CN201614655U - Drainage box culvert dredging device - Google Patents

Drainage box culvert dredging device Download PDF

Info

Publication number
CN201614655U
CN201614655U CN2010200040970U CN201020004097U CN201614655U CN 201614655 U CN201614655 U CN 201614655U CN 2010200040970 U CN2010200040970 U CN 2010200040970U CN 201020004097 U CN201020004097 U CN 201020004097U CN 201614655 U CN201614655 U CN 201614655U
Authority
CN
China
Prior art keywords
winch
compartment
bagger
railway carriage
dredging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010200040970U
Other languages
Chinese (zh)
Inventor
龚年华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hu'nan Qisi Environmental Co., Ltd.
Original Assignee
龚年华
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 龚年华 filed Critical 龚年华
Priority to CN2010200040970U priority Critical patent/CN201614655U/en
Application granted granted Critical
Publication of CN201614655U publication Critical patent/CN201614655U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model provides a drainage box culvert dredging device, which is used for dredging silt in a drainage box culvert and comprises a main unit, an auxiliary unit and a dredging vehicle. The main unit comprises a lifting device and a silt discharging winch disposed on the same. The auxiliary unit comprises a dredging winch, and the silt discharging winch and the dredging winch are respectively provided with a connecting rope. The dredging vehicle is provided with a structure suitable for being respectively connected with the connecting rope of the slit discharging winch and the connecting rope of the dredging winch. The dredging vehicle is further provided with an opening for loading silt in. The drainage box culvert dredging device guarantees personnel safety, increasing construction efficiency and lowers safety cost and economical expense.

