CN201695657U - 踏步式逆作坑内挖土平台 - Google Patents

踏步式逆作坑内挖土平台 Download PDF

Info

Publication number
CN201695657U
CN201695657U CN2010201677308U CN201020167730U CN201695657U CN 201695657 U CN201695657 U CN 201695657U CN 2010201677308 U CN2010201677308 U CN 2010201677308U CN 201020167730 U CN201020167730 U CN 201020167730U CN 201695657 U CN201695657 U CN 201695657U
Authority
CN
China
Prior art keywords
platform
excavation
contrary
shoveling
doing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201677308U
Other languages
English (en)
Inventor
周臻全
黄玉林
姜峰
张海荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai First Construction Co Ltd
Original Assignee
Shanghai First Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai First Construction Co Ltd filed Critical Shanghai First Construction Co Ltd
Priority to CN2010201677308U priority Critical patent/CN201695657U/zh
Application granted granted Critical
Publication of CN201695657U publication Critical patent/CN201695657U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本实用新型公开了一种踏步式逆作坑内挖土平台,其设置在逆作基坑内,周边逆作结构梁板自上而下逐层加大,呈踏步式结构,其特征在于,所述挖土平台可与同层逆作梁板结构相连,所述挖土平台包括平台和加固装置,所述平台为逆作地下室楼板结构,地下室楼板结构下设有若干格构立柱,所述加固装置设置于格构立柱与平台之间。本实用新型利用地下室楼板结构,并采取相应的加固措施,以形成坑内就近挖土的操作平台,与同层逆作结构相连,可实现土方机械直接进入坑内。采用本实用新型可以提高土方开挖施工效率,出土速度达到常规逆作施工的2倍以上。

Description

踏步式逆作坑内挖土平台
技术领域
本实用新型涉及建筑地下工程施工技术领域,特别是一种用于踏步式逆作施工的挖土平台,具体地说是一种踏步式逆作坑内坑内挖土平台。
背景技术
当前基坑工程逆作挖土多为坑下小挖机水平驳运至出土口或基坑边,再由地面上的长臂挖机或抓斗挖除,这种挖土方式的问题在于土方经由坑下挖出至地面的过程中驳运次数过多,施工机械损耗较大,以致挖土效率低下,在超大型基坑工程逆作施工中表现尤为明显。
发明内容
本实用新型所要解决的技术问题是提供一种可以减少土方驳运次数和施工机械损耗、提高挖土施工工效的踏步式逆作坑内挖土平台,以克服现有技术存在的上述缺陷。
本实用新型解决技术问题的技术方案如下:
一种踏步式逆作坑内挖土平台,其设置在逆作基坑内,周边逆作结构梁板自上而下逐层加大,呈踏步式结构,其特征在于,所述挖土平台可与同层逆作梁板结构相连,所述挖土平台包括平台和加固装置,所述平台为逆作地下室楼板结构,地下室楼板结构下设有若干格构立柱,所述加固装置设置于格构立柱与平台之间。
由以上公开的技术方案可知,本实用新型踏步式逆作坑内挖土平台是在周边逆作结构自上而下逐层增加的形式下,利用地下室楼板结构,并采取相应的加固措施,以形成坑内就近挖土的操作平台,与同层逆作结构相连,可实现土方机械直接进入坑内。从而提供挖土机械就近取土的作业面。采用本实用新型可以提高土方开挖施工效率,出土速度达到常规逆作施工的2倍以上。
附图说明
图1为本实用新型坑内挖土平台结构示意图。
图2为本实用新型坑内挖土平台加固装置结构示意图。
图3为本实用新型坑内挖土平台锚固钢筋平面结构示意图。
图4为图3锚固钢筋立面结构示意图。
具体实施方式
下面结合附图进一步说明本实用新型。
如图1和图2所示,本实用新型踏步式逆作坑内挖土平台,其设置在逆作基坑内,周边逆作结构梁板2自上而下逐层加大,呈踏步式结构,其特征在于,所述挖土平台1可与同层逆作梁板结构相连,所述挖土平台包括平台3和加固装置4,所述平台3为逆作地下室楼板结构,地下室楼板结构下设有若干格构立柱5,所述加固装置4设置于格构立柱5与平台3之间。
如图2~4所示,所述加固装置4包括设置于平台下格构立柱之间的纵向剪力撑41、横向剪力撑42、锚固钢筋43和连接缀板44,所述纵向剪力撑41和横向剪力撑42均为槽钢剪力撑;所述锚固钢筋43一端焊接与格构立柱端部,另一端锚入平台中;所述连接缀板44连接于平台下两相邻格构立柱5之间。

Claims (3)

