CN201671311U - Elevator shaft inside construction protecting rack - Google Patents

Elevator shaft inside construction protecting rack Download PDF

Info

Publication number
CN201671311U
CN201671311U CN2010202064433U CN201020206443U CN201671311U CN 201671311 U CN201671311 U CN 201671311U CN 2010202064433 U CN2010202064433 U CN 2010202064433U CN 201020206443 U CN201020206443 U CN 201020206443U CN 201671311 U CN201671311 U CN 201671311U
Authority
CN
China
Prior art keywords
elevator shaft
fulcrum bar
horizontal
long fulcrum
shaft inside
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202064433U
Other languages
Chinese (zh)
Inventor
牟培超
刘广文
苏强
董桂花
张毅
刘兵
闫培明
刘欣
王玉春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong urban construction vocational college
Original Assignee
Shandong urban construction vocational college
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong urban construction vocational college filed Critical Shandong urban construction vocational college
Priority to CN2010202064433U priority Critical patent/CN201671311U/en
Application granted granted Critical
Publication of CN201671311U publication Critical patent/CN201671311U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

An elevator shaft inside construction protecting rack mainly resolves problems of building construction safety and comprises long supporting poles, short supporting poles, horizontal beams and a horizontal panel. The bottom end of each short supporting pole is hinged with the middle of each long supporting pole, top ends of the short supporting poles and the long supporting poles are respectively hinged with two ends of each horizontal beam, the two sets of the long supporting poles, the short supporting poles and the horizontal beams are disposed under the horizontal panel in parallel, and the horizontal panel is fixed on the two horizontal beams. The elevator shaft inside construction protecting rack is hoisted via a tower crane, is convenient for assembling and disassembling without workers and occupies little elevator shaft inside space, and further, other operations can be performed inside the elevator shaft simultaneously. In addition, the elevator shaft inside construction protecting rack is safe and reliable in use, simple in structure and easy to be manufactured.

