CN211173275U - Line-side down-type small and medium-sized high-speed railway station building layout structure - Google Patents
Line-side down-type small and medium-sized high-speed railway station building layout structure Download PDFInfo
- Publication number
- CN211173275U CN211173275U CN201921615147.6U CN201921615147U CN211173275U CN 211173275 U CN211173275 U CN 211173275U CN 201921615147 U CN201921615147 U CN 201921615147U CN 211173275 U CN211173275 U CN 211173275U
- Authority
- CN
- China
- Prior art keywords
- hall
- railway station
- station building
- waiting
- railway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009423 ventilation Methods 0.000 claims description 4
- 238000007689 inspection Methods 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 4
- 238000005457 optimization Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
Images
Landscapes
- Residential Or Office Buildings (AREA)
Abstract
本实用新型公开了一种线侧下式中小型高铁站房平面布置结构,包括铁路站场和位于铁路站场一侧且低于轨面至少5米的主体站房,所述主体站房包括中部挑高的候车大厅以及两侧的双层结构区,所述候车大厅一侧的双层结构区的下层布置有出站厅,上层布置办公用房和设备用房;所述候车大厅另一侧的双层结构区的下层布置有售票厅,上层为办公用房和设备用房;所述铁路站场两侧设有均设楼梯及电梯,所述铁路站场底部设有贯通的旅客通道;所述主体站房的出口经或不经旅客通道分别与所述铁路站场两侧的楼梯及电梯连通。本实用新型空间紧凑合理,造价低廉、施工简便、满足办公及旅客动线优化要求。
The utility model discloses a line-side down type small and medium-sized high-speed railway station building plane layout structure, which comprises a railway station yard and a main station building located at one side of the railway station yard and at least 5 meters below the rail surface. The main station building includes The waiting hall is elevated in the middle and the double-layer structure area on both sides. The lower layer of the double-layer structure area on one side of the waiting hall is arranged with an exit hall, and the upper layer is arranged with office rooms and equipment rooms; the other side of the waiting hall is arranged. The lower floor of the double-layer structure area on the side is arranged with a ticket hall, and the upper floor is an office room and an equipment room; the railway yard is provided with stairs and elevators on both sides, and the bottom of the railway yard is provided with a pass-through passenger passage ; The exit of the main station building is communicated with the stairs and elevators on both sides of the railway station through or without the passenger passage. The utility model has compact and reasonable space, low cost, simple and convenient construction, and can meet the optimization requirements of office and passenger moving lines.
Description
技术领域technical field
本实用新型涉及一种轨道交通用房屋平面布置结构。The utility model relates to a plane layout structure of a house for rail transit.
背景技术Background technique
为节约投资与铁路运营安全,中小型高铁站房一般布置在铁路站场一侧,称为线侧式铁路站房。根据铁路站场线路和站房平台城市广场的地形高差关系,线侧式站房细分为线侧平式、线侧下式、线侧上式等几种形式。线侧下式高铁站是线侧式铁路站房的一种,其特点是高铁站房位于站场的一侧,站房和站场相对独立,首层地面标高低于轨面高差较大(高差5~10m),需经过旅客地道到达中间站台。高速铁路在穿越城市时,为了保障运输安全,往往会把线路架起以高于百年一遇洪水位,导致车站所在地的广场及路网与铁路线路的标高存在较大高差,对于高峰小时旅客发送量少于5000人或最高聚集人数小于3000人的中小型高铁车站而言,如何在尽可能减少投资成本的前提下,有效利用空间、便于施工,满足高铁车站关于管理用房、设备用房、功能厅和卫生间等配置需要,满足旅客进出站、购票和候车等动线要求,是本领域技术人员需要进行研究的方法。In order to save investment and railway operation safety, small and medium-sized high-speed railway station buildings are generally arranged on one side of the railway yard, which is called a line-side railway station building. According to the relationship between the terrain and height of the railway station line and the station building platform, the line side station building is subdivided into several forms such as line side flat type, line side lower type, and line side upper type. The line-side down-type high-speed railway station is a type of line-side railway station building. It is characterized in that the high-speed railway station building is located on one side of the station yard. (The height difference is 5-10m), and it is necessary to go through the passenger tunnel to reach the intermediate platform. When high-speed railways pass through cities, in order to ensure transportation safety, the lines are often erected higher than the once-in-a-century flood level, resulting in a large height difference between the square and road network where the station is located and the elevation of the railway line. For small and medium-sized high-speed rail stations with less than 5,000 people or a maximum gathering number of less than 3,000 people, how to effectively use space and facilitate construction on the premise of reducing investment costs as much as possible to meet the requirements of high-speed rail stations for management rooms and equipment rooms. It is a method that those skilled in the art need to research.
