CN206902702U - Mixed mud built pile - Google Patents

Mixed mud built pile Download PDF

Info

Publication number
CN206902702U
CN206902702U CN201720343135.7U CN201720343135U CN206902702U CN 206902702 U CN206902702 U CN 206902702U CN 201720343135 U CN201720343135 U CN 201720343135U CN 206902702 U CN206902702 U CN 206902702U
Authority
CN
China
Prior art keywords
pile body
pile
hole
fixed column
vertical bars
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720343135.7U
Other languages
Chinese (zh)
Inventor
张延东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingjian Group Co Ltd
Original Assignee
Qingjian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingjian Group Co Ltd filed Critical Qingjian Group Co Ltd
Priority to CN201720343135.7U priority Critical patent/CN206902702U/en
Application granted granted Critical
Publication of CN206902702U publication Critical patent/CN206902702U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses mixed mud built pile, including the first pile body, second pile body, horizontal bar and vertical bars, first pile body includes horizontal bar, vertical bars and concrete, horizontal bar and vertical bars, which cooperate, forms bar-mat reinforcement, concrete casting is entered in bar-mat reinforcement by mould, concrete and rebar net is connected as a single entity, first pile body is internally threaded hole, screwed hole bottom is provided with siphunculus, second pile body includes horizontal bar, vertical bars, concrete and fixed column, fixed column is located at the second pile body bottom, and it is fixedly connected with the second pile body, iron plate is provided with outside fixed column, screw thread is provided with the outside of iron plate, second pile body is internally threaded hole and siphunculus, the first hole is equipped with first pile body and the second pile body, and it is provided with steel plateelement in outside.The mixed mud built pile, by provided with screwed hole and fixed column coordinate between each other, the first pile body and the second pile body are connected, then pass through steel plateelement and connect the first pile body and the second pile body, improve the overall structural stability of pile body.

