CN206646837U - A kind of special limiter of glomeration building prefabricated construction wall piece - Google Patents

A kind of special limiter of glomeration building prefabricated construction wall piece Download PDF

Info

Publication number
CN206646837U
CN206646837U CN201621339193.4U CN201621339193U CN206646837U CN 206646837 U CN206646837 U CN 206646837U CN 201621339193 U CN201621339193 U CN 201621339193U CN 206646837 U CN206646837 U CN 206646837U
Authority
CN
China
Prior art keywords
adjusting rod
wall piece
prefabricated construction
construction wall
special limiter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621339193.4U
Other languages
Chinese (zh)
Inventor
王凤来
刁领双
孙绪杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd filed Critical HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201621339193.4U priority Critical patent/CN206646837U/en
Application granted granted Critical
Publication of CN206646837U publication Critical patent/CN206646837U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of special limiter of glomeration building prefabricated construction wall piece, it is related to a kind of limiter.During crane lifting wall piece is assembled, it is difficult to exactly fall in position line because can be waved when flooring is in place by lifting wall piece, the accuracy difference and time and effort consuming of positioning.The utility model includes datum plate, adjusting rod, bracket assembly, rocking handle and bottom plate, the floor level is set and it is detachably connected in the bar dowel section of flooring, support frame as described above component is arranged on bottom plate, the adjusting rod is horizontally set on bracket assembly, the adjusting rod makes extended and retracted action along its axial direction on bracket assembly, one end of the adjusting rod is fixedly connected with the datum plate being vertically arranged, and the other end of the adjusting rod is removably connected with rocking handle.The utility model structure design is simple and easy to use, effectively saves time and manpower, can realize effective positioning of wall piece.The utility model is used to position the wall piece under confined state.

Description

A kind of special limiter of glomeration building prefabricated construction wall piece
Technical field
A kind of limiter is the utility model is related to, belongs to construction apparatus field.
Background technology
On the premise of country vigorously advocates building industrialization, prefabricated construction is as in the core in building industrialization Hold, be various structural systems in the research in this field and apply focus.The assembled steel for having long-range pattern of comparative maturity at present Structure, the masonry structure building most being had a large capacity and a wide range as China, until just beginning with substantial progress in recent years.At present, Through successfully solving the prefabricated construction technical problem of wall piece, and there is successful engineering construction to put into practice, complete wall piece from Packing, lifting, a series of in place, construction technology operations of adjustment, realize the prefabricated construction of masonry structure.
With steel construction and concrete structure except that the prefabricated construction of masonry structure, vertical connection rely on mortar joint Realize, it is desirable to which the wall slabbing that is positioned at of wall piece determines behind mortar joint position.The component of steel construction is assembled by bolt in place, coagulation Native component typically reserves larger connection space, and the connection of masonry wall piece is carried out in the high mortar joints of 1cm.So in wall piece It is accurate in position during dropping place, adjustment below will be provided conveniently.
In built with ribbed bricks wall piece prefabricated construction, a key link is by suspension hook by prevention concrete hollow wall piece Plan installation site is hung to, and is slowly fallen, it is finally in place in design attitude.The difficult point of the link is suspention of the wall piece in suspension hook Under, it may occur that swing, it is necessary to operating personnel control its accurate position, fall just in defined position line, when wall piece occurs Move horizontally, operating personnel are just needed firmly to restore it into assigned position, and the adjustment is operated, and wall piece may be made to occur again Opposite over-large displacement, the problem of causing to adjust back and forth, and when adjustment, need to push out wall piece a little while, Tie wall piece inwards again a little while, when wall piece falling speed is very fast, adjustment will be more difficult.Engineering is used as vertical transport instrument Crane be generally derrick crane, its service radius is generally large, and more than tens meters, hoistman can only refer to according to flooring The sign language for waving personnel is translated and lifted by lifting object, each translation of suspension hook, lifts minimum in 20cm or so, it is difficult to precisely Positioning, can be waved when flooring is in place by lifting wall piece and be difficult to fall in position line exactly.
In a word, during crane lifting wall piece is assembled, because can be waved by lifting wall piece when flooring is in place and It is difficult to fall in position line exactly, the accuracy difference and time and effort consuming of positioning.
Utility model content
The utility model provides a kind of glomeration building prefabricated construction wall piece special limiter, in order to solve to hang in crane During dress wall piece is assembled, it is difficult to exactly fall in position line because can be waved when flooring is in place by lifting wall piece It is interior, the problem of the accuracy of positioning difference and time and effort consuming.
The utility model adopts the technical scheme that to solve above-mentioned technical problem:
A kind of special limiter of glomeration building prefabricated construction wall piece, including datum plate, adjusting rod, bracket assembly, Rocking handle and bottom plate, the floor level is set and it is detachably connected in the bar dowel section of flooring, and support frame as described above component is set Put on bottom plate, the adjusting rod is horizontally set on bracket assembly, and the adjusting rod is along its axial direction in support frame group Extended and retracted action is made on part, one end of the adjusting rod is fixedly connected with the datum plate being vertically arranged, the regulation The other end of bar is removably connected with rocking handle.
The utility model is that a kind of glomeration builds the special limiter of prefabricated construction wall piece, it is preferable that support frame as described above Component includes support frame body and at least two thread bush, and support frame as described above body is shaped as rectangle, at least two spiral shell Line set is sequentially arranged in the top of support frame body, and each thread bush is coaxially disposed with adjusting rod, and outer spiral shell is machined with adjusting rod Line, the inwall processing of each thread bush have internal thread, and adjusting rod sequentially passes through at least two thread bush, adjusting rod and each screw thread External threading connects.
The utility model is that a kind of glomeration builds the special limiter of prefabricated construction wall piece, it is preferable that thread bush is spiral shell It is female.
The utility model is that a kind of glomeration builds the special limiter of prefabricated construction wall piece, it is preferable that datum plate is remote Face on the basis of the end face of adjusting rod.
The utility model is that a kind of glomeration builds the special limiter of prefabricated construction wall piece, it is preferable that the bottom plate edge Its thickness direction is machined with positioning hole, and the bottom plate is detachably connected by the bar dowel section of positioning hole and flooring.
The utility model is that a kind of glomeration builds the special limiter of prefabricated construction wall piece, it is preferable that the shape of datum plate Shape is circle.
The utility model is that a kind of glomeration builds the special limiter of prefabricated construction wall piece, it is preferable that the adjusting rod The one end being connected with rocking handle is machined with assembly head or blind hole, and one end that the rocking handle is engaged with adjusting rod is provided with adapter sleeve Or plug.
The beneficial effects of the utility model:
1st, the utility model provides stable and effective reference plane by datum plate to lifting wall piece, and datum plate passes through regulation Cooperate the movement effectively realized under datum plate horizontal direction between bar, bracket assembly and rocking handle, and the utility model is wall Being fallen during piece prefabricated construction reduces a direction for needing power to control, and without pushing directly on lifting wall piece, that is, pushes out The direction of power no longer needs manpower control, and only need to inwards tense and lean on the stopper, substantially reduces operating personnel Operation difficulty, while accelerate regulation and locating speed, save positioning time, improve the operating efficiency of workmen.
2nd, the utility model by between bottom plate and positioning hole cooperate effectively realize centered on positioning hole around point The effect of rotation, datum plate is by coordinating adjusting rod, bracket assembly and rocking handle effectively to realize datum plate along unidirectional adjustable range Effect, be advantageous to flexible and quick positioning, it is simple and easy to operate.
3rd, it is detachably connected between rocking handle and adjusting rod, not only reduces cost, be also moved easily and transport.
4th, set location of the present utility model and locating effect can effectively meet the disposable fall of suspension hook of crane Larger requirement so that lifting wall piece simply fall in the operable scope of the utility model, effectively save crane operation and Positioning time, save the positioning step of crane.
Brief description of the drawings
Fig. 1 illustrates main structure figure of the present utility model;
Fig. 2 illustrates overlooking structure figure of the present utility model;
Fig. 3 illustrates the main structure figure of datum plate 1.
Embodiment
Construction content of the present utility model and the function that can reach are understood in depth to be easy to those skilled in the art Benefit, detailed description below is enumerated, and coordinate Figure of description 1, Fig. 2 and Fig. 3 to be discussed in detail and be described as follows:
Embodiment one:Present embodiment includes datum plate 1, adjusting rod 2, bracket assembly 3, rocking handle 4 and bottom plate 5, the bottom plate 5 is horizontally disposed and it is detachably connected in the bar dowel section of flooring, and support frame as described above component 3 is arranged on bottom plate On 5, the adjusting rod 2 is horizontally set on bracket assembly 3, and the adjusting rod 2 is along its axial direction on bracket assembly 3 Extended and retracted action is made, one end of the adjusting rod 2 is fixedly connected with the datum plate 1 being vertically arranged, the adjusting rod 2 The other end be removably connected with rocking handle 4.
The height that the utility model leaves ground 300mm or so is its positioning height, under meeting that the suspension hook of crane is disposable The larger requirement of range of decrease degree so that wall piece can simply fall in the operable scope of limiter.
The position of the bar dowel section of flooring at anchor point of the present utility model within the specific limits, the utility model Itself possesses regulatory function.
Embodiment two:Bracket assembly 3 described in present embodiment includes support frame body 3-1 and at least two Thread bush 3-2's, support frame as described above body 3-1 is shaped as rectangle, and at least two thread bush 3-2 is sequentially arranged in support frame Body 3-1 top, each thread bush 3-2 are coaxially disposed with adjusting rod 2, and external screw thread, each thread bush are machined with adjusting rod 2 3-2 inwall processing has internal thread, and adjusting rod 2 sequentially passes through at least two thread bush 3-2, adjusting rod 2 and each thread bush 3-2 Threaded connection.Other can realize the setting for the replaceable at least two thread bush 3-2 of supplementary structure that adjusting rod 2 moves.
Embodiment three:Thread bush 3-2 is nut in present embodiment.Nut easily purchase and it is cheap.
Embodiment four:Face on the basis of end face of the datum plate 1 away from adjusting rod 2 in present embodiment.Datum plate 1 It is used to be connected with adjusting rod 2 close to the end face of adjusting rod 2, face on the basis of end face of the datum plate 1 away from adjusting rod 2, uses Mutually it is adjacent in lifting wall piece.
Embodiment five:Bottom plate 5 described in present embodiment is machined with positioning hole 6, the bottom along its thickness direction Plate 5 is detachably connected by the bar dowel section of positioning hole 6 and flooring.
The setting of positioning hole 6 is integrally effectively positioned for the ease of the utility model in present embodiment.
Embodiment six:Datum plate 1 is shaped as circle in present embodiment.The shape is easy to process and positioning is imitated Fruit is good.
Embodiment seven:One end that adjusting rod 2 described in present embodiment is connected with rocking handle 4 is machined with assembly head Or blind hole, the rocking handle 4 are provided with adapter sleeve or plug with one end that adjusting rod 2 is engaged.
Other can realize the structure being detachably connected between adjusting rod 2 and rocking handle 4.
Embodiment eight:The length of adjusting rod 2 is 230mm in present embodiment.
The data are drawn for sampling test, and datum plate 1 can either be coordinated to realize effectively positioning and effectively save adjusting rod 2 Manufacture material.
Operation principle of the present utility model:
By adjusting the position of datum plate 1, it is overlapped with wall piece position line, this position be exactly wall piece it is in place after position Put, when wall piece slowly falls under the suspention of suspension hook and is down to 1 absolute altitude of datum plate, wall piece is tensed and withstands datum plate 1, makes wall piece Flooring position is fallen on along under datum plate 1, now the position of wall piece is accurate location.Fixation of the present utility model, using riding one point anchors Solid mode, in the pre-buried bar dowel section of flooring, be enclosed on by positioning hole 6 in bar dowel section, now the utility model is overall flat The position in face is fixed, but can be rotated, to adjust the angle of the reference plane of datum plate 1 and wall piece position line, be allowed to Position line overlaps.The bar dowel section can also be replaced with expansion bolt.
Application method of the present utility model it is following some:
1st, use when firstly the need of the pre-buried bar dowel section in flooring casting concrete, the lengths of rebar be higher by flooring 2cm with It is upper.The positioning of lengths of rebar determines according to the position line of wall piece, makes being in adjustable extent for datum plate 1.
2nd, by limiter by positioning hole 6, single-point is fixed in embedded bar section.
3rd, the drive of rotary bottom plate 5 datum plate 1 is parallel with wall piece position line, i.e., adjusting rod 2 is vertical with wall piece.
4th, rocking handle 4 is operated, adjusting rod 2, which moves, causes datum plate 1 to be overlapped with wall piece position line, and this is rotated by a small margin when being related to It is rotated further by bottom plate 5 during utility model to be finely adjusted, to ensure that datum plate 1 overlaps with wall piece position line.
When the 5th, being fallen under wall piece near datum plate 1, wall piece is tensed with instrument short rod, is allowed to be close on datum plate 1, Wall piece is set to be fallen along datum plate 1 again.
6th, after wall piece is in place, the utility model is removed.

Claims (8)

  1. A kind of 1. special limiter of glomeration building prefabricated construction wall piece, it is characterised in that:Including datum plate(1), adjusting rod (2), bracket assembly(3), rocking handle(4)And bottom plate(5), the bottom plate(5)It is horizontally disposed with and it is detachably connected on flooring In bar dowel section, support frame as described above component(3)It is arranged on bottom plate(5)On, the adjusting rod(2)It is horizontally set on bracket assembly (3)On, the adjusting rod(2)Along its axial direction in bracket assembly(3)On make extended and retracted action, the regulation Bar(2)One end be fixedly connected with the datum plate being vertically arranged(1), the adjusting rod(2)The other end be removably connected with and shake Handle(4).
  2. A kind of 2. special limiter of glomeration building prefabricated construction wall piece according to claim 1, it is characterised in that:Institute State bracket assembly(3)Including support frame body(3-1)With at least two thread bush(3-2), support frame as described above body(3-1)'s It is shaped as rectangle, at least two thread bush(3-2)It is sequentially arranged in support frame body(3-1)Top, each thread bush (3-2)With adjusting rod(2)It is coaxially disposed, adjusting rod(2)On be machined with external screw thread, each thread bush(3-2)Inwall processing have Internal thread, adjusting rod(2)Sequentially pass through at least two thread bush(3-2), adjusting rod(2)With each thread bush(3-2)Screw thread connects Connect.
  3. 3. a kind of special limiter of glomeration building prefabricated construction wall piece according to claim 1 or 2, its feature exist In:Thread bush(3-2)For nut.
  4. A kind of 4. special limiter of glomeration building prefabricated construction wall piece according to claim 3, it is characterised in that:Base Quasi- plate(1)Away from adjusting rod(2)End face on the basis of face.
  5. A kind of 5. special limiter of glomeration building prefabricated construction wall piece according to claim 4, it is characterised in that:Institute State bottom plate(5)Positioning hole is machined with along its thickness direction(6), the bottom plate(5)Pass through positioning hole(6)With the bar dowel section of flooring It is detachably connected.
  6. 6. a kind of special limiter of glomeration building prefabricated construction wall piece, its feature exist according to claim 1 or 5 In:Datum plate(1)Be shaped as circle.
  7. A kind of 7. special limiter of glomeration building prefabricated construction wall piece according to claim 6, it is characterised in that:Institute State adjusting rod(2)With rocking handle(4)The one end being connected is machined with assembly head or blind hole, the rocking handle(4)With adjusting rod(2)Match One end of conjunction is provided with adapter sleeve or plug.
  8. A kind of 8. special limiter of glomeration building prefabricated construction wall piece according to claim 7, it is characterised in that:Adjust Pole(2)Length be 230mm.
CN201621339193.4U 2016-12-07 2016-12-07 A kind of special limiter of glomeration building prefabricated construction wall piece Expired - Fee Related CN206646837U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621339193.4U CN206646837U (en) 2016-12-07 2016-12-07 A kind of special limiter of glomeration building prefabricated construction wall piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621339193.4U CN206646837U (en) 2016-12-07 2016-12-07 A kind of special limiter of glomeration building prefabricated construction wall piece

Publications (1)

Publication Number Publication Date
CN206646837U true CN206646837U (en) 2017-11-17

Family

ID=60284015

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621339193.4U Expired - Fee Related CN206646837U (en) 2016-12-07 2016-12-07 A kind of special limiter of glomeration building prefabricated construction wall piece

Country Status (1)

Country Link
CN (1) CN206646837U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116290847A (en) * 2023-04-17 2023-06-23 中国十九冶集团有限公司 PC component positioning baffle

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116290847A (en) * 2023-04-17 2023-06-23 中国十九冶集团有限公司 PC component positioning baffle

Similar Documents

Publication Publication Date Title
CN106088587A (en) A kind of Combined formwork support system
CN112324160A (en) Temporary support frame for mounting assembly lattice type steel structure and use method
CN111764686A (en) Floor support plate supporting device
CN109898652A (en) Steel part connection structure and attaching method thereof
CN208310187U (en) From angle hydraulic climbing form frame system
CN206646837U (en) A kind of special limiter of glomeration building prefabricated construction wall piece
CN202000651U (en) Adjustable wall-mounted supporting device for reinforcing upright columns
CN206458110U (en) Rectangle steel tubing string construction plumbing device in inverse method one-column one-pile
CN107816209A (en) The large-scale Roof Truss construction technology of installation is lifted across outer both sides
CN112302259A (en) Floor thickness and floor double-layer steel bar protection layer thickness control device and manufacturing method
CN211114801U (en) Roof template supporting component for constructional engineering
CN206859658U (en) A kind of adjustable slab form support system
CN204475814U (en) A kind of working platform for building
CN215907403U (en) Fine adjustment tool for supporting large steel formwork
CN216664200U (en) Novel steel structure embedded column base
CN206902768U (en) A kind of post-cast strip adjustable supporting
CN206971725U (en) Hang the erecting device of mould
CN214402806U (en) Temporary support frame for mounting lattice type steel structure
CN215055289U (en) Building templates strutting arrangement
CN210918219U (en) Adjustable post-cast strip supporting device for house construction
CN209924441U (en) Adjustable bracket of formwork support
CN208949829U (en) A kind of truss-like cantilever form
CN209603145U (en) A kind of deep foundation pit support structure
CN209384602U (en) A kind of walltile level height location adjusting device
CN206308961U (en) A kind of floor tile Level tune part

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171117

Termination date: 20191207