CN201546735U - Lining trolley of synchronous construction with TBM advancing under condition of continuous belt conveyer mucking - Google Patents

Lining trolley of synchronous construction with TBM advancing under condition of continuous belt conveyer mucking Download PDF

Info

Publication number
CN201546735U
CN201546735U CN2009202502238U CN200920250223U CN201546735U CN 201546735 U CN201546735 U CN 201546735U CN 2009202502238 U CN2009202502238 U CN 2009202502238U CN 200920250223 U CN200920250223 U CN 200920250223U CN 201546735 U CN201546735 U CN 201546735U
Authority
CN
China
Prior art keywords
continuous belt
tbm
trolley
chassis
belt machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202502238U
Other languages
Chinese (zh)
Inventor
邓勇
王雁军
齐梦学
孙帮助
张富国
赵战欣
赵洪力
郭惠川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN2009202502238U priority Critical patent/CN201546735U/en
Application granted granted Critical
Publication of CN201546735U publication Critical patent/CN201546735U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A lining trolley of synchronous construction of simultaneous construction with TBM advancing under the condition of continuous belt conveyer mucking comprises a trolley rack, and is characterized in that a support with a special roller and an adjusting mechanism for a continuous belt conveyer is installed on the trolley rack; a large diameter flexadux passing mechanism is arranged on a trolley upper portion trolley structure; a trolley lower portion rack adopts a truss type transverse beam; the space of the lower portion rack leads at least two marshalling trains to pass through; a pipeline is arranged on a trolley; one end of the pipeline is connected to a concrete dispenser; and the other end of the pipeline is installed on a concrete casting opening needed by process. The lining trolley resolves the problem that open TBM advancing can not be simultaneously constructed with secondary die casting lining under the condition of continuous belt conveyer mucking, greatly shortens integral construction period of long and large tunnels, greatly increases safety in the period of tunnel construction, and conforms to the requirement of timely construction of secondary lining after the tunnels are dug.

Description

The lining trolley tunneling synchronous under the continuous belt machine muck removal condition with TBM
Technical field:
The utility model relates to a kind of constructing tunnel equipment of growing up, the lining trolley tunneling synchronous with TBM under particularly a kind of continuous belt machine muck removal condition.
Background technology:
Along with the continuous progress of Tunnel Design and construction level, the construction of TBM method has become the tunnel-preference of growing up, domestic this job practices of also wideling popularize.No matter adopted rail means of transportation muck removal or continuous belt machine muck removal in the work progress in the past, all be to apply the secondary moulded lining after the TBM driving is finished, can't realize that TBM tunnels and the secondary moulded lining is constructed synchronously, duration is longer, and can not conform to above the gauge of determining with tunnel excavation face spacing with the secondary lining of present code requirement.
Summary of the invention:
In order to overcome under the open type TBM continuous belt machine muck removal situation, tunnel the problem that can not construct synchronously with secondary lining, the utility model provides the chassis that TBM tunnels and the secondary moulded lining can be constructed synchronously under a kind of continuous belt machine muck removal condition.
The technical solution of the utility model is: the lining trolley tunneling synchronous with TBM under a kind of continuous belt machine muck removal condition, comprise the chassis stand, it is characterized in that: the support that the special use of continuous belt machine has roller and has guiding mechanism is installed on the chassis stand, in chassis upper stage shelf structure, the major diameter pneumatic hose is set and walks mechanism, chassis bottom stand adopts the truss-like crossbeam, and chassis bottom rack space is current simultaneously for two row marshalings at least; Arrange pipeline on the chassis, pipeline one end is connected in concrete dispenser, and the other end is installed on the concreting mouth of technological requirement.
The diameter of above-mentioned major diameter pneumatic hose is 2200mm.
Above-mentioned major diameter pneumatic hose outside is equipped with pneumatic hose protection tube, arranges some rollers in this protection tube.
The effective clear height 2800mm of above-mentioned chassis bottom rack space, effectively clear span 4000mm.
The above-mentioned rollers support is installed on the chassis column by bolt, realizes the upper and lower adjustment that roller supports by double nut; On the base plate of installing on the rolling wheel support, slotted hole is set, with the left and right adjustment that realizes that roller supports.
Between above-mentioned rollers support and the rolling wheel support mounting base yielding rubber piece is set.
Of the present utility model have following advantage and a good effect:
1, can realize that continuous belt machine muck removal is uninterrupted under the secondary moulded lining execution conditions.
2, can realize that TBM constructs required major diameter pneumatic hose ventilation uninterruptedly under the secondary moulded lining execution conditions.
3, can realize that the transportation of four rail two-wire rails is uninterrupted under TBM driving and the secondary moulded lining synchronization job working condition.
4, can realize not voltage regulator tube operation, avoid concrete pipeline in the process of building to influence train passage below the chassis.
5, solved the problem that country rock in the construction of TBM method open-assembly time is long, be unfavorable for adjoining rock stability, constructing tunnel duration shortens greatly simultaneously.
Description of drawings:
Fig. 1 is a synchronization lining chassis schematic cross-sectional view.
Fig. 2 is a synchronization lining chassis structure elevation.
Fig. 3 is that the position concerns schematic diagram between the ditch of the little abutment wall of chassis traveling and tunnel structure.
Fig. 4 is chassis upset bed die structure and upset track thereof.
Fig. 5 is the triangular support bracket two-segment type structure design schematic diagram that the continuous belt machine is fixed in the hole wall.
Fig. 6 is that the continuous belt machine passes through the thin portion of lining trolley structural representation.
1. inverted arch prefabricated sections among the figure, the 2. little abutment wall of chassis traveling, 3. chassis upset bed die; 4. bottom stand, 5. truss-like crossbeam, 6. top stand; 7. pneumatic hose is protected tube, 8. vent hose, 9. concrete dispenser; 10. tunnel excavation outline line, 11. combined bolting and shotcrete layers, 12. secondary lining layers; 13. the continuous belt machine, 14. continuous belt machine support rollers, 15. chassis bottom girders; 16. train and gauge thereof, 17. chassis traveling rail, 18. train traveling rail; 19. chassis column; 20. rolling wheel support, the cable channel of 21. tunnel structure things, the ditch of 22. tunnel structure things; 23. chassis bed die upset trajectory; 24. the two-segment type A-frame that the continuous belt machine is fixed at the hole wall, 25. rectangular tubes (conveyor longeron), 26. additional beams; 27. belt roller supporting plate; 28. the cushion block between additional beam and the rectangular tube, 29. bolts, 30. double nuts; 31. rolling wheel support mounting base plate; 32. the rolling wheel support mounting base, 33. yielding rubber pieces, 34. rolling wheel supports.
The specific embodiment:
1, as Fig. 1, rail haulage vehicle (16) gauge that the construction material transport point needs is of a size of 1900 * 2600mm (wide * height), current for realizing that rail transports four rail two-wires, consider simultaneously the train passage safe distance, the path arrangement pitch, require under the chassis door frame, the above effectively headroom of rail (18) rail level is not less than 4000 * 2800mm (wide * height).
For guaranteeing headroom in the stand, be required to be chassis and lay track specially, designed little abutment wall (2) for this reason, traveling is on as the little abutment wall in the both sides of a tunnel structure part, and the end face of this little abutment wall (2) is bottom surface, ditch, tunnel (22) (referring to Fig. 3); Chassis bottom stand (4), effective clear height 2800mm, effective clear span 4000mm can be current simultaneously for 2 row marshalings, provides condition for TBM driving and Second Lining Construction need to transport a large amount of construction materials fast incessantly.
As Fig. 1, occupy the train passage space for avoiding in the concreting process voltage regulator tube operation, influence TBM driving material and the concrete transportation of secondary lining, the present invention has designed special-purpose concrete dispenser (9) and perfect piping system, according to the concreting technological requirement, arrange pipeline on chassis, an end is connected in concrete dispenser, and the other end is installed on the concreting mouth of technological requirement.The concrete that the delivery pump pumping comes, the quantity that requires according to casting craft and building a little is assigned to exactly in the corresponding pipeline through concrete dispenser, and then sends to and build a little.
As Fig. 4, influence clear span in the train passage when avoiding the demoulding, footing mould (3) is designed to the small size turning mould, guarantees that its upset running orbit (23) can not surmount bottom girder (15) inboard.
2, as Fig. 1; TBM construction vent hose (8) diameter 2200mm, no matter need to guarantee which kind of duty lining trolley be in, but all continuous ventilatings; at chassis upper stage frame the major diameter pneumatic hose is set and walks mechanism and safeguard procedures, be i.e. pneumatic hose protection tube (7).
Arrange some rollers in the pneumatic hose protection tube, avoid air chimney directly to contact the power of effectively reducing friction with steel construction piece.The oblique transition girder of air chimney is adopted in the chassis end, reduces the resistance when walking to greatest extent.
3, as Fig. 5, in the secondary moulded lining work progress, continuous belt machine (13) all needs running continuously in any case, and the chassis zone only allows to remove the continuous belt machine at the fixing triangular support bracket (24) of hole wall.When chassis advanced, chassis the place ahead conveyor tripod need be removed by part, and the rear tripod need be installed on the hole wall that lining cutting finishes by part.
4, as Fig. 6, be fixed with belt roller supporting plate (27) on the conveyor quarter bend (25), the bottom is not a plane, can not directly walk on roller, therefore additional track (being called for short additional beam) (26) below quarter bend.Additional beam adopts hollow quarter bend to make, and weight reduction adopts Simple fastener to install, and is convenient to operation.Additional beam top keeps at a certain distance away and adds the weld pad piece, to dodge the connecting screw rod on the former conveyor quarter bend.Each is some for additional trammel lattice: 4572mm/2000mm/, causes the interference of cushion block and screw rod when preventing same specification.
5, as Fig. 6, rolling wheel support (34) can the upper and lower, left and right adjustment and effectively locking, with adapt to chassis with respect to conveyor have upper and lower to or during the relative displacement of left and right direction, conveyor can still keep original attitude constant.Rolling wheel support (34) is installed on the chassis column (19) by bolt (29), realizes the upper and lower adjustment that roller supports by double nut (30); Simultaneously, on the rolling wheel support mounting base plate (31) slotted hole is set, to adjust about the support of realization roller; After the adjustment of roller position is finished, realize effectively locking by double nut (30).
6, for to avoid the vibration in the continuous belt machine running that chassis and lining concrete structure are impacted, need simple, the obvious results damping device of project organization.As figure (5), specific practice is: between rolling wheel support (34) and rolling wheel support mounting base (32) yielding rubber piece (33) is set.If the conveyor vibration influence to concrete structure still can not be effectively avoided in this measure, special-shaped column can also be set, be installed between inverted arch prefabricated section and the turning rolls, with conduct vibrations to inverted arch prefabricated section (1).

