CN205603125U - Special hoist device that horizontal water tube cooler heat exchange tube was changed - Google Patents
Special hoist device that horizontal water tube cooler heat exchange tube was changed Download PDFInfo
- Publication number
- CN205603125U CN205603125U CN201620326916.0U CN201620326916U CN205603125U CN 205603125 U CN205603125 U CN 205603125U CN 201620326916 U CN201620326916 U CN 201620326916U CN 205603125 U CN205603125 U CN 205603125U
- Authority
- CN
- China
- Prior art keywords
- mast
- heat exchange
- hoisting
- tube cooler
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Abstract
一种横管冷却器换热管更换的专用吊装装置,包括人字桅杆,两个桅杆旋转支座和卷扬机,其特征在于:所述人字桅杆为两根桅杆立柱,所述两个桅杆旋转支座(9)各包括支座底板(91)和两块中心设有通孔(93)的立板(92),其中:两个桅杆旋转支座(9)焊接在横管冷却器塔顶边沿,顶部设置吊耳(11)与人字桅杆第1吊耳之间设有手拉葫芦(8),所述卷扬机(4)设置在地面上;设置起重滑轮,卷扬机钢丝绳通过3个起重滑轮最终与吊装钢丝绳组连接,达成横管冷却器换热管更换的专用吊装装置。本实用新型具有吊装装置结构简单、制作方便和解决传统横管冷却器换热管更换吊装方式存在的不足,节省费用,提高换热管吊装安全性的优点。
A special hoisting device for replacing heat exchange tubes of a horizontal tube cooler, including a gabled mast, two mast rotation supports and a winch, characterized in that: the gabled mast is two mast columns, and the two masts rotate The supports (9) each include a support bottom plate (91) and two vertical plates (92) with through holes (93) in the center, wherein: two mast rotating supports (9) are welded on the top of the horizontal tube cooler tower On the edge, a chain block (8) is provided between the lifting lug (11) on the top and the first lug of the herringbone mast, and the winch (4) is set on the ground; a lifting pulley is set, and the hoist wire rope passes through 3 hoists The heavy pulley is finally connected with the hoisting wire rope group to achieve a special hoisting device for replacing the heat exchange tube of the horizontal tube cooler. The utility model has the advantages of simple structure of the hoisting device, convenient manufacture, solving the shortcomings of the traditional horizontal tube cooler heat exchange tube replacement and hoisting method, saving costs, and improving the safety of the heat exchange tube hoisting.
Description
技术领域 technical field
本实用新型涉及一种吊装装置,具体地说,是一种横管冷却器换热管更换的专用吊装装置。 The utility model relates to a hoisting device, in particular to a special hoisting device for replacing heat exchange tubes of a horizontal tube cooler.
背景技术 Background technique
横管冷却器是焦化厂煤气净化区域的主要设备,用于煤气的冷却,运行一定周期后需要对内部的换热管进行更换,换热管吊装常规使用汽车吊进行吊装,由于换热管吊装数量大(一般都达到数千根),位置高,操作空间小(搭设的脚手架影响吊装),这种吊装方法也不经济、安全。 The horizontal tube cooler is the main equipment in the gas purification area of the coking plant. It is used for cooling the gas. After a certain period of operation, the internal heat exchange tube needs to be replaced. The quantity is large (generally thousands of pieces), the location is high, and the operating space is small (the erected scaffolding affects the hoisting). This hoisting method is not economical and safe.
因此已知的使用汽车吊进行吊装换热管的方式存在着上述种种不便和问题。 Therefore, there are above-mentioned various inconveniences and problems in the known mode of using a car crane to hoist the heat exchange tubes.
发明内容 Contents of the invention
本实用新型的目的,在于提出一种解决传统横管冷却器换热管更换吊装方式的不足的安全可靠的横管冷却器换热管更换的专用吊装装置。 The purpose of this utility model is to propose a safe and reliable special hoisting device for replacing the heat exchange tubes of the horizontal tube cooler which solves the deficiency of the traditional horizontal tube cooler heat exchange tube replacement hoisting method.
