external mold
internal model
mold
wind power
power tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721105058.8U
Other languages
Chinese (zh)
Inventor
马恒
武兴亮
董龙锋
崔立明
阎明伟
赵智博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Building Construction Research Institute Co Ltd
Original Assignee
Beijing Building Construction Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Building Construction Research Institute Co Ltd filed Critical Beijing Building Construction Research Institute Co Ltd
Priority to CN201721105058.8U priority Critical patent/CN207747197U/en
Application granted granted Critical
Publication of CN207747197U publication Critical patent/CN207747197U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model is related to a kind of prefabricated wind power tower equipmentization molds of high-precision, including external mold, internal model, bed die, backform, center steel column, multiple interior external molds are to pull rod, multiple horizontally-supported, supporting racks and embedded part;Wherein:Bed die is arranged on embedded part;External mold and internal model are fixed on bed die;Center steel column is arranged at the center of internal model, is arranged on embedded part;Horizontally-supported both ends are connected respectively in center steel column and internal model;External mold connects supporting rack;Interior external mold is connected between external mold and the top of internal model pull rod;Backform is connected between external mold and the top of internal model, is located at interior external mold to below pull rod.The utility model precision is high, dismounting is convenient, construction is scientific and reasonable, it is easy to disassemble to be used in turn, and can ensure wind power tower cylinder prefabricated precision and pour quality, can meet assembled steel reinforced concrete wind power tower transformation segment transition backing plate it is counter play requirement, the needs of practical application can be met well.

