CN201526176U - Modularized workshop structure - Google Patents
Modularized workshop structure Download PDFInfo
- Publication number
- CN201526176U CN201526176U CN2009201111311U CN200920111131U CN201526176U CN 201526176 U CN201526176 U CN 201526176U CN 2009201111311 U CN2009201111311 U CN 2009201111311U CN 200920111131 U CN200920111131 U CN 200920111131U CN 201526176 U CN201526176 U CN 201526176U
- Authority
- CN
- China
- Prior art keywords
- production
- factory building
- modularized
- courtyard
- floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Residential Or Office Buildings (AREA)
Abstract
The utility model discloses a modularized workshop structure which relates to the structural design of a multi-floor pharmaceutical company clean workshop. The workshop consists of at least two-floor building with the first floor being a comprehensive area (A) and the other floor being a production operation area (B), wherein the production operation area (B) consists of at least one modularized production area (3) and a visit corridor (C) surrounding the production operation area which are independent with each other; the comprehensive area (A) is provided with an entrance (D), a changing room and a shower cubicle for each modularized production area (3). The modularized workshop structure leads the transportation of workers to be more convenient, reduces the walking distance, lowers the air conditioning energy consumption and embodies the energy-saving feature. Secondly, the design of a courtyard on a staircase not only can lead the staircase to meet the requirements of fire standards, but also can conduct natural lighting through the courtyard and reduce the investment cost. The changing rooms and shower cubicles for the workers can be arranged on the first floor and on the interlayer between the staircases of all the floors, thus leading the personnel of different production areas to conveniently enter the corresponding production areas, and fully using the used space among the floors. The circular visit corridor and the workshop production module do not generate any intersection, and disposable caps, masks and the like need not to be used, thus reducing the cost of the company.
Description
Technical field
The utility model relates to the structure design of a kind of multilayer pharmaceutical enterprise clean room.
Background technology
In traditional pharmacy corporation clean room design, the staff enters Production Regional generally dual mode, and the one, entering each Production Regional again after unified the changing one's clothes near the entrance hall, factory building workshop, the 2nd, the staff directly enters the production area after each Production Regional is changed one's clothes.No matter but which kind of mode, the staff all needs to walk exterior feature or passage by special staff, if the factory building scale of construction is bigger, it is relatively just long that then personnel enter the distance of production area, just exist staff's route when entering the production area longer, thereby reduce the effective time, and the long defective that will increase corresponding air conditioning energy consumption of passage.Tradition pharmacy corporation factory building washroom is arranged near the operation room, and it is improper to be provided with as ventilation, can produce smell, might bring certain risk to quality managemant simultaneously, causes the contamination of products accident.In traditional pharmacy plant designing, the visitor generally need pass through the change one's clothes program identical with the staff, visit along staffs only then, visitor's number can cause more for a long time change one's clothes crowded, increase the use of disposable cap, mouth mask etc., add the cost of large enterprises.Visitor and staffs only are parallel, can cause certain influence to production.
The structure design of the utility model factory building has overcome the shortcoming of above traditional pharmacy factory building, realizes that the production operation district and the personnel channel of each function is relatively independent.
The utility model content
The purpose of this utility model is to overcome the drawback of traditional pharmacy corporation plant designing, is taking into full account the special requirement of pharmacy corporation for the production operation district of factory building, and a kind of a kind of modularized factory building structure of convenient and swift, energy-conservation, health is provided.
A kind of modularized factory building structure described in the utility model, factory building is made of floor rooms at least 2, it is characterized in that: one deck is the mixed use area, one deck is above to be the production operating space, the production operation district forms by at least one modularization Production Regional with around the visit corridor in production operation district, modularization Production Regional and separate around the visit corridor in production operation district, the mixed use area is provided with inlet, dressing room and the shower cubicle of each modularization Production Regional.
Described modularized factory building structure is provided with courtyard in each modularization Production Regional, and the inlet of each modularization Production Regional is located at one deck, and dressing room and shower cubicle are arranged in the Stall interlayer of one deck.
Described Stall interlayer is the next door of stair in each modularization Production Regional, a structure interlayer that adds between 2.8~3.3 meters eminences in distance one deck ground are pushed up extremely from level to level.
Described modularized factory building structure, described visit corridor be arranged at each floor production operation district around, visit between corridor and the production operation district direct interface channel be not set, separate.
Modularized factory building structure described in the utility model, the centre in each floor production operation district is provided with courtyard, and the modularization Production Regional is separated in the both sides of courtyard, and the centre of courtyard is provided with interface channel, the two ends of courtyard are respectively arranged with stair, and each modularization Production Regional interconnects by passage.
A side of courtyard is provided with stair as staff only in the modularized factory building structure described in the utility model, each modularization Production Regional, and each layer staircase interlayer is provided with dressing room or shower cubicle or washroom.
Modularized factory building structure described in the utility model, the ground of visiting the corridor are higher than 0.4~0.6 meter on the ground in production operation district.
Modularized factory building structure described in the utility model, every layer floor height is between 5~7 meters.
Modularized factory building structure described in the utility model, factory building one deck mixed use area is provided with warehouse district, power station, switchgear house.
Modularized factory building structure described in the utility model, utilize the interlayer position of the staircase between each floor of multilayer pharmaceutical factory building that the washroom is set, staircase interlayer between each floor promptly is meant the corner of stair between each layer, can make full use of the space of pharmacy factory building floor height, the interlayer different with the floor height of modularization Production Regional is set.Described modularized factory building structure is independently visited between corridor and the production operation district around the production operation district of factory building direct interface channel is not set, and is separate; Visit ground, corridor and be higher than 0.4~0.6 meter on ground, production operation district, be convenient to visit to Production Regional, modularized factory building structure described in the utility model, the staff only needs the modularization Production Regional that can enter corresponding production operation district by the other independent personnel's stair of courtyard, traffic is the most easily, significantly reduce personnel's travel distance, avoided the problem of the long air conditioning energy consumption that brings apart from the corridor simultaneously, embodied energy-conservation characteristics.Secondly, stair add the design of courtyard, can avoid sealing the equipment that stair need equipment cup and forced fume exhaust, can make the staircase natural ventilation again, the comfortableness that the increase personnel pass through makes stair can pass through the courtyard natural lighting again even stair satisfy the requirement of fire protection rule, reduces cost of investment.Staff's dressing room, shower cubicle are arranged at one deck, convenient management, and the Stall interlayer of one deck is as personnel's dressing room and shower cubicle, the space of the one deck that can make full use of, the problem that the solution personnel change one's clothes does not influence the use of one deck again, reaches the purpose of saving building costs.To change one's clothes, the clean system of people such as shower is arranged at each layer staircase interlayer position, the Production Regional that makes the personnel of variant Production Regional can enter appropriate level has the most easily made full use of the usage space of floor gap again.Utilize the position of each floor gap staircase interlayer that the washroom is set, can satisfy employee's needs, can avoid health to produce influence again, also can directly ventilate simultaneously, avoid the generation of peculiar smell and the health influence of Production Regional to courtyard to Production Regional.Special-purpose annular is set in the utility model visits the corridor, visit the corridor simultaneously and do not produce any intersection with the Workshop Production module, the visitor is to need not to use disposable cap, mouth mask etc. visiting Production Regional, reduce the cost of enterprise, simultaneously visitor's number can or not cause more for a long time yet change one's clothes crowded, visit the corridor and compare 0.4~0.6 meter of lifting with the plant operations face, make the visitor recognize the production procedure of modern pharmaceutical enterprise, the production operation of enterprise is not had any impact simultaneously in a more favourable mode.
Description of drawings
Fig. 1 is the utility model one deck mixed use area plane structure schematic diagram.
Fig. 2 is the utility model production operation district plane structure schematic diagram.
Fig. 3 is the utility model production operation district plane structure schematic diagram.
Fig. 4 is the utility model staircase interlayer and stair counter structure schematic diagram.