为实现上述目的,本实用新型的技术解决方案是: For achieving the above object, the technical solution of the utility model is:
一种横管冷却器换热管更换的专用吊装装置,在横管冷却器侧面边缘搭设换热管各层拆除平台,且在横管冷却器顶部设置专用吊装装置,包括人字桅杆,两个桅杆旋转支座和卷扬机,其特征在于: A special hoisting device for replacing the heat exchange tubes of a horizontal tube cooler. A platform for dismantling each layer of heat exchange tubes is set up on the side edge of the horizontal tube cooler, and a special hoisting device is set on the top of the horizontal tube cooler, including a herringbone mast, two Mast swivel support and hoist, characterized by:
所述人字桅杆由两根桅杆立柱构成人字形,桅杆立柱为钢管,人字桅杆顶端设有第1吊耳和第2吊耳,中部设有第3吊耳,两底端各设有转动耳座,转动耳座中设有转动耳座孔; The herringbone mast is composed of two mast columns in a herringbone shape. The mast columns are steel pipes. The top of the herringbone mast is equipped with a first lifting lug and a second lifting lug, the middle is equipped with a third lifting lug, and the two bottom ends are respectively equipped with rotating An ear seat, a rotating ear seat hole is arranged in the rotating ear seat;
所述两个桅杆旋转支座各包括支座底板和两块中心设有通孔的立板,两块立板有一定间隔相互平行;两块立板垂直焊接固定于支座底板;所述两个桅杆旋转支座的两块立板中间各容置一个人字桅杆的转动耳座,且用销轴连接转动耳座孔和立板的通孔; The two mast rotating supports each include a support bottom plate and two vertical plates with through holes in the center, and the two vertical plates are parallel to each other with a certain interval; the two vertical plates are welded and fixed to the support bottom plate vertically; the two vertical plates Each of the two vertical plates of a mast rotating support accommodates a rotating ear seat of a herringbone mast, and a pin shaft is used to connect the hole of the rotating ear seat and the through hole of the vertical plate;
其中:两个桅杆旋转支座焊接在横管冷却器塔顶边沿,横管冷却器顶部设置吊耳与人字桅杆第1吊耳之间设有手拉葫芦,以控制人字桅杆的俯仰角度a; Among them: two mast rotating bearings are welded on the edge of the top of the cross-tube cooler tower, and a chain hoist is set between the lifting lug on the top of the cross-tube cooler and the first lug of the herringbone mast to control the pitch angle of the herringbone mast a;
所述卷扬机设置在地面上;设置起重滑轮,第1起重滑轮用钢丝绳与第2吊耳连接,第2起重滑轮用钢丝绳与桅杆立柱中部的第3吊耳连接,第3起重滑轮设置在横管冷却器底部;卷扬机钢丝绳通过第3起重滑轮转向沿横管冷却器向上,经第2起重滑轮转折顺着桅杆立柱向上,经第1起重滑轮转折垂直向下经配重,最终与吊装钢丝绳组连接,吊装钢丝绳组用于捆扎吊运换热管,达成横管冷却器换热管更换的专用吊装装置。 The hoist is set on the ground; lifting pulleys are set, the first lifting pulley is connected with the second lifting lug with a steel wire rope, the second lifting pulley is connected with the third lifting lug at the middle of the mast column with a steel wire rope, and the third lifting pulley Set at the bottom of the horizontal tube cooler; the wire rope of the hoist turns upwards along the horizontal tube cooler through the third lifting pulley, turns upwards along the mast column through the second lifting pulley, turns vertically downward through the counterweight through the first lifting pulley , and finally connected with the hoisting steel wire rope group, which is used for binding and lifting the heat exchange tubes to achieve a special hoisting device for replacing the heat exchange tubes of the horizontal tube cooler.
