CN207747197U - A kind of prefabricated wind power tower equipmentization mold of high-precision - Google Patents
A kind of prefabricated wind power tower equipmentization mold of high-precision Download PDFInfo
- Publication number
- CN207747197U CN207747197U CN201721105058.8U CN201721105058U CN207747197U CN 207747197 U CN207747197 U CN 207747197U CN 201721105058 U CN201721105058 U CN 201721105058U CN 207747197 U CN207747197 U CN 207747197U
- Authority
- CN
- China
- Prior art keywords
- external mold
- internal model
- mold
- wind power
- power tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Wind Motors (AREA)
Abstract
The utility model is related to a kind of prefabricated wind power tower equipmentization molds of high-precision, including external mold, internal model, bed die, backform, center steel column, multiple interior external molds are to pull rod, multiple horizontally-supported, supporting racks and embedded part;Wherein:Bed die is arranged on embedded part;External mold and internal model are fixed on bed die;Center steel column is arranged at the center of internal model, is arranged on embedded part;Horizontally-supported both ends are connected respectively in center steel column and internal model;External mold connects supporting rack;Interior external mold is connected between external mold and the top of internal model pull rod;Backform is connected between external mold and the top of internal model, is located at interior external mold to below pull rod.The utility model precision is high, dismounting is convenient, construction is scientific and reasonable, it is easy to disassemble to be used in turn, and can ensure wind power tower cylinder prefabricated precision and pour quality, can meet assembled steel reinforced concrete wind power tower transformation segment transition backing plate it is counter play requirement, the needs of practical application can be met well.
Description
Technical field
The utility model is related to a kind of prefabricated wind power tower equipmentization molds of high-precision.
Background technology
As the research and development of domestic wind-powered electricity generation industry technology are promoted and " go up a hill, plunge into the commercial sea, move towards the low wind speed region in the central and east " is strategic
Deepen constantly practicable, while increasing wind power tower height, structure type is more diversified, in conjunction with assembly concrete
The characteristics of structure high-quality, Fast Installation construction, making precision of the assembly concrete wind power tower to tower mold, prefabricated structure
More stringent requirements are proposed for the quality that pours of part.The cast-in-place wind power tower template of tradition is heavy, install and form removal difficulty is larger, construction
In the process as the increase of tower height degree, construction cost and difficulty of construction will be significantly increased.Meanwhile steel reinforced concrete tower is by lower part concrete
The precision and flatness requirement of structure to transition backing plate when steel superstructure switch transition are more difficult in cast-in-place wind power tower template
It realizes.And the popularization of assembly concrete wind power tower can solve the above problems well, while also to the processing of mold essence
Degree and handling procedure provide better safeguard measure.Therefore, it is wanted for the high-precision mold of assembly concrete wind power tower
The prefabricated tower requirement of high-quality of summing, especially combines the precision and flatness requirement of steel reinforced concrete tower transformation segment transition backing plate, research and development
Go out the equipment mold that a kind of novel trans beat the prefabricated wind power tower of high-precision, is that the technology of those skilled in the art's urgent need to resolve is difficult
Topic.
Utility model content
For the above-mentioned prior art the problem of, the purpose of this utility model is to provide one kind can avoid in appearance
State the prefabricated wind power tower equipmentization mold of high-precision of technological deficiency.
In order to realize above-mentioned purpose of utility model, the technical scheme that the utility model is provided is as follows:
A kind of prefabricated wind power tower equipmentization mold of high-precision, including it is external mold, internal model, bed die, backform, center steel column, more
A interior external mold is to pull rod, multiple horizontally-supported, supporting racks and embedded part;Wherein:Bed die is arranged on embedded part;External mold and internal model are fixed
On bed die;Center steel column is arranged at the center of internal model, is arranged on embedded part;Horizontally-supported both ends are connected respectively to central steel
On column and internal model;External mold connects supporting rack;Interior external mold is connected between external mold and the top of internal model pull rod;Backform is connected to outer
Between mould and the top of internal model, it is located at interior external mold to below pull rod.
Further, interior external mold uses 45# steel to pull rod.
Further, early stripping formwork system is equipped in internal model.
Further, the mold further includes transition backing plate, and transition backing plate is on bed die, the bottom of external mold and internal model
Portion.
Further, the mold further includes multiple center steel column diagonal braces, and the both ends of center steel column diagonal brace are connected respectively to
On center steel column and embedded part.
The prefabricated wind power tower equipmentization mold of high-precision provided by the utility model, precision is high, dismounting is convenient, construction science
Rationally, easy to disassemble to be used in turn, and can ensure the prefabricated precision of wind power tower cylinder and pour quality, assembled steel can be met
The transformation segment transition backing plate of mixed wind power tower is counter to play requirement, can meet the needs of practical application well.
