CN102758441A - 一种逆作条件下深基坑平台接力出土方法及结构 - Google Patents

一种逆作条件下深基坑平台接力出土方法及结构 Download PDF

Info

Publication number
CN102758441A
CN102758441A CN2011101023079A CN201110102307A CN102758441A CN 102758441 A CN102758441 A CN 102758441A CN 2011101023079 A CN2011101023079 A CN 2011101023079A CN 201110102307 A CN201110102307 A CN 201110102307A CN 102758441 A CN102758441 A CN 102758441A
Authority
CN
China
Prior art keywords
platform
earth
deep foundation
foundation ditch
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101023079A
Other languages
English (en)
Inventor
张明
兰永基
张家国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN2011101023079A priority Critical patent/CN102758441A/zh
Publication of CN102758441A publication Critical patent/CN102758441A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种逆作条件下深基坑平台接力出土方法及结构,本发明从深基坑的出土面开始、通过出土面上的挖掘机将出土面的土石方转送至上一层转土平台上,然后由该层转土平台上方的停机平台上的挖掘机将该层转土平台上的土石方转送至上一层的转土平台上;再由该上一层转土平台上方的挖掘机将该上一层转土平台上的土石方转送至再上一层的转土平台上,如此类推,直到设在深基坑顶面的挖掘机将最上一层转土平台的土石方转送到深基坑顶面上的运输土石方车上,最后由运输土石方车将土石方运输到指定卸土点即成。本发明具有施工简单、出土成本低、使用安全、高效、快捷等优点。

Description

一种逆作条件下深基坑平台接力出土方法及结构
技术领域
本发明涉及一种逆作条件下深基坑平台接力出土方法及结构,属于建筑地基施工技术领域。
背景技术
当今城市建设及旧城改造工程建设速度越来越快,但施工用场地也越来越小,逆作法施工技术渐渐成为超深基坑的施工的选项。但逆作法施工最关键在于土方暗挖及出土技术,现阶段暗挖多采用履带式抓斗取土,提土设备出土或利用原车道到取土面等方式出土,这些出土方式主要存在着对结构施工影响较大的问题,并存在着出土不稳定、工效低和成本较高等问题。因此,现有的逆作条件下深基坑的出土方式还是不够理想。
发明内容
本发明的目的是:提供一种对结构施工影响较小、出土施工稳定、工效较高并且成本较低的逆作条件下深基坑平台接力出土方法及结构,以克服现有技术的不足。
本发明的是这样实现的:本发明的一种逆作条件下深基坑平台接力出土方法包括采用现有的逆作法制作深基坑的方法,本发明的出土方法是从深基坑顶面到出土面在深基坑内的不同高度位置上设置2~8个转土平台,并且将转土平台按台阶形式分布,在每两个转土平台之间设置一个停机平台,并且在深基坑顶面、出土面及每个停机平台上都配置一台挖掘机;从出土面开始、通过出土面上的挖掘机将出土面的土石方转送至上一层转土平台上,然后由该层转土平台上方的停机平台上的挖掘机将该层转土平台上的土石方转送至上一层的转土平台上;再由该上一层转土平台上方的挖掘机将该上一层转土平台上的土石方转送至再上一层的转土平台上,如此类推,直到设在深基坑顶面的挖掘机将最上一层转土平台的土石方转送到深基坑顶面上的运输土石方车上,最后由运输土石方车将土石方运输到指定卸土点即成。
根据上述方法制作的本发明的一种逆作条件下深基坑平台接力出土结构为:该结构包括通过逆作法制作的深基坑,在深基坑内的不同高度位置上设置有2~8个转土平台,在每两个转土平台之间设置有一个停机平台,并且在深基坑顶面、出土面及每个停机平台上都设有一台挖掘机。
上述转土平台为钢筋混凝土板式结构或钢板结构。
上述停机平台为土堆式平台结构。
在土堆式的停机平台的表面上覆盖有一层混凝土加强板。
由于采用了上述技术方案,本发明通过在深基坑内的不同高度位置上设置转土平台和停机平台,这样即可通过多台挖掘机采用接力的方式将深基坑内出土面的土石方输送到深基坑的顶面上,最后再由运输土石方车将土石方运输到指定卸土点。本发明与现有技术比较,本发明的施工技术相对较简单、出土成本低,可以安全、高效、快捷出土,有效的保证了施工工期及逆作法施工的顺利进行;并且本发明对整个建筑结构的施工影响小,其出土施工工作能够稳定地进行。本发明特别适用于所有逆作及暗挖工程,如民用建筑地下室逆作、地铁、地下空间暗挖工程等,特别适合于施工场地狭窄、复杂的施工条件下使用。
附图说明
图1为本发明的结构示意图。
附图标记说明:1-转土平台,2-挖掘机,3-停机平台、4-土石方。
具体实施方式
下面,结合附图和实施例对本发明作进一步的详细说明。
本发明的实施例:先按本发明的一种逆作条件下深基坑平台接力出土结构进行施工,该结构包括通过逆作法制作的深基坑,实施时,在深基坑内的不同高度位置上设置有2~8个转土平台1,转土平台1的设置数量可根据实际使用的需要进行设置,将每两个转土平台1之间的高度间隔距离控制15~30米之间,转土平台1可制作成钢筋混凝土板式的结构或搭建成钢板结构的平台;然后在每两个转土平台1之间设置有一个停机平台3,停机平台3可根据现场条件制作成土堆式的平台结构,如果土堆式的平台结构的强度不够的话,可在土堆式的停机平台3的表面上在浇筑覆盖一层厚度为150~200毫米厚的采用c25素混凝土浇筑的加固混凝土加强板即可;然后在深基坑顶面、出土面及每个停机平台3上都设置一台挖掘机2。当施工完本发明的结构后,即可按本发明的一种逆作条件下深基坑平台接力出土方法进行出土施工,即从出土面开始、通过出土面上的挖掘机2将出土面的土石方4转送至上一层转土平台1上,然后由该层转土平台1上方的停机平台3上的挖掘机2将该层转土平台1上的土石方转送至上一层的转土平台1上;再由该上一层转土平台1上方的挖掘机2将该上一层转土平台1上的土石方转送至再上一层的转土平台1上,如此类推,直到设在深基坑顶面的挖掘机2将最上一层转土平台1的土石方转送到深基坑顶面上的运输土石方车上,最后由运输土石方车将土石方运输到指定卸土点即成。