发明内容SUMMARY OF THE INVENTION
本实用新型的目的是为了解决上述技术问题,提供一种空间紧凑合理,造价低廉、施工简便、满足管理及旅客动线优化要求的线侧下式中小型高铁站房平面布置结构。The purpose of this utility model is to solve the above-mentioned technical problems, and to provide a small and medium-sized high-speed railway station building layout structure under the line side, which is compact and reasonable in space, low in cost, simple in construction, and meets the requirements of management and optimization of passenger moving lines.
技术方案包括铁路站场和位于铁路站场一侧且低于轨面至少5米的主体站房,所述主体站房包括中部挑高的候车大厅以及两侧的双层结构区,所述候车大厅一侧的双层结构区的下层布置有出站厅,上层布置管理用房和设备用房;所述候车大厅另一侧的双层结构区的下层布置有售票厅,上层布置管理用房和设备用房;所述铁路站场两侧设有均设楼梯及电梯,所述铁路站场底部设有贯通的旅客通道;所述主体站房的出口经或不经旅客通道分别与所述铁路站场两侧的楼梯及电梯连通。The technical solution includes a railway yard and a main station building located on one side of the railway yard and at least 5 meters below the rail surface, the main station building including a waiting hall elevated in the middle and a double-layered structure area on both sides, the waiting hall. The lower level of the double-layer structure area on one side of the hall is arranged with the departure hall, and the upper level is arranged with management rooms and equipment rooms; the lower level of the double-layer structure area on the other side of the waiting hall is arranged with a ticket hall, and the upper level is arranged with management rooms and equipment rooms; stairs and elevators are provided on both sides of the railway yard, and a pass-through passenger passage is arranged at the bottom of the railway yard; the exit of the main station building is connected to the The stairs and elevators on both sides of the railway station are connected.
所述候车大厅的入口处设有外门斗,所述候车大厅内设有与入口处对应的服务台,所述入口处与服务台之间的转运通道连通售票厅;所述服务台后方的候车区经安检设施与售票厅连通。There is an outer door bucket at the entrance of the waiting hall, a service desk corresponding to the entrance is arranged in the waiting hall, and the transfer passage between the entrance and the service desk is connected to the ticket hall; The waiting area is connected to the ticket office through the security check facility.
所述出站厅的内侧布置有为候车区服务的管理用房,外侧布置有设备用房和为出站厅服务的第一卫生间;所述售票厅的外侧布置有管理用房,后方布置有为候车区服务的第二卫生间。The inside of the exit hall is arranged with a management room serving the waiting area, and the outside is arranged with an equipment room and a first toilet serving the exit hall; the outside of the ticket hall is arranged with a management room, and the rear is arranged with a room for management. A second toilet serving the waiting area.
所述两侧的双层结构区的上层中部设有用于通风和采光的天井。A patio for ventilation and lighting is provided in the middle of the upper layer of the double-layer structure area on both sides.
所述铁路站场上设有站台雨棚;所述铁路站场两侧的楼梯上方设有挡雨罩棚。A platform canopy is arranged on the railway station yard; a rain shield canopy is arranged above the stairs on both sides of the railway station yard.
有益效果:Beneficial effects:
1.采用挑高候车厅和两侧的双层结构区结合,挑高的候车厅能够给带乘客舒适的感受,也有利于通风和采风;合理利用两侧空间的高度,设置双层结构区,上层可用来布置更多的管理用房与设备用房,从而将更多的一层空间让给售票厅和出站厅。1. The high-rise waiting hall is combined with the double-layer structure area on both sides. The high-rise waiting hall can give passengers a comfortable feeling, and is also conducive to ventilation and wind collection; rationally use the height of the space on both sides to set up a double-layer structure area , the upper floor can be used to arrange more management rooms and equipment rooms, so as to give more space on the first floor to the ticket hall and the departure hall.