Description

Mixed mud built pile
Technical field
It the utility model is related to building trade pile tube installation applied technical field, specially mixed mud built pile.
Background technology
The part that mixed mud base is connected with each other with mixed mud reinforcement component, it is mainly used in the connection of building lot pile tube, It, which acts on the one hand being mainly used in rising when making high strength cement pile tube, draws framework of steel reinforcement, is allowed to produce prestressing force, on the other hand In piling, pile end board is subjected to piling machine hammering, and plays the connection function between pile tube two-by-two, and it is system in summary Make the indispensable hardware of prestressed high strength cement pipe pile, and traditional mixed mud built pile is a straight cement Post, the inside are provided with bar-mat reinforcement, and outside, which is poured, is inoculated with cement, but intensity is not high, and transport also inconvenience, on the outside of concrete column There is no fixing device so that traditional concrete column does not reach standard in sometimes quality requirement.For this, we devise a New mixed mud built pile, solve the problems, such as that traditional mixed mud built pile is inconvenient for use.
Utility model content
The purpose of this utility model is to provide mixed mud built pile, to solve existing technological deficiency and inaccessiable Technical requirements.
To achieve the above object, the utility model provides following technical scheme:Mixed mud built pile, including the first pile body, Second pile body, horizontal bar and vertical bars, first pile body include horizontal bar, vertical bars and concrete, and horizontal bar and vertical bars, which cooperate, to be formed Bar-mat reinforcement, concrete casting is entered in bar-mat reinforcement by mould, concrete and rebar net is connected as a single entity, and is provided with inside the first pile body Screwed hole, screwed hole bottom are provided with siphunculus, and second pile body includes horizontal bar, vertical bars, concrete and fixed column, and fixed column is located at Second pile body bottom, and being fixedly connected with the second pile body, is provided with iron plate outside fixed column, and iron plate outside is provided with screw thread, second Body is internally threaded hole and siphunculus, the first hole is equipped with first pile body and the second pile body, and be provided with steel in outside Plate, steel plateelement are provided with the second hole, and steel plateelement bottom is provided with supporting plate, and the second pile body top is provided with retainer ring, supporting plate and Pull bar is provided between retainer ring.
Preferably, the second pile body bottom is provided with fixed column, and iron plate is connected as a single entity with fixed column, is provided with the outside of iron plate Screw thread, fixed column are detachably connected with the screwed hole in the first pile body by screw thread.
Preferably, the steel plateelement is provided with the second hole, and nut is detachably connected through the second hole with the first hole.
Preferably, the supporting plate is fixedly connected with the first pile body, and retainer ring is fixedly connected with the second pile body, pull bar connection Supporting plate and retainer ring.
Preferably, the horizontal bar and vertical bars, which intersect, bundles.
Compared with prior art, the beneficial effects of the utility model are as follows:
1. compared with traditional mixed mud built pile, the pile body of the mixed mud built pile first insertion ground after improvement, and the Two pile bodies are then connected by fixed column with the screwed hole on the first pile body, outside then steel plateelement is fixed on into the first hole with screw On, connect the first pile body and the second pile body more close, structure is more firm, in transport installing/dismounting etc. all very just It is prompt.
2. compared with traditional mixed mud built pile, the mixed mud built pile after improvement is then provided with supporting plate and consolidated outside Determine ring, supporting plate and retainer ring are stationarily connected on built pile, and are connected between the two by pull bar, make built pile whole Body structure is more firm.
Brief description of the drawings
Fig. 1 is the utility model mixed mud built pile the first pile body internal structure schematic diagram;
Fig. 2 is the utility model mixed mud built pile the second pile body internal structure schematic diagram;
Fig. 3 is the utility model mixed mud built pile steel plateelement structural representation;
Fig. 4 is the utility model mixed mud built pile steel plateelement external structure schematic diagram;
In figure:The pile bodies of 1- first, the pile bodies of 2- second, 3- horizontal bars, 4- vertical bars, 5- concrete, 6- screwed holes, 7- pull bars, 8- Inwall, 9- iron plates, 10- fixed columns, the holes of 11- first, 12- steel plateelements, the holes of 13- second, 14- supporting plates, 15- retainer rings.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-4 are referred to, the utility model provides a kind of technical scheme:Mixed mud built pile, including the first pile body 1, Two pile bodies 2, horizontal bar 3 and vertical bars 4, first pile body 1 include horizontal bar 3, vertical bars 4 and concrete 5, horizontal bar 3 and the phase interworking of vertical bars 4 Bar-mat reinforcement is combined into, is poured concrete 5 into bar-mat reinforcement by mould, concrete 5 is connected as a single entity with bar-mat reinforcement, the first pile body 1 is internally threaded hole 6, and the bottom of screwed hole 6 is provided with siphunculus, and second pile body 2 includes horizontal bar 3, vertical bars 4, concrete 5 and consolidated Fixed column 10, fixed column 10 is located at the bottom of the second pile body 2, and is fixedly connected with the second pile body 2, and the outside of fixed column 10 is provided with iron plate 9, The outside of iron plate 9 is provided with screw thread, and the second pile body 2 is internally threaded hole 6 and siphunculus, equal on the pile body 2 of the first pile body 1 and second Provided with the first hole 11, and steel plateelement 12 is provided with outside, steel plateelement 12 is provided with the second hole 13, and the bottom of steel plateelement 12 is provided with branch Fagging 14, the top of the second pile body 2 are provided with retainer ring 15, and pull bar 7 is provided between supporting plate 14 and retainer ring 15.
The bottom of second pile body 2 is provided with fixed column 10, and iron plate 9 is connected as a single entity with fixed column 10, is provided with the outside of iron plate 9 Screw thread, fixed column 10 are detachably connected with the screwed hole 6 in the first pile body 1 by screw thread, screw thread and fixed column on screwed hole 6 Screw thread on 10 is dislocation, and both are connected together by rotation.The steel plateelement 12 is provided with the second hole 13, and nut is through the Two holes 13 are detachably connected with the first hole 11, connect the top of the first pile body 1 and the bottom of the second pile body 2, pile body is fixed.Institute State supporting plate 14 to be fixedly connected with the first pile body 1, retainer ring 15 is fixedly connected with the second pile body 2, and pull bar 7 connects the He of supporting plate 14 Retainer ring 15, first of built pile fixation are fixed with steel plateelement 12, and second by supporting plate 14 and is fixed by pull bar 7 Ring 15 connects, further fixed Combination stake.The horizontal bar 3 and vertical bars 4 intersect and bundled, and both intersect can be with So that the overall structure quality of built pile is improved significantly.
The utility model mixed mud built pile first inserts the first pile body 1 in ground, then the second pile body 2 is passed through into screwed hole 6 and fixed column 10 be detachably connected and connect together, steel plateelement 12 is fixed on built pile with screw, then pull bar 7 is connected into branch Fagging 14 and retainer ring 15, pass through two layers of fixation so that the architecture quality of built pile is improved significantly.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. mixed mud built pile, including the first pile body(1), the second pile body(2), horizontal bar(3)And vertical bars(4), it is characterised in that:Institute State the first pile body(1)Including horizontal bar(3), vertical bars(4)And concrete(5), horizontal bar(3)And vertical bars(4)Cooperate composition reinforcing bar Net, by mould by concrete(5)Pour into bar-mat reinforcement, concrete(5)It is connected as a single entity with bar-mat reinforcement, the first pile body(1)It is interior Portion is provided with screwed hole(6), screwed hole(6)Bottom is provided with siphunculus, second pile body(2)Including horizontal bar(3), vertical bars(4), coagulation Soil(5)And fixed column(10), fixed column(10)It is located at the second pile body(2)Bottom, and with the second pile body(2)It is fixedly connected, it is fixed Post(10)Outside is provided with iron plate(9), iron plate(9)Outside is provided with screw thread, the second pile body(2)It is internally threaded hole(6)And siphunculus, First pile body(1)With the second pile body(2)On be equipped with the first hole(11), and it is provided with steel plateelement in outside(12), steel plate Part(12)It is provided with the second hole(13), steel plateelement(12)Bottom is provided with supporting plate(14), the second pile body(2)Top is provided with retainer ring (15), supporting plate(14)And retainer ring(15)Between be provided with pull bar(7).
2. mixed mud built pile according to claim 1, it is characterised in that:Second pile body(2)Bottom is provided with fixed column (10), iron plate(9)With fixed column(10)It is connected as a single entity, in iron plate(9)Outside is provided with screw thread, fixed column(10)With the first pile body (1)Interior screwed hole(6)It is detachably connected by screw thread.
3. mixed mud built pile according to claim 1, it is characterised in that:Steel plateelement(12)It is provided with the second hole(13), Nut passes through the second hole(13)With the first hole(11)It is detachably connected.
4. mixed mud built pile according to claim 1, it is characterised in that:Supporting plate(14)With the first pile body(1)It is fixed Connection, retainer ring(15)With the second pile body(2)It is fixedly connected, pull bar(16)Connect supporting plate(14)And retainer ring(15).
5. mixed mud built pile according to claim 1, it is characterised in that:Horizontal bar(3)And vertical bars(4)Intersect binding Together.
CN201720343135.7U 2017-04-02 2017-04-02 Mixed mud built pile Expired - Fee Related CN206902702U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720343135.7U CN206902702U (en) 2017-04-02 2017-04-02 Mixed mud built pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720343135.7U CN206902702U (en) 2017-04-02 2017-04-02 Mixed mud built pile