本实用新型的横管冷却器换热管更换的专用吊装装置还可以采用以下的技术措施来进一步实现。 The special hoisting device for replacing the heat exchange tubes of the horizontal tube cooler of the present invention can also be further realized by adopting the following technical measures.
前述的横管冷却器换热管更换的专用吊装装置,其中所述两根桅杆立柱之间设有二根平行的第1撑杆和第2撑杆,第1撑杆和第2撑杆相距一定间隔,且在间隔中设置斜撑杆以提高人字桅杆强度。 The above-mentioned special hoisting device for replacing the heat exchange tubes of the cross tube cooler, wherein two parallel first struts and second struts are arranged between the two mast columns, and the distance between the first strut and the second strut is There is a certain interval, and diagonal braces are set in the interval to improve the strength of the gable mast.
前述的横管冷却器换热管更换的专用吊装装置,其中所述第1吊耳和第2吊耳呈对应固定设置在人字桅杆的两侧。 In the special hoisting device for replacing the heat exchange tubes of the horizontal tube cooler, the first lifting lug and the second lifting lug are correspondingly and fixedly arranged on both sides of the gable mast.
前述的横管冷却器换热管更换的专用吊装装置,其中所述手拉葫芦规格要能承载桅杆吊装重量,卷扬机起重量要能承载预计吊装的换热管重量,人字桅杆的结构强度要达到吊装承载力要求,人字桅杆的俯仰角度要保证人字桅杆伸出距离能够超出换热管拆除平台。 The above-mentioned special hoisting device for replacing the heat exchange tubes of the horizontal tube cooler, wherein the specifications of the chain block must be able to bear the hoisting weight of the mast, the lifting capacity of the hoist must be able to bear the weight of the heat exchange tubes that are expected to be hoisted, and the structural strength of the herringbone mast must be To meet the hoisting bearing capacity requirements, the pitch angle of the gable mast must ensure that the protruding distance of the gable mast can exceed the heat exchange tube removal platform.
采用上述技术方案后,本实用新型的横管冷却器换热管更换的专用吊装装置具有以下优点: After adopting the above technical scheme, the special hoisting device for replacing the heat exchange tube of the horizontal tube cooler of the utility model has the following advantages:
1、专用吊装装置结构简单、制作方便; 1. The special hoisting device has a simple structure and is easy to manufacture;
2、专用吊装装置安装简便快捷,吊装方法简单实用、操作性强,适用于各类高度、大小、工况的横管冷却器的换热管更换吊装,可以解决传统横管冷却器换热管更换吊装方式存在的不足,节省换热管吊装机械台班费,提高换热管吊装安全性; 2. The special hoisting device is easy and quick to install, the hoisting method is simple and practical, and the operability is strong. It is suitable for the replacement and hoisting of the heat exchange tubes of the horizontal tube coolers of various heights, sizes and working conditions, and can solve the problem of heat exchange tubes of traditional horizontal tube coolers. Replace the shortcomings of the hoisting method, save the cost of the heat exchange tube hoisting machinery, and improve the safety of the heat exchange tube hoisting;
3、专用吊装装置制作成本低,降低横管冷却器换热管更换大修工程成本。 3. The production cost of the special hoisting device is low, which reduces the cost of the replacement and overhaul project of the heat exchange tube of the horizontal tube cooler.