2.出站厅的一侧布置有为候车区服务的管理用房,可以方便的为旅客提供服务,同时也将候车厅和出站厅分隔开来,从而隔开候车旅客和出站旅客,便于分流;外侧布置有设备用房和为出站厅服务的第一卫生间,该处的设备用房可以将出入口单独朝外设置,不和出站旅客的动线冲突;2. A management room serving the waiting area is arranged on one side of the departure hall, which can provide convenient services for passengers. At the same time, it also separates the waiting hall and the departure hall, so as to separate the waiting passengers and the departing passengers. The equipment room and the first toilet serving the outbound hall are arranged on the outside, and the equipment room here can be set up with the entrance and exit facing outwards separately, so as not to conflict with the moving lines of outbound passengers;
3.售票厅的外侧布置有管理用房,后方布置有为候车区服务的第二卫生间,此处的管理用房同样可以将出入口单独朝外设置,由于上层分担了管理用房和设备用房的空间负担,因而下层可以设置更多的卫生间,厕位数完全满足《铁路旅客车站设计规范》。3. There is a management room on the outside of the ticket hall, and a second toilet serving the waiting area at the back. The management room here can also be set up with the entrance and exit separately. Since the upper floor shares the management room and equipment room Therefore, more toilets can be set up on the lower floor, and the number of toilets fully meets the "Code for Design of Railway Passenger Stations".
4.候车厅的入口处与服务台之间的形成转运通道连通售票厅,来自候车厅入口和售票厅的旅客统一经安检设施进入候车厅,便于统一管理的同时也最大程度优化旅客动线。4. A transfer channel is formed between the entrance of the waiting hall and the service desk to connect the ticket hall. Passengers from the entrance of the waiting hall and the ticket hall enter the waiting hall through the security check facilities, which is convenient for unified management and optimizes the passenger flow to the greatest extent.
5.本实用新型空间紧凑合理,造价低廉、施工简便,满足车站管理及旅客动线优化要求。5. The utility model has compact and reasonable space, low cost and simple construction, and meets the requirements of station management and passenger movement optimization.
附图说明Description of drawings
图1是本实用新型的线侧下式中小型高铁站下层平面布置示意图;1 is a schematic diagram of the lower level layout of a line-side down-type small and medium-sized high-speed railway station of the present invention;
图2是本实用新型的线侧下式中小型高铁站上层平面布置示意图;2 is a schematic diagram of the upper floor plan layout of the line-side down type medium and small high-speed railway station of the present invention;
图3是本实用新型的实施例的车站垂轨道方向剖面结构示意图。FIG. 3 is a schematic cross-sectional structural diagram of a station in a vertical track direction according to an embodiment of the present invention.
图中:1候车大厅,2售票厅,3出站厅,4第一卫生间,5设备用房,6管理用房,7转运通道,8第二卫生间,9楼梯,10安检设施,11挡雨罩棚,12旅客地道,13站台雨棚,14电梯,15外门斗,16服务台,17天井,18铁路站场,19主体站房,20候车区。In the picture: 1 waiting hall, 2 ticket hall, 3 departure hall, 4 first toilet, 5 equipment room, 6 management room, 7 transfer passage, 8 second toilet, 9 stairs, 10 security check facilities, 11 rain protection Canopy, 12 passenger tunnels, 13 platform canopies, 14 elevators, 15 outer door buckets, 16 service desks, 17 patios, 18 railway yards, 19 main station buildings, and 20 waiting areas.
具体实施方式Detailed ways
下面结合附图对本实用新型作进一步解释说明:Below in conjunction with accompanying drawing, the utility model is further explained:
参见图1-图3,铁路站场18和位于铁路站场18一侧且低于轨面至少5米的主体站房19,所述主体站房19包括中部挑高的候车大厅1以及两侧的双层结构区,所述候车大厅1一侧的双层结构区的下层布置有出站厅3,上层布置管理用房6和设备用房5;所述候车大厅1另一侧的双层结构区的下层布置有售票厅3,上层为管理用房6和设备用房5;所述铁路站场18两侧设有均设楼梯9及电梯14,所述铁路站场18底部设有贯通的旅客通道12;所述主体站房19的出口经或不经旅客通道12分别与所述铁路站场19两侧的楼梯9及电梯14连通。所述两侧的双层结构区的上层中部设有用于通风和采光的天井17。1-3, the
所述候车大厅1的入口处设有外门斗15,所述候车大厅1内设有与入口处对应的服务台16,所述入口处与服务台16之间的转运通道7连通售票厅2;所述服务台16后方的候车区20经安检设施10与售票厅2连通。The entrance of the waiting hall 1 is provided with an
所述出站厅3的内侧布置有为候车区20服务的管理用房6,外侧布置有设备用房5和为出站厅3服务的第一卫生间8;所述售票厅的外侧布置有管理用房6,后方布置有为候车区20服务的第二卫生间8。The inside of the
所述铁路站场18上设有站台雨棚13;所述铁路站场18两侧的楼梯9上方设有挡雨罩棚11。The
出站旅客从铁路站场18分别经由两侧的楼梯9或电梯14下至下层,对侧旅客经旅客通道12进入出站厅3后出站,同侧旅客直接进入出站厅3出站;进站旅客可由候车大厅1的外门斗15进入转运通道7经售票厅2通过安检设施10进入候车大厅1的候车区20,或者由售票厅2的入口直接进入售票厅2购票后再通过安检设施10进入候车大厅1的候车区20。候车区20的旅客可以经楼梯9或电梯14登入铁路站场18,或者穿过旅客通道12到铁路站场18的对侧,再经楼梯9或电梯14登入铁路站场18。Passengers going out from the
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921615147.6U CN211173275U (en) | 2019-09-26 | 2019-09-26 | Line-side down-type small and medium-sized high-speed railway station building layout structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921615147.6U CN211173275U (en) | 2019-09-26 | 2019-09-26 | Line-side down-type small and medium-sized high-speed railway station building layout structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211173275U true CN211173275U (en) | 2020-08-04 |
Family
ID=71794129
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921615147.6U Expired - Fee Related CN211173275U (en) | 2019-09-26 | 2019-09-26 | Line-side down-type small and medium-sized high-speed railway station building layout structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211173275U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112096131A (en) * | 2020-08-20 | 2020-12-18 | 中国建筑科学研究院有限公司 | Transportation hub complex personnel evacuation facility |
| CN112922437A (en) * | 2021-01-28 | 2021-06-08 | 杭州中联筑境建筑设计有限公司 | Portable medium-sized railway passenger station arrangement structure |
| CN113863771A (en) * | 2021-09-28 | 2021-12-31 | 杭州中联筑境建筑设计有限公司 | Canopy upper cover building structure for high-speed railway platform |
-
2019
- 2019-09-26 CN CN201921615147.6U patent/CN211173275U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112096131A (en) * | 2020-08-20 | 2020-12-18 | 中国建筑科学研究院有限公司 | Transportation hub complex personnel evacuation facility |
| CN112096131B (en) * | 2020-08-20 | 2022-03-25 | 中国建筑科学研究院有限公司 | Transportation hub complex personnel evacuation facility |
| CN112922437A (en) * | 2021-01-28 | 2021-06-08 | 杭州中联筑境建筑设计有限公司 | Portable medium-sized railway passenger station arrangement structure |
| CN113863771A (en) * | 2021-09-28 | 2021-12-31 | 杭州中联筑境建筑设计有限公司 | Canopy upper cover building structure for high-speed railway platform |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN211173275U (en) | Line-side down-type small and medium-sized high-speed railway station building layout structure | |
| CN110700318A (en) | An Intercity Railway Underground Station Integrated Development Above the Track Area | |
| CN112096131B (en) | Transportation hub complex personnel evacuation facility | |
| CN211395746U (en) | Intercity railway underground station of track area top integration development | |
| CN211223399U (en) | Underground one deck side formula station public area arrangement structure | |
| Chen et al. | Elements of the core area transport system oriented to station–city integration | |
| CN205474885U (en) | Single track station of way midspan seat formula | |
| CN206987456U (en) | Public Areas Associated with Metro Station arrangement | |
| CN214246782U (en) | Elevated railway station with traffic valleys | |
| CN113802917B (en) | Three-dimensional composite building structure in front of railway passenger station | |
| CN206841421U (en) | The urban track traffic transfer stop of separate type subway concourse | |
| CN108749821B (en) | Tramcar underground station | |
| CN103556843B (en) | Outdoor platform evacuation system for vertical traffic trunk and branch transition in high-rise buildings | |
| CN204567664U (en) | The semi-underground station of platform open type | |
| CN102704710A (en) | Separate independent corridor connection type multi-compartment multi-family common elevator | |
| CN216007960U (en) | Canopy upper cover building structure for high-speed railway platform | |
| CN202578033U (en) | Corridor connecting separated independent common elevator for multiple residences and families | |
| CN112252776B (en) | An interchange station system with corridors suitable for suspended rail transit | |
| CN205035706U (en) | Three -dimensional stack transportation junction of festival ground type | |
| CN110626359A (en) | Layout structure of a side-type station public area on the first basement level | |
| CN113863771A (en) | Canopy upper cover building structure for high-speed railway platform | |
| CN213705414U (en) | Urban underground rail transit transfer station | |
| CN211037045U (en) | A double-layer comprehensive pipe gallery with shared personnel entrance and exit | |
| CN212529619U (en) | Transfer station of underground rail transit and underground rail transit | |
| CN115323848A (en) | Three-dimensional traffic nuclear system of rail yard station complex |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200804 |