Description

A kind of prefabricated wind power tower equipmentization mold of high-precision
Technical field
The utility model is related to a kind of prefabricated wind power tower equipmentization molds of high-precision.
Background technology
As the research and development of domestic wind-powered electricity generation industry technology are promoted and " go up a hill, plunge into the commercial sea, move towards the low wind speed region in the central and east " is strategic Deepen constantly practicable, while increasing wind power tower height, structure type is more diversified, in conjunction with assembly concrete The characteristics of structure high-quality, Fast Installation construction, making precision of the assembly concrete wind power tower to tower mold, prefabricated structure More stringent requirements are proposed for the quality that pours of part.The cast-in-place wind power tower template of tradition is heavy, install and form removal difficulty is larger, construction In the process as the increase of tower height degree, construction cost and difficulty of construction will be significantly increased.Meanwhile steel reinforced concrete tower is by lower part concrete The precision and flatness requirement of structure to transition backing plate when steel superstructure switch transition are more difficult in cast-in-place wind power tower template It realizes.And the popularization of assembly concrete wind power tower can solve the above problems well, while also to the processing of mold essence Degree and handling procedure provide better safeguard measure.Therefore, it is wanted for the high-precision mold of assembly concrete wind power tower The prefabricated tower requirement of high-quality of summing, especially combines the precision and flatness requirement of steel reinforced concrete tower transformation segment transition backing plate, research and development Go out the equipment mold that a kind of novel trans beat the prefabricated wind power tower of high-precision, is that the technology of those skilled in the art's urgent need to resolve is difficult Topic.
Utility model content
For the above-mentioned prior art the problem of, the purpose of this utility model is to provide one kind can avoid in appearance State the prefabricated wind power tower equipmentization mold of high-precision of technological deficiency.
In order to realize above-mentioned purpose of utility model, the technical scheme that the utility model is provided is as follows:
A kind of prefabricated wind power tower equipmentization mold of high-precision, including it is external mold, internal model, bed die, backform, center steel column, more A interior external mold is to pull rod, multiple horizontally-supported, supporting racks and embedded part;Wherein:Bed die is arranged on embedded part;External mold and internal model are fixed On bed die;Center steel column is arranged at the center of internal model, is arranged on embedded part;Horizontally-supported both ends are connected respectively to central steel On column and internal model;External mold connects supporting rack;Interior external mold is connected between external mold and the top of internal model pull rod;Backform is connected to outer Between mould and the top of internal model, it is located at interior external mold to below pull rod.
Further, interior external mold uses 45# steel to pull rod.
Further, early stripping formwork system is equipped in internal model.
Further, the mold further includes transition backing plate, and transition backing plate is on bed die, the bottom of external mold and internal model Portion.
Further, the mold further includes multiple center steel column diagonal braces, and the both ends of center steel column diagonal brace are connected respectively to On center steel column and embedded part.
The prefabricated wind power tower equipmentization mold of high-precision provided by the utility model, precision is high, dismounting is convenient, construction science Rationally, easy to disassemble to be used in turn, and can ensure the prefabricated precision of wind power tower cylinder and pour quality, assembled steel can be met The transformation segment transition backing plate of mixed wind power tower is counter to play requirement, can meet the needs of practical application well.
Description of the drawings
Fig. 1 is longitudinal schematic cross-sectional view of the utility model;
Fig. 2 is the schematic top view of bed die;
Fig. 3 is the schematic top view of internal model;
Fig. 4 is the schematic top view of external mold;
Fig. 5 is the schematic top view of backform;
In figure, 1- external molds;2- internal models;3- bed dies;4- backforms;The centers 5- steel column;External mold is to pull rod in 6-;7- level branch Support;The centers 8- steel column diagonal brace;9- transition backing plates;10- supporting racks;11- embedded parts.
Specific implementation mode
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with the accompanying drawings and specifically Embodiment is described further the utility model.It should be appreciated that specific embodiment described herein is only explaining this reality With novel, it is not used to limit the utility model.Based on the embodiments of the present invention, those of ordinary skill in the art are not having There is the every other embodiment obtained under the premise of making creative work, shall fall within the protection scope of the present invention.
As shown in Figures 1 to 5, the prefabricated wind power tower equipmentization mold of a kind of high-precision, including external mold 1, internal model 2, bed die 3, backform 4, center steel column 5, multiple interior external molds are to pull rod 6, multiple horizontally-supported 7, multiple center steel column diagonal braces 8, transition backing plate 9, supporting rack 10 and embedded part 11;Wherein:External mold 1, internal model 2, bed die 3, backform 4 are tubular;Bed die 3 is arranged on embedded part 11; External mold 1 and internal model 2 are fixed on bed die 3;Center steel column 5 is arranged at the center of internal model 2, is arranged on embedded part 11;Horizontally-supported 7 Both ends be connected respectively on center steel column 5 and internal model 2;External mold 1 connects supporting rack 10;Interior external mold is connected to external mold 1 to pull rod 6 Between the top of internal model 2;Backform 4 is connected between external mold 1 and the top of internal model 2, is located at interior external mold to 6 lower section of pull rod;In The both ends of heart steel column diagonal brace 8 are connected respectively on center steel column 5 and embedded part 11;Transition backing plate 9 is on bed die 3,1 and of external mold The bottom of internal model 2.
The specific installation spelling sequence of each component of prefabricated wind power tower equipmentization mold is in high precision:
1) central point of being subject to puts cross datum line and installs bed die 3 on embedded part 11, and transition backing plate is installed on bed die 3 9;
2) spot welding positioning and installation center steel column 5 and center steel column diagonal brace 8 after 3 top surface levelling of bed die;
3) internal model 2 and horizontally-supported 7, backform 4 and external mold 1 are installed successively;
4) external mold is to pull rod 6 in being installed after adjustment positioning;
5) supporting rack 10 is installed and fastens all bolts.
After the installation positioning of bed die 3, slurry seal pipe is installed in 3 inner side and outer side of bed die respectively, is leaked when to avoid casting concrete Slurry.
The error of 4 prestressed pore passage of bed die 3 and backform should control within ± 2mm.
When installation center steel column 5 and center steel column diagonal brace 8, it should fall, protect to bottom centre's point messenger wire at 5 top of center steel column Hold fastening center steel column diagonal brace 8 and bottom bolts while line falls concentric.
It is suitable for reading away from central point radius that internal model 2 measures internal model 2 after installation is complete, fastens horizontally-supported 7 successively, and ensure internal model 2 upper and lower openings are coaxial.
Backform 4 is installed successively by 4 anchor point of backform, and prestressed stretch-draw hole site up and down should be measured.
Just pilled-in selvedge frame bolt is answered when external mold 1 being installed successively according to the positioning of external mold 1 on bed die 3, and is installed in mold bottom Interior external mold is to pull rod 6.
It is easy to disassemble after tower for ease of pouring, early stripping formwork system is equipped in internal model 2.
Interior external mold uses 45# steel to pull rod 6.
The prefabricated wind power tower equipmentization mold of high-precision provided by the utility model, precision is high, dismounting is convenient, construction science Rationally, easy to disassemble to be used in turn, and can ensure the prefabricated precision of wind power tower cylinder and pour quality, assembled steel can be met The transformation segment transition backing plate of mixed wind power tower is counter to play requirement, can meet the needs of practical application well.
The embodiment of the utility model above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Cannot the limitation to the utility model patent range therefore be interpreted as.It should be pointed out that for the ordinary skill of this field For personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these belong to this The protection domain of utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (4)

