CN201794070U - Implanted anti-corrosion precast pile applied to saline soil foundation - Google Patents

Implanted anti-corrosion precast pile applied to saline soil foundation Download PDF

Info

Publication number
CN201794070U
CN201794070U CN2010205458263U CN201020545826U CN201794070U CN 201794070 U CN201794070 U CN 201794070U CN 2010205458263 U CN2010205458263 U CN 2010205458263U CN 201020545826 U CN201020545826 U CN 201020545826U CN 201794070 U CN201794070 U CN 201794070U
Authority
CN
China
Prior art keywords
pile
pile body
anticorrosion
implanted
corrosion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205458263U
Other languages
Chinese (zh)
Inventor
黄明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI CHANGJIA INDUSTRY DEVELOPMENT Co Ltd
Original Assignee
SHAANXI CHANGJIA INDUSTRY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI CHANGJIA INDUSTRY DEVELOPMENT Co Ltd filed Critical SHAANXI CHANGJIA INDUSTRY DEVELOPMENT Co Ltd
Priority to CN2010205458263U priority Critical patent/CN201794070U/en
Application granted granted Critical
Publication of CN201794070U publication Critical patent/CN201794070U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to an implanted anti-corrosion precast pile applied to a saline soil foundation. A pile body and a pile tip are precast respectively, and the pile body is tightly covered by a geosynthetic material and an anti-corrosion material to achieve anti-corrosion effect. Compared with a filling pile or other piles, the utility model has the advantages that: the precast pile has high construction speed and good anti-corrosion effect, is easy to operate, particularly ensures that the anti-corrosion layer of the pile body cannot be damaged, reduces engineering cost, saves a large number of materials, ensures the engineering quality of foundations in saline soil areas, and the like. The precast pile is suitable for pile foundation engineering in the saline soil foundation.

