CN201722684U - Compound pile - Google Patents
Compound pile Download PDFInfo
- Publication number
- CN201722684U CN201722684U CN2010202489734U CN201020248973U CN201722684U CN 201722684 U CN201722684 U CN 201722684U CN 2010202489734 U CN2010202489734 U CN 2010202489734U CN 201020248973 U CN201020248973 U CN 201020248973U CN 201722684 U CN201722684 U CN 201722684U
- Authority
- CN
- China
- Prior art keywords
- pile
- cement mixing
- mixing method
- compound
- cast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model provides a compound pile. The compound pile comprises a cement mixing pile and a concrete filling pile, wherein the cement mixing pile surrounds the concrete filling pile in the radial direction. The compound pile is formed by arranging the cement mixing pile at the periphery of the concrete filling pile. The compound pile can be applied to a soil structure with a soft flow plastic layer, so that concrete filling fullness coefficient is low and the compound pile has high carrying capacity.
Description
Technical field
The utility model relates to building field, particularly relates to the building foundation engineering field.
Background technology
Revolve and scrape out hole technology surplus the application in loess area existing ten year, because of its mechanization degree height, advantage such as speed of fulfiling hole is fast, verticality good, the side friction of stake is big, this technology has obtained using rapidly and widely.But in using, engineering also run into some problems, see that as perforate sand or perforate are that plastic flow is moulded formation conditions such as layer, local burning into sand layer, cause problems such as boring difficulty, hole wall collapse, concrete spouting fullness coefficient be bigger than normal, does not still have and clearly effectively consolidate the wall measure and solve.
The utility model content
The purpose of this utility model provides a kind of compound pile, to solve the problems of the technologies described above.
To achieve these goals, the utility model adopts following technical scheme:
A kind of compound pile comprises cement mixing method and cast-in-place concrete pile, and described cement mixing method is radially surrounding described cast-in-place concrete pile.
Described cement mixing method comprises at least two.
Described cement mixing method comprises 7, and these 7 cement mixing methods are distributed in described cast-in-place concrete pile periphery.
The diameter of described cast-in-place concrete pile is 700mm, and the diameter of described cement mixing method is 500mm, the center 550mm of the center to center distance cast-in-place concrete pile of described cement mixing method.
The length of described cast-in-place concrete pile is long than the length of cement mixing method.
Compared with prior art, the utility model forms a kind of compound pile by in the cast-in-place concrete pile periphery cement mixing method being set, this kind compound pile can be applied to have plastic flow and mould in the soil structure of layer, the supporting capacity height of little and this compound pile of concrete spouting fullness coefficient.
Description of drawings
Fig. 1 is the structural representation of embodiment 1 compound pile;
Fig. 2 is the sectional view of Fig. 1 along the A-A line;
Fig. 3 is the structural representation of embodiment 2 compound piles;
Fig. 4 is the sectional view of Fig. 3 along the B-B line.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is done and to be described in further detail.
See also shown in Figure 1ly, a kind of compound pile of the utility model comprises cement mixing method 1 and cast-in-place concrete pile 2, and described cement mixing method 1 surrounds cast-in-place concrete pile 2 diametrically.
See also Figure 1 and Figure 2,2 footpaths of cast-in-place concrete pile are 700mm in the present embodiment, evenly lay 7 along 2 week of cast-in-place concrete pile
Cement mixing method 1, overlap joint 50mm, 1 long process to plastic flow of cement mixing method are moulded the following 1m of layer place, cement mixing method 1 center to center distance cast-in-place concrete pile 2 center 550mm.Cement mixing method 1 pile body cement parameter is 5%~7%, and promptly every meter long cement consumption of stake is about 35kg.During construction, 7 cement mixing methods 1 that are shaped earlier, treat that it solidifies after, rotary digging drilling hole pours into then and forms cast-in-place concrete pile 2, the length of cast-in-place concrete pile 2 is long than the length of cement mixing method 1, a kind of compound pile of the utility model just completes like this.
See also Fig. 3 and shown in Figure 4,2 footpaths of cast-in-place concrete pile are 700mm in the present embodiment, 1 of 2 Zhou Bushe of cast-in-place concrete pile
Cement mixing method 1,1 long process to plastic flow of cement mixing method are moulded the following 1m of layer place.Cement mixing method 1 pile body cement parameter is 5%~7%.During construction, first shaping cement mixing method 1, treat that it solidifies after, pour into formation then at cement mixing method 1 center rotary digging drilling hole
Cast-in-place concrete pile 2, the length of cast-in-place concrete pile 2 is long than the length of cement mixing method 1, a kind of compound pile of the utility model just completes like this.
Table 1, indoor cement soil body compression test
Annotate: the cement-soil test block (70.7 * 70.7 * 70.7, unit: mm), cement mixing content 7%.
As can be seen from Table 1, the compressive strength of cement mixing method after 1 seven days reaches more than the 400KPa, can carry out rotary digging drilling hole and situation that hole wall can not occur subsiding, pour into then forming cast-in-place concrete pile 2, the concrete spouting fullness coefficient reduces before.
A kind of compound pile of the utility model is around 2 holes of cast-in-place concrete pile of intending pore-forming, with the host of cement as curing compound, by the deep mixer tool, curing compound and foundation soil are forced to stir, weak soil is hardened become to have the cement mixing method 1 of globality, water stability and certain intensity, the effect that play strengthening soft foundation, improves pile body frictional resistance; Rotary digging drilling hole forms cast-in-place concrete pile 2 in cement mixing method 1 then, pore-forming smoothly and can be applied to and have plastic flow and mould in the soil structure of layer, the bearing capacity of the cast-in-place concrete pile of the compound pile after the shaping before also improves greatly.
Claims (5)
1. compound pile, it is characterized in that: comprise cement mixing method (1) and cast-in-place concrete pile (2), described cement mixing method (1) is radially surrounding described cast-in-place concrete pile (2).
2. compound pile according to claim 1, it is characterized in that: described cement mixing method (1) comprises at least two.
3. compound pile according to claim 1, it is characterized in that: described cement mixing method (1) comprises 7, these 7 cement mixing methods (1) are distributed in described cast-in-place concrete pile (2) periphery.
4. as compound pile as described in the claim 3, it is characterized in that: the diameter of described cast-in-place concrete pile (2) is 700mm, the diameter of described cement mixing method (1) is 500mm, the center 550mm of the center to center distance cast-in-place concrete pile (2) of described cement mixing method (1).
5. as compound pile as described in the claim 4, it is characterized in that: the length of described cast-in-place concrete pile (2) is long than the length of cement mixing method (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202489734U CN201722684U (en) | 2010-07-06 | 2010-07-06 | Compound pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202489734U CN201722684U (en) | 2010-07-06 | 2010-07-06 | Compound pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201722684U true CN201722684U (en) | 2011-01-26 |
Family
ID=43490999
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202489734U Expired - Fee Related CN201722684U (en) | 2010-07-06 | 2010-07-06 | Compound pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201722684U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102268875A (en) * | 2011-01-28 | 2011-12-07 | 中天建设集团有限公司天津分公司 | Foundation pit timbering construction method by overcoring bored piles in two rows of stirring piles |
CN107190763A (en) * | 2017-06-14 | 2017-09-22 | 中铁第四勘察设计院集团有限公司 | By many paxilla Shu Hecheng class large diameter pile and its construction method |
CN108612096A (en) * | 2018-04-02 | 2018-10-02 | 中国十七冶集团有限公司 | A kind of cement mixing method reinforces the construction method of spiral-digging pore |
-
2010
- 2010-07-06 CN CN2010202489734U patent/CN201722684U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102268875A (en) * | 2011-01-28 | 2011-12-07 | 中天建设集团有限公司天津分公司 | Foundation pit timbering construction method by overcoring bored piles in two rows of stirring piles |
CN107190763A (en) * | 2017-06-14 | 2017-09-22 | 中铁第四勘察设计院集团有限公司 | By many paxilla Shu Hecheng class large diameter pile and its construction method |
CN108612096A (en) * | 2018-04-02 | 2018-10-02 | 中国十七冶集团有限公司 | A kind of cement mixing method reinforces the construction method of spiral-digging pore |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102587358B (en) | Construction technology of high polymer material post-grouting squeezed cast-in-place pile | |
CN104863131A (en) | Polygonal cement-soil stirring pile and formation method thereof | |
CN103993611A (en) | Anti-floating piled raft structure combining deep-layer jet-grouting cement-soil board and anchor and construction method | |
CN206408655U (en) | The top plate sidewall structure of covered back-digging construction | |
CN104343111A (en) | Composite foundation for reinforcing thick sand soil layer by using node piles | |
CN104863132A (en) | Bougainvillea spectabilis willd-shaped cement-soil mixing pile and shaping method thereof | |
CN105672307A (en) | Expanded-base combination end pile bearing foundation | |
CN206189392U (en) | Prefabricated PVC sleeve concrete pile | |
CN202227336U (en) | Rigid flexible composite foundation pile | |
CN201722684U (en) | Compound pile | |
CN201660880U (en) | Double-shaft stirring pile envelop enclosure structure with cast-in place piles driven internally | |
CN104480956B (en) | A kind of minor diameter mold-bagged concrete pile composite foundation | |
CN206752454U (en) | One kind perfusion embedded pile | |
CN111101510A (en) | Method for manufacturing stirring rock-entering precast pile and stirring rock-entering precast pile | |
CN203866852U (en) | Anti-floating pile structure composited by deep spiral-spraying cement soil plate and anchor rod | |
CN205934916U (en) | Steel casing pipe pore -forming anti -floating anchor rod | |
CN105239566B (en) | Multi-head stirring type large-diameter cast-in-situ pipe pile device and application thereof | |
CN107916663A (en) | A kind of construction method for soft soil foundation | |
CN2716340Y (en) | Immersed tube for filling pile | |
CN205999887U (en) | Boring steel reinforcement cage hoop slip casting broken stone pile | |
CN110144918A (en) | Hypogee dewatering well antiseepage plugging construction method | |
CN206956707U (en) | It is a kind of to be used for the ground-connecting-wall that ultra-deep foundation pit is gone along with sb. to guard him in water-rich sand layer stratum | |
CN205501998U (en) | Expand end combination end -bearing pile basis | |
CN203768913U (en) | Cast-in-place foundation pit enclosure structure combined with cemented soil | |
CN204898645U (en) | Construction waste regeneration drainage CFG pile foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110126 Termination date: 20160706 |