Description of the drawings
Fig. 1 is longitudinal schematic cross-sectional view of the utility model;
Fig. 2 is the schematic top view of bed die;
Fig. 3 is the schematic top view of internal model;
Fig. 4 is the schematic top view of external mold;
Fig. 5 is the schematic top view of backform;
In figure, 1- external molds;2- internal models;3- bed dies;4- backforms;The centers 5- steel column;External mold is to pull rod in 6-;7- level branch
Support;The centers 8- steel column diagonal brace;9- transition backing plates;10- supporting racks;11- embedded parts.
Specific implementation mode
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with the accompanying drawings and specifically
Embodiment is described further the utility model.It should be appreciated that specific embodiment described herein is only explaining this reality
With novel, it is not used to limit the utility model.Based on the embodiments of the present invention, those of ordinary skill in the art are not having
There is the every other embodiment obtained under the premise of making creative work, shall fall within the protection scope of the present invention.
As shown in Figures 1 to 5, the prefabricated wind power tower equipmentization mold of a kind of high-precision, including external mold 1, internal model 2, bed die
3, backform 4, center steel column 5, multiple interior external molds are to pull rod 6, multiple horizontally-supported 7, multiple center steel column diagonal braces 8, transition backing plate
9, supporting rack 10 and embedded part 11;Wherein:External mold 1, internal model 2, bed die 3, backform 4 are tubular;Bed die 3 is arranged on embedded part 11;
External mold 1 and internal model 2 are fixed on bed die 3;Center steel column 5 is arranged at the center of internal model 2, is arranged on embedded part 11;Horizontally-supported 7
Both ends be connected respectively on center steel column 5 and internal model 2;External mold 1 connects supporting rack 10;Interior external mold is connected to external mold 1 to pull rod 6
Between the top of internal model 2;Backform 4 is connected between external mold 1 and the top of internal model 2, is located at interior external mold to 6 lower section of pull rod;In
The both ends of heart steel column diagonal brace 8 are connected respectively on center steel column 5 and embedded part 11;Transition backing plate 9 is on bed die 3,1 and of external mold
The bottom of internal model 2.
The specific installation spelling sequence of each component of prefabricated wind power tower equipmentization mold is in high precision:
1) central point of being subject to puts cross datum line and installs bed die 3 on embedded part 11, and transition backing plate is installed on bed die 3
9;
2) spot welding positioning and installation center steel column 5 and center steel column diagonal brace 8 after 3 top surface levelling of bed die;
3) internal model 2 and horizontally-supported 7, backform 4 and external mold 1 are installed successively;
4) external mold is to pull rod 6 in being installed after adjustment positioning;
5) supporting rack 10 is installed and fastens all bolts.
After the installation positioning of bed die 3, slurry seal pipe is installed in 3 inner side and outer side of bed die respectively, is leaked when to avoid casting concrete
Slurry.
The error of 4 prestressed pore passage of bed die 3 and backform should control within ± 2mm.
When installation center steel column 5 and center steel column diagonal brace 8, it should fall, protect to bottom centre's point messenger wire at 5 top of center steel column
Hold fastening center steel column diagonal brace 8 and bottom bolts while line falls concentric.
It is suitable for reading away from central point radius that internal model 2 measures internal model 2 after installation is complete, fastens horizontally-supported 7 successively, and ensure internal model
2 upper and lower openings are coaxial.
Backform 4 is installed successively by 4 anchor point of backform, and prestressed stretch-draw hole site up and down should be measured.
Just pilled-in selvedge frame bolt is answered when external mold 1 being installed successively according to the positioning of external mold 1 on bed die 3, and is installed in mold bottom
Interior external mold is to pull rod 6.
It is easy to disassemble after tower for ease of pouring, early stripping formwork system is equipped in internal model 2.
Interior external mold uses 45# steel to pull rod 6.
The prefabricated wind power tower equipmentization mold of high-precision provided by the utility model, precision is high, dismounting is convenient, construction science
Rationally, easy to disassemble to be used in turn, and can ensure the prefabricated precision of wind power tower cylinder and pour quality, assembled steel can be met
The transformation segment transition backing plate of mixed wind power tower is counter to play requirement, can meet the needs of practical application well.
The embodiment of the utility model above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
Cannot the limitation to the utility model patent range therefore be interpreted as.It should be pointed out that for the ordinary skill of this field
For personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these belong to this
The protection domain of utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.
Claims (4)
1. a kind of prefabricated wind power tower equipmentization mold of high-precision, which is characterized in that including external mold, internal model, bed die, backform, in
Heart steel column, multiple interior external molds are to pull rod, multiple horizontally-supported, supporting racks and embedded part;Wherein:Bed die is arranged on embedded part;External mold
It is fixed on bed die with internal model;Center steel column is arranged at the center of internal model, is arranged on embedded part;Horizontally-supported both ends connect respectively
It is connected in center steel column and internal model;External mold connects supporting rack;Interior external mold is connected between external mold and the top of internal model pull rod;Top
Mould is connected between external mold and the top of internal model, is located at interior external mold to below pull rod, the mold further includes multiple center steel columns
The both ends of diagonal brace, center steel column diagonal brace are connected respectively on center steel column and embedded part.
