CN201424653Y - Concrete pouring frame - Google Patents

Concrete pouring frame Download PDF

Info

Publication number
CN201424653Y
CN201424653Y CN2009200860360U CN200920086036U CN201424653Y CN 201424653 Y CN201424653 Y CN 201424653Y CN 2009200860360 U CN2009200860360 U CN 2009200860360U CN 200920086036 U CN200920086036 U CN 200920086036U CN 201424653 Y CN201424653 Y CN 201424653Y
Authority
CN
China
Prior art keywords
base
concrete
tripod
forehead plate
passage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200860360U
Other languages
Chinese (zh)
Inventor
李晨光
钟卫斌
胡江平
黎明中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
WUHAN JINGYE FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN JINGYE FOUNDATION ENGINEERING Co Ltd filed Critical WUHAN JINGYE FOUNDATION ENGINEERING Co Ltd
Priority to CN2009200860360U priority Critical patent/CN201424653Y/en
Application granted granted Critical
Publication of CN201424653Y publication Critical patent/CN201424653Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a concrete pouring frame, which comprises a base of which the middle is provided with a passage; the base thereon is provided with a tripod, the top of the tripod is provided with an upper forehead plate on which a fixed pulley is arranged, the base thereon is further provided with a winding machine of which the bobbin line is fixedly connected to the upper forehead plate around the fixed pulley and a movable pulley between the base and the upper forehead plate, the lower part of the movable pulley is connected with a concrete hopper of which the lower part is connected with a guide tube, and the concrete hopper and the guide tube are capable of moving up and down in the passage on the base. The utility model has simple structure, convenient operation, low cost, high pouring quality and quick speed.

Description

Concrete is built frame
Technical field
The utility model relates to a kind of concrete and builds frame.
Background technology
Along with the acceleration of underground construction, diaphragm wall short because of its duration, and sealing is good, Stability Analysis of Structures, and the advantage of not having bath sound and a pollution was widely used in 21 century.Therefore how reducing construction cost has become the core value that can unit in charge of construction win the market.Reduce the construction cost of per pass operation, striving unexpectedly of unit in charge of construction's hardware also is an important link except management, and the cast of diaphragm wall concrete is the important procedure of construction of diaphragm wall.At present, on the construction market all custom to adopt crane pour concrete (seeing accompanying drawing 1), the function of crane be exactly simply to transfer conduit, on carry conduit.Single catheter length all is not more than 3m, and the pulling force that promotes or transfer the conduit maximum is no more than 2.6 tons (diaphragm wall is by 50 meters dark considerations).Crane is as large-scale plant equipment expense height not only, and operation is slow, and plugging when often causing the concrete construction causes quality accidents such as diaphragm wall folder mud, cavity.
Summary of the invention
The purpose of this utility model is to address the above problem and provide a kind of simple in structure, and easy to operate, cost is low, and the pouring quality height, and fireballing concrete is built frame.
The utility model solves the problems of the technologies described above the technical scheme that is adopted:
In the middle of comprising, it is provided with the base of passage, base is provided with tripod, the tripod top is provided with the forehead plate, last forehead plate is provided with fixed pulley, also is provided with hoist engine on the base, after the serving of hoist engine is walked around movable pulley between fixed pulley and base and the last forehead plate, be fixed in then on the forehead plate, be connected to the concrete bucket under the described movable pulley, be connected with conduit under the concrete bucket, described concrete bucket and conduit can move up and down in the passage of base.
Above-mentioned fixed pulley is 2, is symmetrical arranged on last forehead plate.
Be welded with hanger on the above-mentioned base.
Be welded with cat ladder on the above-mentioned tripod.
Be provided with the landing slab of passage in the middle of being fixed with on the above-mentioned base.
Above-mentioned base is provided with the conduit position-limited rack.
Compared with prior art, the utility model has been obtained following technique effect:
1, this utility model is simple in structure, and is easy to operate, and cost is low, and the concrete wall quality height of building out, and progress is fast;
2,, strengthened the stationarity of handling and laborsaving by being symmetrical arranged two fixed pulleys;
3, made things convenient for moving of equipment by on base, being welded with hanger; Made things convenient for the maintenance of equipment by on tripod, being welded with cat ladder; The dismounting and the replacing of equipment have been made things convenient for by the landing slab that is provided with passage in the middle of on base, being fixed with; By on base, being provided with the precision that the conduit position-limited rack has guaranteed the conduit operation, further improve the quality of building.
Description of drawings
Fig. 1 is the schematic diagram of prior art;
Fig. 2 is a vertical view of the present utility model;
Fig. 3 is the sectional view of Fig. 2 at the A-A place.
Wherein: 1-base, 2-tripod, the last forehead plate of 3-, 4-fixed pulley, 5-hoist engine, 6-movable pulley, 7-concrete bucket, 8-conduit.
The specific embodiment
Further specify embodiment of the present utility model below in conjunction with accompanying drawing.
Embodiment 1
Referring to Fig. 2-3, a kind of concrete is built frame, in the middle of comprising, it is provided with the base 1 of passage, base is provided with tripod 2, the tripod top is provided with forehead plate 3, is arranged with two fixed pulleys 4 on the last forehead plate, also is provided with hoist engine 5 on the base, the serving of hoist engine is fixed on the forehead plate after walking around movable pulley 6 between fixed pulley and base and the last forehead plate then.The power that described hoist engine is general is not less than 3500W; Be connected to concrete bucket 7 under the described movable pulley, be connected with conduit 8 under the concrete bucket, described concrete bucket and conduit can move up and down in the passage of base.On base, be welded with hanger, when needs are changed pouring location, fishhook can be hung on the hanger and get final product; Be welded with cat ladder and made things convenient for the maintenance of equipment on tripod, marquis when pulley goes wrong comes it is keeped in repair by cat ladder; Be provided with the landing slab 9 of passage in the middle of being fixed with on base, other equipment is not directly arranged on the base, and is provided in a side of on the landing slab that is welded on the base, has made things convenient for the dismounting and the replacing of equipment; Be provided with the precision that the conduit position-limited rack has guaranteed the conduit operation on base, further improve the quality of building, the conduit position-limited rack can select for use angle steel to be welded.
In the concrete design process of using, must guarantee the height of tripod, conveniently promote or transfer conduit.The height of general tripod can not be lower than 6m, guarantees that simultaneously tripod has enough width, can satisfy a truck with grout mixer and water tank simultaneously and build.Concrete size can have more needs concrete the setting.
Assemble this device concrete is poured in the concrete bucket then, start hoist engine and just can carry out building of concrete body.It not only is fit to building of the continuous concrete body of subterranean wall, and suitable bore column irrigating pile concrete underwater casting.Put into practice it and obtained huge economic benefit and social benefit by concrete.Replace crane by the said equipment, can not only save the turnover field expense of crane, also save simultaneously the crane rent, company is an example with capital, Wuhan smelting basis, and its ground-connecting-wall annual value of production is calculated by 3,000 ten thousand, and the construction period was by 8 months, totally 8 projects, crane is saved a crane rent and crane turnover 3,*8+,5*8,=64 ten thousand altogether by 12 tons of mobile cranes, so 1 year energy of this equipment saves 640,000 for capital, Wuhan smelting basis company.And do not produce noise, waste gas, floating dust when adopting this equipment construction, strengthened the competitiveness in market in this field for enterprise.
Protection domain of the present utility model is not limited to the above embodiments, and obviously, those skilled in the art can carry out various changes and distortion and not break away from scope and spirit of the present utility model the utility model.If these changes and distortion belong in the scope of the utility model claim and equivalent technologies thereof, intention then of the present utility model also comprises these changes and is out of shape interior.

Claims (6)

1. concrete is built frame, it is characterized in that: the base (1) that is provided with passage in the middle of it comprises, base is provided with tripod (2), the tripod top is provided with forehead plate (3), last forehead plate is provided with fixed pulley (4), also be provided with hoist engine (5) on the base, the serving of hoist engine is walked around (6) behind the movable pulley between fixed pulley and base and the last forehead plate, be fixed in then on the forehead plate, be connected to concrete bucket (7) under the described movable pulley, be connected with conduit (8) under the concrete bucket, described concrete bucket and conduit can move up and down in the passage of base.
2. concrete according to claim 1 is built frame, it is characterized in that: described fixed pulley is 2, is symmetrical arranged on last forehead plate.
3. concrete according to claim 1 and 2 is built frame, it is characterized in that: be welded with hanger on the described base.
4. concrete according to claim 1 and 2 is built frame, it is characterized in that: be welded with cat ladder on the described tripod.
5. concrete according to claim 1 and 2 is built frame, it is characterized in that: the landing slab that is provided with passage on described base in the middle of being fixed with.
6. concrete according to claim 1 and 2 is built frame, it is characterized in that: be provided with the conduit position-limited rack on described base.
CN2009200860360U 2009-05-26 2009-05-26 Concrete pouring frame Expired - Fee Related CN201424653Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200860360U CN201424653Y (en) 2009-05-26 2009-05-26 Concrete pouring frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200860360U CN201424653Y (en) 2009-05-26 2009-05-26 Concrete pouring frame

Publications (1)

Publication Number Publication Date
CN201424653Y true CN201424653Y (en) 2010-03-17

Family

ID=42024095

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200860360U Expired - Fee Related CN201424653Y (en) 2009-05-26 2009-05-26 Concrete pouring frame

Country Status (1)

Country Link
CN (1) CN201424653Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173042A (en) * 2019-12-30 2020-05-19 倡创(上海)咨询管理事务所 Advanced water stop post-cast strip of foundation slab and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173042A (en) * 2019-12-30 2020-05-19 倡创(上海)咨询管理事务所 Advanced water stop post-cast strip of foundation slab and construction method

Similar Documents

Publication Publication Date Title
CN102102365B (en) Slurry protection wall bored pile concrete casting device
CN103074871B (en) Arc-shaped slope concrete sliding and lifting template
CN205382488U (en) Water conservancy project concrete dam body job -specific formwork
CN201424653Y (en) Concrete pouring frame
CN204456115U (en) A kind of crane barge pile driving barge with leading truck
CN207747197U (en) A kind of prefabricated wind power tower equipmentization mold of high-precision
CN202946193U (en) Tunnel center gutterway formwork
CN203145192U (en) Auxiliary hoisting and jointing device for steel structural box columns
CN202324567U (en) Moving type large-scale operation platform
CN108374351B (en) Simple hoisting device and method for dismantling box girder bailey pieces
CN201109996Y (en) Fluid pressure climbing template apparatus
CN203795865U (en) Lifting tumbling barrel for super-high concrete casting
CN204780928U (en) Major diameter bored concrete pile concrete first set groundwater increment controlling means
CN201645413U (en) Simple gin-pole mechanism for demolishing internal climbing tower crane
CN202644483U (en) Pier large steel template
CN113503032A (en) Double-sided superposed shear wall cavity concrete pouring tool
CN203655155U (en) Anchor pole drilling machine
CN204492001U (en) A kind of concrete column
CN202985769U (en) Pipeline mold with operating platform
CN208201789U (en) A kind of telescoping steel form for box culvert construct
CN203514322U (en) Concrete vertical casting device
CN204413129U (en) A kind of plane four-point supporting formula proportioning device
CN210973786U (en) Movable small template hoisting support
CN213625702U (en) Pipe gallery roof construction trolley and trolley set
CN215516375U (en) Manhole hoisting device for foundation reinforcement cage

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA FIRST METALLURGICAL CONSTRUCTION GROUP CORPO

Free format text: FORMER OWNER: WUHAN JINGYE FOUNDATION ENGINEERING CO., LTD.

Effective date: 20101210

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430080 NO.1, BINGANG ROAD, QINGSHAN DISTRICT, WUHAN CITY, HUBEI PROVINCE TO: 430081 NO.3, GONGYE AVENUE, QINGSHAN DISTRICT, WUHAN CITY, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20101210

Address after: 430081 Wuhan Industrial Zone, Qingshan District, Hubei, No. 3

Patentee after: China First Metallurgical Group Co., Ltd.

Address before: 430080, No. 1, foreshore Road, Qingshan District, Hubei, Wuhan

Patentee before: Wuhan Jingye Foundation Engineering Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100317

Termination date: 20170526