Prior art keywords
bridge
formation machine
cap
bridge formation
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202366109U
Other languages
Chinese (zh)
Inventor
李密良
吴宗庆
王春兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN2010202366109U priority Critical patent/CN201738242U/en
Application granted granted Critical
Publication of CN201738242U publication Critical patent/CN201738242U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a rigid supporting device for the mounting of a bridge transitional span T-shaped edge beam. The device comprises embedded steel plates (1), a supporting steel pipe (2) and a base mechanism, wherein the base mechanism comprises a concrete column (12), a cap beam (11) and a base steel plate (5), the cap beam (11) is placed on the concrete column (12), the base steel plate (5) is horizontally placed at the end part of the cap beam (11), the lower end of the supporting steel pipe (2) is welded on the base steel plate (5), and the embedded steel plates (1) welded with the supporting steel pipe (2) are arranged at the upper end of the supporting steel pipe (2). The utility model has the advantages of simple structure, convenient operation, safety, reliability, low construction cost, etc.

Description

Bridge transition cross T-shaped side bar is installed the rigid support device
Technical field
The utility model relates to bracing or strutting arrangement, particularly relates to a kind of bridge transition cross T-shaped side bar the rigid support device is installed.
Background technology
In that large bridge is cast-in-place when striding with prefabricated mid-span, because the proper supporting device is not provided, generally be that precast beam is installed earlier, pour into a mould cast-in-situ box girder then, but prestressed reinforcement can only carry out tensioned at one end in this restriction cast-in-situ box girder, surpasses the standard allowable error with two ends simultaneous tension data differences, has a strong impact on case beam stress system, change over the force structure behind the bridge, reduce bridge application life.
Summary of the invention
Technical problem to be solved in the utility model is: provide a kind of when the bridge formation machine is installed side bar, do not allow box beam flange plate be subjected to vertical active force and the impaired frame sedan-chair pusher side that causes turns over, but bridge formation machine track directly props up a kind of load-bearing rigid support device of pad on pre-embedded steel slab, and this device is installed the rigid support device for bridge transition cross T-shaped side bar.
The technical scheme that its technical problem that solves the utility model adopts is: comprise pre-embedded steel slab, supporting steel pipe and foundation means, wherein, foundation means is made up of concrete pillar, cap, pedestal steel plate, and cap rests on the concrete pillar, and the pedestal steel plate lies in the cap end; Described supporting steel pipe, its lower end are welded on the pedestal steel plate, and its upper end is provided with the pre-embedded steel slab that is weldingly connected with it.
The utility model compared with prior art has following beneficial effect to be:
1. gather materials on the spot, can reuse, construction cost is low, and is pollution-free;
2. simple in structure, dismounting is simple and convenient;
3. required supporting steel pipe is the quarter butt stress system, stablizes, stress deformation is little, safe and reliable, and good effect is played in the protection of box beam flange plate.
Description of drawings
Fig. 1 is a rigid support device profile of the present utility model.
Fig. 2 is the A-A sectional view among Fig. 1.
Fig. 3 is that bridge formation machine of the present utility model is installed T type side bar bridge formation machine profile in place.
Fig. 4 is a bridge formation machine of the present utility model T type side bar profile in place when T type side bar is installed.
Among the figure: 1. pre-embedded steel slab; 2. supporting steel pipe; 3.T beam support pinner; 4.T beam block; 5. pedestal steel plate; 6. case beam block; 7. bridge formation machine; 8.T type beam; 9. bridge formation machine track; 10. case beam; 11. cap; 12. concrete pillar.
The specific embodiment
The bridge transition cross T-shaped side bar that the utility model provides is installed the rigid support device, its structure as shown in Figure 1, Figure 2, Figure 3 and Figure 4: form by pre-embedded steel slab 1, supporting steel pipe 2, foundation means and installing mechanism.
Described foundation means is made up of concrete pillar 12, cap 11, the pedestal steel plate 5 of structure under the bridge, and wherein: cap 11 rests on the concrete pillar 12.Pedestal steel plate 5 lies in cap 11 ends, and this place must be with sander with the cap surface finish and guarantee that absolute altitude is on same horizontal plane.
Described supporting steel pipe 2 is a spiral steel pipe, and referring to Fig. 1: its lower end is welded on the pedestal steel plate 5; Its upper end is welded on below the pre-embedded steel slab 1, to support the frange plate cage of reinforcement of case beam 10.When vertically placing, this supporting steel pipe guarantees circumference on same horizontal plane, and cuts into groove that fully welding is full with pedestal steel plate 5 with pre-embedded steel slab 1, supporting steel pipe 2 for favourable supporting steel pipe 2 with oxygen welding.This supporting steel pipe is the quarter butt stress system, and its size is generally long 2.5m, diameter phi 500 and wall thickness 5mm.
Described pre-embedded steel slab 1 has two, referring to Fig. 3 and Fig. 4: after treating the 10 frange plate template installations of case beam, on template and in pedestal steel plate 5 vertical position levels, first pre-embedded steel slab is installed, first pre-embedded steel slab put level, guarantee that four footmarks in its bottom surface are high consistent, second pre-embedded steel slab is installed above first pre-embedded steel slab simultaneously, second pre-embedded steel slab is welded on the box beam flange plate cage of reinforcement, and guarantee second pre-embedded steel slab end face level, the absolute altitude of second pre-embedded steel slab is consistent with case beam 10 frange plate end face concrete absolute altitudes, helps the track sleeper and props up the pad level.The bottom of case beam 10 rests on the cap 11.
Described installing mechanism is made up of bridge formation machine 7, bridge formation machine track 9, T type beam 8 (side bar), and is shown in Figure 4 as Fig. 3: bridge formation machine track laterally is placed on the case beam 10, and vertical with the bridge floor center line.Prop up poppet bridge machine track 9 at first pre-embedded steel slab 1 end face with sleeper, make bridge formation machine track 9 keep level, the bridge formation machine 7 T type beam 8 of slinging laterally moves on to case beam limit portion slowly from case beam 10 middle parts, mobile then bridge formation machine overhead traveling crane is traversing in place with T type beam once more, transfer on the T beam support pinner 3, by T beam block 4 location, and temporary fixed.
The utility model is a kind of load-bearing rigid support device that a kind of long-armed frange plate that solves case beam 10 is not subjected to vertical active force; facts have proved: T type beam 8 (side bar) installation processes and the all-the-way tracking that carries out in place are when checking; the long-armed frange plate of not finding case beam 10 occurs rich down; any crack does not appear in this frange plate end face root, and the case beam obtains intact protection.Side bar can be in place, reach and prevent that frame sedan-chair machine from installing the purpose that the anti-bridge formation pusher side of bridge transition cross T-shaped side bar turns over, this device plays good result.

Claims (3)

1. bridge transition cross T-shaped side bar is installed the rigid support device, it is characterized in that this device comprises pre-embedded steel slab (1), supporting steel pipe (2) and foundation means, wherein: foundation means is made up of concrete pillar (12), cap (11), pedestal steel plate (5), cap (11) rests on the concrete pillar (12), and pedestal steel plate (5) lies in cap (11) end; Described supporting steel pipe (2), its lower end are welded on the pedestal steel plate (5), and its upper end is provided with the pre-embedded steel slab (1) that is weldingly connected with it.
2. bridge transition cross T-shaped side bar according to claim 1 is installed the rigid support device, it is characterized in that this device also comprises installing mechanism, this mechanism is made up of bridge formation machine (7), T type beam (8) and bridge formation machine track (9), and wherein: the bottom roller of bridge formation machine (7) and bridge formation machine track (9) are movably connected; Bridge formation machine track (9) laterally is placed on the case beam (10) that links to each other with cap (11) top, and vertical with the bridge floor center line; T type beam (8) is suspended on the track on top of bridge formation machine (7).
3. bridge transition cross T-shaped side bar according to claim 2 is installed the rigid support device, and the bottom of the machine track (9) that it is characterized in that building bridge is provided with to be adjusted this track and keep the sleeper of level to prop up pad, and this sleeper props up the top that pad is positioned at pre-embedded steel slab (1).
CN2010202366109U 2010-06-24 2010-06-24 Rigid supporting device for mounting of bridge transitional span T-shaped edge beam Expired - Fee Related CN201738242U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202366109U CN201738242U (en) 2010-06-24 2010-06-24 Rigid supporting device for mounting of bridge transitional span T-shaped edge beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202366109U CN201738242U (en) 2010-06-24 2010-06-24 Rigid supporting device for mounting of bridge transitional span T-shaped edge beam

Publications (1)

Publication Number Publication Date
CN201738242U true CN201738242U (en) 2011-02-09

Family

ID=43553520

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202366109U Expired - Fee Related CN201738242U (en) 2010-06-24 2010-06-24 Rigid supporting device for mounting of bridge transitional span T-shaped edge beam

Country Status (1)

Country Link
CN (1) CN201738242U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102912739A (en) * 2012-10-16 2013-02-06 中铁十局集团有限公司 Supporting structure for temporary beam pivot below existing bridge cantilever plate
CN103015329A (en) * 2012-12-31 2013-04-03 中铁第四勘察设计院集团有限公司 I-section steel girder reinforcement small box girder structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102912739A (en) * 2012-10-16 2013-02-06 中铁十局集团有限公司 Supporting structure for temporary beam pivot below existing bridge cantilever plate
CN103015329A (en) * 2012-12-31 2013-04-03 中铁第四勘察设计院集团有限公司 I-section steel girder reinforcement small box girder structure

Similar Documents

Publication Publication Date Title
CN101899815B (en) Device for preventing bridging machine from rolling-over in installation process of bridge transition cross T-shaped boundary beam of bridging machine
CN106004885A (en) Light rail assembled type elevated railway station for high intensity area
CN102518034B (en) Bidirectional pre-bent multi-steel-girder and concrete bridge deck combined small box girder bridge structure
CN109881587B (en) Integral installation method of main tower upper cross beam support in strong wind environment
CN201738242U (en) Rigid supporting device for mounting of bridge transitional span T-shaped edge beam
CN101922158A (en) Device and method for integral underpinned vibration isolation of subway underpass building foundation
CN102797223A (en) Construction method for cast-in-place of continuous beam at turnout junction for passenger transport line in seawall area by false work method
CN101649603A (en) 50-meter T-shaped beam prefabricated assembling process
CN205951961U (en) A overhead station of light rail assembled for highly seismic region
CN211141349U (en) Track panel well gantry crane foundation fixing structure
CN111962402A (en) Lateral sliding installation method for steel box girder
CN203766764U (en) Subway platform reinforcing device
CN215629274U (en) Light prefabricated section gate-type pier capping beam structure
CN202099878U (en) Embedded part for evacuation platform of magnetic suspension project
CN213389757U (en) Lateral sliding installation system for steel box girder
CN213867105U (en) Embedded ladder-shaped prefabricated prestressed track slab
CN211117960U (en) Main jacking device for pipe jacking construction
CN204715362U (en) A kind of deep foundation ditch embedded column base bracing frame
CN213539038U (en) Non-embedded type rear tower crane foundation device suitable for building construction
CN212426772U (en) Suspended bracket system for cast-in-place bridge deck of steel plate composite beam
CN211735114U (en) A antidumping reinforced structure for rectangle single-column mound bridge
CN108868277B (en) Reverse construction method installation construction method of metal yield damper
CN216339675U (en) Hole week edge side wall template bearing structure is reserved to subway station medium plate
CN213440250U (en) Precast beam end removes pedestal device
CN213538662U (en) Combined temporary support for box girder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110209

Termination date: 20170624