Claims (6)

1. the lining trolley tunneling synchronous under the continuous belt machine muck removal condition with TBM, comprise the chassis stand, it is characterized in that: the support that the special use of continuous belt machine has roller and has guiding mechanism is installed on the chassis stand, in chassis upper stage shelf structure, the major diameter pneumatic hose is set and walks mechanism, chassis bottom stand adopts the truss-like crossbeam, and chassis bottom rack space is current simultaneously for two row marshalings at least; Arrange pipeline on the chassis, pipeline one end is connected in concrete dispenser, and the other end is installed on the concreting mouth of technological requirement.
2. the lining trolley tunneling synchronous with TBM under the continuous belt machine muck removal condition according to claim 1, it is characterized in that: the diameter of above-mentioned major diameter pneumatic hose is 2200mm.
3. the lining trolley tunneling synchronous with TBM under the continuous belt machine muck removal condition according to claim 1 is characterized in that: above-mentioned major diameter pneumatic hose outside is equipped with pneumatic hose protection tube, arranges some rollers in this protection tube.
4. the lining trolley tunneling synchronous with TBM under the continuous belt machine muck removal condition according to claim 1 is characterized in that: the effective clear height 2800mm of above-mentioned chassis bottom rack space, effectively clear span 4000mm.
5. the lining trolley tunneling synchronous under the continuous belt machine muck removal condition according to claim 1 with TBM, it is characterized in that: the above-mentioned rollers support is installed on the chassis column by bolt, realizes the upper and lower adjustment that roller supports by double nut; On the base plate of installing on the rolling wheel support, slotted hole is set, with the left and right adjustment that realizes that roller supports.
6. the lining trolley tunneling synchronous with TBM under the continuous belt machine muck removal condition according to claim 1 or 5 is characterized in that: between above-mentioned rollers support and the rolling wheel support mounting base yielding rubber piece is set.
CN2009202502238U 2009-11-12 2009-11-12 Lining trolley of synchronous construction with TBM advancing under condition of continuous belt conveyer mucking Expired - Fee Related CN201546735U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202502238U CN201546735U (en) 2009-11-12 2009-11-12 Lining trolley of synchronous construction with TBM advancing under condition of continuous belt conveyer mucking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202502238U CN201546735U (en) 2009-11-12 2009-11-12 Lining trolley of synchronous construction with TBM advancing under condition of continuous belt conveyer mucking

Publications (1)

Publication Number Publication Date
CN201546735U true CN201546735U (en) 2010-08-11

Family

ID=42601909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202502238U Expired - Fee Related CN201546735U (en) 2009-11-12 2009-11-12 Lining trolley of synchronous construction with TBM advancing under condition of continuous belt conveyer mucking

Country Status (1)

Country Link
CN (1) CN201546735U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102477866A (en) * 2010-11-25 2012-05-30 中铁十八局集团有限公司 Formworking jumbo with favorable ventilation performance
CN102518449A (en) * 2011-12-05 2012-06-27 中铁十八局集团有限公司 Tunnel boring machine (TBM) synchronous lining trolley for overlaying inner cambered surface inverted-arch precast block tunnel and hole

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102477866A (en) * 2010-11-25 2012-05-30 中铁十八局集团有限公司 Formworking jumbo with favorable ventilation performance
CN102518449A (en) * 2011-12-05 2012-06-27 中铁十八局集团有限公司 Tunnel boring machine (TBM) synchronous lining trolley for overlaying inner cambered surface inverted-arch precast block tunnel and hole

Similar Documents

Publication Publication Date Title
CN102061926A (en) TBM tunneling and secondary lining synchronous construction method at mucking of continuous belt conveyor and trolley
CN101929341B (en) Construction method for TBM synchronization lining
CN201246169Y (en) Tunnel development synchronous lining formwork trolley
CN103899335A (en) Inverted arch lining trolley, synchronous tunnel operating system and inverted arch synchronous lining method
CN102337905A (en) Open type TBM (Tunnel Boring Machine) fullface synchronous lining trolley for hydraulictunnel
CN103133012A (en) Open type tunnel boring machine (TBM) on-site concrete inverted arch synchronous lining trolley
CN108756892B (en) Work platform, continuous operation system and continuous operation method for tunnel construction
CN203308471U (en) Open type TBM cast-in-place concrete inverted arch synchronous lining trolley
CN202991063U (en) Large-section tunnel hydraulic trolley
CN104179090B (en) A kind of subway is laid a railway track system
CN105755964A (en) Low-level bridge erection machine for erecting high-speed railway bridge
CN201546735U (en) Lining trolley of synchronous construction with TBM advancing under condition of continuous belt conveyer mucking
CN203847130U (en) Cast-in-situ inverted arch lining trolley and concrete curing system capable of being synchronously constructed along with boring of TMB (tunnel boring machine)
CN105525926B (en) The pneumatic tracked carrier of digging laneway and supporting platform
CN108952768A (en) A kind of stage apparatus of Shield tunnel secondary grouting
CN102518449A (en) Tunnel boring machine (TBM) synchronous lining trolley for overlaying inner cambered surface inverted-arch precast block tunnel and hole
CN210217775U (en) Steel mould trolley for small-section tunnel
CN202417521U (en) TBM (tunnel boring machine) synchronization lining trolley for paving intrados inverted arch precast blocks in tunnel and hole
CN103397889A (en) Starting trolley for split starting of shield
CN202300422U (en) Open type tunnel boring machine (TBM) full cross section synchronous lining building trolley for hydraulic tunnel
CN206797384U (en) Supporting trailer after shield machine marshaling travelling platform and shield machine
CN207018012U (en) A kind of tunnel partition wall uses formwork jumbo
KR102100692B1 (en) Construction method of concrete ballast in tunnel
CN111173445B (en) Drilling is with moving platform truck based on construction of TBM method tunnel
CN213235079U (en) Concrete formwork supporting structure for underground excavation tunnel deformation joint post-cast strip

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100811

Termination date: 20141112

EXPY Termination of patent right or utility model