Claims (5)

1.一种逆作条件下深基坑平台接力出土方法,包括采用逆作法制作深基坑的方法,其特征在于:从深基坑顶面到出土面在深基坑内的不同高度位置上设置2~8个转土平台(1),并且将转土平台(1)按台阶形式分布,在每两个转土平台(1)之间设置一个停机平台(3),并且在深基坑顶面、出土面及每个停机平台(3)上都配置一台挖掘机(2);从出土面开始、通过出土面上的挖掘机(2)将出土面的土石方(4)转送至上一层转土平台(1)上,然后由该层转土平台(1)上方的停机平台(3)上的挖掘机(2)将该层转土平台(1)上的土石方转送至上一层的转土平台(1)上;再由该上一层转土平台(1)上方的挖掘机(2)将该上一层转土平台(1)上的土石方转送至再上一层的转土平台(1)上,如此类推,直到设在深基坑顶面的挖掘机(2)将最上一层转土平台(1)的土石方转送到深基坑顶面上的运输土石方车上,最后由运输土石方车将土石方运输到指定卸土点即成。
2.一种逆作条件下深基坑平台接力出土结构,包括通过逆作法制作的深基坑,其特征在于:在深基坑内的不同高度位置上设置有2~8个转土平台(1),在每两个转土平台(1)之间设置有一个停机平台(3),并且在深基坑顶面、出土面及每个停机平台(3)上都设有一台挖掘机(2)。
3.根据权利要求2所述的逆作条件下深基坑平台接力出土结构,其特征在于:转土平台(1)为钢筋混凝土板式结构或钢板结构。
4.根据权利要求2所述的逆作条件下深基坑平台接力出土结构,其特征在于:停机平台(3)为土堆式平台结构。
5.根据权利要求4所述的逆作条件下深基坑平台接力出土结构,其特征在于:在土堆式的停机平台(3)的表面上覆盖有一层混凝土加强板。
CN2011101023079A 2011-04-23 2011-04-23 一种逆作条件下深基坑平台接力出土方法及结构 Pending CN102758441A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101023079A CN102758441A (zh) 2011-04-23 2011-04-23 一种逆作条件下深基坑平台接力出土方法及结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101023079A CN102758441A (zh) 2011-04-23 2011-04-23 一种逆作条件下深基坑平台接力出土方法及结构

Publications (1)

Publication Number Publication Date
CN102758441A true CN102758441A (zh) 2012-10-31

Family

ID=47053074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101023079A Pending CN102758441A (zh) 2011-04-23 2011-04-23 一种逆作条件下深基坑平台接力出土方法及结构

Country Status (1)

Country Link
CN (1) CN102758441A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131565A (zh) * 2014-06-18 2014-11-05 中国建筑第四工程局有限公司 一种逆作土方正作开挖的施工方法
CN104695445A (zh) * 2015-01-21 2015-06-10 中国建筑第八工程局有限公司 地下室逆作法土方开挖方法
CN104790406A (zh) * 2015-03-26 2015-07-22 中国建筑第八工程局有限公司 地下室逆作工程土方水平倒运方法
CN105064264A (zh) * 2015-08-11 2015-11-18 赵金龙 一套超大规模水利工程及其建设技术
CN106013165A (zh) * 2016-06-23 2016-10-12 程华清 一种集装箱组合式基坑出土方法
CN110924399A (zh) * 2019-11-11 2020-03-27 中国电建集团华东勘测设计研究院有限公司 一种深基坑土方开挖方法
CN113293766A (zh) * 2021-03-30 2021-08-24 内蒙古科技大学 大型盖挖逆作t型换乘地铁车站综合土方开挖方法
CN115198794A (zh) * 2022-07-19 2022-10-18 中铁建工集团有限公司 基于盖挖逆作法深基坑工程的钢管柱分节逆向施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2576340B1 (fr) * 1985-01-18 1987-04-24 Fel Jean Louis Procede de construction de cavites au-dessous de locaux existants, ainsi que les moyens et le materiau pour la mise en oeuvre du procede
CN1978794A (zh) * 2005-12-02 2007-06-13 上海市第七建筑有限公司 大开口逆作法开挖技术
CN101713191A (zh) * 2009-10-23 2010-05-26 广东省基础工程公司 一种用于基坑深层土方开挖的装置及方法
CN101775821A (zh) * 2009-12-10 2010-07-14 中国建筑一局(集团)有限公司 逆作法施工土方垂直运输装置及方法
CN201695657U (zh) * 2010-04-22 2011-01-05 上海市第一建筑有限公司 踏步式逆作坑内挖土平台
CN202023195U (zh) * 2011-04-23 2011-11-02 中国建筑第四工程局有限公司 一种逆作条件下深基坑平台接力出土结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2576340B1 (fr) * 1985-01-18 1987-04-24 Fel Jean Louis Procede de construction de cavites au-dessous de locaux existants, ainsi que les moyens et le materiau pour la mise en oeuvre du procede
CN1978794A (zh) * 2005-12-02 2007-06-13 上海市第七建筑有限公司 大开口逆作法开挖技术
CN101713191A (zh) * 2009-10-23 2010-05-26 广东省基础工程公司 一种用于基坑深层土方开挖的装置及方法
CN101775821A (zh) * 2009-12-10 2010-07-14 中国建筑一局(集团)有限公司 逆作法施工土方垂直运输装置及方法
CN201695657U (zh) * 2010-04-22 2011-01-05 上海市第一建筑有限公司 踏步式逆作坑内挖土平台
CN202023195U (zh) * 2011-04-23 2011-11-02 中国建筑第四工程局有限公司 一种逆作条件下深基坑平台接力出土结构

