CN201458593U - Simple hoisting machine tool for heat exchanger floating head - Google Patents
Simple hoisting machine tool for heat exchanger floating head Download PDFInfo
- Publication number
- CN201458593U CN201458593U CN2009201107566U CN200920110756U CN201458593U CN 201458593 U CN201458593 U CN 201458593U CN 2009201107566 U CN2009201107566 U CN 2009201107566U CN 200920110756 U CN200920110756 U CN 200920110756U CN 201458593 U CN201458593 U CN 201458593U
- Authority
- CN
- China
- Prior art keywords
- heat exchanger
- welded
- locking cap
- column
- crossbeam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000007667 floating Methods 0.000 title claims abstract description 20
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 14
- 239000010959 steel Substances 0.000 claims abstract description 14
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 abstract description 10
- 238000007670 refining Methods 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 2
- 238000007689 inspection Methods 0.000 abstract 1
- 239000000126 substance Substances 0.000 abstract 1
- 239000000725 suspension Substances 0.000 description 9
- 238000000034 method Methods 0.000 description 8
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 241000282326 Felis catus Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000005194 fractionation Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The simple hoisting machine for the heat exchanger floating head is applied to the inspection and maintenance of petrochemical devices. Is characterized in that: the lower end of the stand column is inserted into the lower fixing cap, the bottom of the lower fixing cap is welded with the vertical fixing plate, the stand column is welded with the annular tray, the stand column is sleeved with a sleeve, the sleeve is welded with one end of the cross beam, the cross beam adopts I-shaped steel, the upper portion of the other end of the cross beam is welded with the fixing lugs, the top of the stand column is sleeved with the upper fixing cap, the outer wall of the upper fixing cap is welded with the fixing lugs, and the two fixing lugs are connected with an inclined pull rod through bolts. The effect is as follows: the heat exchanger component hoisting can be completed, the simple hoisting machine tool of the heat exchanger floating head is required to be disassembled and assembled, each component can be lifted by manpower, the machine-class cost of a crane can be greatly saved, and the heat exchanger hoisting machine tool is particularly suitable for heat exchanger maintenance operation of oil refining chemical devices.
Description
Technical field
The utility model relates to the checking maintenance instrument of petrochemical unit, the lifting special tool that uses when being a kind of the maintenance.
Background technology
In some oil refinery factories, because factors such as general layouts, framed structure setting, technological process trend, cause the other crane of some heat exchanger can't erect-position; No suspension centre above raising the nose above water to breathe; Or the reasons such as technology, instrument pipeline of gathering below the suspension centre cause heat exchanger floating head dismounting difficulty, and then influence heat exchanger and take out a series of activities such as cored, tube bank, housing cleaning.Below be to be that example is enumerated in the refining and petrochemical processing units ubiquitous problem in the heat exchanger floating head disassembly process with 1,800,000 tons of/year ARGG devices:
1, the basic framework of 24 cat head oil gas-hot water heat exchangers of four layers of platform place of perforated plat column northeast side item (E10201/1-24) is not provided with hanging beam, simultaneously since the heat exchanger floating head side with install between the internal channel between across pump house, crane can't erect-position, raises the nose above water to breathe the lifting difficulty and cause.The maintenance of this heat exchanger is to adopt interim hanging beam is installed on the basis of former framework, owing to need get angry, take and tear scaffold open, utilize means materials etc. to increase the extensive work amount.
2, the three layers of deck roof oil gas in fractionation Tata southern side aftercooler, item E10204/1-8, owing to raise the nose above water to breathe the no suspension centre in top, crane reason such as can't enter the fire passage in and cause that to raise the nose above water to breathe lifting difficult, and maintenance in the past is to utilize oil-gas pipeline above the heat exchanger as suspension centre.The method damages pipeline, and use at present has been under an embargo.
3, four heat exchangers of E10204/9-11, because no hanging beam, the crane eave tile can't enter in the framework, causes the lifting difficulty, what maintenance was adopted is the hole for hoist that the grid of upper platform directly over the heat exchanger floating head is cut out a 100*100, and the pipeline that sets up a DN150 lifts as the lifting beam.But the method exists two defectives (1) to get angry, if heat exchanger valve is not tight or interior media can't be swept only, then can not adopt the method; (2) suspension centre and grid intensity are without check, and only lifting by rule of thumb causes the accident easily.
4, four heat exchanger tops of E10212/A-D are Gulf spray naphtha jar and five process pipeline, and the crane eave tile can't reach the lifting position.Maintenance is a method of adopt making door type mast-up, though also finished operation, gallows frame exist welding capacity big, need to cooperate with crane make, preserve, transportation inconvenience, commonality is poor, cost is too high shortcoming, be unfavorable for the device handling labor.
The utility model content
The purpose of this utility model is: a kind of switching heat-exchanger floating head simple and easy hoisting facility are provided, finish the heat exchanger component lifting, and require heat exchanger floating head simple and easy hoisting facility can dismantle, assemble, each parts all can be carried with manpower.
The technical solution adopted in the utility model is: heat exchanger floating head simple and easy hoisting facility, mainly by adapter plate, following locking cap, column, pallet, sleeve, last locking cap, fixing ear, digonal link, tie bolt and crossbeam are formed, column is a steel cylindrical tube. it is characterized in that: in the lower end of column is inserted in following locking cap, following locking cap is a steel pipe, end at steel pipe is welded with the end. and the bottom at following locking cap is welded with the vertical fixing plate, straight two holes of lacking are arranged on the adapter plate. the flange of adapter plate and equipment is close together, can be fixed together with the flange of screw adapter plate and equipment. be welded with an annular pallet on the column. on column, be with a sleeve, sleeve can rotate. the end welding of sleeve and crossbeam. and what crossbeam adopted is I-beam section. erecting equipment, as jack, hoist ceiling crane and pulley etc. can be suspended on the I-beam section, and to slide mobile along I-beam section. the top at the other end of crossbeam is welded with fixedly ear, fixedly the structure of ear is porose on the steel plate. be with locking cap at the top of column, be welded with fixedly ear on the outer wall of last locking cap. last locking cap fixedly the bolted connection that fixedly adopts between the ear of ear and crossbeam digonal link is arranged. will descend locking cap to be fixed on the flange of equipment, in locking cap under the column insertion, sleeve is inserted in from the column top, locking cap on the band of column top. digonal link is fixed between two hangers with bolt, finished the assembling of heat exchanger floating head simple and easy hoisting facility. at last hoist ceiling crane is suspended on the crossbeam, just can begins to lift docking facility.
When slinging weight in order to make, the column stress balance is welded with the balance hook on last locking cap.Utilize fixedly suspension cable of balance hook.
For hoist ceiling crane is walked on crossbeam, can not walk out crossbeam, on the top of crossbeam upright opening is arranged, in upright opening, be inserted with backing pin.Backing pin adopts cylindrical reinforcing bar to curve square.
The beneficial effects of the utility model: the utility model heat exchanger floating head simple and easy hoisting facility, can finish heat exchanger component lifting, and require the heat exchanger floating head simple and easy hoisting facility can dismounting, but each parts with all lifts to move of manpower, simple structure, cheap.In certain covering device maintenance process, use, solved the difficult problem that multiple different model heat exchanger size such as E10201, E10204/9-11, E10212/A-D is raised the nose above water to breathe dismounting, save about 20,000 yuan of the expense of making interim suspension bracket, saved about 70,000 yuan of crane One-Shift Costs.Use this hoisting machine tool and not only can solve the part heat exchanger and do not have suspension centre or the unknown of suspension centre intensity, also can save the crane One-Shift Costs in a large number, especially be fit to the heat exchanger checking maintenance operation of refining and petrochemical processing units.
Description of drawings
Fig. 1 is the utility model heat exchanger floating head simple and easy hoisting implement structure generalized section.
Among the figure, 1. adapter plate 2. descends locking cap, 3. column, and 4. pallet, 5. sleeve is 6. gone up locking cap, 7. balance hook, 8. fixing ear, 9. digonal link, 10. tie bolt, 11. backing pins, 12. crossbeams.
The specific embodiment
Embodiment 1: with heat exchanger floating head simple and easy hoisting facility is example, and the utility model is described in further detail.
Consult Fig. 1.The utility model heat exchanger floating head simple and easy hoisting facility, by adapter plate 1, down locking cap 2, column 3, pallet 4, sleeve 5, go up locking cap 6, balance hook 7, fixedly ear 8, digonal link 9, tie bolt 10, backing pin 11 and crossbeam 12 are formed.Φ
On column 3, be welded with an annular pallet 4, specification Φ 199 * 20mm, length 20mm.Be with a sleeve 5 on the column 3 and on annular pallet 4, sleeve 5 specification Φ 179 * 10mm, length 200mm.Sleeve 5 can rotate.Sleeve 5 welds with an end of crossbeam 12.Crossbeam 12, employing be I-beam section, specification is 16.
Top at the other end of crossbeam 12 is welded with fixedly ear 8, and fixedly ear 8 adopts steel plates 100 * 100 * 10mm.Fixedly the structure of ear 8 is that a hole is arranged on steel plate.Be with locking cap 6 at the top of column 3, on the outer wall of last locking cap 6, be welded with a fixedly ear 8.Between the fixedly ear 8 of the fixedly ear 8 of last locking cap 6 and crossbeam 12, adopt bolt 10 to be connected with digonal link 9, digonal link 9 specification Φ 50 * 5mm, length 915mm.
On last locking cap 6, be welded with a balance hook 7.
In the both sides, top of crossbeam 12 upright opening is arranged respectively, in upright opening, is inserted with a backing pin 11. backing pins 11 respectively and adopts cylindrical reinforcing bar to curve square.
Claims (3)
1. heat exchanger floating head simple and easy hoisting facility, mainly by adapter plate (1), following locking cap (2), column (3), pallet (4), sleeve (5), last locking cap (6), fixing ear (8), digonal link (9), tie bolt (10) and crossbeam (12) are formed, column (3) is a steel cylindrical tube, it is characterized in that: in the lower end of column (3) is inserted in following locking cap (2), following locking cap (2) is a steel pipe, end at steel pipe is welded with the end, bottom at following locking cap (2) is welded with vertical fixing plate (1), straight two holes of lacking are arranged on the adapter plate (1), on column (3), be welded with an annular pallet (4), on column (3), be with a sleeve (5), sleeve (5) can rotate, sleeve (5) welds with an end of crossbeam (12), what crossbeam (12) adopted is I-beam section, top at the other end of crossbeam (12) is welded with fixedly ear (8), fixedly the structure of ear (8) is porose on steel plate, be with locking cap (6) at the top of column (3), on the outer wall of last locking cap (6), be welded with fixedly ear (8), fixedly adopt bolt (10) to be connected with digonal link (9) between the fixedly ear (8) of ear (8) and crossbeam (12) at last locking cap (6).
2. heat exchanger floating head simple and easy hoisting facility according to claim 1 is characterized in that: be welded with balance hook (7) on last locking cap (6).
3. heat exchanger floating head simple and easy hoisting facility according to claim 1 is characterized in that: there is upright opening on the top at crossbeam (12), is inserted with backing pin (11) in upright opening, and backing pin (11) adopts cylindrical reinforcing bar to curve square.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201107566U CN201458593U (en) | 2009-08-07 | 2009-08-07 | Simple hoisting machine tool for heat exchanger floating head |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201107566U CN201458593U (en) | 2009-08-07 | 2009-08-07 | Simple hoisting machine tool for heat exchanger floating head |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201458593U true CN201458593U (en) | 2010-05-12 |
Family
ID=42385947
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009201107566U Expired - Lifetime CN201458593U (en) | 2009-08-07 | 2009-08-07 | Simple hoisting machine tool for heat exchanger floating head |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201458593U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102730560A (en) * | 2012-07-06 | 2012-10-17 | 武桥重工集团股份有限公司 | Diagonal draw bar mechanism used for rotating cantilever type gantry crane |
-
2009
- 2009-08-07 CN CN2009201107566U patent/CN201458593U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102730560A (en) * | 2012-07-06 | 2012-10-17 | 武桥重工集团股份有限公司 | Diagonal draw bar mechanism used for rotating cantilever type gantry crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20240262657A1 (en) | Construction System | |
CN206859698U (en) | A kind of high-rise building air conditioner water vertical shaft Large Diameter Pipeline standpipe inverted construction facility | |
CN201458593U (en) | Simple hoisting machine tool for heat exchanger floating head | |
CN205603125U (en) | Special hoist device that horizontal water tube cooler heat exchange tube was changed | |
CN107416685A (en) | Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge | |
CN201932344U (en) | Cage device for ship side sectional folding operation | |
CN214737874U (en) | A erection equipment that is used for pressure steel pipe in power station large-depth shaft | |
CN202038813U (en) | Simple detachable portal frame | |
CN208869171U (en) | One kind lifting reusable porous grade for steelwork tower truss and hangs lid | |
CN206220460U (en) | For the operating platform of tower | |
CN107055367A (en) | The central jack-up system of internally climbing tower crane | |
CN209668612U (en) | A kind of aerated blocks handling apparatus convenient for assembling and being used in turn | |
CN108145629B (en) | Heat exchanger shifting tool and application method thereof | |
CN112777521A (en) | Special device and method for removing and reinstalling overhaul impeller of pump station unit in overhaul | |
CN107304030B (en) | Special hoisting device for replacing heat exchange tube of transverse tube cooler and application method thereof | |
CN205243147U (en) | Hoist that uses during special high -tension transmission iron tower of helicopter assemblage | |
CN211733634U (en) | Combined roof hoisting weight frame and connecting mechanism comprising same | |
CN205077876U (en) | Prestressed steel strand pulling machine and tensioning jack suspension device | |
CN216920466U (en) | In-situ protection device for pipeline above deep foundation pit | |
JP3243674U (en) | Sliding trolley for reversing platform for large storage tanks | |
CN112299232B (en) | Method for hoisting tower top L-shaped tower-attached pipeline of large-scale tower equipment by single main lifting lug | |
CN218608494U (en) | Integrated easy-to-overhaul air purifying chamber applied to electrolytic flue gas purification system | |
CN207073290U (en) | Supporting structure | |
CN218434602U (en) | Novel aerial working platform | |
CN203171202U (en) | Installation device for radiation furnace tubes of industrial cylindrical furnace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20100512 |
|
CX01 | Expiry of patent term |