CN201772984U - 压力测试集成阀 - Google Patents
压力测试集成阀 Download PDFInfo
- Publication number
- CN201772984U CN201772984U CN2010201827466U CN201020182746U CN201772984U CN 201772984 U CN201772984 U CN 201772984U CN 2010201827466 U CN2010201827466 U CN 2010201827466U CN 201020182746 U CN201020182746 U CN 201020182746U CN 201772984 U CN201772984 U CN 201772984U
- Authority
- CN
- China
- Prior art keywords
- valve
- unloader
- pressure
- container
- pump end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
本实用新型为压力测试集成阀,解决已有装置体积大,维护不便保压不可靠,使用寿命短的问题。阀体(2)上有进水接头(9)、出水接头(13)和余水口(8),进水接头(9)依次经阀体内的流道上的单向阀(5)、气动截止阀(10)、高压过滤器(3)与出水接头(13)连接,高压过滤器与出水接头之间的流道上并联有压力表(1)、压力传感器(12)和手动卸荷阀(4),单向阀与气动截止阀之间的流道上有支流道与容器卸荷阀(6)连接,单向阀与进水接头(9)之间的流道上有支流道与泵端卸荷阀(11)连接,手动卸荷阀,容器卸荷阀、泵端卸荷阀经集水体(14)与余水口(8)连接。
Description
技术领域:
本实用新型与压力测试系统中用作控制高压介质的流向、过滤、截止、卸荷的控制装置有关。
背景技术:
现在常用的压力测试控制装置原理如图1所示,各部件之间连接采用高压硬管连接。工作过程:升压时将远控卸荷阀和手动卸荷阀关闭,高压介质通过单向阀直接进入试压容器,依靠单向阀保压,远控卸荷阀卸荷。其缺点:1.系统保压时,必须使高压泵停机。2.保压时单向阀前后均为高压,单向阀保压效果难以保证。3.系统保压时,远控卸荷阀也参与保压,保压环节较多,降低了保压可靠性。4.当试压容器在有压状态进行二次升压时,高压泵将带负荷启动,将对高压泵、电动机、阀等形成有害冲击。5.各功能元件之间采用分散布置,硬管连接方式组合,安装和维护都较为困难。6.各阀易被卸荷介质(卸荷介质常常带有较多杂质)中的杂质磨损,使用寿命短。7.当被试容器较小在卸荷时,卸荷速度过快,由于压力变化太大常常造成压力表指针损坏。
实用新型内容:
本实用新型的目的是提供一种所有单元集成于阀体,体积小,安装维护方便,保压可靠,使用寿命长的压力测试集成阀。
本实用新型是这样实现的:
本实用新型压力测试集成阀,将单向阀5、气动截止阀10、高压过滤器3、容器卸荷阀6、泵端卸荷阀11集成在一个整体阀体2内,通过阀体2内的流道连通,阀体2上有进水接头9、出水接头13和余水口8,进水接头9依次经阀体内的流道上的单向阀5、气动截止阀10、高压过滤器3与出水接头13连接,单向阀5与气动截止阀10之间的流道上有支流道与容器卸荷阀6连接,单向阀5与进水接头9之间的流道上有支流道与泵端卸荷阀11连接。
容器卸荷阀6与集水体14的连接通道上有卸荷速度调节器7,高压过滤器与出水接头之间的流道上并联有压力表1、压力传感器12和手动 卸荷阀4,手动卸荷阀,容器卸荷阀、泵端卸荷阀卸荷口经集水体14与余水口8连接。
阀体2的上端面装有压力表1,高压过滤器3的螺堵16和单向阀5的螺堵15,右侧面装有手动卸荷阀4的手柄17,左侧面装有容器卸荷阀6、余水口8、速度调节器7,正面装有气动截止阀10、进水接头9、出水接头13,背面装有压力传感器12和泵端卸荷阀11。
本实用新型有如下优点:
1、使用整体式集成结构,体积减小为原来的三分之一,安装维护方便。
2、在系统保压时,可选择高压泵停机或不停机。(注:当有的试压需要频繁起动时,选择停机会对电动机及泵造成损害。)
3、试压容器在有压时起动泵,电动机也是零负荷起动。
4、使用气动截止阀保压,减少了保压环节,保压可靠性大幅提高。
5、控制阀汇内集成高压过滤器,将对试压容器和控制阀汇均能有效的保护,将各功能阀的使用寿命延长了4-6倍;同时维护简单。
6、容器卸荷口采用了卸荷速度调节器,可根据试压容器大小调节卸荷速度,使卸荷时压力平稳下降。
附图说明:
图1为已有压力测试控制装置原理图。
图2为本实用新型的原理图。
图3为本实用新型的轴侧图。
图4为图3的俯视图。
图5为图4的A-A剖视图。
具体实施方式:
压力测试集成阀原理如图2所示,主要由三组卸荷阀(泵端卸荷阀11、容器卸荷阀6、手动卸荷阀4)、一组单向阀5、一组气动截止阀10、一组高压过滤器3、一组卸荷速度调节器7、一个压力表1和一个传感器12构成。压力测试集成阀将所有组成单元集成在一个阀体上,如图3所示。工作原理:控制阀初始状态为泵端卸荷阀开启,容器卸荷阀关闭,气动截止阀开启,手动卸荷阀关闭。此时开启试压泵,试压介质经泵端卸荷阀流回水箱,系统及泵均不带压。当需要升压时,关闭泵端卸荷阀,高压介质经单向阀、气动截止阀、高压过滤器进入试压容器。到达试压 目标值,先打开泵端卸荷阀卸除试压泵压力,此时由单向阀保压,然后关闭气动截止阀,容器保压效果由气动截止阀保证。卸压时,先开启气动截止阀,再开启容器卸荷阀卸荷。
如图4和图5该阀为整体式集成阀。进水接头同泵端卸荷阀以及单向阀进口连通,泵端卸荷阀的卸荷口同余水口连通;单向阀出口同容器卸荷阀及气动截止阀进口连通,容器卸荷阀的卸荷口通过卸荷速度调节器同余水口连通;气动截止阀出口与高压过滤器进口连通;高压过滤器出口同手动卸荷阀、传感器、压力表以及出水接头连通,手动卸荷阀卸荷口同余水口连通。
工作过程:高压介质由进水接头进入控制阀汇,当泵端卸荷阀开启时,高压介质将被卸荷通过卸荷口流回余水口,整个系统处于常压;当泵端卸荷阀关闭时,高压介质将打开单向阀通过气动截止阀、高压过滤器再由出水接头进入试压容器,系统处于升压状态;当试压容器压力达到目标值时,打开泵端卸荷阀泵端卸荷,此时高压介质将通过单向阀保压,再将气动截止阀关闭,高压介质被截断,系统处于保压状态,泵端为常压;当需要将试压容器卸荷时,先打开气动截止阀,再将容器卸荷阀打开,试压容器内的高压介质经出水接头、高压过滤器、气动截止阀、容器卸荷阀、卸荷阀速度调节器流回余水口,系统卸荷;手动卸荷阀在容器卸荷阀出现故障时使用。
Claims (3)
1.压力测试集成阀,其特征在于将单向阀(5)、气动截止阀(10)、高压过滤器(3)、容器卸荷阀(6)、泵端卸荷阀(11)集成在一个整体阀体(2)内,通过阀体(2)内的流道连通,阀体(2)上有进水接头(9)、出水接头(13)和余水口(8),进水接头(9)依次经阀体内的流道上的单向阀(5)、气动截止阀(10)、高压过滤器(3)与出水接头(13)连接,单向阀(5)与气动截止阀(10)之间的流道上有支流道与容器卸荷阀(6)连接,单向阀(5)与进水接头(9)之间的流道上有支流道与泵端卸荷阀(11)连接。
2.根据权利要求1所述的集成阀,其特征在于容器卸荷阀(6)与集水体(14)的连接通道上有卸荷速度调节器(7),高压过滤器与出水接头之间的流道上并联有压力表(1)、压力传感器(12)和手动卸荷阀(4),手动卸荷阀,容器卸荷阀、泵端卸荷阀卸荷口经集水体(14)与余水口(8)连接。
3.根据权利要求1所述的集成阀,其特征在于阀体(2)的上端面装有压力表(1),高压过滤器(3)的螺堵(16)和单向阀(5)的螺堵(15),右侧面装有手动卸荷阀(4)的手柄(17),左侧面装有容器卸荷阀(6)、速度调节器(7)、余水口(8),正面装有气动截止阀(10)、进水接头(9)、出水接头(13),背面装有压力传感器(12)和泵端卸荷阀(11)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201827466U CN201772984U (zh) | 2010-05-07 | 2010-05-07 | 压力测试集成阀 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201827466U CN201772984U (zh) | 2010-05-07 | 2010-05-07 | 压力测试集成阀 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201772984U true CN201772984U (zh) | 2011-03-23 |
Family
ID=43752832
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201827466U Expired - Fee Related CN201772984U (zh) | 2010-05-07 | 2010-05-07 | 压力测试集成阀 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201772984U (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102808815A (zh) * | 2012-07-30 | 2012-12-05 | 西安思坦仪器股份有限公司 | 稳定保压液压泵阀系统 |