Description

The implanted anticorrosion preformed pile of using in the brining ground foundation
Technical field
The utility model relates to a kind of implanted anticorrosion preformed pile, particularly a kind of implanted anticorrosion preformed pile that is adapted at using in the brining ground foundation.
Background technology
Be rich in the saline soil area of bittern, the mechanical strength of foundation soil is low, compressibilty is high, and general building must adopt artificial foundation and pile foundation; Important building and Rail Highway bridge must adopt the steel bar concrete pile plinth.Because contain in the brining ground foundation soil building materials such as steel, concrete had the sulfate radical of deep-etching and the bittern of chlorion.Steel and concrete are the main body building materials of present various important buildings, so be that the builing industry personnel research and develop target at saline soil area steel work and concrete anticorrosion problem always.Structure at exposed ground can regularly be brushed various etch-proof materials, and the anticorrosion difficulty that just compares of underground construction, member directly contacts with bittern with the salinized soil of deep-etching on the one hand, and the 2nd, can't regularly brush anticorrosive.Etch-proof stake at present commonly used mainly contains three kinds: (one) is the cast-in-place concrete pile with thick walled steel tube parcel and protection, and wall thickness is general 〉=10 ㎜, promptly in the life-span internal corrosion of using less than the concrete pile body.General stake is long at tens meters, 0.5~2.0 meter in stake footpath, and the steel material of use is very big, and cost is very high; These steel are also eroded year by year simultaneously.(2) cast-in-place concrete pile or the preformed pile of employing anti-corrosion concrete or adding anticorrisive agent material, anticorrisive agent material and anti-corrosion concrete price height, the cost of increase engineering.(3) anticorrosion concrete Wrapping pile, this stake type and job practices are suitable for large-scale pile body, use at brining ground foundation.To the pile foundation of the big less stake type of pile body quantity, the speed of application of the method is slower, and gene is that shear strength is low in saturated salt marsh soil, and the necking down and the hole of collapsing easily take place in the stake hole, and it is complicated that construction technology seems.So, to study a kind of cheaply, it is essential that technology can prevent effectively that simply again the novel pile body of bittern corrosion from becoming.
The utility model content
The purpose of this utility model provides a kind of implanted anticorrosion preformed pile, solve etch-proof stake engineering cost height commonly used at present, construction technology complicated technology problem.
For achieving the above object, the utility model adopts following technical scheme:
The implanted anticorrosion preformed pile of using in a kind of brining ground foundation, the pile body that comprises precast concrete, the peripheral close anticorrosion cloth that is tied with of described pile body, pile body is implanted end the piling bar point is installed, described piling bar point is the soffit that taper that one group of gusset is combined into is welded on base plate, and plate upper surface is welded with snap ring, and the internal diameter of described snap ring equates with the external diameter of pile body, the pile body bottom snaps in the snap ring, and described anticorrosion cloth is the synthetic geotextiles of anti-corrosion material.
The external surface of described pile body and anticorrosion cloth all is coated with anti-corrosion material.
The cross section of described pile body and snap ring is circular or square.
Compared with prior art the utlity model has following characteristics and beneficial effect:
1. the utility model adopts domestic and international construction work to be extensive use of the prefabricated concrete pile body of geosynthetics and anti-corrosion material parcel, and simple in structure, cheap, material source is extensive; The preformed pile that is adopted is the ordinary concrete preformed pile, can reduce construction cost thereby the manufacture craft difficulty is little.
2. the machinery that adopts of the construction of the anticorrosion preformed pile of the utility model is pile foundation engineering vibration sinking tube rig and Clothoid type rig commonly used, the process maturation, and implementation result is easy to guarantee, and the engineering properties of anticorrosion preformed pile and static pressure are with to squeeze into pile sinking identical.
3. the utility model is implanted the measure that the preformed pile method has been taked the protection pile body, and the stake asepticised outer layer can be not destroyed, guarantees anticorrosion ability.Simultaneously fast at saturated brining ground foundation speed of application, the bad phenomenon such as hole, necking down of collapsing can not appear.
The utility model has overcome traditional etch-proof stake engineering cost height, the shortcoming of construction technology complexity, and it is cheap to have solved anticorrosion stake, and technology can effectively prevent the technical problem of bittern corrosion simply again.
The utility model can be widely used in pile foundation engineering in the brining ground foundation.
Description of drawings
The utility model is described in more detail below in conjunction with accompanying drawing.
Fig. 1 is a structural representation of the present utility model.
Fig. 2 makees anticorrosion precast pile schematic diagram on ground.
Fig. 3 is a Clothoid type rig schematic diagram in place.
Fig. 4 is a Clothoid type rig pile hole schematic diagram.
Fig. 5 prepares schematic diagram before preformed pile is implanted.
Fig. 6 is the schematic diagram in the anticorrosion preformed pile embedded pile hole of slinging.
Fig. 7 is pile body and pile body connection diagram.
Fig. 8 is that pile body and pile crown connecting portion are made the preservative treatment schematic diagram.
Fig. 9 implants the anticorrosion preformed pile to the design elevation schematic diagram.
Figure 10 is the slit schematic diagram between closely knit pile body and the stake hole wall.
Figure 11 is a pile crown preservative treatment schematic diagram.
Figure 12 is a piling bar point structural representation.
Figure 13 is the upward view of Figure 12.
Figure 14 is the vertical view of Figure 12.
Figure 15 is pile body and piling bar point connection diagram.
Figure 16 is a lifting protection chuck structural representation.
Figure 17 is the elevation of Figure 16.
Figure 18 is a Submersed type stake machine location schematic diagram.
Figure 19 is a Submersed type stake machine pore-forming schematic diagram.
Figure 20 is that Submersed type stake machine is implanted the pile body schematic diagram.
Figure 21 is Submersed type stake machine pile body and pile body connection diagram.
Figure 22 is a Submersed type stake machine immersed tube vibratory compaction slit schematic diagram.
Figure 23 is that Submersed type stake machine implantation anticorrosion preformed pile is finished figure.
Reference numeral: 1-pile body, 2-piling bar point, 2.1-gusset, 2.2-base plate, 2.3-snap ring, the anticorrosion cloth of 3-, 4-Submersed type stake machine, 5-stake hole, 6-lifting protection chuck, the semicircle anchor ear of 6.1-, 6.2-split bolt, 6.3-suspension ring are buckled, 7-slit, 8-compact material, 9-anticorrosive coat, 10-vibration sinking tube, 11-weld seam, 12-design elevation, 13-Clothoid type stake machine.
The specific embodiment
Embodiment is referring to shown in Figure 1, the implanted anticorrosion preformed pile of using in a kind of brining ground foundation, the pile body 1 that comprises precast concrete, the described pile body 1 peripheral close anticorrosion cloth 3 that is tied with, pile body is implanted end piling bar point 2 is installed, described piling bar point 2 is the soffit that taper that one group of gusset 2.1 is combined into is welded on base plate 2.2, plate upper surface is welded with snap ring 2.3, the internal diameter of described snap ring 2.3 equates with the external diameter of pile body 1, the pile body bottom snaps in the snap ring 2.3, and described anticorrosion cloth 3 is the synthetic geotextiles of anti-corrosion material.
The external surface of described pile body 1 and anticorrosion cloth 3 all is coated with anti-corrosion material.
The cross section of described pile body 1 and snap ring 2.3 is circular or square.
Implementation method of the present utility model is referring to shown in Figure 18~22, and step is as follows:
Step 1 is coated with anti-corrosion material at pile body 1 external surface of precast concrete, wraps up in anticorrosion cloth 3, wraps up in anticorrosion cloth 3 external surfaces and is coated with anti-corrosion material and makes the anticorrosion preformed pile, makes piling bar head 2, simultaneously pile-forming machine perching;
Step 2 is connected vibration sinking tube 10 ends of piling bar head 2 with the stake machine, with the vibration sinking tube 10 of stake machine fix stake position also pore-forming to design elevation 12;
Step 3 is installed lifting protection chuck 6 at the lifting end of anticorrosion precast pile, does the anticorrosion precast pile and implants preparation;
Step 4, the lifting appliance of stake machine reliably is connected with the lifting protection chuck 6 of the pile body 1 of anticorrosion preformed pile, and the pile body 1 of anticorrosion preformed pile is packed into vibration sinking tube 10;
Step 5, in the pile body 1 vibration embedded pile hole 5 with the anticorrosion preformed pile, pile body joint weld seam 11 connects, and does preservative treatment, and whole pile bottom surface reaches to stay after the projected depth and shakes 5-10 minute;
Step 6, it is closely knit that the slit 7 that makes between pile body 1, piling bar point 2 and the stake hole wall has been dialled in vibration sinking tube 10 vibrations;
Step 7 at the pile body 1 part coated anti-corrosion layer 9 that bassets, is done preservative treatment.
Described stake machine is a Submersed type stake machine 4.
The maximum outside diameter of the described piling bar head 2 of step 2 is identical with the vibration sinking tube external diameter.
Referring to Fig. 2~Figure 17, different with said method is that described step 2 is with the drill bit stake position of stake machine and the pore-forming that circles round; Described step 4 is that the lifting appliance of stake machine reliably is connected with the lifting protection chuck 6 of the pile body 1 of anticorrosion preformed pile; Described step 6 is a filling compact material 8 in the slit 7 between pile body 1, piling bar point 2 and the stake hole wall, carries out closely knit processing.
Described stake machine is a Clothoid type stake machine 13.
The described encapsulation process method of step 6 is that filler is closely knit, slip casting is closely knit or filler slip casting is closely knit.
Semicircle anchor ear 6.1 make-ups that described lifting protection chuck 6 is two two ends band handles form, and shank connects by split bolt 6.2, and the bottom of described circular anchor ear 6.1 has suspension ring and buckles 6.3.

Claims (3)

1. the implanted anticorrosion preformed pile of using in the brining ground foundation, the pile body (1) that comprises precast concrete, it is characterized in that: the peripheral close anticorrosion cloth (3) that is tied with of described pile body (1), pile body is implanted end piling bar point (2) is installed, described piling bar point (2) is the soffit that taper that one group of gusset (2.1) is combined into is welded on base plate (2.2), plate upper surface is welded with snap ring (2.3), the internal diameter of described snap ring (2.3) equates with the external diameter of pile body (1), the pile body bottom snaps in the snap ring (2.3), and described anticorrosion cloth (3) is the synthetic geotextiles of anti-corrosion material.
2. the implanted anticorrosion preformed pile of using in the brining ground foundation according to claim 1 is characterized in that: the external surface of described pile body (1) and anticorrosion cloth (3) all is coated with anti-corrosion material.
3. the implanted anticorrosion preformed pile of using in the brining ground foundation according to claim 1 is characterized in that: the cross section of described pile body (1) and snap ring (2.3) is for circular or square.
CN2010205458263U 2010-09-28 2010-09-28 Implanted anti-corrosion precast pile applied to saline soil foundation Expired - Lifetime CN201794070U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205458263U CN201794070U (en) 2010-09-28 2010-09-28 Implanted anti-corrosion precast pile applied to saline soil foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205458263U CN201794070U (en) 2010-09-28 2010-09-28 Implanted anti-corrosion precast pile applied to saline soil foundation

Publications (1)

Publication Number Publication Date
CN201794070U true CN201794070U (en) 2011-04-13

Family

ID=43848990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205458263U Expired - Lifetime CN201794070U (en) 2010-09-28 2010-09-28 Implanted anti-corrosion precast pile applied to saline soil foundation

Country Status (1)

Country Link
CN (1) CN201794070U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101942829A (en) * 2010-09-28 2011-01-12 陕西长嘉实业发展有限公司 Implantable corrosion-proof preformed pile for use in salt oil foundation and construction method thereof
CN103526753A (en) * 2013-10-24 2014-01-22 华煜建设集团有限公司 Anti-corrosion precast pile
CN103953036A (en) * 2014-04-14 2014-07-30 国家电网公司 Construction method of anticorrosion protective sleeve for pipe connection of offshore saline soil electric transmission line pile foundation

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101942829A (en) * 2010-09-28 2011-01-12 陕西长嘉实业发展有限公司 Implantable corrosion-proof preformed pile for use in salt oil foundation and construction method thereof
CN101942829B (en) * 2010-09-28 2011-10-19 陕西长嘉实业发展有限公司 Implantable corrosion-proof preformed pile for use in salt oil foundation and construction method thereof
CN103526753A (en) * 2013-10-24 2014-01-22 华煜建设集团有限公司 Anti-corrosion precast pile
CN103953036A (en) * 2014-04-14 2014-07-30 国家电网公司 Construction method of anticorrosion protective sleeve for pipe connection of offshore saline soil electric transmission line pile foundation
CN103953036B (en) * 2014-04-14 2016-01-20 国家电网公司 The anticorrosion sheath construction method of a kind of beach salty soil transmission line of electricity pile foundation pile extension

Similar Documents

Publication Publication Date Title
CN101942829B (en) Implantable corrosion-proof preformed pile for use in salt oil foundation and construction method thereof
CN103215960B (en) Grouting method for high polymer vertical support system
CN105951826B (en) A kind of pile tube inner suction ground anchorage and its hydraulic pressure injection method
CN101787698B (en) Anti-corrosion inclusion bored concrete pile used for saline soil foundation and construction method thereof
CN101736760A (en) Prestressed anti-floating anchor rod and construction method thereof
CN202466594U (en) Horizontal jet grouting soil anchoring and cast-in-place pile compound foundation pit supporting structure
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
JP6279945B2 (en) Soil surface anti-slip method for earth structure
CN203222809U (en) Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line
CN109505297A (en) A kind of resistance to compression resistance to plucking variable diameters steel reinforcement cage club-footed pile
CN201794070U (en) Implanted anti-corrosion precast pile applied to saline soil foundation
CN103953036A (en) Construction method of anticorrosion protective sleeve for pipe connection of offshore saline soil electric transmission line pile foundation
CN212052717U (en) Structure for penetrating karst cave of precast tubular pile
CN108842792A (en) A kind of layering is interior to draw anchor pole and construction method with being lifted discharging type
CN209211459U (en) Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA
CN202139587U (en) Steel pile tube with closed conical end
CN107299644A (en) A kind of pile anchor rod basis available for soft clay area
CN207160041U (en) Anchor rod type artificial digging pile
CN110331735A (en) A kind of tower crane mounting structure for coastal region soft layer
CN102966095A (en) Compound pile cast with concrete on site and filled with sand and construction method thereof
CN201722684U (en) Compound pile
CN207362837U (en) A kind of concrete filled steel tube carrier pile
CN204199274U (en) The compound pile of the outer pile body intensity adjustable of pile body band enlarged footing in a kind of reserved mud space
CN203866821U (en) Lead hole implant cloth bag gravel grouting pile
CN209798812U (en) Offshore wind power composite foundation structure with combination of inner steel pipe piles and outer steel pipe piles

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20110413

Effective date of abandoning: 20111019