CN206986732U - A kind of bridge pier concrete casting device - Google Patents

A kind of bridge pier concrete casting device Download PDF

Info

Publication number
CN206986732U
CN206986732U CN201720791515.7U CN201720791515U CN206986732U CN 206986732 U CN206986732 U CN 206986732U CN 201720791515 U CN201720791515 U CN 201720791515U CN 206986732 U CN206986732 U CN 206986732U
Authority
CN
China
Prior art keywords
bridge pier
fixed plate
support bar
placing
avris
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720791515.7U
Other languages
Chinese (zh)
Inventor
李基宏
李基瀚
王娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720791515.7U priority Critical patent/CN206986732U/en
Application granted granted Critical
Publication of CN206986732U publication Critical patent/CN206986732U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of bridge pier concrete casting device, including bridge pier formwork for placing, first support bar and second support bar, the first fixed plate and the second fixed plate are respectively arranged with the outside of the bridge pier formwork for placing, the first support bar is fixedly connected through the first fixing hoop and the second fixing hoop and its lower end by the first fixes sleeve with firm banking template, the avris of the bridge pier formwork for placing is respectively arranged with the first avris fixed plate and the second avris fixed plate, the second support bar is fixedly connected through the first anchor tip and the second anchor tip and its lower end by the second fixes sleeve with firm banking template.The bridge pier concrete casting device, it is convenient to carry out overall remove and install;Overall bearing strength is improved, concrete extrusion is not easily susceptible to and damages;Ensure that in casting process be not in shift phenomenon, improve the quality poured;It is convenient for the dismounting of every layer of bridge pier formwork for placing.

Description

A kind of bridge pier concrete casting device
Technical field
Bridge pier construction technique field is the utility model is related to, specially a kind of bridge pier concrete casting device.
Background technology
The intermediate support structure of bridge is referred to as bridge pier.Bridge pier can be divided into solid pier, column pier and framed bent pier etc..Build bridge pier Material can use timber, building stones, concrete, armored concrete, steel etc..Bridge pier is when being poured, it is necessary to which bridge pier pours dress Put and shaping is fixed to the concrete poured.
But existing bridge pier pours device and is inconvenient to carry out removing and installing for entirety, while bearing strength is weak, for a long time Easily damaged after use by concrete extrusion, and for overall without the fixed installation for carrying out integration, so that Overall stability is influenceed, easily occurs shift phenomenon in casting process, reduces the quality poured.In view of the above-mentioned problems, Innovative design is carried out on the basis of original bridge pier concrete casting device.
Utility model content
The purpose of this utility model is to provide a kind of bridge pier concrete casting device, to solve to carry in above-mentioned background technology Go out to be inconvenient to carry out removing and installing for entirety, while bearing strength is weak, after long-time use easily by concrete extrusion is gone out Now damage, and for overall without the fixed installation for carrying out integration, so as to influence overall stability, in casting process Easily there is shift phenomenon, the problem of reducing pouring quality.
To achieve the above object, the utility model provides following technical scheme:A kind of bridge pier concrete casting device, including Bridge pier formwork for placing, first support bar and second support bar, the first fixation is respectively arranged with the outside of the bridge pier formwork for placing Plate and the second fixed plate, and it is respectively fixed with the first fixing hoop and the second fixing card in the first fixed plate and the second fixed plate Hoop, the first support bar pass through the first fixes sleeve and fixation through the first fixing hoop and the second fixing hoop and its lower end Base template is fixedly connected, and the avris of the bridge pier formwork for placing is respectively arranged with the first avris fixed plate and the second avris is fixed Plate, and it is respectively fixed with the first anchor tip and the second anchor tip, institute in the first avris fixed plate and the second avris fixed plate State second support bar and pass through the second fixes sleeve and firm banking through the first anchor tip and the second anchor tip and its lower end Template is fixedly connected.
Preferably, the surrounding spaced set of the bridge pier formwork for placing has the reinforcement of vertical stratification.
Preferably, first fixed plate and the second fixed plate are symmetrically arranged with 2 on the axis of bridge pier formwork for placing It is individual, and the outside of the first fixed plate and the second fixed plate is correspondingly fixed with the first fixing hoop of 2 symmetrical structures and second solid Determine clip.
Preferably, the first nipple of the first support bar upper end and the first screw thread of another first support bar lower end Plug is threadedly coupled, and the number of first support bar is equal with the number of bridge pier formwork for placing.
Preferably, the first avris fixed plate and the second avris fixed plate are symmetrical on the axis of bridge pier formwork for placing 2 are provided with, and the outside of the first avris fixed plate and the second avris fixed plate is correspondingly fixed with the first of 2 symmetrical structures and consolidated Determine joint and the second anchor tip.
Preferably, the second nipple of the second support bar upper end and the second screw thread of another second support bar lower end Plug is threadedly coupled, and the number of second support bar is equal with the number of bridge pier formwork for placing.
Preferably, the firm banking template is "convex" shaped structure, and end area is more than bridge pier formwork for placing thereon Horizontal foot print.
Compared with prior art, the beneficial effects of the utility model are:The bridge pier concrete casting device,
(1)It is overall assembled using multiple bridge pier formwork for placing, it is convenient to carry out overall remove and install;
(2)The surrounding spaced set of pier formwork for placing has the reinforcement of vertical stratification, improves overall bearing strength, It is not easily susceptible to concrete extrusion and damages;
(3)Installation is fixed in the support bar that surrounding is provided with integrative-structure, improves overall stability, ensures to pour Be not in shift phenomenon during building, improve the quality poured;
(4)The support bar of integration is assembled for more piece, and joint number is mutually corresponding with bridge pier formwork for placing, is convenient for The dismounting of every layer of bridge pier formwork for placing;
(5)Firm banking template is "convex" shaped structure, and end area is more than the horizontal occupation of land of bridge pier formwork for placing thereon Area, the base template of large area make it that overall structure is stable.
Brief description of the drawings
Fig. 1 is the utility model bridge pier integral assembling structural representation;
Fig. 2 is the utility model bridge pier formwork for placing overlooking the structure diagram;
Fig. 3 is the utility model A point mplifying structure schematic diagrams;
Fig. 4 is the utility model B point mplifying structure schematic diagrams.
In figure:1st, bridge pier formwork for placing, the 2, first fixed plate, the 3, first fixing hoop, the 4, second fixed plate, 5, second is solid Determine clip, 6, reinforcement, 7, first support bar, the 701, first nipple, the 702, first threaded pin, the 8, first avris fixes Plate, the 9, first anchor tip, the 10, second avris fixed plate, the 11, second anchor tip, 12, second support bar, the 1201, second spiral shell Line joint, the 1202, second threaded pin, the 13, first fixes sleeve, the 14, second fixes sleeve, 15, firm banking template.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-4 are referred to, the utility model provides a kind of technical scheme:A kind of bridge pier concrete casting device, including bridge Pier formwork for placing 1, the first fixed plate 2, the first fixing hoop 3, the second fixed plate 4, the second fixing hoop 5, reinforcement 6, first Support bar 7, the first nipple 701, the first threaded pin 702, the first avris fixed plate 8, the first anchor tip 9, the second side Side fixed plate 10, the second anchor tip 11, second support bar 12, the second nipple 1201, the second threaded pin 1202, first Fixes sleeve 13, the second fixes sleeve 14 and firm banking template 15, the outside of bridge pier formwork for placing 1 are respectively arranged with first and consolidated The fixed plate 4 of fixed board 2 and second, and the first fixing hoop 3 and second is respectively fixed with the first fixed plate 2 and the second fixed plate 4 Fixing hoop 5, the first fixed plate 2 and the second fixed plate 4 are symmetrically arranged with 2, and on the axis of bridge pier formwork for placing 1 The outside of one fixed plate 2 and the second fixed plate 4 is correspondingly fixed with the first fixing hoop 3 and the second fixing card of 2 symmetrical structures Hoop 5, symmetrical structure installation in front and rear sides is stable, and the surrounding spaced set of bridge pier formwork for placing 1 has the reinforcement of vertical stratification 6, overall bearing strength is improved, concrete extrusion is not easily susceptible to and damages, first support bar 7 passes through the first fixing hoop 3 It is fixedly connected with the second fixing hoop 5 and its lower end by the first fixes sleeve 13 with firm banking template 15, first support bar 7 First nipple 701 of upper end is threadedly coupled with the first threaded pin 702 of another lower end of first support bar 7, and first The number of strut 7 is equal with the number of bridge pier formwork for placing 1, realizes the dismounting of first support bar 7, the side of bridge pier formwork for placing 1 Side is respectively arranged with the first avris fixed plate 8 and the second avris fixed plate 10, and the first avris fixed plate 8 and the second avris are fixed The first anchor tip 9 and the second anchor tip 11, the first avris fixed plate 8 and the second avris fixed plate are respectively fixed with plate 10 10 are symmetrically arranged with 2, and the first avris fixed plate 8 and the second avris fixed plate 10 on the axis of bridge pier formwork for placing 1 Outside be correspondingly fixed with the first anchor tip 9 and the second anchor tip 11 of 2 symmetrical structures, left and right sides symmetrical structure peace Dress is stable, and second support bar 12 passes through the second fixes sleeve through the first anchor tip 9 and the second anchor tip 11 and its lower end 14 are fixedly connected with firm banking template 15, the second nipple 1201 of the upper end of second support bar 12 and another second support bar Second threaded pin 1202 of 12 lower ends is threadedly coupled, and the number of second support bar 12 and the number phase of bridge pier formwork for placing 1 Deng realizing the dismounting of second support bar 17, firm banking template 15 is "convex" shaped structure, and end area pours more than bridge pier thereon The horizontal foot print of building mould 1, make it that overall structure is stable using the firm banking template 15 of large area.
Operation principle:Overall splicing installation is carried out using multiple bridge pier formwork for placing 1 first, then first support bar 7 Consolidated through the first fixing hoop 3 and the second fixing hoop 5 and its lower end by the first fixes sleeve 13 with firm banking template 15 Fixed connection, carries out the fixed installation of front and rear sides, while second support bar 12 passes through the first anchor tip 9 and the second anchor tip 11 and its lower end be fixedly connected by the second fixes sleeve 14 with firm banking template 15, carry out the left and right sides fixed installation, So as to improve overall stability, ensure that in casting process be not in shift phenomenon, improve the quality poured, and The surrounding spaced set of bridge pier formwork for placing 1 has the reinforcement 6 of vertical stratification, improves overall bearing strength, be not easy by Damaged to concrete extrusion, and first support bar 7 and second support bar 12 are that more piece is assembled, and joint number and bridge pier Formwork for placing 1 is mutually corresponding, the dismounting of every layer of bridge pier formwork for placing 1 is convenient for, finally using the firm banking mould of large area Plate 15 make it that overall structure is stable.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (7)

1. a kind of bridge pier concrete casting device, including bridge pier formwork for placing(1), first support bar(7)And second support bar (12), it is characterised in that:The bridge pier formwork for placing(1)Outside be respectively arranged with the first fixed plate(2)With the second fixed plate (4), and the first fixed plate(2)With the second fixed plate(4)On be respectively fixed with the first fixing hoop(3)With the second fixing hoop (5), the first support bar(7)Through the first fixing hoop(3)With the second fixing hoop(5)And its lower end is fixed by first Sleeve(13)With firm banking template(15)It is fixedly connected, the bridge pier formwork for placing(1)Avris be respectively arranged with the first side Side fixed plate(8)With the second avris fixed plate(10), and the first avris fixed plate(8)With the second avris fixed plate(10)Upper difference It is fixed with the first anchor tip(9)With the second anchor tip(11), the second support bar(12)Through the first anchor tip(9) With the second anchor tip(11)And its lower end passes through the second fixes sleeve(14)With firm banking template(15)It is fixedly connected.
A kind of 2. bridge pier concrete casting device according to claim 1, it is characterised in that:The bridge pier formwork for placing (1)Surrounding spaced set have the reinforcement of vertical stratification(6).
A kind of 3. bridge pier concrete casting device according to claim 1, it is characterised in that:First fixed plate(2) With the second fixed plate(4)On bridge pier formwork for placing(1)Axis be symmetrically arranged with 2, and the first fixed plate(2)With second Fixed plate(4)Outside be correspondingly fixed with the first fixing hoop of 2 symmetrical structures(3)With the second fixing hoop(5).
A kind of 4. bridge pier concrete casting device according to claim 1, it is characterised in that:The first support bar(7) First nipple of upper end(701)With another first support bar(7)First threaded pin of lower end(702)Threaded connection, and First support bar(7)Number and bridge pier formwork for placing(1)Number it is equal.
A kind of 5. bridge pier concrete casting device according to claim 1, it is characterised in that:The first avris fixed plate (8)With the second avris fixed plate(10)On bridge pier formwork for placing(1)Axis be symmetrically arranged with 2, and the first avris is consolidated Fixed board(8)With the second avris fixed plate(10)Outside be correspondingly fixed with the first anchor tip of 2 symmetrical structures(9)With second Anchor tip(11).
A kind of 6. bridge pier concrete casting device according to claim 1, it is characterised in that:The second support bar(12) Second nipple of upper end(1201)With another second support bar(12)Second threaded pin of lower end(1202)Threaded connection, And second support bar(12)Number and bridge pier formwork for placing(1)Number it is equal.
A kind of 7. bridge pier concrete casting device according to claim 1, it is characterised in that:The firm banking template (15)For "convex" shaped structure, and end area is more than bridge pier formwork for placing thereon(1)Horizontal foot print.
CN201720791515.7U 2017-07-03 2017-07-03 A kind of bridge pier concrete casting device Expired - Fee Related CN206986732U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720791515.7U CN206986732U (en) 2017-07-03 2017-07-03 A kind of bridge pier concrete casting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720791515.7U CN206986732U (en) 2017-07-03 2017-07-03 A kind of bridge pier concrete casting device

Publications (1)

Publication Number Publication Date
CN206986732U true CN206986732U (en) 2018-02-09

Family

ID=61400473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720791515.7U Expired - Fee Related CN206986732U (en) 2017-07-03 2017-07-03 A kind of bridge pier concrete casting device

Country Status (1)

Country Link
CN (1) CN206986732U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098097A (en) * 2018-10-19 2018-12-28 佛山科学技术学院 A kind of bridge column foot formwork for placing convenient for assembling

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098097A (en) * 2018-10-19 2018-12-28 佛山科学技术学院 A kind of bridge column foot formwork for placing convenient for assembling

Similar Documents

Publication Publication Date Title
CN201416148Y (en) Symmetrical anchoring rope pull rod shuttering for oblique post
CN206986732U (en) A kind of bridge pier concrete casting device
CN209837676U (en) Building stand pours template with outside braced frame
CN209482709U (en) A kind of in-situ concrete wall subsiding crack typified form
CN205171994U (en) A stencil assembly for clear water concrete construction
CN207582948U (en) A kind of morning tears formula superimposed sheet temporary supporting system open
CN206458091U (en) A kind of constructional form fixing apparatus
CN209603128U (en) A kind of pile for prestressed pipe
CN104746434B (en) Closure segment formwork system without dismantling outer formwork
CN208633387U (en) PC column vertical steel bar correcting device
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN207685674U (en) The device of double rod iron method construction bridges bent caps
CN207686280U (en) A kind of aluminum alloy mould plate early dismantling head device that assortable full hall scaffold uses
CN206385568U (en) A kind of city integrated piping lane hoisting ring device
CN205134291U (en) Large -scale steel form with adjustable
CN210529735U (en) Building steel structure platform base
CN208235943U (en) A kind of fashioned iron hood type concrete single-column pours strengthening construction device
CN206902702U (en) Mixed mud built pile
CN102926544A (en) Method for constructing wall pulling steel bars in frame column and structure thereof
CN206467999U (en) A kind of construction formwork for placing
CN204940523U (en) A kind of curved surface net frame four crutch mounting structure
CN213539684U (en) Pouring template for building construction
CN208380067U (en) A kind of assembled architecture assembling device
CN214739893U (en) Assembled wall embodiment pouring hidden column template fixing device
CN211285428U (en) Concrete guardrail link plate assembled template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180209

Termination date: 20190703