Among the figure, 1-staircase interlayer; Courtyard in the 2-modularization Production Regional; 3-modularization Production Regional; The 4-passage; The A-mixed use area; B-production operation district; C-visits the corridor; The inlet of D-modularization Production Regional; Courtyard in the middle of the E-production operation district; F-Stall interlayer.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in further detail the utility model content, but the utility model patent is not limited to this.
Embodiment 1
A kind of modularized factory building structure, factory building is made of floor rooms 2, every layer floor height is at 5 meters, one deck is mixed use area A, be production operating space B more than two layers, production operation district B forms by a modularization Production Regional 3 with around the visit corridor C around the production operation district B, and direct interface channel is not set between modularization Production Regional 3 and the visit corridor C around the production operation district, separate, the ground of visiting corridor C is higher than 0.4 meter on the ground in production operation district.Courtyard 2 is set in the modularization Production Regional 3, the inlet D of modularization Production Regional 3 is located at one deck mixed use area A, dressing room and shower cubicle are arranged in the Stall interlayer F of one deck, interlayer F is the next door of stair in modularization Production Regional 3, a structure interlayer that adds between the 2.8 meters eminences in distance one deck ground are pushed up extremely from level to level.A side of courtyard 2 is provided with stair as staff only in modularization Production Regional 3, and each layer staircase interlayer 1 all is provided with dressing room, shower cubicle and washroom.Factory building one deck mixed use area A is provided with warehouse district, power station, switchgear house.
A kind of modularized factory building structure, factory building is made of floor rooms 3, every layer floor height is at 6 meters, one deck is mixed use area A, two, three layers are production operating space B, production operation district B forms by 3 modularization Production Regional 3 with around the visit corridor C around the production operation district B, between modularization Production Regional 3 and the visit corridor C direct interface channel is not set around the production operation district, separate, the ground of visiting corridor C is higher than 0.5 meter on the ground in production operation district, Stall interlayer F is located at a structure interlayer that extremely adds between the top from level to level apart from the 3 meters eminences in one deck ground, and all the other are with embodiment 1.
Modularized factory building structure described in the utility model, factory building is made of floor rooms 10, every layer floor height is at 7 meters, the centre of each floor production operation district B is provided with courtyard E, with the both sides of modularization Production Regional 3 separations at courtyard E, the centre of courtyard E is provided with interface channel 4, and the two ends of courtyard are respectively arranged with stair.All the other are with embodiment 2.
By one deck mixed use area A, above each floor production operation district B of one deck and form around the visit corridor C in production operation district.Production operation district B is divided into 4 independently modularization production areas 3, its inlet D is located at one deck, in each modularization Production Regional courtyard 2 is set, staff's dressing room, shower cubicle are arranged on the Stall interlayer F of one deck, Stall interlayer F is the next door of stair in each modularization Production Regional, a structure interlayer that adds between the 3.3 meters eminences in distance one deck ground are pushed up extremely from level to level; Visit corridor C be arranged at above each the floor production operation district of one deck around, visit between corridor C and the production operation district direct interface channel be not set, separate, visit ground, corridor is higher than 0.6 meter on ground, production operation district, all the other are with embodiment 2.
Embodiment 5
Described modularized factory building structure, factory building is made of floor rooms 5, and every layer floor height is at 5.5 meters, and modularization production area 3 is 8, and all the other are with embodiment 3.
Claims (8)
1. modularized factory building structure, factory building is made of floor rooms at least 2, it is characterized in that: one deck is mixed use area (A), one deck is above to be production operating space (B), production operation district (B) forms by at least one modularization Production Regional (3) with around the visit corridor (C) in production operation district, modularization Production Regional (3) and separate around the visit corridor (C) in production operation district, mixed use area (A) is provided with inlet (D), dressing room and the shower cubicle of each modularization Production Regional (3).
2. modularized factory building structure according to claim 1, it is characterized in that, in each modularization Production Regional (3) courtyard (2) is set, the inlet (D) of each modularization Production Regional (3) is located at one deck, and dressing room and shower cubicle are arranged in the Stall interlayer (F) of one deck.
3. modularized factory building structure according to claim 2 is characterized in that, described Stall interlayer (F) is the next door of stair in each modularization Production Regional, a structure interlayer that adds between 2.8~3.3 meters eminences in distance one deck ground are pushed up extremely from level to level.
4. modularized factory building structure according to claim 1, it is characterized in that, the centre in each floor production operation district (B) is provided with courtyard (E), with the both sides of modularization Production Regional (3) separation at courtyard (E), the centre of courtyard (E) is provided with interface channel (4), the two ends of courtyard (E) are respectively arranged with stair, and each modularization Production Regional (3) interconnects by passage (4).
5. modularized factory building structure according to claim 1 is characterized in that, a side of each interior courtyard of modularization Production Regional (3) (2) is provided with stair, and each layer staircase interlayer (1) is provided with dressing room or shower cubicle or washroom.
6. modularized factory building structure according to claim 1 is characterized in that, the ground of visiting corridor (C) is higher than 0.4~0.6 meter on the ground in production operation district.
7. modularized factory building structure according to claim 1 is characterized in that every layer floor height is between 5~7 meters.
8. modularized factory building structure according to claim 1 is characterized in that, factory building one deck mixed use area (A) is provided with warehouse district, power station, switchgear house.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201111311U CN201526176U (en) | 2009-03-30 | 2009-03-30 | Modularized workshop structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201111311U CN201526176U (en) | 2009-03-30 | 2009-03-30 | Modularized workshop structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201526176U true CN201526176U (en) | 2010-07-14 |
Family
ID=42517465
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009201111311U Expired - Fee Related CN201526176U (en) | 2009-03-30 | 2009-03-30 | Modularized workshop structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201526176U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106401224A (en) * | 2016-11-24 | 2017-02-15 | 中国电子工程设计院 | Clean room factory structure |
-
2009
- 2009-03-30 CN CN2009201111311U patent/CN201526176U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106401224A (en) * | 2016-11-24 | 2017-02-15 | 中国电子工程设计院 | Clean room factory structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101503916B (en) | Modularized factory building structure | |
CN204402090U (en) | Avoid the biological medicine mill construction of the stream of people, logistics intersection | |
CN211173275U (en) | Plane arrangement structure of line side-down type small and medium high-speed rail station house | |
CN201526176U (en) | Modularized workshop structure | |
CN112096131B (en) | Transportation hub complex personnel evacuation facility | |
CN204590232U (en) | A kind of core tube of high-rise building | |
CN205035706U (en) | Three -dimensional stack transportation junction of festival ground type | |
CN201694713U (en) | Special elevator for fifth, sixth and seventh floors of multi-storey residential building | |
CN210858148U (en) | Novel enclose box-like commercial building | |
CN213705414U (en) | Urban underground rail transit transfer station | |
CN204238579U (en) | A kind of multi-storey residential buildings add the uninterrupted communication structure connecing elevator | |
CN207063624U (en) | A kind of self-propelled parking building that saves land | |
CN202578033U (en) | Corridor connecting separated independent common elevator for multiple residences and families | |
CN201943371U (en) | Superposition villa | |
CN110469162B (en) | Clean factory building integral structure for medicine production and factory building operation method | |
CN205688578U (en) | Separate type steelframe glass architecture | |
CN212317573U (en) | Residential traffic core and building with same | |
CN203474172U (en) | Layered elevator with inner lift cars and outer lift cars | |
Mui | From intelligent building to smart city-A case study | |
CN204369367U (en) | A kind of three-dimensional column elevator structure | |
CN202767560U (en) | High-rise apartment building access hub with natural lighting and ventilation design | |
CN203583917U (en) | Gear-type residential building | |
CN201420406Y (en) | Tower-type high-rise residential building for solving ventilation problem of middle households | |
CN207420139U (en) | A kind of line side formula railway station building arrangement | |
CN203112265U (en) | Underground garage power control device matched with elevator monitoring system for use |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100714 Termination date: 20120330 |