Description

Desilting equipment is contained in the draining railway carriage or compartment
Technical field
The utility model relates to drainage pipe mediation field, contains desilting equipment in particular to a kind of draining railway carriage or compartment.
Background technology
At present, the general method of damming that adopts of desilting is contained in the draining railway carriage or compartment, in manually containing down to the railway carriage or compartment, utilizes facility such as digging machine, bulldozer, and silt particle is got.In the operating personnel is contained to the railway carriage or compartment down, can not get ensureing, and must influence normal draining that the cost that each side is paid is too high owing to dam for personal security and efficiency of construction.
The utility model content
The utility model aims to provide a kind of draining railway carriage or compartment and contains desilting equipment, and the general method of damming that adopts of desilting is contained in the draining railway carriage or compartment that can solve before this, influences normal draining, dangerous, problem such as efficient is low.
The utility model provides a kind of draining railway carriage or compartment to contain desilting equipment, is used for clearing up the deposit that the draining railway carriage or compartment is contained, and comprising: main frame, subsidiary engine, bagger; Main frame comprises: lifting gear and be arranged on and put the mud winch on the lifting gear; Subsidiary engine comprises: the winch of dredging; Put the mud winch, the winch of dredging has connection cord respectively; Bagger has the suitable structure that is connected with the connection cord of the connection cord of putting the mud winch, the winch of dredging respectively; Bagger also has the opening of the deposit that is fit to pack into.
Preferably, culvert desilting equipment in draining railway carriage or compartment also comprises: transport vehicle is used to transport the deposit that clears.
Preferably, the bagger bottom has the wheel of being convenient to roll.
Preferably, opening is opened in the side of bagger.
Preferably, bagger is provided with and covers renovating of opening.
Preferably, bagger is provided with the quick sorting hole of muddy water.
Preferably, lifting gear is a crane, puts on the cantilever that the mud winch is arranged on crane.
Preferably, connection cord is wire rope or hawser or Sythetic fiber rope.
Preferably, put the mud winch, the winch of dredging is hydraulic wireline winch.
Because draining of the present utility model railway carriage or compartment is contained desilting equipment and is comprised: main frame, subsidiary engine, bagger; Main frame comprises: lifting gear and be arranged on and put the mud winch on the lifting gear; Subsidiary engine comprises: the winch of dredging; During work, bagger is connected with the connection cord of the connection cord of putting the mud winch, the winch of dredging respectively; Traction by the winch of dredging can make bagger move back and forth in the draining railway carriage or compartment is contained, deposit in the draining railway carriage or compartment contained is packed in the bagger, by lifting gear bagger is risen then, make the bagger that deposit is housed leave the draining railway carriage or compartment and contain, thereby the deposit that the draining railway carriage or compartment is contained is cleared up.Like this, can carry out desilting on the ground, need not to dam, not influence normal draining, and desilting in need not manually to contain down to the railway carriage or compartment, guaranteed personal security, improved efficiency of construction, reduced safety cost and economic cost.
Description of drawings
Accompanying drawing herein is used to provide further understanding of the present utility model, constitutes the application's a part, and illustrative examples of the present utility model and explanation thereof are used to explain the utility model, do not constitute improper qualification of the present utility model.In the accompanying drawings:
Fig. 1 has schematically shown the structure of containing desilting equipment according to the draining railway carriage or compartment of embodiment of the present utility model, wherein, prepares to dredge under the bagger in the culvert of draining railway carriage or compartment;
The structure of desilting equipment is contained in the draining railway carriage or compartment that Fig. 2 has schematically shown embodiment of the present utility model, wherein, bagger pack into the draining railway carriage or compartment contain in deposit;
The structure of desilting equipment is contained in the draining railway carriage or compartment that Fig. 3 has schematically shown embodiment of the present utility model, and wherein, the bagger draining railway carriage or compartment of packing into is put the mud winch behind the deposit in containing and risen;
Fig. 4 has schematically shown the structure of the draining railway carriage or compartment culvert desilting equipment of embodiment of the present utility model, and wherein, the deposit that lifting gear is packed bagger into is poured in the transport vehicle;
Fig. 5 has schematically shown the main TV structure that is connected with the winch of dredging of cantilever of the wherein device of embodiment of the present utility model;
Fig. 6 has schematically shown the sectional structure that is connected with the winch of dredging of cantilever of the wherein device of embodiment of the present utility model;
Fig. 7 has schematically shown the structure of the bagger of embodiment of the present utility model.
The specific embodiment
Describe the utility model below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
Fig. 1 to Fig. 5 has schematically shown the draining railway carriage or compartment culvert desilting equipment of embodiment of the present utility model and the structure of associated components wherein.Desilting equipment is contained in draining railway carriage or compartment according to embodiment of the present utility model, is used for clearing up the deposit that the draining railway carriage or compartment is contained, and as shown in Figure 1, contains desilting equipment according to the draining railway carriage or compartment of embodiment of the present utility model and comprises: main frame 1, subsidiary engine 20, bagger 30; Main frame 1 comprises: lifting gear 10 and be arranged on and put mud winch 101 on the lifting gear; Subsidiary engine comprises: the winch 203 of dredging; Put mud winch 101, the winch 203 of dredging has connection cord 201 and 105 respectively; Bagger 30 has the suitable structure that is connected with the connection cord 105 of the connection cord 201 of putting the mud winch, the winch of dredging respectively; Bagger 30 also has the opening 305 of the deposit that is fit to pack into.
During work, bagger 30 is connected with the connection cord 201 of the connection cord 105 of putting the mud winch, the winch of dredging respectively; Traction by the winch 203 of dredging can make bagger 30 contain reciprocating motion in 50 in the draining railway carriage or compartment, 50 deposit was packed in the bagger in the draining railway carriage or compartment contained, by lifting gear 10 bagger is risen then, make the bagger that deposit is housed leave the draining railway carriage or compartment and contain, thereby the deposit 501 that the draining railway carriage or compartment is contained is cleared up.Like this, can on ground 60, carry out desilting, need not to dam, not influence normal draining, and need not manually to contain desilting in 50, guarantee personal security, improve efficiency of construction, reduce safety cost and economic cost down to the railway carriage or compartment.
As shown in Figures 1 to 4, main frame 1 can have the tractor that has trailer, and lifting gear 10 can be arranged on the trailer, so that lifting gear 10 can arrive the job site easily; Perhaps main frame 1 itself is exactly a mobile crane.Subsidiary engine 20 can be mobile crane, also can be crane, or other lifting gear, and subsidiary engine 20 can stretch out support arm in underground or railway carriage or compartment is contained, so that support dredge winch 203 and other auxiliary cleaning equipments, and poling machine etc. for example.If subsidiary engine 20 itself has mobility, the transportation of the winch 203 of then conveniently dredging.Subsidiary engine 20 can also be provided with devices such as pulley, support so that and the winch 203 of dredging match the change of the direction of the connection cord of the winch 203 of realizing dredging, the setting in the confined space of winch 203 in subsidiary engine 20 of being convenient to dredge.The winch 203 of dredging can take various suitable manner to be arranged in the subsidiary engine 20, and the winch 203 of for example dredging adopts the fixing mode of screw to be fixed on the chassis of subsidiary engine 20, in addition, and can also be with reference to the set-up mode of other prior aries.
