CN201762695U - Structure applicable to large and medium-sized mechanical device to enter long tunnel for overhaul - Google Patents
Structure applicable to large and medium-sized mechanical device to enter long tunnel for overhaul Download PDFInfo
- Publication number
- CN201762695U CN201762695U CN2010202962997U CN201020296299U CN201762695U CN 201762695 U CN201762695 U CN 201762695U CN 2010202962997 U CN2010202962997 U CN 2010202962997U CN 201020296299 U CN201020296299 U CN 201020296299U CN 201762695 U CN201762695 U CN 201762695U
- Authority
- CN
- China
- Prior art keywords
- tunnel
- overhaul
- maintenance
- shaft
- medium
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Abstract
The utility model relates to a structure applicable to a large and medium-sized mechanical device to enter a long tunnel for overhaul. The utility model aims at providing a structure applicable to a large and medium-sized mechanical device to enter a long tunnel for overhaul, which can meet the requirement of the large and medium-sized mechanical device to safely enter the tunnel for overhaul so as to increase the working efficiency of tunnel overhaul and ensure the water diversion power generation efficiency of a power station. The utility model has the technical scheme that an air vent is enlarged and arranged to form an overhaul air well with the size meeting the entrance of the large and medium-sized mechanical device, a concrete bent frame is casted around the top of the overhaul air well, the bent frame is covered by an openable prefabricated bridge deck, and the prefabricated bridge deck is connected with the tunnel road. The structure can be applied to the overhaul maintenance work of water diversion tunnels of hydropower stations, and is especially applicable to the overhaul maintenance work of water diversion tunnels of high-capacity long water diversion type water conservancy and hydropower engineering.
Description
Technical field
The utility model relates to a kind of structure that makes things convenient for the tunnel maintenance, particularly a kind ofly be applicable to that big-and-middle-sized plant equipment enters the structure of long tunnel maintenance, can be used for the repair and maintenance work of power station diversion tunnel, the repair and maintenance work of the diversion tunnel of especially big capacity, long water channeling type Hydraulic and Hydro-Power Engineering.
Background technology
For the permanent safety that guarantees tunnel structure with satisfy power plant safety operation needs, the diversion tunnel in the Hydraulic and Hydro-Power Engineering generally need be provided with access path, so that regularly carry out the work such as maintenance, inspection, scarfing cinder of tunnel.
General, difference according to project scale, grade, diversion and power pattern and tunnel structure layout, the structural configuration of access path and maintenance mode have following several frequently seen pattern usually: 1. enter maintenance, patrol or utilize the reservoir emptying phase by tunnel inlet gate well air vent, enter maintenance by the tunnel import; 2. the block section that utilizes tunnel construction to prop up the hole is provided with enter hole, mandoor etc. as tunnel emptying access path; 3. the enter hole of ball valve, gate valve such as tube valve etc. who utilizes power station penstock enter hole, water wheels unit is as access path.More than several frequently seen tunnel access path structural configuration pattern in the Hydraulic and Hydro-Power Engineering of having built, especially in, in the long diversion and power system engineering of short diversion and power system or low capacity ripe utilization is arranged, artificial or small mechanical equipment passes in and out tunnel in the time of can making things convenient for tunnel emptying maintenance.But, for big capacity, the Hydraulic and Hydro-Power Engineering of long diversion tunnel, owing to exist tunnel section big, the hole line length, tunnel geological conditions complexity along the line, some tunnel adopts combined bolting and shotcrete as the permanent liner protection structure, factors such as tunnel scarfing cinder workload is big, adopt artificial or when carrying out the tunnel maintenance by small mechanical equipment, operating efficiency is low, overhaul length consuming time, have a strong impact on power station diversion and power benefit, therefore maintenance and the scarfing cinder work that must be correlated with by means of the big-and-middle-sized repair apparatus of necessity, and adopt above-mentioned several frequently seen access path arrangement will be difficult to satisfy the requirement that big-and-middle-sized equipment passes in and out tunnel, need consider the layout of repair apparatus transit passage separately.
Summary of the invention
The technical problems to be solved in the utility model is: for solving the deficiencies in the prior art, propose a kind ofly to be applicable to that big-and-middle-sized plant equipment enters the structure of long tunnel maintenance, can satisfy big-and-middle-sized repair apparatus safety and enter tunnel and overhaul, with the operating efficiency that improves the tunnel maintenance, the diversion and power benefit that guarantees the power station.
The technical scheme that the utility model adopted is: a kind ofly be applicable to that big-and-middle-sized plant equipment enters the structure of long tunnel maintenance, the vertical gate shaft that has diversion tunnel and be connected with diversion tunnel, described gate shaft comprises gate slot, the traffic route and the bridge-type opening and closing device of gate shaft top, and the air vent in gate slot downstream, it is characterized in that: described air vent enlarges arranges that forming a size satisfies the maintenance vertical shaft that big-and-middle-sized repair apparatus passes in and out, built concrete frame around the top of this maintenance vertical shaft, and at this covering prefabricated bridge to be opened/closed above framed bent, described prefabricated bridge and described traffic route join.
Described concrete frame comprises one group of vertical column of arranging, between adjacent each column the connection level to beam.
Be provided with vertical enter hole in the lining shaft of described maintenance vertical shaft periphery.
The beneficial effects of the utility model are: the utility model enlarges layout formation maintenance vertical shaft with the air vent of gate shaft, ventilatory function when this vertical shaft not only has gate opening/closing, and its size can satisfy the turnover of big-and-middle-sized repair apparatus, can shorten the time of tunnel maintenance, thereby guarantee the plant generator benefit; Maintenance vertical shaft top joins with the traffic route of gate shaft by the prefabricated bridge that covers on concrete frame and the framed bent, forms whole traffic aisle, makes things convenient for vehicle, personnel to walk, and satisfy safety requirements; During the tunnel maintenance, can directly utilize the bridge-type opening and closing device of backwater gate to hang out prefabricated bridge, hang in repair apparatus, realize the purpose that conventional gate opening/closing equipment complex utilizes; In the concrete lining of maintenance vertical shaft, the enter hole is set separately, specializes in the maintainer and pass in and out the tunnel use, improved the vertically current safety of the big discrepancy in elevation of maintainer.
Description of drawings
Fig. 1 is the front view of the utility model embodiment.
Fig. 2 is the A-A sectional view of Fig. 1.
Fig. 3 is the B-B sectional view of Fig. 1.
Fig. 4 is the C-C sectional view of Fig. 1.
Fig. 5 is the D-D sectional view of Fig. 1.
The specific embodiment
As shown in Figure 1, the present embodiment vertical gate shaft that has a diversion tunnel 1 and be connected with this diversion tunnel 1.Gate shaft comprises the traffic route 9 (as shown in Figure 5) of the gate slot 3 that is used to place backwater gate, lining shaft 4, lining shaft 4 tops and as the bridge-type opening and closing device 5 (position of opening and closing device is higher than traffic route) of gate hoist, this opening and closing device is fixed on the crane girder in the hoist chamber, benefit exhaust requirements when opening and closing for satisfying the diversion tunnel backwater gate also is provided with air vent in the downstream of gate slot.Among Fig. 1, Reference numeral 10 is a gate maintenance chamber, and Reference numeral 11 is stair, and arrow is represented water (flow) direction.
The operating efficiency of present embodiment when accelerating the tunnel repair and maintenance carried out above-mentioned air vent to enlarge and arranged, forms the maintenance vertical shaft 2 that a size can satisfy big-and-middle-sized repair apparatus turnover.Concreting framed bent 6 around the maintenance vertical shaft top, as Fig. 1, Fig. 3, shown in Figure 4: as described in framed bent by vertical column 6-1 and level to beam 6-2 form, beam 6-2 is connected between the adjacent column 6-1.As Fig. 1, shown in Figure 5, concrete frame 6 top also is coated with prefabricated bridge 7 to be opened/closed, these bridge deck and the traffic route above the gate shaft 9 join to make things convenient for vehicle, personnel's walking, when tunnel overhauls, can hang out this bridge deck by bridge-type opening and closing device 5, hang in repair apparatus and overhaul.As Fig. 2, shown in Figure 3, for improving the vertically current safety of the big discrepancy in elevation of maintainer, in the concrete lining of maintenance vertical shaft, also be provided with the enter hole 8 who meets the security protection dimensional requirement separately, specialize in the maintainer and pass in and out tunnel usefulness.
Claims (3)
1. one kind is applicable to that big-and-middle-sized plant equipment enters the structure of long tunnel maintenance, the vertical gate shaft that has diversion tunnel (1) and be connected with diversion tunnel, described gate shaft comprises gate slot (3), lining shaft (4), the traffic route (9) and the bridge-type opening and closing device (5) of lining shaft (4) top, and the air vent in gate slot downstream, it is characterized in that: described air vent enlarges arranges that forming a size satisfies the maintenance vertical shaft (2) that big-and-middle-sized repair apparatus passes in and out, built concrete frame (6) around the top of this maintenance vertical shaft, and at this covering prefabricated bridge to be opened/closed (7) above framed bent, described prefabricated bridge (7) joins with described traffic route (9).
2. according to claim 1ly be applicable to that big-and-middle-sized plant equipment enters the structure of long tunnel maintenance, it is characterized in that: described concrete frame (6) comprises one group of vertical column (6-1) of arranging, between adjacent each column (6-1) the connection level to beam (6-2).
3. according to claim 1 and 2ly be applicable to that big-and-middle-sized plant equipment enters the structure of long tunnel maintenance, is characterized in that: be provided with vertical enter hole (8) in the lining shaft (4) of described maintenance vertical shaft (2) periphery.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202962997U CN201762695U (en) | 2010-08-17 | 2010-08-17 | Structure applicable to large and medium-sized mechanical device to enter long tunnel for overhaul |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202962997U CN201762695U (en) | 2010-08-17 | 2010-08-17 | Structure applicable to large and medium-sized mechanical device to enter long tunnel for overhaul |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201762695U true CN201762695U (en) | 2011-03-16 |
Family
ID=43715306
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202962997U Expired - Lifetime CN201762695U (en) | 2010-08-17 | 2010-08-17 | Structure applicable to large and medium-sized mechanical device to enter long tunnel for overhaul |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201762695U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102505671A (en) * | 2011-11-18 | 2012-06-20 | 中国水电顾问集团成都勘测设计研究院 | Overhead maintenance passage for diversion tunnels |
CN104831741A (en) * | 2015-05-13 | 2015-08-12 | 天津大学 | Box and bucket type foundation purifying water building structure and application thereof |
CN104947637A (en) * | 2015-07-07 | 2015-09-30 | 中国电建集团成都勘测设计研究院有限公司 | Diversion tunnel blockage gate detecting system and detecting method |
CN109371933A (en) * | 2018-11-23 | 2019-02-22 | 中国电建集团成都勘测设计研究院有限公司 | Underground workshop ventilating system |
CN110316648A (en) * | 2019-06-28 | 2019-10-11 | 国家电网有限公司 | Restricted clearance hydraulic cylinder integral hoisting method |
CN110374070A (en) * | 2019-07-30 | 2019-10-25 | 浙江省水利水电勘测设计院 | One kind setting shaft structure of marking time |
-
2010
- 2010-08-17 CN CN2010202962997U patent/CN201762695U/en not_active Expired - Lifetime
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102505671A (en) * | 2011-11-18 | 2012-06-20 | 中国水电顾问集团成都勘测设计研究院 | Overhead maintenance passage for diversion tunnels |
CN102505671B (en) * | 2011-11-18 | 2013-11-20 | 中国水电顾问集团成都勘测设计研究院 | Overhead maintenance passage for diversion tunnels |
CN104831741A (en) * | 2015-05-13 | 2015-08-12 | 天津大学 | Box and bucket type foundation purifying water building structure and application thereof |
CN104947637A (en) * | 2015-07-07 | 2015-09-30 | 中国电建集团成都勘测设计研究院有限公司 | Diversion tunnel blockage gate detecting system and detecting method |
CN104947637B (en) * | 2015-07-07 | 2016-08-17 | 中国电建集团成都勘测设计研究院有限公司 | Blocking sluice gate of diversion tunnel detecting system and detection method |
CN109371933A (en) * | 2018-11-23 | 2019-02-22 | 中国电建集团成都勘测设计研究院有限公司 | Underground workshop ventilating system |
CN109371933B (en) * | 2018-11-23 | 2024-02-27 | 中国电建集团成都勘测设计研究院有限公司 | Underground powerhouse ventilation system of hydropower station |
CN110316648A (en) * | 2019-06-28 | 2019-10-11 | 国家电网有限公司 | Restricted clearance hydraulic cylinder integral hoisting method |
CN110316648B (en) * | 2019-06-28 | 2020-10-30 | 国家电网有限公司 | Integral hoisting method for hydraulic cylinder in limited space |
CN110374070A (en) * | 2019-07-30 | 2019-10-25 | 浙江省水利水电勘测设计院 | One kind setting shaft structure of marking time |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201762695U (en) | Structure applicable to large and medium-sized mechanical device to enter long tunnel for overhaul | |
CN205662947U (en) | Coincide assembled underground pipe gallery system | |
CN206942764U (en) | The supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole | |
CN201874614U (en) | Drainage structure for emptying overhaul of derivation tunnel | |
CN203034429U (en) | Semi-buried type hydroelectric power house | |
CN106013221A (en) | Four-layer rectangle-like urban underground complex | |
CN206110073U (en) | Multi -functional full through -flow lock chamber pump station | |
CN208605197U (en) | A kind of building structure that subway driving section is built together with Urban Underground pipe gallery | |
CN106013013B (en) | Tubular power station separate combination type factory building system | |
CN206189448U (en) | Elliptical section city underground complex | |
CN107829408A (en) | Rectangle aqueduct construction telescoping steel form | |
CN206157701U (en) | Navigation construction's water delivery and dissipation structure | |
CN201485843U (en) | Stream-guidance navigation pier structure | |
CN205776115U (en) | Diversion tunnel lock chamber maintenance structure | |
CN207469305U (en) | Pipe gallery overhauls and escape route integrated system | |
CN101644040A (en) | Flow guide and navigation pier structure and construction method thereof | |
CN208718721U (en) | A kind of railway large diameter shield tunnel rail flowering structure of rapid construction | |
CN207228069U (en) | Rectangle aqueduct construction telescoping steel form | |
CN109681213B (en) | Construction method for accelerating urban underground road by adding vertical shaft turning positive hole at inclined shaft end | |
CN209539357U (en) | One kind increasing vertical shaft hole of becoming a full member in inclined shaft end and post descends road construction structure | |
CN201943054U (en) | Spillway tunnel rebuilt from diversion tunnel through adopting dragon tail tilting type | |
CN208605198U (en) | A kind of building structure that subway station is built together with Urban Underground pipe gallery | |
CN202064330U (en) | Pressure steel pipe inspection access channel structure for high-head hydropower plant | |
CN206956773U (en) | A kind of four layers of class stairstepping Urban Underground Complex | |
CN206189460U (en) | Part is prefabricated assembles steel reinforced concrete and congeals local soil type and close utility tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20110316 |