CN201459690U CN2009201246200U CN200920124620U CN201459690U CN 201459690 U CN201459690 U CN 201459690U CN 2009201246200 U CN2009201246200 U CN 2009201246200U CN 200920124620 U CN200920124620 U CN 200920124620U CN 201459690 U CN201459690 U CN 201459690U
Authority
CN
China
Prior art keywords
beam structure
trough girder
composite beam
chute
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201246200U
Other languages
Chinese (zh)
Inventor
扈晓雯
汤旸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina East China Engineering Corp
Original Assignee
Hydrochina East China Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina East China Engineering Corp filed Critical Hydrochina East China Engineering Corp
Priority to CN2009201246200U priority Critical patent/CN201459690U/en
Application granted granted Critical
Publication of CN201459690U publication Critical patent/CN201459690U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a chute composite beam structure, which aims to solve a technical problem with the design of a chute composite beam structure to solve the problems that the design and construction of dam tops and communication bridges as well as the laying of electric cables and oil pipes are difficult, and enables the high-lift operation to be safer and the construction quality to be more ensured. The technical scheme for the problems is that the chute composite beam structure is provided with a prefabricated chute beam, and is characterized in that a prefabricated cap plate and flange plates on two sides thereof are arranged at the top part of the chute beam through metal embedded parts, the prefabricated cap plate shares the same plane with the top part of the flange plates, and a mounting gap is kept. The utility model is suitable for hydraulic and hydro-power engineering, urban highway engineering, communication bridge engineering and harbor engineering.

Description

Grooved composite beam structure
Technical field
The utility model relates to a kind of grooved composite beam structure.Be applicable to Hydraulic and Hydro-Power Engineering, urban road engineering, traffic bridge engineering, port works.
Background technology
Because functional requirements such as dam crest platform, bridge end face, dock operation face are arranged, various slab and girders are widely used in Hydraulic and Hydro-Power Engineering, urban road engineering, traffic bridge engineering, port works.General slab and girder or be that formwork erection is built at the construction field (site), prior formwork erection is built in precast yard, wait to reach and transport to the job site after the length of time and lift, limited by job site condition restriction or precast yard place, time-consuming, problem is more outstanding when the slab and girder that has cable and oil pipe to lay requirement is designed and constructed.
Summary of the invention
The technical problems to be solved in the utility model is: the problem that existence is arranged at prior art, a kind of grooved composite beam structure is provided, be intended to solve dam dam crest and the design and construction of traffic bridge, cable and oil pipe and lay problems such as difficulty, and making work high above the ground safer, workmanship is more guaranteed.
The technical scheme that the utility model adopted is: grooved composite beam structure, has prefabricated trough girder, it is characterized in that arranging by metal embedded part at the top of trough girder the frange plate on prefabricated cover plate and both sides, prefabricated cover plate and frange plate top flush and reserve installs seam.
Described metal embedded part is the angle steel I that is embedded in the trough girder top, and the right-angle side of angle steel I forms the plane at the top of trough girder; Another metal embedded part is the angle steel II that is embedded in the trough girder top, the right-angle side of angle steel II imbed the trough girder top and its opening portion upwards.
It is 2% weathering, the gutter of the weathering end and the gutter of bottom, gutter that gradient is set on the base plate of described trough girder.
Described trough girder top is provided with ribs.
The pre-buried band steel of described trough girder inside wall.
The pre-buried vertical joint bar in described trough girder top.
The beneficial effects of the utility model are: the utility model arranges for water conservancy and hydropower hinge, highway communication end face plate-girder and construction provides a kind of new mentality of designing, be about to the structural stratification design and construction of beam, the deadweight that handling has alleviated beam when installing has reduced the requirement to the construction lifting appliance; During top cast-in-place plate construction, the double template of doing of bottom precast plate and pre-buried angle steel does not need to scaffold erecting again, has avoided work high above the ground danger, workmanship safety guaranteed.Especially solution is had the hinge dam crest bridge design constructional difficulties of cable and oil pipe arrangement requirement, effect of the present invention is obvious especially.
Description of drawings
Fig. 1 is a plan view of the present utility model.
Fig. 2 is the A-A sectional drawing of Fig. 1.
The specific embodiment
As shown in Figure 1, present embodiment has prefabricated trough girder 1, and its top is provided with the ribs 4 that specification is 10 * 10cm, and the spacing of ribs is one of 200cm.The cast-in-place frange plate 9 of prefabricated cover plate 10 and both sides is arranged by metal embedded part in top at trough girder, and prefabricated cover plate flushes and reserves with the frange plate top installs seam 13, can doublely do dam crest or highway communication.
Described metal embedded part is the angle steel I (6) (specification L10cm) that is embedded in the trough girder top, and the right-angle side of angle steel I forms the plane at the top of trough girder, so that prefabricated cover plate 10 smooth the shelving in top; Another metal embedded part is the angle steel II (7) (specification L5cm) that is embedded in the trough girder top, the right-angle side of angle steel II imbed the trough girder top and its opening portion upwards, be used as that the protection of cover plate periphery is double does cast-in-place plate construction formwork.
This example is provided with gradient on the base plate of trough girder 1 be 2% weathering 12, at the lowest part of weathering gutter 2 arranged, and the bottom, gutter is provided with gutter 3.
The pre-buried band steel 5 of described trough girder 1 inside wall is in order to the usefulness of cable rack or tubing rack welding.
The pre-buried vertical joint bar 8 in described trough girder 1 top is used for the cast-in-place plate in top and combines with lower wings listrium interlayer.
This example is with the structural stratification design and construction of beam, and the deadweight that handling has alleviated beam when installing has reduced the requirement to the construction lifting appliance; When the cast-in-place plate in top was constructed, the double template of doing of bottom precast plate and pre-buried angle steel did not need to scaffold erecting again, has avoided work high above the ground danger, workmanship safety to be guaranteed.

Claims (6)

1. a grooved composite beam structure has prefabricated trough girder (1), it is characterized in that: arrange the frange plate (9) on prefabricated cover plate (10) and both sides by metal embedded part at the top of trough girder, prefabricated cover plate and frange plate top flush and reserve installs seam (13).
2. grooved composite beam structure according to claim 1 is characterized in that: described metal embedded part is the angle steel I (6) that is embedded in the trough girder top, and the right-angle side of angle steel I forms the plane at the top of trough girder; Another metal embedded part is the angle steel II (7) that is embedded in the trough girder top, the right-angle side of angle steel II imbed the trough girder top and its opening portion upwards.
3. grooved composite beam structure according to claim 1 and 2 is characterized in that: it is 2% weathering (12), the gutter (2) of the weathering end and the gutter (3) of bottom, gutter that gradient is set on the base plate of described trough girder (1).
4. grooved composite beam structure according to claim 1 and 2 is characterized in that: described trough girder (1) top is provided with ribs (4).
5. grooved composite beam structure according to claim 1 and 2 is characterized in that: the pre-buried band steel of described trough girder (1) inside wall (5).
6. grooved composite beam structure according to claim 1 and 2 is characterized in that: the pre-buried vertical joint bar in described trough girder (1) top (8).
CN2009201246200U 2009-07-13 2009-07-13 Chute composite beam structure Expired - Fee Related CN201459690U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201246200U CN201459690U (en) 2009-07-13 2009-07-13 Chute composite beam structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201246200U CN201459690U (en) 2009-07-13 2009-07-13 Chute composite beam structure

Publications (1)

Publication Number Publication Date
CN201459690U true CN201459690U (en) 2010-05-12

Family

ID=42387043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201246200U Expired - Fee Related CN201459690U (en) 2009-07-13 2009-07-13 Chute composite beam structure

Country Status (1)

Country Link
CN (1) CN201459690U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433937A (en) * 2011-12-12 2012-05-02 中冶建工集团有限公司 Precast beam slab connecting structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433937A (en) * 2011-12-12 2012-05-02 中冶建工集团有限公司 Precast beam slab connecting structure

Similar Documents

Publication Publication Date Title
CN103924505B (en) Use prefabricated steel-concrete combination T beam and the construction method of Wavelike steel webplate
CN104264575B (en) A kind of prestress steel case Concrete Combination Continuous Beam bridge structure and construction technology
CN105735466B (en) Prefabricated wall column one-part form steel bar connecting structure and method
CN103866693B (en) A kind of mounting method of steel concrete bowstring arch bridge arch rib
CN103437300A (en) Construction method for erecting double cantilevers for pier top steel beam without pier-side bracket
CN106012960A (en) Assembly type long piled wharf upper structure system and construction method thereof
CN101487233B (en) Method for mounting temporary pier top beam section of large-span steel box girder cable-stayed bridge
CN113719029A (en) Assembly type beam-column connecting joint based on hidden corbels and construction method thereof
CN104790436A (en) High-rise building basement roof settlement post-pouring joint advanced water stop construction method
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN103790176B (en) Construction method for embedded short limb column structure
CN104314009A (en) Large segment lifting mechanism and use method thereof
CN110645022A (en) Self-anchored formwork support system for connecting channel and construction method
CN203684457U (en) Light assembled shear wall structure
CN103967332B (en) The construction method of a kind of building site enclosing
CN110439267A (en) A kind of aluminum alloy mould plate applied to laminated floor slab construction
CN202989781U (en) Width widened cast-in-place box beam moving support
CN105040810A (en) Connecting node suitable for framed shear wall structure reverse construction method
CN205557538U (en) Assembled underground structure system based on prefabricated component
CN102535344A (en) Concrete transportation method for bridge body of high-pier bridge in gully region
CN201459690U (en) Chute composite beam structure
CN104947804B (en) A kind of steel bracket and the construction method that beam-column node structure is built using it
CN204475536U (en) With the precast member for reinforcing bar concrete that rigid joint connects
CN203668894U (en) Concrete prefabricated form structure allowing rapid installation
CN207122021U (en) Assembled bolt connection concrete-filled steel tube shear wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100512

Termination date: 20180713