CN201560399U - 跨电气化铁路立交桥施工挂篮防电防水防坠落装置 - Google Patents
跨电气化铁路立交桥施工挂篮防电防水防坠落装置 Download PDFInfo
- Publication number
- CN201560399U CN201560399U CN2009200939828U CN200920093982U CN201560399U CN 201560399 U CN201560399 U CN 201560399U CN 2009200939828 U CN2009200939828 U CN 2009200939828U CN 200920093982 U CN200920093982 U CN 200920093982U CN 201560399 U CN201560399 U CN 201560399U
- Authority
- CN
- China
- Prior art keywords
- electric
- cross beam
- electric groove
- suspension rod
- hanging basket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
本实用新型公布了一种跨电气化铁路立交桥施工挂篮防电防水防坠落装置。它由悬挂在前横梁和后横梁下方的多个绝缘槽组成的绝缘槽组、位于防电挂槽组上方的防坠落平台、防护栏杆、防护网、边模拦护平台和设置在绝缘槽组外侧的排水管组成。绝缘槽上设有横轴,横轴上设有吊杆,吊杆与横轴铰接,吊杆可在横轴上横向移动。绝缘槽通过吊杆悬挂在前横梁和后横梁下方对接触网起到绝缘屏蔽的作用;防坠落平台、防护栏杆、防护网、边模拦护平台可防止料具坠落到接触网及铁路线上;排水管可将雨水和施工用水排到远离接触网的安全地带。本实用新型设计合理,安装拆除快捷方便,对应用场地条件要求不高,安全可靠,特别适用于跨越多条电气化铁路立交桥的施工。
Description
技术领域
本适用新型涉及一种上跨电气化铁路立交桥施工防电装置,特别涉及一种跨电气化铁路立交桥施工挂篮防电防水防坠落装置。
背景技术
在上跨电气化铁路立交桥悬灌施工中采用的悬灌挂篮,距带电27.5KV的铁路接触网距离较近,施工过程中的施工用水、雨水及料具极易坠落到带电27.5KV的铁路接触网上,因短路致使接触网烧断造成行车事故及人员触电伤亡事故。因此,上跨电气化铁路立交桥悬灌施工中的悬灌挂篮必须采取防电防水防坠落措施。以往的挂篮的防电防坠落措施通常是将悬灌挂篮底部整体封闭,由于体积庞大,加工、吊装拆除难度较大,且无法运输,只得在现场的安装位置就地加工,当安装位置在铁路上方时,此方案无法实施。
实用新型内容
本实用新型的目的是针对现有技术存在的问题和缺陷,设计一种跨电气化铁路立交桥施工挂篮防电防水防坠落装置。
本实用新型的技术方案是:一种跨电气化铁路立交桥施工挂篮防电防水防坠落装置,其特征在于:它由悬挂在前横梁(1)和后横梁(2)下方的防电槽组(3)、铺设在防电槽组(3)上方的防坠落平台(4)、设置在防坠落平台(4)周边的防护栏杆(5)、防护网(6)、设置在边模(7)上部的边模拦护平台(8)和设置在防电槽组(3)外侧的排水管(9)组成。
防电槽组(3)由多个防电槽(10)拼装而成,防电槽(10)由纵框(11)、横框(12)、横轴(13)和绝缘外套(14)组成,横轴(13)上设有吊杆(15),吊杆(15)与横轴(13)铰接,吊杆(15)可在横轴(13)上横向移动;吊杆(15)的上部设有穿销孔(16);将防电槽(10)提升到前横梁(1)和后横梁(2)下方,并将吊杆(15)由前横梁(1)和后横梁(2)下方从中部空隙穿入,使穿销孔(16)位于前横梁(1)和后横梁(2)的上方,在吊杆(15)上部的穿销孔(16)内穿入插销(17)并锁定,防电槽(10)即可悬挂在前横梁(1)和后横梁(2)下方,依次将所有的防电槽(10)安装锁定完毕,组成防电槽组(3)。
防电槽组(3)的多个防电槽(10)内安装有管接头(18),管接头(18)可以将相邻的两个防电槽(10)联通。在防电槽组(3)边缘外侧安装有排水管(9),排水管(9)可以调整排水的位置。
实用新型与现有技术相比具有以下优点:本实用新型设计合理,成本低、安装拆除快捷方便,对应用场地条件要求不高,稳定性好,机动性好,安全可靠,特别适用于跨越多条电气化铁路立交桥的施工。
附图说明
图1为本实用新型侧视图;
图2为本实用新型正视图;
图3为本实用新型局部A放大视图;
图4为本实用新型防电槽结构视图;
图中:1为前横梁;2为后横梁;3为防电槽组;4为防坠落平台;5为防护栏杆;6为防护网;7为边模;8为边模拦护平台;9为排水管;10为防电槽;11为纵框;12为横框;13为横轴;14为绝缘外套;15为吊杆;16为穿孔;17为插销;18为管接头;19为接触网带电体;20为接地装置;
具体实施方式
下面结合附图对本实用新型作进一步的描述。
如图1、2、3、4所示,本实用新型由悬挂在前横梁(1)和后横梁(2)下方的防电槽组(3)、铺设在防电槽组(3)上方的防坠落平台(4)、设置在防坠落平台(4)周边的防护栏杆(5)、防护网(6)、设置在边模(7)上部的边模拦护平台(8)和设置在防电槽组(3)外侧的排水管(9)组成。
在电气化铁路上方采用悬灌挂篮修建立交桥时,在距铁路安全距离以外,将防电槽(10)提升到前横梁(1)和后横梁(2)下方,并将吊杆(15)由前横梁(1)和后横梁(2)下方从中部空隙穿入,使穿销孔(16)位于前横梁(1)和后横梁(2)的上方,在吊杆(15)上部的穿销孔(16)内穿入插销(17)并锁定,防电槽(10)即可悬挂在前横梁(1)和后横梁(2)下方,依次将所有的防电槽(10)安装锁定完毕,组成防电槽组(3)。用管接头(18)将所有相邻的两个防电槽(10)联通。在防电槽组(3)边缘外侧安装排水管(9),调整好排水管(9)的排水位置。将防坠落平台(4)安装在防电槽组(3)上面,将边模拦护平台(8)安装在边模上部,将防护栏杆(5)安装在防坠落平台(4)的四周,将防护网(6)安装在防坠落平台(4)的四周的上方。将挂篮的底部和四周全封闭。
所述的防电槽组(3)可以将悬灌挂篮与接触网带电体(19)屏蔽隔离;所述的防坠落平台(4)、防护栏杆(5)、防护网(6)和边模拦护平台(8)可以防止施工过程中的料具坠落到接触网上及运行的铁路线上;排水管(9)可以将聚集在防电槽(10)内的施工用水和雨水导流到远离接触网带电体(19)的安全地带。
本适用新型与现有技术相比有以下优点:
设计合理,成本低、安装拆除快捷方便,对应用场地条件要求不高,稳定性好,机动性好,安全可靠。特别适用于跨越多条电气化铁路立交桥的施工。
Claims (3)
1.一种跨电气化铁路立交桥施工挂篮防电防水防坠落装置,其特征在于:它由悬挂在前横梁(1)和后横梁(2)下方的防电槽组(3)、铺设在防电槽组(3)上方的防坠落平台(4)、设置在防坠落平台(4)周边的防护栏杆(5)、防护网(6)、设置在边模(7)上部的边模拦护平台(8)和设置在防电槽组(3)外侧的排水管(9)组成。
2.根据权利要求1所述的跨电气化铁路立交桥施工挂篮防电防水防坠落装置,其防电槽组(3)由多个防电槽(10)拼装而成,防电槽(10)由纵框(11)、横框(12)、横轴(13)和绝缘外套(14)组成,横轴(13)上设有吊杆(15),吊杆(15)与横轴(13)铰接,吊杆(15)可在横轴(13)上横向移动;吊杆(15)的上部设有穿销孔(16);将防电槽(10)提升到前横梁(1)和后横梁(2)下方,并将吊杆(15)由前横梁(1)和后横梁(2)下方从中部空隙穿入,使穿销孔(16)位于前横梁(1)和后横梁(2)的上方,在吊杆(15)上部的穿销孔(16)内穿入插销(17)并锁定,防电槽(10)即可悬挂在前横梁(1)和后横梁(2)下方,依次将所有的防电槽(10)安装锁定完毕,组成防电槽组(3)。
3.根据权利要求1所述的跨电气化铁路立交桥施工挂篮防电防水防坠落装置,其防电槽组(3)的多个防电槽(10)内安装有管接头(18),管接头(18)可以将相邻的两个防电槽(10)联通;在防电槽组(3)边缘外侧安装有排水管(9),排水管(9)可以调整排水的位置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009200939828U CN201560399U (zh) | 2009-07-10 | 2009-07-10 | 跨电气化铁路立交桥施工挂篮防电防水防坠落装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009200939828U CN201560399U (zh) | 2009-07-10 | 2009-07-10 | 跨电气化铁路立交桥施工挂篮防电防水防坠落装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201560399U true CN201560399U (zh) | 2010-08-25 |
Family
ID=42625545
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009200939828U Expired - Fee Related CN201560399U (zh) | 2009-07-10 | 2009-07-10 | 跨电气化铁路立交桥施工挂篮防电防水防坠落装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201560399U (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102286934A (zh) * | 2011-05-16 | 2011-12-21 | 师长宏 | 铰接悬挂式防护挂槽 |
CN102561193A (zh) * | 2011-12-23 | 2012-07-11 | 中铁四局集团第五工程有限公司 | 一种跨电气化铁路转体连续梁合拢段施工工艺及其挂篮 |
CN107447677A (zh) * | 2017-09-21 | 2017-12-08 | 陈培荣 | 速拼式挂篮防电挂槽组 |
CN109137732A (zh) * | 2018-06-08 | 2019-01-04 | 中交隧道工程局有限公司 | 一种防电挂槽柔性排水装置 |
WO2019047304A1 (zh) * | 2017-09-07 | 2019-03-14 | 朱秀青 | 一种悬臂挂篮施工的防护棚 |
CN109629451A (zh) * | 2019-01-30 | 2019-04-16 | 中铁七局集团郑州工程有限公司 | 跨多股道电气化铁路连续梁桥封闭式挂篮悬浇施工方法 |
-
2009
- 2009-07-10 CN CN2009200939828U patent/CN201560399U/zh not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102286934A (zh) * | 2011-05-16 | 2011-12-21 | 师长宏 | 铰接悬挂式防护挂槽 |
CN102561193A (zh) * | 2011-12-23 | 2012-07-11 | 中铁四局集团第五工程有限公司 | 一种跨电气化铁路转体连续梁合拢段施工工艺及其挂篮 |
WO2019047304A1 (zh) * | 2017-09-07 | 2019-03-14 | 朱秀青 | 一种悬臂挂篮施工的防护棚 |
WO2019047300A1 (zh) * | 2017-09-07 | 2019-03-14 | 朱秀青 | 一种连续梁跨公路附着式防护棚 |
CN107447677A (zh) * | 2017-09-21 | 2017-12-08 | 陈培荣 | 速拼式挂篮防电挂槽组 |
CN109137732A (zh) * | 2018-06-08 | 2019-01-04 | 中交隧道工程局有限公司 | 一种防电挂槽柔性排水装置 |
CN109629451A (zh) * | 2019-01-30 | 2019-04-16 | 中铁七局集团郑州工程有限公司 | 跨多股道电气化铁路连续梁桥封闭式挂篮悬浇施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201560399U (zh) | 跨电气化铁路立交桥施工挂篮防电防水防坠落装置 | |
CN204238149U (zh) | 柔性防撞活动隔离护栏 | |
CN203295961U (zh) | 一种铁路桥桥面安全防护布置结构 | |
CN206887774U (zh) | 一种大刚度跨高速公路全封闭式菱形挂篮 | |
CN204662273U (zh) | 一种可移动式连续梁合龙段施工模具 | |
CN103147389A (zh) | 一种新型的桥梁防护设施 | |
CN102787574B (zh) | 浅基础可移动式防撞装置 | |
CN207227953U (zh) | 一种新型公路桥梁用安全护栏结构 | |
CN206173802U (zh) | 高速公路桥面径流收集系统施工用移动吊篮 | |
CN204898574U (zh) | 一种防撞护栏 | |
CN205329539U (zh) | 一种防撞桥梁护栏 | |
CN203947436U (zh) | 波形梁双层护栏 | |
CN207176494U (zh) | 适于箱梁内部检修养护的通道结构 | |
CN205532717U (zh) | 隧道防护门防倾倒装置以及隧道防护门系统 | |
CN211200116U (zh) | 一种跨高速公路连续梁中跨合龙段钢壳施工防护架 | |
CN203361024U (zh) | 一种跨铁路施工全封闭绝缘装置 | |
CN208870488U (zh) | 一种钢结构工程外围防护装置 | |
WO2019047300A1 (zh) | 一种连续梁跨公路附着式防护棚 | |
CN202175925U (zh) | 桥墩防撞护栏 | |
CN202559705U (zh) | 轨道交通高架车站安全防护隔离措施挂架 | |
CN206940276U (zh) | 一种高速铁路遮板专用悬臂简易吊车 | |
CN208055945U (zh) | 一种市政防护栏 | |
CN205445620U (zh) | 一种用于副井井口的可推移式行人平台 | |
KR101137587B1 (ko) | 비상회차 가드레일 | |
CN212000673U (zh) | 移动防护车 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100825 Termination date: 20130710 |