2. the prefabricated wind power tower equipmentization mold of high-precision according to claim 1, which is characterized in that interior external mold is to pull rod
Using 45# steel.
3. the prefabricated wind power tower equipmentization mold of high-precision according to claim 1, which is characterized in that be equipped in internal model early
Form removal.
4. the prefabricated wind power tower equipmentization mold of high-precision according to claim 1, which is characterized in that the mold also wraps
Transition backing plate is included, transition backing plate is on bed die, the bottom of external mold and internal model.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721105058.8U CN207747197U (en) | 2017-08-31 | 2017-08-31 | A kind of prefabricated wind power tower equipmentization mold of high-precision |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721105058.8U CN207747197U (en) | 2017-08-31 | 2017-08-31 | A kind of prefabricated wind power tower equipmentization mold of high-precision |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207747197U true CN207747197U (en) | 2018-08-21 |
Family
ID=63145656
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721105058.8U Active CN207747197U (en) | 2017-08-31 | 2017-08-31 | A kind of prefabricated wind power tower equipmentization mold of high-precision |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207747197U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109750892A (en) * | 2019-01-18 | 2019-05-14 | 中国十七冶集团有限公司 | A kind of prefabricated assembled mixing blower fan pylon template support method and device |
CN110920104A (en) * | 2019-12-13 | 2020-03-27 | 上海复合材料科技有限公司 | Star sensor support forming die structure suitable for pre-buried star sensitive mounting plate |
CN113414870A (en) * | 2021-02-27 | 2021-09-21 | 江苏金海风电塔筒科技有限公司 | Prefabricated production method of prestressed concrete wind power generation tower barrel |
-
2017
- 2017-08-31 CN CN201721105058.8U patent/CN207747197U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109750892A (en) * | 2019-01-18 | 2019-05-14 | 中国十七冶集团有限公司 | A kind of prefabricated assembled mixing blower fan pylon template support method and device |
CN110920104A (en) * | 2019-12-13 | 2020-03-27 | 上海复合材料科技有限公司 | Star sensor support forming die structure suitable for pre-buried star sensitive mounting plate |
CN113414870A (en) * | 2021-02-27 | 2021-09-21 | 江苏金海风电塔筒科技有限公司 | Prefabricated production method of prestressed concrete wind power generation tower barrel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207747197U (en) | A kind of prefabricated wind power tower equipmentization mold of high-precision | |
CN207003479U (en) | Cast-in-place city utility tunnel whole formwork system | |
CN105220619B (en) | A kind of method of quick manufacture two-wire nose circle solid pier | |
CN208072950U (en) | A kind of combination set shaped steel formwork | |
CN110700105B (en) | Synchronous construction method for high pier column and tie beam and template used in same | |
CN110273539A (en) | A kind of combination set shaped steel formwork and its modeling method | |
CN211923568U (en) | Pier stud reinforcement mould | |
CN106836255B (en) | The integral prefabricated structure of basement bottom board catch pit steel mesh and method of construction | |
CN208501732U (en) | A kind of piping lane cast-in-place construction integral movable type mould bases | |
CN101215968B (en) | Inclined shaft sliding mode structure and inclined shaft pull-crawling construction process | |
CN216765631U (en) | Node composite structure based on steel-concrete composite beam triangular supports | |
CN215164807U (en) | Template mounting structure for steel pipe arch rib outer concrete-wrapped hanging basket construction | |
CN109914476A (en) | Construction process of cast-in-place urban comprehensive pipe gallery | |
CN112412152B (en) | Construction method of underslung derrick-free variable-section rectangular chimney support system | |
CN108678253A (en) | A kind of method of construction of floor structure with ribbing and floor structure with ribbing | |
CN211714006U (en) | Basement water-resistant plate and tower crane one-step forming foundation structure | |
CN205296829U (en) | Superelevation super large cross -section batter post integrally lift up formula template reinforcerment system | |
CN210477335U (en) | Precast box culvert concreting equipment | |
CN111501562A (en) | Cable tower operation platform template separation lift system | |
CN210256628U (en) | Self-adaptive outer mold system for prefabricating concrete | |
CN207794094U (en) | The device being connect with Guan Liang for foundation pit assembled inner bracing member | |
CN212358013U (en) | Cable tower operation platform template separation lift system | |
CN207348880U (en) | A kind of tunnel center gutter formed molding board | |
CN206986732U (en) | A kind of bridge pier concrete casting device | |
CN204875498U (en) | Device of steel sheet installation under supplementary bridge beam supports |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |