CN206971725U - Hang the erecting device of mould - Google Patents
Hang the erecting device of mould Download PDFInfo
- Publication number
- CN206971725U CN206971725U CN201720646377.3U CN201720646377U CN206971725U CN 206971725 U CN206971725 U CN 206971725U CN 201720646377 U CN201720646377 U CN 201720646377U CN 206971725 U CN206971725 U CN 206971725U
- Authority
- CN
- China
- Prior art keywords
- mould
- erecting device
- hanging
- support platform
- hanging mould
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000465 moulding Methods 0.000 abstract description 5
- 238000006073 displacement reaction Methods 0.000 abstract description 4
- 238000009434 installation Methods 0.000 abstract description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 6
- 238000010276 construction Methods 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 4
- 230000003014 reinforcing effect Effects 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 229910052742 iron Inorganic materials 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000009435 building construction Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 230000033228 biological regulation Effects 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A kind of erecting device for hanging mould is the utility model is related to, is plugged in for mould will to be hung at the reserved opening of structure floor bottom, hanging the erecting device of mould includes:Support platform, support is in the bottom for hanging mould;Locating rod, vertically it is fixed on the bottom of support platform;And adjustable support bar, it is sheathed on locating rod and stays on the bottom of support platform.The locating rod that the utility model hangs the erecting device of mould can prevent adjustable support bar to be subjected to displacement and cause to hang molding and block up reserved opening imprecision, produce spillage during so as to prevent from pouring, the problem of avoiding later stage seepage.The utility model hang mould erecting device can Fast Installation, next hole can be moved quickly into after the completion of mould by hanging, and repeated and utilized, improve utilization rate and efficiency.
Description
Technical field
The realm of building construction is the utility model is related to, espespecially a kind of erecting device for hanging mould.
Background technology
Reserved opening is usually required in building construction process, on structure floor and is used for follow-up construction, and these are pre-
Box out mouth is universal smaller, needs to block reserved opening in construction.In existing construction technology, using hanging mould to pre-
Box out mouth is blocked.But when that will be hung mould using iron wire and be fixed at reserved opening, it is big to install the difficulty of reinforcing, and in iron
Hidden leakage defect be present in the position of silk;When using setting up steel pipe frame support and hanging mould, increase the workload of support frame, construction efficiency compared with
It is low.
Utility model content
The defects of the purpose of this utility model is to overcome prior art, there is provided a kind of erecting device for hanging mould, solve existing
Have to be difficult to use in technology and hang the problem of molding blocks up reserved opening.
Realizing the technical scheme of above-mentioned purpose is:
The utility model provides a kind of erecting device for hanging mould, for will hang mould and be plugged in the hole to be provided of structure floor bottom
At mouthful, the erecting device for hanging mould includes:
Support platform, support is in the bottom for hanging mould;
Locating rod, vertically it is fixed on the bottom of the support platform;And
The adjustable adjustable support bar of bearing height, it is sheathed on the locating rod and stays on the bottom of the support platform
Portion.
The utility model hangs the beneficial effect of the erecting device of mould:
The utility model hangs the erecting device of mould by using support platform support in the bottom for hanging mould, will be adjustable
Support bar is sheathed on the locating rod of support platform bottom, and stays on the bottom of support platform, and structure is plugged in so as to hang mould
At the reserved opening of floor slab bottoms, locating rod can prevent adjustable support bar to be subjected to displacement and cause to hang the stifled reserved opening of molding
Imprecision, spillage is produced during so as to prevent from pouring, the problem of avoiding later stage seepage.The utility model hangs the erecting device energy of mould
Enough Fast Installations, next hole can be moved quickly into after the completion of mould by hanging, and repeated and utilized, improve utilization rate and efficiency.
The utility model hang the erecting device of mould further improvement is that, in addition to:
It is sheathed on the spacing ring of the adjustable support bar;And
At least one pair of hound being oppositely arranged, is connected between the support platform and the spacing ring.
The utility model hang the erecting device of mould further improvement is that, the adjustable support bar includes:
Mobile jib;And
The collet of the mobile jib bottom is inserted in, by adjusting the relative position between the mobile jib and the collet, from
And the bearing height to hanging mould is finely adjusted.
The utility model hang the erecting device of mould further improvement is that, the collet includes:
It is inserted in the screw rod of the mobile jib;
The fixing nut being screwed together on the screw rod, the bottom of the mobile jib are placed in the fixing nut;And
It is fixed on the bottom plate of the screw rod bottom.
The utility model hang the erecting device of mould further improvement is that, the support platform includes:
Rectangle frame;And
The head rod that is fastened transversely in the middle part of the rectangle frame and the second connection for being vertically fixed on the rectangle frame
The locating rod is installed with bar, the head rod and the second connecting rod interconnection and interconnection.
The utility model hang the erecting device of mould further improvement is that, the rectangle frame, the head rod and
The connection through hole being provided with for hanging mould described in connection is spaced apart in second connecting rod.
Brief description of the drawings
Fig. 1 is the structural representation for the erecting device that the utility model hangs mould.
Fig. 2 is the floor map of the support platform for the erecting device that the utility model hangs mould.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Refering to Fig. 1, it is shown that the utility model hangs the structural representation of the erecting device of mould.As shown in figure 1, this practicality is new
The erecting device that type hangs mould is plugged at the reserved opening 60 of the bottom of structure floor 50 for will hang mould 40, and the utility model hangs mould
Erecting device include:Support platform 10, locating rod 21 and adjustable support bar 30, the wherein support of support platform 10 are in hanging mould
40 bottom;Locating rod 21 is vertically fixed on the bottom of support platform 10;The bearing height of adjustable support bar 30 is adjustable, adjustable
Section support bar 30 is sheathed on locating rod 21 and stays on the bottom of support platform 10.The utility model hangs the erecting device of mould
Locating rod can prevent adjustable support bar to be subjected to displacement and cause to hang molding and block up reserved opening imprecision, during so as to prevent from pouring
Produce spillage, the problem of avoiding later stage seepage.
Refering to Fig. 2, it is shown that the utility model hangs the floor map of the support platform of the erecting device of mould.Support platform
10 include rectangle frame 11, the connecting rod 13 of head rod 12 and second, and wherein head rod 12 is fastened transversely to rectangle frame
Middle part, the second connecting rod 13 are vertically fixed on rectangle frame 11, the interconnection of 12 and second connecting rod of head rod 13 and intersection
Junction is installed with locating rod 21.In the present embodiment, rectangle frame 11 is welded using angle steel, head rod 12 and the
Two connecting rods 13 are made using angle steel.The structure of support platform 10 is not limited thereto, and can also be made of steel plate
Support platform 10.
It is spaced apart on rectangle frame 11, the connecting rod 13 of head rod 12 and second and leads to provided with the connection that mould 40 is hung for connection
Hole 100, reinforced so as to wear connection through hole 100 using iron nail to hanging mould 40, being capable of the overall fastness of reinforcement structure.
With reference to shown in Fig. 1 and Fig. 2, in the present embodiment, locating rod 21 is made of reinforcing bar.The length of reinforcing bar is according to reality
Depending on needing, the diameter of reinforcing bar is less than the internal diameter of adjustable support bar 30, so as to which adjustable support bar 30 can be sheathed on positioning
On bar 21, so as to which the end of adjustable support bar 30 be fixed, can not arbitrarily it move.The utility model hangs the erecting device of mould
Also include:Spacing ring 22 and at least one pair of hound 23, spacing ring 22 are sheathed on adjustable support bar 30, at least one pair of diagonal brace
Bar 23 is oppositely arranged, and is connected between support platform 10 and spacing ring 22, and position occurs so as to solve adjustable support bar 30
Move and cause to hang the closure imprecision of reserved opening 60 of mould 40, when pouring the problem of generation spillage, later stage seepage.In the present embodiment
In, hound 23 is provided with two pairs, is symmetrical arranged, so as to form stable and firm support to support platform 10 and spacing ring 22.
Adjustable support bar 30 includes:Mobile jib 31 and the collet 32 for being inserted in the bottom of mobile jib 31, by adjusting the He of mobile jib 31
Relative position between collet 32, so as to be finely adjusted to the bearing height for hanging mould 40.Collet 32 includes:Screw rod 320, fixed spiral shell
Mother 321 and bottom plate 322, wherein screw rod 320 are inserted in mobile jib 31, and fixing nut 321 is screwed together on screw rod 320, mobile jib 31
Bottom be placed in fixing nut 321, so as to the position of fixed mobile jib 31, prevent mobile jib 31 from gliding, ensure the fastness of structure
And stability;Bottom plate 322 is fixed on the bottom of screw rod 320, and bottom plate 322 is placed on ground in construction and is supported.Needing
When adjusting bearing height, fixing nut 321, position of the regulation fixing nut 321 on screw rod 320, so as to change master are rotated
Relative position between bar 31 and screw rod 320 is to adjust the bearing height of adjustable support bar 30.
In the present embodiment, collet 32 is provided with external screw thread, and the bottom of mobile jib 31 is provided with the internal thread being adapted to therewith, so as to
Relative position between mobile jib 31 and collet 32 can be changed by rotating collet 32, so as to the length of adjustable support bar 30, to hanging mould
40 height is finely adjusted, and 60 imprecise problem of reserved opening, the overall stabilization of enhancing structure are blocked to prevent from hanging mould 40
Property.
The utility model hangs having the beneficial effect that for the erecting device of mould:
The utility model hangs the erecting device of mould by using support platform support in the bottom for hanging mould, by adjustable support
Rod set is located at the locating rod of support platform bottom, and stays on the bottom of support platform, and structure floor is plugged in so as to hang mould
At the reserved opening of bottom, locating rod can prevent adjustable support bar to be subjected to displacement and cause to hang molding to block up reserved opening not tight
It is close, spillage is produced during so as to prevent from pouring, the problem of avoiding later stage seepage.The erecting device that the utility model hangs mould can be fast
Speed installation, next hole can be moved quickly into after the completion of mould by hanging, and repeated and utilized, improve utilization rate and efficiency.
The utility model is described in detail above in association with accompanying drawing embodiment, those skilled in the art can root
Many variations example is made to the utility model according to described above.Thus, some details in embodiment should not be formed to this practicality
New restriction, the utility model will be used as the scope of protection of the utility model using the scope that appended claims define.
Claims (6)
1. a kind of erecting device for hanging mould, it is plugged in for mould will to be hung at the reserved opening of structure floor bottom, it is characterised in that
The erecting device for hanging mould includes:
Support platform, support is in the bottom for hanging mould;
Locating rod, vertically it is fixed on the bottom of the support platform;And
The adjustable adjustable support bar of bearing height, it is sheathed on the locating rod and stays on the bottom of the support platform.
2. the erecting device as claimed in claim 1 for hanging mould, it is characterised in that also include:
It is sheathed on the spacing ring of the adjustable support bar;And
At least one pair of hound being oppositely arranged, is connected between the support platform and the spacing ring.
3. the erecting device as claimed in claim 1 for hanging mould, it is characterised in that the adjustable support bar includes:
Mobile jib;And
The collet of the mobile jib bottom is inserted in, by adjusting the relative position between the mobile jib and the collet, so as to right
The bearing height for hanging mould is finely adjusted.
4. the erecting device as claimed in claim 3 for hanging mould, it is characterised in that the collet includes:
It is inserted in the screw rod of the mobile jib;
The fixing nut being screwed together on the screw rod, the bottom of the mobile jib are placed in the fixing nut;And
It is fixed on the bottom plate of the screw rod bottom.
5. the erecting device as claimed in claim 1 for hanging mould, it is characterised in that the support platform includes:
Rectangle frame;And
The head rod that is fastened transversely in the middle part of the rectangle frame and the second connecting rod for being vertically fixed on the rectangle frame, institute
State and be installed with the locating rod at head rod and the second connecting rod interconnection and interconnection.
6. the as claimed in claim 5 erecting device for hanging mould, it is characterised in that the rectangle frame, the head rod and
The connection through hole being provided with for hanging mould described in connection is spaced apart in second connecting rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720646377.3U CN206971725U (en) | 2017-06-06 | 2017-06-06 | Hang the erecting device of mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720646377.3U CN206971725U (en) | 2017-06-06 | 2017-06-06 | Hang the erecting device of mould |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206971725U true CN206971725U (en) | 2018-02-06 |
Family
ID=61411434
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720646377.3U Expired - Fee Related CN206971725U (en) | 2017-06-06 | 2017-06-06 | Hang the erecting device of mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206971725U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110107086A (en) * | 2019-04-10 | 2019-08-09 | 五冶集团上海有限公司 | A kind of joint of plate perforating pipe sealing hole formwork-support |
CN110616912A (en) * | 2019-09-28 | 2019-12-27 | 中建三局集团有限公司 | Construction method of flange device for structure reserved hole |
-
2017
- 2017-06-06 CN CN201720646377.3U patent/CN206971725U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110107086A (en) * | 2019-04-10 | 2019-08-09 | 五冶集团上海有限公司 | A kind of joint of plate perforating pipe sealing hole formwork-support |
CN110616912A (en) * | 2019-09-28 | 2019-12-27 | 中建三局集团有限公司 | Construction method of flange device for structure reserved hole |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203499247U (en) | Cylinder shaping wooden mold construction structure | |
CN106639336A (en) | Prefabricated concrete wall panel installation and emplacement orientation adjustment device and construction method thereof | |
CN203960895U (en) | Anchor slab bolt assembly and tower foundation assembly | |
CN206971725U (en) | Hang the erecting device of mould | |
CN205116715U (en) | Cast -in -situ box girder template bracing device | |
CN203239394U (en) | Adjustable coal mine underground pipeline hoisting device | |
CN207686300U (en) | Reinforcement type aluminum alloy pattern plate diagonal brace mechanism | |
CN204570393U (en) | A kind of double-block type bed plate limited impression builds servicing unit | |
CN106088474A (en) | Rectangular steel pipe GFRP pipe concrete coupled column | |
CN206428565U (en) | A kind of concrete set shaped steel formwork support system | |
CN206128634U (en) | Air conditioner shelf and window one -piece casting template support structure that wafts | |
CN206143796U (en) | Rim of a cup basis box steel column and mounting adjustment fixing device | |
CN206902768U (en) | A kind of post-cast strip adjustable supporting | |
CN205857710U (en) | Air-conditioning formwork support structure | |
CN205444197U (en) | Batter pile test model concrete placement stand pipe inclines | |
CN205857709U (en) | Air-conditioning template length governor motion and air-conditioning formwork support structure | |
CN103334584A (en) | Template regulating system for sliding form system | |
CN208072970U (en) | The template system of concrete type seam construction | |
CN203361633U (en) | Template regulating system of sliding form system | |
CN206144142U (en) | Arc beam support die | |
CN206737428U (en) | A kind of wall form verticality adjusting device | |
CN206873919U (en) | A kind of strip thickness control adjusting means | |
CN206971809U (en) | A kind of civil engineering support | |
CN206395738U (en) | Tower crane cab seat | |
CN206070403U (en) | A kind of sliding form apparatus for formwork for placing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180206 |