Preferably, culvert desilting equipment in draining railway carriage or compartment also comprises: transport vehicle 40 is used to transport the deposit 501 that clears.Like this, can guarantee not pollute work ground in the cleaning, play the effect of clean environment firendly in time with the deposit 501 quick shipped off-site that clear.Transport vehicle 40 can be motor vehicle, for example is tipping lorry, also can be bicycle, and only laborsaving not as motor vehicle, efficient is not as motor-driven overall height.
Preferably, bagger 30 bottoms have the wheel of being convenient to roll 301, like this, are convenient to bagger 30 and roll in the desilting process of draining railway carriage or compartment culvert 50, reduce friction.Certainly, also wheel 301 can be set, and level and smooth structure is made in bagger 30 bottoms, like this, also can reduce friction, but may cause certain wearing and tearing bagger 30 bottoms.
Preferably, opening 305 is opened in the side of bagger 30, in the bagger 30 of deposit 501 directly can being packed into like this, accelerates cleaning speed.In addition, opening 305 also can be opened in bagger 30 above, bagger 30 is in the process that moves ahead of cleaning deposit 501, deposit 501 is because the effect of gravity falls into bagger 30 from opening 305.
Preferably, bagger 30 be provided with cover opening renovate 307.Renovate 307 baggers 30 that can prevent to pack into deposit 501 and in the process that is risen by lifting gear 10, spill, pollute ground or the destruction draining railway carriage or compartment that just cleaning is good and contain 50 cleaning.
Preferably, bagger is provided with the quick sorting hole 309 of muddy water, like this, can cause the solid content of alluvial to transport the silt in the deposit 501 and other, and being contained the water that does not influence alluvial in 50, the draining railway carriage or compartment stays in the draining railway carriage or compartment culvert 50, both can accelerate cleaning speed, reduce unnecessary work again, and the omission pollution on the environment of liquid water when reducing transport vehicle transportation deposit 501.
Preferably, lifting gear 10 is a crane, puts on the cantilever 103 that mud winch 101 is arranged on crane, the two close together, be convenient to bagger 30 like this and put the connection of mud winch 101, can also reduce the distance of putting mud winch 101 and bagger 30, be convenient to control the work of bagger 30.Lifting gear 10 can be independent crane or the crane that can Offhost 1 independently travels, also can be for being fixed on the special-purpose crane on the main frame 1 (for example being load-carrying vehicle) specially.If lifting gear 10 can be the crane that can Offhost 1 independently travels, so, main frame 1 is exactly to have the crane of putting mud winch 101, like this, can reduce the transportation that crane needs load-carrying vehicle in addition.Whether need load-carrying vehicle to decide according to concrete lifting strength.Put the mode on the cantilever 103 that mud winch 101 is arranged on crane, for example be, cantilever 103 is provided with hinge 1031, puts mud winch 101 and is enclosed within on the hinge 1031, and like this, putting mud winch 101 can rotate folding and unfolding connection cord 105 around hinge 1031.
Preferably, connection cord 105, connection cord 201 are wire rope or hawser or Sythetic fiber rope, so as bagger 30 with put mud winch 101 and the winch 203 of dredging is realized being flexible coupling.Use the connection cord of above-mentioned material both can realize being flexible coupling, can satisfy higher requirement of strength again, guaranteed the safety of operation.When dredging, the winch 203 traction baggers 30 of dredging, connection cord 105 tensionings, connection cord 201 loosens; After dredging, put mud winch 101 traction baggers 30, connection cord 105 loosens, connection cord 201 tensionings; After bagger 30 arrives predetermined work plane, to put mud winch 101 and tighten up connection cord 105, bagger 30 rises; When put mud winch 101 with connection cord 105 all or part of tightening up after, the cantilever 103 of crane is transported to transport vehicle 40 tops with bagger 30, then the deposit in the bagger 30 501 is poured on the transport vehicle 40.
Preferably, put mud winch 101, the winch 203 of dredging is hydraulic wireline winch, like this, is convenient to the folding and unfolding of connection cord, saves manpower, raise the efficiency, and control more accurate.
General once scale removal process is described below:
At first on the ground 60 of the draining railway carriage or compartment of needs cleaning culvert 50, open opening, form two work planes, main frame, subsidiary engine are separately positioned on by two work planes then, the opening at subsidiary engine place can be convenient to connect bagger 30, the opening at main frame place can be convenient to bagger 30 liftings and pass through, two work planes can for 200 meters with interior distance;
The draining railway carriage or compartment of then clearing up two work plane belows contains 50, is that connection cord is prepared with the messenger of doing connection cord being connected of bagger 30 to carry out poling.Behind the poling, with bagger 30 with put mud winch 101 and the winch 203 of dredging links together by connection cord.Poling and messenger can adopt the method for prior art, do not repeat them here;
Then, the winch 203 of will dredging is put into the draining railway carriage or compartment by lifting gear 10 and is contained 50, loosens cooperation by the tensioning of connection cord 105, connection cord 201, realizes bagger 30 deposit 501 of packing into, contain rise 50 from the draining railway carriage or compartment, the deposit in the bagger 30 501 is poured on the transport vehicle 40.Detailed process is as follows:
When dredging, the winch 203 traction baggers 30 of dredging, connection cord 105 tensionings, connection cord 201 loosens; After dredging, when the winch 203 of promptly dredging drives connection cords 105 tensioning load running certain distances, be generally the distance about 30 1 vehicle bodies of bagger after, put mud winch 101 traction baggers 30, connection cord 105 loosens, connection cord 201 tensionings; After bagger 30 arrives predetermined work plane, to put mud winch 101 and tighten up connection cord 105, bagger 30 rises; When put mud winch 101 with connection cord 105 all or part of tightening up after, the cantilever 103 of crane is transported to transport vehicle 40 tops with bagger 30, then the deposit in the bagger 30 501 is poured on the transport vehicle 40.
As can be seen from the above description, the utility model the above embodiments have realized following technique effect:
1, need not dam,, realize the reciprocating motion of bagger by the winch on the main and auxiliaries.
2, perforate on the bagger can realize that silt particle and the quick of sewage separate.
3,, interior silt particle is contained in the railway carriage or compartment transported by gradual driving.
4, according to the length of the connection cord of the winch on the main and auxiliaries, two work planes can for 200 meters with interior distance, like this, be convenient to the setting of main and auxiliaries, being convenient to has enough cleaning spaces, is convenient to seek suitable cleaning place.
The utility model has guaranteed personal security, has improved efficiency of construction, has reduced safety cost and economic cost.
The above is a preferred embodiment of the present utility model only, is not limited to the utility model, and for a person skilled in the art, the utility model can have various changes and variation.All within spirit of the present utility model and principle, any modification of being done, be equal to replacement, improvement etc., all should be included within the protection domain of the present utility model.

Claims (9)

1. desilting equipment is contained in a draining railway carriage or compartment, is used for clearing up the deposit that the draining railway carriage or compartment is contained, and it is characterized in that, comprising:
Main frame, subsidiary engine, bagger, wherein
Main frame comprises: lifting gear and be arranged on and put the mud winch on the described lifting gear;
Subsidiary engine comprises: the winch of dredging;
Describedly put the mud winch, the described winch of dredging has connection cord respectively,
Described bagger has the suitable structure that is connected with the described connection cord of putting the connection cord of mud winch, the described winch of dredging respectively; Described bagger also has the opening of the described deposit that is fit to pack into.
2. desilting equipment is contained in draining according to claim 1 railway carriage or compartment, it is characterized in that also comprise: transport vehicle is used to transport the described deposit that clears.
3. desilting equipment is contained in draining according to claim 1 railway carriage or compartment, it is characterized in that, described bagger bottom has the wheel of being convenient to roll.
4. desilting equipment is contained in draining according to claim 1 railway carriage or compartment, it is characterized in that described opening is opened in the side of described bagger.
5. desilting equipment is contained in draining according to claim 4 railway carriage or compartment, it is characterized in that described bagger is provided with and covers renovating of described opening.
6. desilting equipment is contained in draining according to claim 1 railway carriage or compartment, it is characterized in that described bagger is provided with the quick sorting hole of muddy water.
7. desilting equipment is contained in draining according to claim 1 railway carriage or compartment, it is characterized in that described lifting gear is a crane, described putting on the cantilever that the mud winch is arranged on described crane.
8. desilting equipment is contained in draining according to claim 1 railway carriage or compartment, it is characterized in that described connection cord is wire rope or hawser or Sythetic fiber rope.
9. desilting equipment is contained in draining according to claim 1 railway carriage or compartment, it is characterized in that, describedly puts the mud winch, the described winch of dredging is hydraulic wireline winch.
CN2010200040970U 2010-01-21 2010-01-21 Drainage box culvert dredging device Expired - Lifetime CN201614655U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010200040970U CN201614655U (en) 2010-01-21 2010-01-21 Drainage box culvert dredging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010200040970U CN201614655U (en) 2010-01-21 2010-01-21 Drainage box culvert dredging device

Publications (1)

Publication Number Publication Date
CN201614655U true CN201614655U (en) 2010-10-27

Family

ID=43001026

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010200040970U Expired - Lifetime CN201614655U (en) 2010-01-21 2010-01-21 Drainage box culvert dredging device

Country Status (1)

Country Link
CN (1) CN201614655U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104815827A (en) * 2015-04-13 2015-08-05 长沙智汛通环保科技有限公司 Drainage pipe network dredging robot and dredging method thereof
CN108373107A (en) * 2018-03-16 2018-08-07 浙江大学苏州工业技术研究院 A kind of underwater desilting Operation Van with emergent Lift-on/Lift-off System and emergent hanging method
CN113882448A (en) * 2021-09-24 2022-01-04 中交第一公路勘察设计研究院有限公司 Method for dredging channel box culvert/hidden culvert

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104815827A (en) * 2015-04-13 2015-08-05 长沙智汛通环保科技有限公司 Drainage pipe network dredging robot and dredging method thereof
CN108373107A (en) * 2018-03-16 2018-08-07 浙江大学苏州工业技术研究院 A kind of underwater desilting Operation Van with emergent Lift-on/Lift-off System and emergent hanging method
CN108373107B (en) * 2018-03-16 2023-11-03 浙江大学苏州工业技术研究院 Underwater dredging operation vehicle with emergency hoisting system and emergency hoisting method
CN113882448A (en) * 2021-09-24 2022-01-04 中交第一公路勘察设计研究院有限公司 Method for dredging channel box culvert/hidden culvert

Similar Documents

Publication Publication Date Title
KR100987633B1 (en) Process of working
CN103057927B (en) A kind of hydraulic foldable conveying arm transporting sand self-unloading oceangoing ship
CN109024724A (en) A kind of mining multi-purpose crawler type traction excavator truck-mounted crane
CN201614655U (en) Drainage box culvert dredging device
CN202247782U (en) Trailer type railway sand-removing machine
CN105370228A (en) Slurry nonlanding intelligent environment-friendly integral well drilling solid control system
CN102433853A (en) Trailer type sand elimination machine for railway
CN205100913U (en) Mud does not fall to ground intelligent environmental protection integration well drilling solid controlling system
CN201753453U (en) Hydraulic loader-digger
CN102910463B (en) Vibration breaking-down shovel
CN104060682A (en) United desilting vehicle
CN116837927A (en) Intelligent online cleaning system for coal mine water sump
CN102501316A (en) Subway track-laying bed construction movable concrete mixer and subway track-laying bed construction method
CN108069215A (en) Cubic metre of earth and stone transmitting device and cubic metre of earth and stone transmission method
CN102009575B (en) Tracked carrier special for intertidal belt
CN204056248U (en) A kind of transfer system loading and unloading carrier and carrier with this system of transferring
AU2014100878B4 (en) Apparatus and method for excavating a cavity and setting an object at least partially therein
CN204982851U (en) Soft base construction multi -function vehicle
DE102015009590B4 (en) Empty pipe laying machine for cable trays
CN201140937Y (en) Bucket type association loading shovel
CN203944624U (en) A kind of portable dredging machine
CN204355603U (en) The upset material-receiving device of vertical trash transhipment station
CN202001056U (en) Crawler type full-hydraulic pressure multifunctional transportation operation car for mines
CN209025120U (en) Mining multi-purpose crawler type draws excavator truck-mounted crane
CN109606097A (en) The mining pneumatic dumper of crawler type

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HUNAN QISI ENVIRONMENTAL CO., LTD.

Free format text: FORMER OWNER: GONG NIANHUA

Effective date: 20110512

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 410000 NO. 613, HENGYU BUILDING, NO. 349, SHUGUANG MIDDLE ROAD, CHANGSHA CITY, HU'NAN PROVINCE TO: 410001 405, 4/F, OFFICE BUILDING, HU'NAN ENVIRONMENTAL PROTECTION SCIENCE + TECHNOLOGY INDUSTRIAL PARK MANAGEMENT COMMITTEE, NO. 18, SECOND SECTION OF WANJIALI SOUTH ROAD, YUHUA DISTRICT, CHANGSHA CITY, HU'NAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110512

Address after: Office building of Wanjiali road 410001 in Hunan province Changsha Yuhua District, two No. 18 Hunan environmental science and Technology Industrial Park Management Committee four floor 405

Patentee after: Hu'nan Qisi Environmental Co., Ltd.

Address before: The dawn of the road 410000 in Hunan province Changsha City Hengyu No. 349 Building No. 613

Patentee before: Gong Nianhua

CX01 Expiry of patent term

Granted publication date: 20101027

CX01 Expiry of patent term