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
周臻全: "中心顺作—周边踏步式逆作施工工艺及关键技术", 《岩土工程学报》 *
徐至钧等: "《逆作法设计与施工》", 30 April 2002 *
陈学光等: "软土地区深基坑逆作法土方组合开挖施工技术", 《建筑施工》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131565A (zh) * 2014-06-18 2014-11-05 中国建筑第四工程局有限公司 一种逆作土方正作开挖的施工方法
CN104131565B (zh) * 2014-06-18 2016-06-22 中国建筑第四工程局有限公司 一种逆作土方正作开挖的施工方法
CN104695445A (zh) * 2015-01-21 2015-06-10 中国建筑第八工程局有限公司 地下室逆作法土方开挖方法
CN104790406A (zh) * 2015-03-26 2015-07-22 中国建筑第八工程局有限公司 地下室逆作工程土方水平倒运方法
CN105064264A (zh) * 2015-08-11 2015-11-18 赵金龙 一套超大规模水利工程及其建设技术
CN106013165A (zh) * 2016-06-23 2016-10-12 程华清 一种集装箱组合式基坑出土方法
CN110924399A (zh) * 2019-11-11 2020-03-27 中国电建集团华东勘测设计研究院有限公司 一种深基坑土方开挖方法
CN113293766A (zh) * 2021-03-30 2021-08-24 内蒙古科技大学 大型盖挖逆作t型换乘地铁车站综合土方开挖方法
CN113293766B (zh) * 2021-03-30 2022-12-30 内蒙古科技大学 大型盖挖逆作t型换乘地铁车站综合土方开挖方法
CN115198794A (zh) * 2022-07-19 2022-10-18 中铁建工集团有限公司 基于盖挖逆作法深基坑工程的钢管柱分节逆向施工方法
CN115198794B (zh) * 2022-07-19 2023-09-05 中铁建工集团有限公司 基于盖挖逆作法深基坑工程的钢管柱分节逆向施工方法

Similar Documents

Publication Publication Date Title
CN102758441A (zh) 一种逆作条件下深基坑平台接力出土方法及结构
CN102127974B (zh) 既有建筑下方新增地下室的设计和施工方法
CN103874803B (zh) 用于建造结构的方法,尤其是建造运营铁路或类似物下通道的方法
CN100443672C (zh) 桩基的地下托换方法
CN105756091B (zh) 一种控制邻近建筑物变形的地铁车站基坑施工方法
CN104131565B (zh) 一种逆作土方正作开挖的施工方法
CN102306225A (zh) 多线叠交隧道施工过程及对隧道变形影响数值模拟方法
CN102635119A (zh) 一种用于旋流井施工的支护方法
CN108755698B (zh) 一种陡坡松散堆积体大倾斜岩面基础施工方法
CN106245652B (zh) 一种临江深基坑土方开挖的施工方法
CN104234082A (zh) 深基坑跃层逆作施工方法
CN202273169U (zh) 栈桥
Zhang et al. Performance of constructing a double-deck subway station by combining the shield method and cavern–pile method
CN203716046U (zh) 一种基坑土方运输钢栈桥
CN109898556A (zh) 一种地下综合管廊结构及下沉式施工方法
CN203742622U (zh) 一种构建承载结构的防渗组件
CN202023195U (zh) 一种逆作条件下深基坑平台接力出土结构
CN201495571U (zh) 逆作法地下暗挖工程专用提土设备
CN106241234A (zh) 一种用于预制综合管廊的自行式运输拼装车
CN109797717A (zh) 一种河道上穿即有地铁隧道的施工方法
CN106988345A (zh) 一种逆作法施工基坑的开挖方法
CN207998850U (zh) 一种临江临海基坑土方水力冲挖系统
CN202451974U (zh) 一种埋地管道抗浮结构
CN101205723A (zh) 管线不搬迁前提下地下建筑出入口施工方法
CN103938640B (zh) 搭设钢平台进行陆上桥梁基础施工工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121031