1. a kind of prefabricated wind power tower equipmentization mold of high-precision, which is characterized in that including external mold, internal model, bed die, backform, in Heart steel column, multiple interior external molds are to pull rod, multiple horizontally-supported, supporting racks and embedded part;Wherein:Bed die is arranged on embedded part;External mold It is fixed on bed die with internal model;Center steel column is arranged at the center of internal model, is arranged on embedded part;Horizontally-supported both ends connect respectively It is connected in center steel column and internal model;External mold connects supporting rack;Interior external mold is connected between external mold and the top of internal model pull rod;Top Mould is connected between external mold and the top of internal model, is located at interior external mold to below pull rod, the mold further includes multiple center steel columns The both ends of diagonal brace, center steel column diagonal brace are connected respectively on center steel column and embedded part.
2. the prefabricated wind power tower equipmentization mold of high-precision according to claim 1, which is characterized in that interior external mold is to pull rod Using 45# steel.
3. the prefabricated wind power tower equipmentization mold of high-precision according to claim 1, which is characterized in that be equipped in internal model early Form removal.
4. the prefabricated wind power tower equipmentization mold of high-precision according to claim 1, which is characterized in that the mold also wraps Transition backing plate is included, transition backing plate is on bed die, the bottom of external mold and internal model.
CN201721105058.8U 2017-08-31 2017-08-31 A kind of prefabricated wind power tower equipmentization mold of high-precision Active CN207747197U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721105058.8U CN207747197U (en) 2017-08-31 2017-08-31 A kind of prefabricated wind power tower equipmentization mold of high-precision

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721105058.8U CN207747197U (en) 2017-08-31 2017-08-31 A kind of prefabricated wind power tower equipmentization mold of high-precision

Publications (1)

Publication Number Publication Date
CN207747197U true CN207747197U (en) 2018-08-21

Family

ID=63145656

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721105058.8U Active CN207747197U (en) 2017-08-31 2017-08-31 A kind of prefabricated wind power tower equipmentization mold of high-precision

Country Status (1)

Country Link
CN (1) CN207747197U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109750892A (en) * 2019-01-18 2019-05-14 中国十七冶集团有限公司 A kind of prefabricated assembled mixing blower fan pylon template support method and device
CN110920104A (en) * 2019-12-13 2020-03-27 上海复合材料科技有限公司 Star sensor support forming die structure suitable for pre-buried star sensitive mounting plate
CN113414870A (en) * 2021-02-27 2021-09-21 江苏金海风电塔筒科技有限公司 Prefabricated production method of prestressed concrete wind power generation tower barrel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109750892A (en) * 2019-01-18 2019-05-14 中国十七冶集团有限公司 A kind of prefabricated assembled mixing blower fan pylon template support method and device
CN110920104A (en) * 2019-12-13 2020-03-27 上海复合材料科技有限公司 Star sensor support forming die structure suitable for pre-buried star sensitive mounting plate
CN113414870A (en) * 2021-02-27 2021-09-21 江苏金海风电塔筒科技有限公司 Prefabricated production method of prestressed concrete wind power generation tower barrel

Similar Documents

Publication Publication Date Title
CN207747197U (en) A kind of prefabricated wind power tower equipmentization mold of high-precision
CN207003479U (en) Cast-in-place city utility tunnel whole formwork system
CN105220619B (en) A kind of method of quick manufacture two-wire nose circle solid pier
CN208072950U (en) A kind of combination set shaped steel formwork
CN110700105B (en) Synchronous construction method for high pier column and tie beam and template used in same
CN110273539A (en) A kind of combination set shaped steel formwork and its modeling method
CN211923568U (en) Pier stud reinforcement mould
CN106836255B (en) The integral prefabricated structure of basement bottom board catch pit steel mesh and method of construction
CN208501732U (en) A kind of piping lane cast-in-place construction integral movable type mould bases
CN101215968B (en) Inclined shaft sliding mode structure and inclined shaft pull-crawling construction process
CN216765631U (en) Node composite structure based on steel-concrete composite beam triangular supports
CN215164807U (en) Template mounting structure for steel pipe arch rib outer concrete-wrapped hanging basket construction
CN109914476A (en) Construction process of cast-in-place urban comprehensive pipe gallery
CN112412152B (en) Construction method of underslung derrick-free variable-section rectangular chimney support system
CN108678253A (en) A kind of method of construction of floor structure with ribbing and floor structure with ribbing
CN211714006U (en) Basement water-resistant plate and tower crane one-step forming foundation structure
CN205296829U (en) Superelevation super large cross -section batter post integrally lift up formula template reinforcerment system
CN210477335U (en) Precast box culvert concreting equipment
CN111501562A (en) Cable tower operation platform template separation lift system
CN210256628U (en) Self-adaptive outer mold system for prefabricating concrete
CN207794094U (en) The device being connect with Guan Liang for foundation pit assembled inner bracing member
CN212358013U (en) Cable tower operation platform template separation lift system
CN207348880U (en) A kind of tunnel center gutter formed molding board
CN206986732U (en) A kind of bridge pier concrete casting device
CN204875498U (en) Device of steel sheet installation under supplementary bridge beam supports

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant