CN101899815B - Device for preventing bridging machine from rolling-over in installation process of bridge transition cross T-shaped boundary beam of bridging machine - Google Patents

Device for preventing bridging machine from rolling-over in installation process of bridge transition cross T-shaped boundary beam of bridging machine Download PDF

Info

Publication number
CN101899815B
CN101899815B CN2010102087124A CN201010208712A CN101899815B CN 101899815 B CN101899815 B CN 101899815B CN 2010102087124 A CN2010102087124 A CN 2010102087124A CN 201010208712 A CN201010208712 A CN 201010208712A CN 101899815 B CN101899815 B CN 101899815B
Authority
CN
China
Prior art keywords
bridge formation
bridge
steel slab
embedded steel
formation machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010102087124A
Other languages
Chinese (zh)
Other versions
CN101899815A (en
Inventor
李密良
吴宗庆
王春兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN2010102087124A priority Critical patent/CN101899815B/en
Publication of CN101899815A publication Critical patent/CN101899815A/en
Application granted granted Critical
Publication of CN101899815B publication Critical patent/CN101899815B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a device for preventing a bridging machine from rolling-over in the installation process of a bridge transition cross T-shaped boundary beam of the bridging machine. The device comprises a preembedded steel plate (1), a support steel pipe (2) and a base mechanism, wherein the base mechanism comprises a concrete pillar (12), a cap beam (11) and a base steel plate (5); the cap beam (11) is arranged on the concrete pillar (12), and the base steel plate (5) is horizontally arranged at the end part of the cap beam (11); and the lower end of the support steel pipe (2) is welded on the base steel plate (5), and the preembedded steel plate (1) which is welded with the support steel pipe (2) is arranged at the upper end of the support steel pipe (2). The invention has the advantages of simple structure, convenient operation, safety and reliability, low construction cost, and the like.

Description

The bridge formation machine is installed the anti-bridge formation pusher side turning-up devices of bridge transition cross T-shaped side bar
Technical field
The present invention relates to bracing or strutting arrangement, particularly relate to a kind of bridge formation machine the anti-bridge formation pusher side turning-up devices of bridge transition cross T-shaped side bar is installed.
Background technology
In that large bridge is cast-in-place when striding with prefabricated mid-span,, generally be first mounting prefabricated beam plate because the proper supporting device is not provided; Pour into a mould cast-in-situ box girder then; But prestressed reinforcement can only carry out tensioned at one end in this restriction cast-in-situ box girder, surpasses the standard allowable error with two ends simultaneous tension data differences, has a strong impact on case beam stress system; Change over the force structure behind the bridge, reduce bridge application life.
Summary of the invention
Technical problem to be solved by this invention is: provide a kind of when the bridge formation machine is installed side bar; Do not allow box beam flange plate to receive vertical active force and the impaired pusher side that causes building bridge turns over; But bridge formation machine track directly props up a kind of load-bearing rigid support device of pad on pre-embedded steel slab, and this device is installed the anti-bridge formation pusher side turning-up devices of bridge transition cross T-shaped side bar for the bridge formation machine.
The technical scheme that the present invention solves its technical problem employing is: comprise pre-embedded steel slab, supporting steel pipe and foundation means, wherein, pre-embedded steel slab has two; The bottom of case beam rests on the cap, treat the installation of box beam flange plate template after, on template and in pedestal steel plate vertical position level, first pre-embedded steel slab is installed; First pre-embedded steel slab put level; Guarantee that four footmarks in its bottom surface are high consistent, second pre-embedded steel slab is installed above first pre-embedded steel slab simultaneously, second pre-embedded steel slab is welded on the box beam flange plate cage of reinforcement; And guarantee second pre-embedded steel slab end face level, the absolute altitude of second pre-embedded steel slab is consistent with box beam flange plate top surface concrete absolute altitude; Foundation means is made up of concrete pillar, cap, pedestal steel plate, and cap rests on the concrete pillar, and the pedestal steel plate lies in the cap end; Said supporting steel pipe, its lower end are welded on the pedestal steel plate, and its upper end is provided with first pre-embedded steel slab that is weldingly connected with it.
The present invention compared with prior art has following beneficial effect to be:
1. gather materials on the spot, can reuse, construction cost is low, and is pollution-free;
2. simple in structure, dismounting is simple and convenient;
3. required supporting steel pipe is the quarter butt stress system, stablizes, stress deformation is little, safe and reliable, and good effect is played in the protection of box beam flange plate.
Description of drawings
Fig. 1 is the profile that bridge formation machine of the present invention is installed the anti-bridge formation pusher side turning-up devices of bridge transition cross T-shaped side bar.
Fig. 2 is along the vertical view of A-A among Fig. 2.
Fig. 3 is that bridge formation machine of the present invention is installed T type side bar bridge formation machine profile in place.
Fig. 4 is a bridge formation machine of the present invention T type side bar profile in place when T type side bar is installed.
Among the figure: 1. pre-embedded steel slab; 2. supporting steel pipe; 3.T beam support pinner; 4.T beam block; 5. pedestal steel plate; 6. case beam block; 7. bridge formation machine; 8.T type beam; 9. bridge formation machine track; 10. case beam; 11. cap; 12. concrete pillar.
The specific embodiment
Bridge formation machine provided by the invention is installed the anti-bridge formation pusher side turning-up devices of bridge transition cross T-shaped side bar, its structure such as Fig. 1, Fig. 2, Fig. 3 and shown in Figure 4: be made up of pre-embedded steel slab 1, supporting steel pipe 2, foundation means and installing mechanism.
Said foundation means is made up of concrete pillar 12, cap 11, the pedestal steel plate 5 of structure under the bridge, and wherein: cap 11 rests on the concrete pillar 12.Pedestal steel plate 5 lies in cap 11 ends, and this place must be with sander with the cap surface finish and guarantee that absolute altitude is on same horizontal plane.
Said supporting steel pipe 2 is a spiral steel pipe, and referring to Fig. 1: its lower end is welded on the pedestal steel plate 5; Its upper end is welded on below the pre-embedded steel slab 1, to support the frange plate cage of reinforcement of case beam 10.When vertically placing, this supporting steel pipe guarantees circumference on same horizontal plane, and cuts into groove that fully welding is full with pedestal steel plate 5 with pre-embedded steel slab 1, supporting steel pipe 2 for favourable supporting steel pipe 2 with oxygen welding.This supporting steel pipe is the quarter butt stress system, and its size is generally long 2.5m, diameter phi 500 and wall thickness 5mm.
Said pre-embedded steel slab 1 has two; Referring to Fig. 3 and Fig. 4: after treating the 10 frange plate template installations of case beam, on template and in pedestal steel plate 5 vertical position levels, first pre-embedded steel slab is installed, first pre-embedded steel slab put level; Guarantee that four footmarks in its bottom surface are high consistent; Second pre-embedded steel slab is installed above first pre-embedded steel slab simultaneously, and second pre-embedded steel slab is welded on the box beam flange plate cage of reinforcement, and guarantees second pre-embedded steel slab end face level; The absolute altitude of second pre-embedded steel slab is consistent with case beam 10 frange plate end face concrete absolute altitudes, helps the track sleeper and props up the pad level.The bottom of case beam 10 rests on the cap 11.
Said installing mechanism is made up of bridge formation machine 7, bridge formation machine track 9, T type beam 8 (side bar), and is shown in Figure 4 like Fig. 3: bridge formation machine track laterally is placed on the case beam 10, and vertical with the bridge floor center line.Prop up poppet bridge machine track 9 at first pre-embedded steel slab 1 end face with sleeper; Make bridge formation machine track 9 keep level; The bridge formation machine 7 T type beam 8 of slinging laterally moves on to case beam limit portion slowly from case beam 10 middle parts, it is traversing in place with T type beam once more to move bridge formation machine overhead traveling crane then, transfers on the T beam support pinner 3; By T beam block 4 location, and temporary fixed.
The present invention is a kind of load-bearing rigid support device that a kind of long-armed frange plate that solves case beam 10 does not receive vertical active force; Facts have proved: when T type beam 8 (side bar) installation processes and in place are carried out the all-the-way tracking inspection; The long-armed frange plate of not finding case beam 10 occurs rich down; Any crack does not appear in this frange plate end face root, and the case beam obtains intact protection.Can side bar be in place, reach and prevent that the bridge formation machine from installing the purpose that the anti-bridge formation pusher side of bridge transition cross T-shaped side bar turns over, this device plays good result.

Claims (3)

1. a bridge formation machine is installed the anti-bridge formation pusher side turning-up devices of bridge transition cross T-shaped side bar; It is characterized in that this device comprises pre-embedded steel slab (1), supporting steel pipe (2) and foundation means, wherein: pre-embedded steel slab (1) has two, and the bottom of case beam (10) rests on the cap (11); After treating the installation of case beam (10) frange plate template; On template and in pedestal steel plate (5) vertical position level, first pre-embedded steel slab is installed, first pre-embedded steel slab put level, guarantees that four footmarks in its bottom surface are high consistent; Second pre-embedded steel slab is installed above first pre-embedded steel slab simultaneously; Second pre-embedded steel slab is welded on the box beam flange plate cage of reinforcement, and guarantees second pre-embedded steel slab end face level, and the absolute altitude of second pre-embedded steel slab is consistent with case beam (10) frange plate end face concrete absolute altitude; Foundation means is made up of concrete pillar (12), cap (11), pedestal steel plate (5), and cap (11) rests on the concrete pillar (12), and pedestal steel plate (5) lies in cap (11) end; Said supporting steel pipe (2), its lower end are welded on the pedestal steel plate (5), and its upper end is provided with first pre-embedded steel slab that is weldingly connected with it.
2. bridge formation machine according to claim 1 is installed the anti-bridge formation pusher side turning-up devices of bridge transition cross T-shaped side bar; It is characterized in that this device also comprises installing mechanism; This installing mechanism is made up of bridge formation machine (7), T type side bar (8) and bridge formation machine track (9), and wherein: the bottom roller of bridge formation machine (7) and bridge formation machine track (9) are movably connected; Bridge formation machine track (9) laterally is placed on the case beam (10) that links to each other with cap (11) top, and vertical with the bridge floor center line; T type side bar (8) is suspended on the track on top of bridge formation machine (7).
3. bridge formation machine according to claim 2 is installed the anti-bridge formation pusher side turning-up devices of bridge transition cross T-shaped side bar; It is characterized in that the building bridge bottom of machine track (9) is provided with this track of adjustment and keeps the sleeper of level to prop up pad, and this sleeper props up the top that pad is positioned at pre-embedded steel slab (1).
CN2010102087124A 2010-06-24 2010-06-24 Device for preventing bridging machine from rolling-over in installation process of bridge transition cross T-shaped boundary beam of bridging machine Expired - Fee Related CN101899815B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102087124A CN101899815B (en) 2010-06-24 2010-06-24 Device for preventing bridging machine from rolling-over in installation process of bridge transition cross T-shaped boundary beam of bridging machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102087124A CN101899815B (en) 2010-06-24 2010-06-24 Device for preventing bridging machine from rolling-over in installation process of bridge transition cross T-shaped boundary beam of bridging machine

Publications (2)

Publication Number Publication Date
CN101899815A CN101899815A (en) 2010-12-01
CN101899815B true CN101899815B (en) 2012-01-25

Family

ID=43225702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102087124A Expired - Fee Related CN101899815B (en) 2010-06-24 2010-06-24 Device for preventing bridging machine from rolling-over in installation process of bridge transition cross T-shaped boundary beam of bridging machine

Country Status (1)

Country Link
CN (1) CN101899815B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243640B (en) * 2013-06-03 2015-07-08 中铁上海工程局集团有限公司 Cap beam efficient, convenient and quick to construct and construction method thereof
CN105484161A (en) * 2015-12-14 2016-04-13 中铁十九局集团第二工程有限公司 Method for constructing cast-in-place panel of T-shaped beam by using steel template
CN110983948A (en) * 2019-10-31 2020-04-10 上海市政工程设计研究总院(集团)有限公司 Pier capping beam capable of preventing beam body from overturning and using method thereof
CN113403956B (en) * 2021-07-02 2022-09-30 中铁七局集团郑州工程有限公司 Method for erecting end-span trimming beam at point where high-speed railway platform line merges into turnout beam

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4131214A1 (en) * 1991-09-19 1993-03-25 Gernot Wolperding Frame for multi-span deck bridge - has transverse girders formed as bridge bearing beams, supported on piers
CN201240314Y (en) * 2008-06-13 2009-05-20 杭州专用汽车有限公司 Bridge detection vehicle

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4719625B2 (en) * 2006-06-06 2011-07-06 ショーボンド建設株式会社 Installation method of bridge fall prevention device
JP2008285981A (en) * 2007-05-21 2008-11-27 Matsuoka Chiteki Shoyuken Jimusho:Kk Separating and removing method of bridge girder

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4131214A1 (en) * 1991-09-19 1993-03-25 Gernot Wolperding Frame for multi-span deck bridge - has transverse girders formed as bridge bearing beams, supported on piers
CN201240314Y (en) * 2008-06-13 2009-05-20 杭州专用汽车有限公司 Bridge detection vehicle

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP特开2007-327180A 2007.12.20
JP特开2008-285981A 2008.11.27

Also Published As

Publication number Publication date
CN101899815A (en) 2010-12-01

Similar Documents

Publication Publication Date Title
CN101575911B (en) Top-down decreasing-formwork formwork system and construction method
US20180148896A1 (en) Support for a panel of a section of guided transport track
JP2009057685A (en) Movable suspension support
CN103437300A (en) Construction method for erecting double cantilevers for pier top steel beam without pier-side bracket
CN101899815B (en) Device for preventing bridging machine from rolling-over in installation process of bridge transition cross T-shaped boundary beam of bridging machine
WO2011120186A1 (en) Track system for magnetic suspension passenger traffic line
CN102518034B (en) Bidirectional pre-bent multi-steel-girder and concrete bridge deck combined small box girder bridge structure
CN102720137A (en) Prefabrication construction method for trough girder sections of track traffic high-level bridge
CN105803924A (en) Simply supported T beam sidewalk combination structure and combination method of mixed passenger and freight railway
CN110725324A (en) Shear wall high-limb guide wall conversion supporting structure and construction method thereof
CN113216014B (en) Construction method of viaduct slope-adjusting elevated-connection jacking structure
CN102797223A (en) Construction method for cast-in-place of continuous beam at turnout junction for passenger transport line in seawall area by false work method
CN201738242U (en) Rigid supporting device for mounting of bridge transitional span T-shaped edge beam
CN101649603A (en) 50-meter T-shaped beam prefabricated assembling process
CN111962402A (en) Lateral sliding installation method for steel box girder
CN203766764U (en) Subway platform reinforcing device
JP2002194704A (en) Method for constructing girder
CN202099878U (en) Embedded part for evacuation platform of magnetic suspension project
CN213389757U (en) Lateral sliding installation system for steel box girder
CN204715362U (en) A kind of deep foundation ditch embedded column base bracing frame
KR101302045B1 (en) Improved rail road bridge remodeling structure and construction method thereof
CN111395154A (en) Be used for bridge rubber support installation positioner
CN111041989A (en) Rapid installation method of prefabricated assembled bridge
CN216339675U (en) Hole week edge side wall template bearing structure is reserved to subway station medium plate
CN106480793B (en) A kind of prefabricated floating plate ballast construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA FIRST METALLURGICAL CONSTRUCTION GROUP CORPO

Free format text: FORMER OWNER: WUHAN CFMCGC TRAFFIC ENGINEERING CO., LTD.

Effective date: 20101210

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20101210

Address after: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3

Applicant after: China First Metallurgical Group Co., Ltd.

Address before: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3

Applicant before: Wuhan First Metallurgical Communication Engineering Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120125

Termination date: 20200624