附图说明 Description of drawings
图1为本实用新型实施例的人字桅杆结构示意图; Fig. 1 is the structural representation of the herringbone mast of the utility model embodiment;
图2为图1的侧视图; Fig. 2 is the side view of Fig. 1;
图3为本实用新型实施例的桅杆旋转支座结构示意图; Fig. 3 is a schematic diagram of the structure of the mast rotating support of the utility model embodiment;
图4为图3的侧视图; Fig. 4 is the side view of Fig. 3;
图5为本实用新型实施例的销轴结构示意图; Fig. 5 is a schematic diagram of the pin shaft structure of the utility model embodiment;
图6为本实用新型实施例的横管冷却器换热管更换的专用吊装装置结构示意图; Fig. 6 is a structural schematic diagram of a special hoisting device for replacing heat exchange tubes of a horizontal tube cooler according to an embodiment of the present invention;
图7为本实用新型实施例的横管冷却器换热管更换的专用吊装装置使用状态示意图。 Fig. 7 is a schematic diagram of the usage state of the special hoisting device for replacing the heat exchange tubes of the horizontal tube cooler according to the embodiment of the present invention.
图中:1第1起重滑轮,2第2起重滑轮,3第3起重滑轮,4卷扬机,5配重,6吊装钢丝绳组,7人字桅杆,71桅杆立柱,72第1撑杆,73第2撑杆,74斜撑杆,75第1吊耳,76第2吊耳,77第3吊耳,78转动耳座,79转动耳座孔,8手拉葫芦,9桅杆旋转支座,91支座底板,92立板,93通孔,10销轴,11吊耳,12换热管,13横管冷却器。 In the figure: 1 the 1st hoisting pulley, 2 the 2nd hoisting pulley, 3 the 3rd hoisting pulley, 4 hoist, 5 counterweight, 6 hoisting wire rope group, 7 herringbone mast, 71 mast column, 72 the first strut , 73 No. 2 brace, 74 Diagonal brace, 75 No. 1 lug, 76 No. 2 lug, 77 No. 3 lug, 78 Rotating ear seat, 79 Rotating ear seat hole, 8 Chain hoist, 9 Mast rotating support Seat, 91 support base plates, 92 vertical plates, 93 through holes, 10 pin shafts, 11 lifting lugs, 12 heat exchange tubes, and 13 horizontal tube coolers.
具体实施方式 detailed description
以下结合实施例及其附图对本实用新型作更进一步说明。 Below in conjunction with embodiment and accompanying drawing thereof, the utility model is described further.
实施例1 Example 1
本实用新型的横管冷却器换热管更换的专用吊装装置,在横管冷却器侧面边缘搭设换热管拆除平台(图中未示出),且在横管冷却器顶部设置吊耳,包括人字桅杆,两个桅杆旋转支座和卷扬机。 The special hoisting device for the replacement of the heat exchange tubes of the horizontal tube cooler of the utility model sets up a heat exchange tube removal platform (not shown in the figure) on the side edge of the horizontal tube cooler, and sets lifting lugs on the top of the horizontal tube cooler, including T-mast, two mast swivels and hoist.
现请参阅图1和图2,图1为本实用新型实施例的人字桅杆结构示意图,图2为图1的侧视图。如图所示,所述人字桅杆7由两根桅杆立柱71构成人字形,桅杆立柱为钢管,其顶端设有第1吊耳75和第2吊耳76,中部设有第3吊耳77,两底端各设有转动耳座78,转动耳座中设有转动耳座孔79;两根桅杆立柱之间设有二根平行的第1撑杆72和第2撑杆73,第1撑杆和第2撑杆相距一定间隔,且在间隔中设置斜撑杆74以提高人字桅杆强度。所述第1吊耳(75)和第1吊耳(76)呈对应固定设置在人字桅杆的两侧。 Please refer to Fig. 1 and Fig. 2 now. Fig. 1 is a schematic diagram of the structure of a herringbone mast according to an embodiment of the present invention, and Fig. 2 is a side view of Fig. 1 . As shown in the figure, the herringbone mast 7 is formed in a herringbone shape by two mast columns 71, the mast columns are steel pipes, the top of which is provided with a first lug 75 and a second lug 76, and the middle is provided with a third lug 77 , the two bottom ends are respectively provided with a rotating ear seat 78, and the rotating ear seat is provided with a rotating ear seat hole 79; two parallel first struts 72 and the second strut 73 are arranged between the two mast columns, and the first There is a certain interval between the strut and the second strut, and a diagonal strut 74 is set in the interval to improve the strength of the chevron mast. The first lifting lug (75) and the first lifting lug (76) are correspondingly and fixedly arranged on both sides of the gable mast.
图3为本实用新型实施例的桅杆旋转支座结构示意图,图4为图3的侧视图,图5为本实用新型实施例的销轴结构示意图。所述两个桅杆旋转支座9各包括支座底板91和两块中心设有通孔93的立板92,两块立板有一定间隔相互平行;两块立板垂直焊接固定于支座底板;所述两个桅杆旋转支座9的两块立板中间各容置一个人字桅杆的转动耳座78,且用销轴连接转动耳座孔79和立板92的通孔93; Fig. 3 is a schematic diagram of the structure of the mast rotating support of the embodiment of the utility model, Fig. 4 is a side view of Fig. 3, and Fig. 5 is a schematic diagram of the structure of the pin shaft of the embodiment of the utility model. The two mast swivel supports 9 each include a support base plate 91 and two vertical plates 92 with through holes 93 in the center, and the two vertical plates are parallel to each other with a certain interval; the two vertical plates are vertically welded and fixed on the support base plate In the middle of the two vertical plates of the two mast rotating bearings 9, each accommodates a rotating ear seat 78 of a herringbone mast, and connects the through hole 93 of the rotating ear seat hole 79 and the vertical plate 92 with a pin shaft;
其中:两个桅杆旋转支座9焊接在横管冷却器塔顶边沿,横管冷却器顶部设置吊耳11与人字桅杆第1吊耳75之间设有手拉葫芦8,以控制人字桅杆的俯仰角度;所述手拉葫芦规格要能承载桅杆吊装重量,卷扬机起重量要能承载预计吊装的换热管重量,人字桅杆的结构强度要达到吊装承载力要求,人字桅杆的俯仰角度要保证人字桅杆伸出距离能够超出换热管拆除平台。 Among them: two mast swivel supports 9 are welded on the edge of the top of the horizontal tube cooler tower, and a chain hoist 8 is provided between the lifting lug 11 on the top of the horizontal tube cooler and the first lifting lug 75 of the herringbone mast to control the herringbone The pitch angle of the mast; the specification of the chain hoist must be able to bear the lifting weight of the mast; The angle should ensure that the protruding distance of the gable mast can exceed the heat exchange tube removal platform.
所述卷扬机4设置在地面上;设置起重滑轮,第1起重滑轮1用钢丝绳与第2吊耳76连接,第2起重滑轮2用钢丝绳与桅杆立柱71中部的第3吊耳77连接,第3起重滑轮3设置在横管冷却器底部;卷扬机钢丝绳通过第3起重滑轮3转向沿横管冷却器向上,经第2起重滑轮2转折顺着桅杆立柱71向上,经第1起重滑轮1转折垂直向下经配重5,最终与吊装钢丝绳组6连接,吊装钢丝绳组用于捆扎吊运换热管12,达成横管冷却器换热管更换的专用吊装装置。 The hoist 4 is set on the ground; a lifting pulley is set, the first lifting pulley 1 is connected with the second lifting lug 76 with a steel wire rope, and the second lifting pulley 2 is connected with the third lifting lug 77 in the middle of the mast column 71 with a steel wire rope , the third hoisting pulley 3 is set at the bottom of the cross tube cooler; the hoist wire rope passes through the third hoisting pulley 3 and turns upward along the cross tube cooler, turns upwards along the mast column 71 through the second hoisting pulley 2, and passes through the first The hoisting pulley 1 turns vertically downwards through the counterweight 5, and finally connects with the hoisting wire rope group 6. The hoisting wire rope group is used for binding and lifting the heat exchange tubes 12 to achieve a special hoisting device for replacing the heat exchange tubes of the horizontal tube cooler.