CN104712806A (zh) * | 2015-03-20 | 2015-06-17 | 广西三维铁路轨道制造有限公司 | 墩头器快速截止阀 |
CN107218404A (zh) * | 2017-05-16 | 2017-09-29 | 凯迈(洛阳)气源有限公司 | 集成阀及使用该集成阀的气瓶 |
CN108255210A (zh) * | 2017-12-27 | 2018-07-06 | 中国船舶重工集团公司第七0研究所 | 一种用于压力釜的高精度压力控制系统及方法 |
CN108693045A (zh) * | 2018-07-18 | 2018-10-23 | 和峻(广州)胶管有限公司 | 橡胶胶管在线高压定压测试系统 |
-
2010
- 2010-05-07 CN CN2010201827466U patent/CN201772984U/zh not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102808815A (zh) * | 2012-07-30 | 2012-12-05 | 西安思坦仪器股份有限公司 | 稳定保压液压泵阀系统 |
CN104712806A (zh) * | 2015-03-20 | 2015-06-17 | 广西三维铁路轨道制造有限公司 | 墩头器快速截止阀 |
CN107218404A (zh) * | 2017-05-16 | 2017-09-29 | 凯迈(洛阳)气源有限公司 | 集成阀及使用该集成阀的气瓶 |
CN108255210A (zh) * | 2017-12-27 | 2018-07-06 | 中国船舶重工集团公司第七0研究所 | 一种用于压力釜的高精度压力控制系统及方法 |
CN108693045A (zh) * | 2018-07-18 | 2018-10-23 | 和峻(广州)胶管有限公司 | 橡胶胶管在线高压定压测试系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201772984U (zh) | 压力测试集成阀 | |
CN104645707A (zh) | 油田注水定压连续过滤装置及其过滤工艺 | |
CN208254546U (zh) | 一种地热尾水回灌测试系统 | |
CN216520925U (zh) | 一种液氩储罐的输出装置 | |
CN201943910U (zh) | 一种液压手动泵 | |
CN206092370U (zh) | 一种带有电动感应装置的水泵 | |
CN209791303U (zh) | 一种带反冲洗的净水系统 | |
CN103726538A (zh) | 串联顶压无负压给水设备 | |
CN209098342U (zh) | 一种三级一体成型水路板 | |
CN201671840U (zh) | 抽取地下液体装置 | |
CN106049613A (zh) | 一种专用卫生间供水系统 | |
CN201449325U (zh) | 止回阀的寿命试验装置 | |
CN205804500U (zh) | 一种专用卫生间供水系统 | |
CN208397027U (zh) | 一种煤磨机液压站加压系统 | |
CN202446651U (zh) | 持续补偿负压引流袋 | |
CN210068486U (zh) | 新型井下主排水泵高效节能真空射流引水装置 | |
CN206477409U (zh) | 水增压器 | |
CN105268574A (zh) | 一种喷雾主机及其工作方法 | |
CN201368001Y (zh) | 一种手动抽水器 | |
CN101424089A (zh) | 高位蓄水箱无负压供水系统 | |
CN208966772U (zh) | 一种液压管道耐压测试回路 | |
CN215665124U (zh) | 一种分离器自动排污系统 | |
CN2292919Y (zh) | 隔膜泵自动补油装置 | |
CN220847830U (zh) | 一种移动供热储能车罐箱加水系统 | |
CN211599540U (zh) | 一种预防二次供水加压设备超量取水的进水口装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110323 Termination date: 20170507 |