CN201650114U - 轮式旋挖钻机 - Google Patents
轮式旋挖钻机 Download PDFInfo
- Publication number
- CN201650114U CN201650114U CN2010201747599U CN201020174759U CN201650114U CN 201650114 U CN201650114 U CN 201650114U CN 2010201747599 U CN2010201747599 U CN 2010201747599U CN 201020174759 U CN201020174759 U CN 201020174759U CN 201650114 U CN201650114 U CN 201650114U
- Authority
- CN
- China
- Prior art keywords
- rotary drilling
- drilling rig
- drilling machine
- hydraulic cylinder
- chassis assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201747599U CN201650114U (zh) | 2010-04-29 | 2010-04-29 | 轮式旋挖钻机 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201747599U CN201650114U (zh) | 2010-04-29 | 2010-04-29 | 轮式旋挖钻机 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201650114U true CN201650114U (zh) | 2010-11-24 |
Family
ID=43115345
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201747599U Expired - Fee Related CN201650114U (zh) | 2010-04-29 | 2010-04-29 | 轮式旋挖钻机 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201650114U (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102182401A (zh) * | 2011-03-30 | 2011-09-14 | 余大州 | 折叠式全液压履带打桩机 |
CN103161403A (zh) * | 2011-12-19 | 2013-06-19 | 上海金泰工程机械有限公司 | 装备旋挖钻机的挖掘机 |
CN106837168A (zh) * | 2015-12-07 | 2017-06-13 | 中国电力科学研究院 | 一种旋挖钻机 |
CN109989705A (zh) * | 2019-05-17 | 2019-07-09 | 天明(南京)智能装备科技有限公司 | 高效排渣的工程钻机 |
-
2010
- 2010-04-29 CN CN2010201747599U patent/CN201650114U/zh not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102182401A (zh) * | 2011-03-30 | 2011-09-14 | 余大州 | 折叠式全液压履带打桩机 |
CN102182401B (zh) * | 2011-03-30 | 2013-06-05 | 余大州 | 折叠式全液压履带打桩机 |
CN103161403A (zh) * | 2011-12-19 | 2013-06-19 | 上海金泰工程机械有限公司 | 装备旋挖钻机的挖掘机 |
CN106837168A (zh) * | 2015-12-07 | 2017-06-13 | 中国电力科学研究院 | 一种旋挖钻机 |
CN109989705A (zh) * | 2019-05-17 | 2019-07-09 | 天明(南京)智能装备科技有限公司 | 高效排渣的工程钻机 |
CN109989705B (zh) * | 2019-05-17 | 2024-02-06 | 天明(南京)智能装备科技有限公司 | 高效排渣的工程钻机 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201546631U (zh) | 伸缩桅杆式钻机井架 | |
CN102094579A (zh) | 全液压轮胎式凿岩锚固钻车 | |
CN202242834U (zh) | 公路铁路两用补砟车 | |
CN202688884U (zh) | 公路架桥机后支腿行走支撑升降机构 | |
CN201650114U (zh) | 轮式旋挖钻机 | |
CN202399986U (zh) | 一种车辆液压尾梯 | |
CN203486786U (zh) | 多档位电液两用汽车吊 | |
CN201953311U (zh) | 全液压轮胎式凿岩锚固钻车 | |
CN102491192B (zh) | 塔机引进平台结构 | |
CN203128069U (zh) | 可移动环轨式起重机 | |
CN101830191B (zh) | 集装箱双侧装卸车 | |
CN201713276U (zh) | 伸缩臂叉装机 | |
CN101565154B (zh) | 液控钢丝绳支腿自动翻转装置 | |
CN202968018U (zh) | 折叠式安装叉车 | |
CN103101845A (zh) | 一种井下变轨液压吊车 | |
CN201721533U (zh) | 旋挖钻机履带行走底盘 | |
CN207060197U (zh) | 一种新型全液压自动拆卸配重、履带梁多功能钻机底盘 | |
CN101850936B (zh) | 推杆式支腿自动翻转装置 | |
CN201472100U (zh) | 一种车辆平衡器 | |
CN201325362Y (zh) | 道路清障车s型吊臂机构 | |
CN203268174U (zh) | 矿用防爆半挂运输车 | |
CN201592975U (zh) | 越野软包夹车 | |
CN201010483Y (zh) | 倒立桅柱式升降机构 | |
CN202924623U (zh) | 一种井下变轨液压吊车 | |
CN201573697U (zh) | 轮式装载机的双置转向装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: CHINA RAILWAY SANLI HEAVY INDUSTRY CO., LTD. Free format text: FORMER OWNER: HENAN SANLI MECHANICAL MANUFACTURE CO., LTD. Effective date: 20130208 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 450100 ZHENGZHOU, HENAN PROVINCE TO: 450016 ZHENGZHOU, HENAN PROVINCE |
|
TR01 | Transfer of patent right |
Effective date of registration: 20130208 Address after: 450016 No. sixth, 99 Avenue, Zhengzhou Economic Development Zone, Henan, China Patentee after: HENAN SANLI MECHANICAL MANUFACTURE CO., LTD. Address before: 450100 No. 1 Tashan Road, Zhengzhou, Henan, Xingyang Patentee before: Henan Sanli Mechanical Manufacture Co., Ltd. |
|
ASS | Succession or assignment of patent right |
Owner name: CHINA RAILWAY ENGINEERING EQUIPMENT GROUP TUNNEL E Free format text: FORMER OWNER: CHINA RAILWAY SANLI HEAVY INDUSTRY CO., LTD. Effective date: 20141202 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 450016 ZHENGZHOU, HENAN PROVINCE TO: 453000 XINXIANG, HENAN PROVINCE |
|
TR01 | Transfer of patent right |
Effective date of registration: 20141202 Address after: Xinxiang City, Henan province 453000 West intersection of West Road and Renmin Road northbound 300 meters Patentee after: Tunnel device Manufacturing Co., Ltd of China Railway Engineering equipment group Address before: 450016 No. sixth, 99 Avenue, Zhengzhou Economic Development Zone, Henan, China Patentee before: HENAN SANLI MECHANICAL MANUFACTURE CO., LTD. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101124 Termination date: 20180429 |
|
CF01 | Termination of patent right due to non-payment of annual fee |