实施例2 Example 2
一种横管冷却器换热管更换的专用吊装装置的使用方法,包括以下步骤: A method for using a special hoisting device for replacing heat exchange tubes of a horizontal tube cooler, comprising the following steps:
a、制作、安装横管冷却器换热管更换的专用吊装装置 a. Make and install the special hoisting device for replacing the heat exchange tubes of the horizontal tube cooler
借鉴桅杆起重机起重原理,设计了该吊具,该专用吊装装置由人字桅杆、手拉葫芦、支座、卷扬机、起重滑轮、配重、吊装钢丝绳等组成。卷扬机用作该专用吊装装置的起重部件,桅杆用作吊装工具的导向支撑,滑轮用作吊装钢丝绳的导向; The spreader is designed by referring to the lifting principle of the mast crane. The special lifting device is composed of a herringbone mast, a chain block, a support, a winch, a lifting pulley, a counterweight, and a lifting wire rope. The hoist is used as the lifting part of the special hoisting device, the mast is used as the guide support of the hoisting tool, and the pulley is used as the guide of the hoisting wire rope;
b、在横管冷却器换热管更换现场安装专用吊装装置 b. Install a special hoisting device at the replacement site of the heat exchange tube of the horizontal tube cooler
人字桅杆通过制作的两个桅杆旋转支座固定在横管冷却器顶部,并用固定在冷却器顶部吊耳上的手拉葫芦调整人字桅杆的俯仰角度a,施工现场地面上固定一台卷扬机,卷扬机钢丝绳通过一个安装在横管冷却器底部、两个安装在人字桅杆吊耳上的起重滑轮进行导向,将吊装换热管的卷扬机钢丝绳从地面导向到横管冷却器顶部,并通过人字桅杆上的滑轮向下导向,卷扬机钢丝绳端部连接两根钢丝绳组,并在吊装钢丝绳上部挂上一个配重,用于没有荷载时钢丝绳的上下; The herringbone mast is fixed on the top of the cross tube cooler through the two mast rotating supports made, and the pitch angle a of the herringbone mast is adjusted by a chain hoist fixed on the lifting lug on the top of the cooler, and a winch is fixed on the ground of the construction site , the hoist wire rope is guided through a hoisting pulley installed at the bottom of the cross-tube cooler and two hoisting pulleys installed on the lugs of the gable mast, and the hoist wire rope for hoisting the heat exchange tube is guided from the ground to the top of the cross-tube cooler, and passed through The pulley on the herringbone mast guides downward, and the end of the hoist wire rope is connected to two wire rope groups, and a counterweight is hung on the upper part of the hoisting wire rope for the up and down of the wire rope when there is no load;
c、进行载荷试验,检验起重性能是否能够达到安全要求 c. Carry out a load test to check whether the lifting performance can meet the safety requirements
由于是起重设备,需要进行载荷试验,载荷试验分以下步骤进行。 Since it is a lifting device, a load test is required, and the load test is carried out in the following steps.
(1)空载试验:开动卷扬机,在横管冷却器全高度范围内进行1~2次试验,检查起吊钢丝绳升降是否顺利,有无卡阻,卷扬机制动、控制系统是否正常。 (1) No-load test: start the winch, and conduct 1-2 tests within the full height range of the cross tube cooler to check whether the hoisting wire rope goes up and down smoothly, whether there is any jamming, whether the brake and control system of the winch are normal.
(2)额定载荷试验:起吊额定载荷重物,进行起升试验,检查人字桅杆有无变形,起吊物升降是否顺利无卡阻,桅杆固定用手拉葫芦有无异常。 (2) Rated load test: Lift the rated load heavy object, carry out the lifting test, check whether the gable mast is deformed, whether the hoisting object is lifted and lowered smoothly without jamming, and whether there is any abnormality in the chain hoist used to fix the mast.