Description

Construction protection frame in a kind of elevator shaft
Technical field
The utility model relates to the construction of lift well protector, specifically is construction protective frame in a kind of elevator shaft.
Background technology
Elevator shaft is one of position of the easiest generation high falling security incident in the building operations.In order to prevent the generation of high falling accident, general steel tube fastener formula scaffold building four pipe holders, the mode of which floor completely spreading scaffold floor above every of adopting in traditional elevator shaft.This protection mode needs special scaffolder to build a framework, and sets up and remove all cumbersome, owing to shelf is arranged in elevator shaft, can't carry out the elevator installation work in the well.
The utility model content
In order to overcome the shortcoming that above-mentioned prior art exists, the purpose of this utility model is to provide construction protection frame in a kind of elevator shaft, and it is taken and tears open all easily, and it is few to take in the elevator shaft space, makes in the elevator shaft and can carry out other operations simultaneously.
For addressing the above problem, the utility model by the following technical solutions: construction protection frame in this elevator shaft comprises long fulcrum bar, short strut, horizontal beam, horizontal panel; The bottom of described short strut and the middle part of described long fulcrum bar are hinged, and the top of described short strut, long fulcrum bar is hinged with the two ends of described horizontal beam respectively; Described long fulcrum bar, short strut, horizontal beam are provided with two covers and are set in parallel in the below of described horizontal panel; Described horizontal panel is fixed on two horizontal beams.
During use, construct at second floor as the constructor, the bottom of described long fulcrum bar is against the elevator shaft door opening place of Stall.Described horizontal panel is positioned at the elevator shaft door opening place of second floor, and concordant with the ground of second floor, the horizontal panel rear side withstands on the hoistway wall, and the constructor can not fall when second floor is constructed like this.Construction finishes as second floor, need directly should protect frame integral hoisting with tower crane in the construction of the 3rd buildings.Promote the bottom of long fulcrum bar before promoting, because between long fulcrum bar and the short strut and between long fulcrum bar and the horizontal beam, be between short strut and the horizontal beam hinged, so the whole protection frame can fold, the bottom of long fulcrum bar breaks away from Stall elevator shaft door opening place, thereby can overslaugh not promote.Make the bottom of long fulcrum bar be against the elevator shaft door opening place of second floor again, horizontal panel gets final product with the ground in the 3rd buildings is concordant.
As further technical scheme of the present utility model:
The bottom of described long fulcrum bar is provided with the gripping mechanism that cooperates with edge, elevator shaft door opening place, this gripping mechanism is stuck on the edge at elevator shaft door opening place, safety and reliability can avoid the bottom of long fulcrum bar directly to be against slide and cause on the ground, elevator shaft door opening place dangerous.
Further: described gripping mechanism forms by two boards is crossing, intersects the angle that forms and is stuck on the edge, elevator door opening place, realizes reliably chucking.
Further: described two boards intersects vertically, can with the edge close fit at elevator shaft door opening place, safety is better and be convenient to make.
Another kind of scheme: in the construction protection frame, described gripping mechanism is a draw-in groove of opening in the long fulcrum bar bottom in this elevator shaft, and this draw-in groove also can directly be stuck on the edge, elevator door opening place, realizes reliably chucking.
The beneficial effects of the utility model are: it adopts tower crane to promote, and takes and tears open conveniently, does not need the scaffolder to operate, and it is few to take the interior space of elevator shaft, makes in the well and can carry out other operations simultaneously.And safe and reliable, simple in structure, make easily.
Description of drawings
Below in conjunction with drawings and Examples the utility model is described further:
Fig. 1 is the structural representation of the utility model embodiment,
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the user mode reference diagram of the utility model embodiment,
Fig. 4 is the A-A sectional view of Fig. 1;
Among the figure: 1 long fulcrum bar, 2 short struts, 3 flexibly connect pin, 4 horizontal beams, 5 horizontal panels, the elevator shaft door opening of 6 Stalls, 7 hoistway wall, the elevator shaft door opening of 8 second floors, 9 gripping mechanisms.
The specific embodiment
As shown in Figure 1 and Figure 2, the construction protection frame comprises long fulcrum bar 1, short strut 2, horizontal beam 4, horizontal panel 5 in this elevator shaft; The middle part of the bottom of described short strut 2 and described long fulcrum bar 1 is hinged by flexibly connecting pin 3, and the top of described short strut 2, long fulcrum bar 1 is hinged with the two ends of described horizontal beam 4 respectively; Described long fulcrum bar 1, short strut 2, horizontal beam 4 are provided with two covers and are set in parallel in the below of described horizontal panel 5; Described horizontal panel 5 is fixed on two horizontal beams 4.
The bottom of long fulcrum bar 1 is provided with the gripping mechanism 9 that cooperates with edge, elevator shaft door opening place, this gripping mechanism 9 is intersected vertically by two boards and forms, intersecting the angle that forms is stuck on the edge, elevator door opening place, realize reliable chucking, the right angle can with the edge close fit at elevator shaft door opening place, safety is better and be convenient to make.This gripping mechanism 9 can directly be made with angle steel, also can be welded by two block plates.
As shown in Figure 3, Figure 4, during use, construct at second floor as the constructor, the gripping mechanism 9 of described long fulcrum bar 1 bottom is stuck on elevator shaft door opening 6 edges of Stall.Described horizontal panel 5 is positioned at elevator shaft door opening 8 places of second floor, and is concordant with the ground of second floor, and horizontal panel 5 rear sides withstand on the hoistway wall 7, and the constructor can not fall when second floor is constructed like this.Construction finishes as second floor, need directly should protect frame integral hoisting with tower crane in the construction of the 3rd buildings.Promote the bottom of long fulcrum bar 1 during lifting, because between long fulcrum bar 1 and the short strut 2 and between long fulcrum bar 1 and the horizontal beam 4, be between short strut 2 and the horizontal beam 4 hinged, so the whole protection frame can fold, the gripping mechanism 9 of long fulcrum bar 1 bottom breaks away from the edge of the elevator shaft door opening 6 of Stall, thereby can overslaugh not promote; The gripping mechanism 9 of long fulcrum bar 1 bottom is against on elevator shaft door opening 8 edges of second floor again, and horizontal panel 5 gets final product with the ground in the 3rd buildings is concordant.
During the construction of other floors, with aforesaid operations in like manner, repeat no more.
As another kind of embodiment: gripping mechanism described in the utility model can be the draw-in groove of directly opening in the long fulcrum bar bottom, and this draw-in groove also can directly be stuck on the edge, elevator door opening place, realizes reliably chucking.
The utility model is not limited only to the foregoing description.

Claims (5)

1. the interior construction protection frame of elevator shaft is characterized in that: comprise long fulcrum bar, short strut, horizontal beam, horizontal panel; The bottom of described short strut and the middle part of described long fulcrum bar are hinged, and the top of described short strut, long fulcrum bar is hinged with the two ends of described horizontal beam respectively; Described long fulcrum bar, short strut, horizontal beam are provided with two covers and are set in parallel in the below of described horizontal panel; Described horizontal panel is fixed on two horizontal beams.
2. construction protection frame in a kind of elevator shaft according to claim 1, it is characterized in that: the bottom of described long fulcrum bar is provided with the gripping mechanism that cooperates with edge, elevator shaft door opening place.
3. construction protection frame in a kind of elevator shaft according to claim 2 is characterized in that: described gripping mechanism forms by two boards is crossing.
4. construction protection frame in a kind of elevator shaft according to claim 3, it is characterized in that: described two boards intersects vertically.
5. construction protection frame in a kind of elevator shaft according to claim 2 is characterized in that: the draw-in groove of described gripping mechanism for opening in the long fulcrum bar bottom.
CN2010202064433U 2010-05-28 2010-05-28 Elevator shaft inside construction protecting rack Expired - Fee Related CN201671311U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202064433U CN201671311U (en) 2010-05-28 2010-05-28 Elevator shaft inside construction protecting rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202064433U CN201671311U (en) 2010-05-28 2010-05-28 Elevator shaft inside construction protecting rack

Publications (1)

Publication Number Publication Date
CN201671311U true CN201671311U (en) 2010-12-15

Family

ID=43328723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202064433U Expired - Fee Related CN201671311U (en) 2010-05-28 2010-05-28 Elevator shaft inside construction protecting rack

Country Status (1)

Country Link
CN (1) CN201671311U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195232A (en) * 2013-04-08 2013-07-10 宁波东新建筑有限公司 Construction platform of elevator shaft and method for utilizing construction platform to construct elevator shaft
CN103774838A (en) * 2014-01-29 2014-05-07 上海中锦建设集团股份有限公司 Assembly type safe operation platform for elevator shaft construction and use method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195232A (en) * 2013-04-08 2013-07-10 宁波东新建筑有限公司 Construction platform of elevator shaft and method for utilizing construction platform to construct elevator shaft
CN103195232B (en) * 2013-04-08 2015-07-22 宁波东新建筑有限公司 Construction platform of elevator shaft and method for utilizing construction platform to construct elevator shaft
CN103774838A (en) * 2014-01-29 2014-05-07 上海中锦建设集团股份有限公司 Assembly type safe operation platform for elevator shaft construction and use method thereof

Similar Documents

Publication Publication Date Title
CN102383588B (en) Lifting platform for protecting safety of high-level construction
CN201099937Y (en) Article-hoisting port safety barrier device
CN202379596U (en) Bulk part hanging basket
CN205012627U (en) Assembly type structure outer wall protects stores pylon outward
CN106437121B (en) It industrializes the anti-object strike of assembled engineering and builds outer construction operation platform
CN102168484B (en) External hanging scaffold and application method thereof
CN201671311U (en) Elevator shaft inside construction protecting rack
CN202450762U (en) Construction lifting platform
CN206233546U (en) A kind of elevator hoistways workbench
CN203374008U (en) Elevator shaft titling plane protective structure
CN202055504U (en) Externally-hung scaffold
CN202577925U (en) Lifting type platform in elevator shaft
CN201083018Y (en) Mobile multipurpose fast mounting scaffold
CN203222995U (en) Construction hoist feeding and discharging operation platform
CN205023680U (en) Chain slat type construction elevator door
CN108756063A (en) A kind of steel structure column convenient for adjusting
CN105155832B (en) A kind of hanging basket equipment and its moving method
CN206987350U (en) Exterior wall finishing hanging basket
CN207792627U (en) Portable Worker carrying basket
CN204357138U (en) Simple steel structure lifting upending frame
CN203878957U (en) Protective screen module unit
CN202953642U (en) Folding elevator car roof guardrail
CN203392657U (en) Machine maintenance platform
CN112049398A (en) Construction hanging basket convenient to split
CN207004425U (en) A kind of new drill jumbo service platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101215

Termination date: 20110528