pipe frame 8, it is made up of shelf, bracket adjustment support 10 and castor 11, wherein: shelf by many crisscross and interconnective vertical support bar and horizon bar form, present embodiment provides 16 vertical support bar, with the steel pipe buckle these vertical support bar is connected with horizon bar; Four vertical support bar are one group, the middle construction passage of reserving.A castor 11 is respectively installed in bottom by the vertical support bar outside the shelf two ends, in vertical support bar upper end, middle two groups of limits mold is installed and is regulated support 6, put the horizontal lumps of wood 5 in this support, when regulating the absolute altitude of the very useful mold 3 of masonry arch, only need the knob mold to regulate the screw mandrel that supports on 6; The bottom of remaining vertical support bar is equipped with bracket adjustment and supports 10.
A guardrail 4 is respectively installed at place, two ends on the shelf top of steel pipe frame 8, and this guardrail is formed by connecting by the steel pipe buckle by two vertical support bar and two horizon bars.
The exit of reserving the construction passage in the middle of the shelf of steel pipe frame 8 is provided with cat ladder 9, and this cat ladder is to be formed by connecting by the steel pipe buckle by the vertical support bar of steel pipe frame 8 and horizon bar.
The movable operation platform that the utility model adopts, mold support integral support; its use is during with the vault inside lining building of coke oven flue 1; the work progress of the mold that installed is an example to begin at first: traversing carriage to vault lining of flue is built initial point by laying bricks or stones; mounting bracket is regulated and is supported 10 under the vertical support bar of soaring; regulate the screw mandrel that supports on 10 by swinging mounting; 4 castors of support bottom are adjusted to the state that does not stress; effectively the application life of protection and prolongation castor, also make the supporting capacity of movable operation platform stronger.In vertical support bar upper end, middle two groups of limits mold is installed and is regulated support 6, put the horizontal lumps of wood 5 in this support, the very useful mold 3 of masonry arch (abbreviation mold) is placed on the horizontal lumps of wood 5, absolute altitude position with tape measure and definite mold top, by regulating the screw mandrel that supports on 6, make the top absolute altitude of mold be adjusted to correct absolute altitude position, reach the standard that to build by laying bricks or stones.After this section was built by laying bricks or stones and finished, at first Panasonic's mold was regulated and is supported 6, and mold is moved on on one side, cleans the operation of colluding brickwork joint, and Panasonic's bracket adjustment supports 10 again, for installing of next mold prepared.
The utility model effect: the operating platform bearing capacity is strong, conveniently moving, and the absolute altitude that installs the very useful mold of masonry arch is regulated simple.The effect that the utility model use is described is remarkable.
More than explanation only is an Application Example of the present utility model, can not limit the interest field of the utility model certainly with this, and therefore the equivalence of being done according to the utility model claim changes, and still belongs to protection domain of the present utility model.

Claims (4)

1. a movable operation platform, mold support integral support, it is characterized in that described movable operation platform, mold support integral support and be made up of mold adjusting support (6), operating platform (7) and traversing carriage, traversing carriage is equipped with castor (11), and mold adjusting support (6) and operating platform (7) are contained in the top at traversing carriage.
2. movable operation platform according to claim 1, mold support integral support, it is characterized in that described traversing carriage mainly is made up of guardrail (4), steel pipe frame (8) and cat ladder (9), wherein: a guardrail (4) is respectively installed at the place, two ends on the shelf top of steel pipe frame (8), and cat ladder (9) is positioned at the exit of reserving the construction passage in the middle of the shelf.
3. movable operation platform according to claim 2, mold supports integral support, it is characterized in that described steel pipe frame (8) is by shelf, bracket adjustment supports (10) and castor (11) is formed, wherein: shelf by many crisscross and interconnective vertical support bar and horizon bar form, a castor (11) is respectively installed in bottom by the vertical support bar outside the shelf two ends, vertical support bar upper end, two groups of limits is installed mold and is regulated support (6) in the middle of shelf, put the horizontal lumps of wood (5) in this support, the bottom of remaining vertical support bar is equipped with bracket adjustment and supports (10).
4. movable operation platform according to claim 2, mold support integral support, it is characterized in that described cat ladder (9) is formed by connecting by the steel pipe buckle by the vertical support bar and the horizon bar of steel pipe frame (8).
CN201020266569XU 2010-07-22 2010-07-22 Movable operating platform and fixture supporting integrated support Expired - Fee Related CN201794283U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020266569XU CN201794283U (en) 2010-07-22 2010-07-22 Movable operating platform and fixture supporting integrated support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020266569XU CN201794283U (en) 2010-07-22 2010-07-22 Movable operating platform and fixture supporting integrated support

Publications (1)

Publication Number Publication Date
CN201794283U true CN201794283U (en) 2011-04-13

Family

ID=43849203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020266569XU Expired - Fee Related CN201794283U (en) 2010-07-22 2010-07-22 Movable operating platform and fixture supporting integrated support

Country Status (1)

Country Link
CN (1) CN201794283U (en)

Similar Documents

Publication Publication Date Title
CN101870872B (en) Method for building vault lining of flue
CN204126230U (en) Assembly scaffold unit
CN205063331U (en) Slipform architecture
WO2009017354A3 (en) Multi-horizontal structure member forming method
CN202090605U (en) Tool type floor evenness and floor slab negative reinforcement protecting layer control device
CN203021923U (en) Big cantilever bent cap steel truss construction platform
CN201794283U (en) Movable operating platform and fixture supporting integrated support
CN206554500U (en) Steel structure concrete, which is poured, uses adjustable transverse support bar
CN206632972U (en) The mobile assembled steel reinforced former material stockyard of one kind
CN102127971A (en) Adjustable leveling stool and method for controlling floorslab thickness by using same
CN204780925U (en) City gate hole type inclined shaft slipform platform truck pulls removal structure
CN204551796U (en) Building structure at the bottom of a kind of Vierendeel girder
CN202787999U (en) Movable type support bridge for efficient large area concrete terrace construction
CN207959875U (en) A kind of construction scaffold
CN206607709U (en) A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure
CN103849709B (en) The installation method of the tilting system of steel-making converter
CN211595513U (en) Coke oven flue vault masonry device
CN100543151C (en) Tamping material leveling unit
CN202544394U (en) Early-dismounting template system
CN206646837U (en) A kind of special limiter of glomeration building prefabricated construction wall piece
CN102888809A (en) Highly-efficient leveling method for construction of large-area concrete ground floor
CN208517943U (en) A kind of concrete support moves horizontally adjustable Hanging Basket
CN208310404U (en) Modular suspension moso bamboo ecology enclosure wall
CN206233565U (en) A kind of adjustable jack of form bracing system
CN201649355U (en) Restrained porous coal gangue brick masonry

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110413

Termination date: 20170722