(3)静载试验 (3) Static load test
卷扬机起吊额定载荷重物,离地面100~200mm 的高度,逐渐加载至1.25倍的额定载荷,悬空时间不少于10分钟,卸去载荷后检查桅杆有无变形,固定手拉葫芦有无异常。如此反复2-3次,仍然无异常。 The hoist lifts the rated load heavy objects, at a height of 100-200mm from the ground, gradually loads to 1.25 times the rated load, and the suspension time is not less than 10 minutes. After the load is removed, check whether the mast is deformed, and whether there is any abnormality in the fixed chain hoist. So repeated 2-3 times, still no exception.
(4)动载试验 (4) Dynamic load test
卷扬机起吊1.1倍额定载荷重物,试验专用吊装装置各部件和卷扬机制动器的功能。试验不得少于3次,目测检查专用吊装吊装各构件有无损害,联接处有无松动或损坏,卷扬机及其控制设备运行情况是否正常。 The winch lifts 1.1 times the rated load, and tests the functions of the components of the special hoisting device and the brake of the winch. The test shall not be less than 3 times. Visually check whether there is any damage to the components of the special hoisting hoisting, whether the joints are loose or damaged, and whether the operation of the winch and its control equipment is normal.
全部试验合格后方可正式使用; It can be used formally only after passing all the tests;
d、正式吊装换热管 d. Official hoisting of heat exchange tubes
通过卷扬机控制吊装钢丝绳的上下,根据换热管更换工艺需要升降到横管冷却器换热管各层吊装位置,开始吊装拆除的换热管到地面和新的换热管到安装位置。 Control the up and down of the hoisting wire rope through the hoist, and lift to the hoisting position of each layer of the heat exchange tube of the horizontal tube cooler according to the heat exchange tube replacement process, and start hoisting the removed heat exchange tube to the ground and the new heat exchange tube to the installation position.
本实用新型具有实质性特点和显著的技术进步,本实用新型的横管冷却器换热管更换的专用吊装装置,可以解决传统横管冷却器换热管更换吊装方式存在的不足,节省换热管吊装机械台班费,降低大修成本,提高换热管吊装安全性。同时本实用新型的横管冷却器换热管更换的专用吊装装置制作及安装简便快捷,制作成本低,吊装方法简单实用、操作性强,适用于各类高度、大小、工况的横管冷却器的换热管更换吊装。 The utility model has substantive features and significant technical progress. The special hoisting device for replacing the heat exchange tubes of the horizontal tube cooler of the utility model can solve the shortcomings of the traditional horizontal tube cooler heat exchange tube replacement and hoisting method, saving heat exchange Reduce the cost of the tube hoisting machine shift, reduce the cost of overhaul, and improve the safety of the heat exchange tube hoisting. At the same time, the special hoisting device for the replacement of the heat exchange tubes of the horizontal tube cooler of the utility model is simple and quick to manufacture and install, with low manufacturing cost, simple and practical hoisting method, strong operability, and is suitable for horizontal tube cooling of various heights, sizes, and working conditions. The heat exchange tube of the device is replaced and hoisted.
以上实施例仅供说明本实用新型之用,而非对本实用新型的限制,有关技术领域的技术人员,在不脱离本实用新型的精神和范围的情况下,还可以作出各种变换或变化。因此,所有等同的技术方案也应该属于本实用新型的范畴,应由各权利要求限定。 The above embodiments are only for illustrating the utility model, rather than limiting the utility model. Those skilled in the relevant technical fields can also make various transformations or changes without departing from the spirit and scope of the utility model. Therefore, all equivalent technical solutions should also belong to the category of the present utility model, and should be defined by each claim.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620326916.0U CN205603125U (en) | 2016-04-19 | 2016-04-19 | Special hoist device that horizontal water tube cooler heat exchange tube was changed |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620326916.0U CN205603125U (en) | 2016-04-19 | 2016-04-19 | Special hoist device that horizontal water tube cooler heat exchange tube was changed |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205603125U true CN205603125U (en) | 2016-09-28 |
Family
ID=56972583
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620326916.0U Expired - Lifetime CN205603125U (en) | 2016-04-19 | 2016-04-19 | Special hoist device that horizontal water tube cooler heat exchange tube was changed |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205603125U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107304030A (en) * | 2016-04-19 | 2017-10-31 | 五冶集团上海有限公司 | The Special lifting device and its application method of horizontal water-tube cooler replacing heat-exchange tube |
| CN107697795A (en) * | 2017-09-27 | 2018-02-16 | 云南建投第二安装工程公司 | Mast frame is carried in a kind of herringbone large-scale component sliding |
| US20190219530A1 (en) * | 2016-10-31 | 2019-07-18 | Kone Corporation | Method for checking the integrity of composite load bearing member |
-
2016
- 2016-04-19 CN CN201620326916.0U patent/CN205603125U/en not_active Expired - Lifetime
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107304030A (en) * | 2016-04-19 | 2017-10-31 | 五冶集团上海有限公司 | The Special lifting device and its application method of horizontal water-tube cooler replacing heat-exchange tube |
| US20190219530A1 (en) * | 2016-10-31 | 2019-07-18 | Kone Corporation | Method for checking the integrity of composite load bearing member |
| US11921071B2 (en) * | 2016-10-31 | 2024-03-05 | Kone Corporation | Method for checking the integrity of composite load bearing member |
| CN107697795A (en) * | 2017-09-27 | 2018-02-16 | 云南建投第二安装工程公司 | Mast frame is carried in a kind of herringbone large-scale component sliding |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11629033B2 (en) | Integral lifting system and lifting method for assembled members | |
| CN104649128B (en) | Special sling for hoisting extra-large structural modules for nuclear power plants | |
| CN100537348C (en) | An integral construction and hoisting method of an offshore platform and its special crane | |
| CN102212630B (en) | Construction method for replacing cooling wall of blast furnace by utilizing movable hanging scaffold | |
| CN205772984U (en) | A kind of hanging apparatus of monolithic steel truss | |
| CN205603125U (en) | Special hoist device that horizontal water tube cooler heat exchange tube was changed | |
| CN106276577A (en) | The suspension bracket of a kind of framework isolated footing and operational approach | |
| CN100590206C (en) | The Construction Method of Converter Whole Translating and Hydraulic Falling Back | |
| CN114992060A (en) | A high-power onshore wind turbine tower and its hoisting equipment and hoisting method | |
| CN107304030B (en) | Special hoisting device for replacing heat exchange tube of transverse tube cooler and application method thereof | |
| CN109592572B (en) | A kind of construction equipment and construction method for reinforced concrete wind power tower | |
| CN204802884U (en) | Storage tank flip -chip balanced hoisting device | |
| WO2021196465A1 (en) | Hoisting system for overweight horizontal high-pressure heater and hoisting method | |
| CN202023508U (en) | Connecting and fixing device for moving top drive of drilling machine and derrick rapidly | |
| CN206088728U (en) | Novel large -scale gallows of taking a trial run | |
| CN203462075U (en) | Furnace-supporting platform frame of converter | |
| CN110668332A (en) | High stability cantilever crane for building | |
| CN103743581B (en) | Test platform device and test method for internal climbing tower crane | |
| CN204569237U (en) | A kind of oscillating type pole equilibrium arm | |
| CN1833987A (en) | Integral lifting method of large bridge crane and its appts | |
| CN206108705U (en) | Gallows of frame isolated footing | |
| CN214737874U (en) | A erection equipment that is used for pressure steel pipe in power station large-depth shaft | |
| CN103754908A (en) | Large-scale seed precipitation tank body mounting construction method | |
| CN204873628U (en) | Caterpillar crane cantilever crane is quick -release formula landing leg for system | |
| CN223950637U (en) | A type of tower crane with added sections |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |