CN201771239U - 新型模块化应急抢修塔 - Google Patents
新型模块化应急抢修塔 Download PDFInfo
- Publication number
- CN201771239U CN201771239U CN2010201224505U CN201020122450U CN201771239U CN 201771239 U CN201771239 U CN 201771239U CN 2010201224505 U CN2010201224505 U CN 2010201224505U CN 201020122450 U CN201020122450 U CN 201020122450U CN 201771239 U CN201771239 U CN 201771239U
- Authority
- CN
- China
- Prior art keywords
- tower
- repair tower
- repairing
- emergency repair
- aid repair
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000008439 repair process Effects 0.000 title claims abstract description 36
- 239000000463 material Substances 0.000 claims abstract description 11
- 229910000838 Al alloy Inorganic materials 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000002131 composite material Substances 0.000 claims description 3
- 238000009413 insulation Methods 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 8
- 230000005540 biological transmission Effects 0.000 abstract description 6
- 238000005260 corrosion Methods 0.000 abstract description 4
- 230000007797 corrosion Effects 0.000 abstract description 4
- 230000003247 decreasing effect Effects 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 6
- 230000005611 electricity Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 3
- 230000011218 segmentation Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000003028 elevating effect Effects 0.000 description 2
- 239000012212 insulator Substances 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201224505U CN201771239U (zh) | 2010-03-04 | 2010-03-04 | 新型模块化应急抢修塔 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201224505U CN201771239U (zh) | 2010-03-04 | 2010-03-04 | 新型模块化应急抢修塔 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201771239U true CN201771239U (zh) | 2011-03-23 |
Family
ID=43751084
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201224505U Expired - Fee Related CN201771239U (zh) | 2010-03-04 | 2010-03-04 | 新型模块化应急抢修塔 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201771239U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013054359A3 (en) * | 2011-10-11 | 2013-07-04 | Valagam Rajagopal Raghunathan | A lattice tower and its fabrication utilizing the composite wraping method |
CN110924730A (zh) * | 2019-12-09 | 2020-03-27 | 广州增立钢管结构股份有限公司 | 一种通用杆塔结构 |
-
2010
- 2010-03-04 CN CN2010201224505U patent/CN201771239U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013054359A3 (en) * | 2011-10-11 | 2013-07-04 | Valagam Rajagopal Raghunathan | A lattice tower and its fabrication utilizing the composite wraping method |
CN110924730A (zh) * | 2019-12-09 | 2020-03-27 | 广州增立钢管结构股份有限公司 | 一种通用杆塔结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101736936A (zh) | 新型模块化应急抢修塔 | |
CN204424739U (zh) | 一种多段组合式箱式变电站 | |
CN104481178A (zh) | 一种复合材料变电站构架 | |
CN205329909U (zh) | 两侧开缝波纹夹芯钢板墙 | |
CN201771239U (zh) | 新型模块化应急抢修塔 | |
CN209874051U (zh) | 一种新型装配式钢结构半刚性梁柱连接节点 | |
CN101736935A (zh) | 一种便于运输的电力事故抢修塔 | |
CN103967317A (zh) | 一种输电线路抢修塔塔身 | |
CN202611287U (zh) | 一种适用于大型火电厂的钢结构组合体系 | |
CN203924753U (zh) | 用于加固集装箱式房屋钢结构柱的加固件以及加固结构 | |
CN201593328U (zh) | 一种便于运输的电力事故抢修塔 | |
CN203471133U (zh) | 钢筋桁架生产线用焊接装置 | |
CN208455880U (zh) | 一种新型装配式冷弯厚壁型钢框架—剪力墙结构体系 | |
CN105317263A (zh) | 全绝缘通用事故抢修塔 | |
CN204311794U (zh) | 一种复合材料变电站构架 | |
CN202405642U (zh) | 一种电柜箱框架 | |
CN212772814U (zh) | 一种钢结构节点连接结构 | |
CN213585090U (zh) | 基于220kV双回路及500kV单回路近远结合的输电线路转角塔 | |
CN202994492U (zh) | 一种t型桥梁静载试验架 | |
CN202610699U (zh) | 一种模块化铝合金人行桥梁结构 | |
CN203161451U (zh) | 一种模块化风力发电机塔筒 | |
CN105625576A (zh) | 串联拉杆拱式预应力钢结构悬臂体系 | |
CN202881841U (zh) | 一种新型大跨度管桥结构 | |
CN207048035U (zh) | 一种组合墙钢梁结构 | |
CN211342030U (zh) | 一种终端站的四柱双斜梁分层构架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: SHANXI ELECTRIC POWER CORPORATION STATE ELECTRIC N Effective date: 20130626 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Du Zhongdong Inventor after: Song Shuting Inventor after: Wang Haipeng Inventor after: Cai Wei Inventor after: Wang Linong Inventor after: Hu Jianxun Inventor after: Zhang Bing Inventor after: Ye Zheng Inventor after: Liu Huanhuan Inventor after: Chen Qi Inventor after: Niu Biao Inventor before: Du Zhongdong Inventor before: Cai Wei Inventor before: Wang Linong Inventor before: Hu Jianxun Inventor before: Zhang Bing Inventor before: Ye Zheng Inventor before: Liu Huanhuan Inventor before: Chen Qi |
|
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: WUHAN, HUBEI PROVINCE TO: 430074 WUHAN, HUBEI PROVINCE Free format text: CORRECT: INVENTOR; FROM: DU ZHONGDONG CAI WEI WANG LINONG HU JIANXUN ZHANG BING YE ZHENG LIU HUANHUAN CHEN QI TO: DU ZHONGDONG CAI WEI WANG LINONG HU JIANXUN ZHANG BING YE ZHENG LIU HUANHUAN CHEN QI NIU BIAO SONG SHUTING WANG HAIPENG |
|
TR01 | Transfer of patent right |
Effective date of registration: 20130626 Address after: 430074 Hubei Province, Wuhan city Hongshan District Luoyu Road No. 143 Patentee after: Wuhan Nari Limited Liability Company of State Grid Electric Power Research Institute Patentee after: Shanxi Electric Power Comany Patentee after: State Grid Corporation of China Address before: Luoyu Road, Hubei province Wuhan city Hongshan District No. 143 Patentee before: Wuhan Nari Limited Liability Company of State Grid Electric Power Research Institute |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110323 Termination date: 20180304 |