1.一种踏步式逆作坑内挖土平台,其设置在逆作基坑内,周边逆作结构梁板(2)自上而下逐层加大,呈踏步式结构,其特征在于,所述挖土平台(1)可与同层逆作梁板结构相连,所述挖土平台包括平台(3)和加固装置(4),所述平台(3)为逆作地下室楼板结构,地下室楼板结构下设有若干格构立柱(5),所述加固装置(4)设置于格构立柱(5)与平台(3)之间。
2.根据权利要求1所述的踏步式逆作坑内挖土平台,其特征在于,所述加固装置(4)包括设置于平台下格构立柱之间的纵向剪力撑(41)、横向剪力撑(42)、锚固钢筋(43)和连接缀板(44),所述锚固钢筋(43)一端焊接与格构立柱端部,另一端锚入平台中;所述连接缀板(44)连接于平台下两相邻格构立柱(5)之间。
3.根据权利要求1所述的踏步式逆作坑内挖土平台,其特征在于,所述纵向剪力撑(41)和横向剪力撑(42)均为槽钢剪力撑。
CN2010201677308U 2010-04-22 2010-04-22 踏步式逆作坑内挖土平台 Expired - Fee Related CN201695657U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201677308U CN201695657U (zh) 2010-04-22 2010-04-22 踏步式逆作坑内挖土平台

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201677308U CN201695657U (zh) 2010-04-22 2010-04-22 踏步式逆作坑内挖土平台

Publications (1)

Publication Number Publication Date
CN201695657U true CN201695657U (zh) 2011-01-05

Family

ID=43396896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201677308U Expired - Fee Related CN201695657U (zh) 2010-04-22 2010-04-22 踏步式逆作坑内挖土平台

Country Status (1)

Country Link
CN (1) CN201695657U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102747737A (zh) * 2012-06-21 2012-10-24 华丰建设股份有限公司 基坑结构的出土平台及其施工方法
CN102758441A (zh) * 2011-04-23 2012-10-31 中国建筑第四工程局有限公司 一种逆作条件下深基坑平台接力出土方法及结构
CN112938688A (zh) * 2020-12-24 2021-06-11 上海建工二建集团有限公司 用于逆作取土口的垂直升降装置及其安装方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102758441A (zh) * 2011-04-23 2012-10-31 中国建筑第四工程局有限公司 一种逆作条件下深基坑平台接力出土方法及结构
CN102747737A (zh) * 2012-06-21 2012-10-24 华丰建设股份有限公司 基坑结构的出土平台及其施工方法
CN102747737B (zh) * 2012-06-21 2015-02-11 华丰建设股份有限公司 基坑结构的出土平台及其施工方法
CN112938688A (zh) * 2020-12-24 2021-06-11 上海建工二建集团有限公司 用于逆作取土口的垂直升降装置及其安装方法

Similar Documents

Publication Publication Date Title
CN106088650B (zh) 一种适用于砖混结构建筑物地下增层的方法及建筑物
CN105863287A (zh) 框架结构建筑物顶升增层和隔震方法
CN108867723B (zh) 框架结构建筑物纠倾并地下增层的方法
CN106245927A (zh) 一种适用于框架结构建筑物地下增层的方法及建筑物
CN1288308C (zh) 一种在运营隧道上方进行深大基坑施工的方法及防变形结构
WO2018133746A1 (zh) 一种由桩和墙组成的地下建筑物及其施工法
CN110468873B (zh) 一种小空间下桥台桩基托换结构及使用方法
CN201695657U (zh) 踏步式逆作坑内挖土平台
CN110593266B (zh) 一种重载通行条件下的基坑坡道加强支护结构施工方法
CN110158609B (zh) 一种基坑内钢筋混凝土支撑梁的机械化破碎拆除方法
CN113417300B (zh) 边坡支护系统及其施工方法
CN205024712U (zh) 一种组合式塔吊基础
KR101187170B1 (ko) 마이크로파일로 전달하는 경사기둥과 기초부 연장 기둥을 라멘골조로 이용한 수직하향증축 시공방법
CN201695398U (zh) 踏步式逆作下坑挖土栈桥
CN101949215A (zh) 钢结构支座安装施工方法
CN204590059U (zh) 一种复合式塔吊基础结构
CN206769047U (zh) 一种钢格构柱与灌注桩连接结构
CN109025349B (zh) 砖混结构建筑物纠倾并地下增层的方法
CN203782738U (zh) 预制式通信基站基础
KR101310677B1 (ko) 레이커 및 합벽 선시공을 이용한 경사대지에서의 역타공법
CN111894036B (zh) 一种条形基础建筑物增设地下室的施工方法
CN103215965A (zh) 层板式高桩承台塔吊基础结构及施工方法
CN114215106A (zh) 上部钢结构全逆作法的多桩托柱结构及施工方法
KR100615149B1 (ko) 콘크리트 지상구조물의 역타설공법
CN208088311U (zh) 桩后反压减弯型桩板支护结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110105

Termination date: 20110422