Publications (1)

Publication Number Publication Date
CN206902702U true CN206902702U (en) 2018-01-19

Family

ID=61289756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720343135.7U Expired - Fee Related CN206902702U (en) 2017-04-02 2017-04-02 Mixed mud built pile

Country Status (1)

Country Link
CN (1) CN206902702U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113089646A (en) * 2021-04-15 2021-07-09 上海工程技术大学 Concrete combined pile and manufacturing method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113089646A (en) * 2021-04-15 2021-07-09 上海工程技术大学 Concrete combined pile and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN206616862U (en) Formwork root bracing means
CN105649213B (en) A kind of construction method of intensive cloth muscle area large-scale steel structure built-in fitting
CN206233609U (en) Can the positioning of turnover type frame column fix component
CN206337819U (en) A kind of bracing means of concrete structure templates for expansion joints
CN106193282A (en) The assembling frame girder construction printed based on 3D
CN106320704A (en) Steel reinforced concrete structure formwork sleeve threaded rod pulling construction method
CN108265824A (en) A kind of high ductility concrete beam and column node of assembled and connection method
CN207079910U (en) A kind of steel concrete shuttering for being easy to quick form removal
CN108755972A (en) Prefabricated component feet and its application method
CN207878789U (en) A kind of assembled architecture reinforcing steel bar connecting device
CN105350641A (en) Frame column connecting node suitable for prefabricating and assembling building, and construction process thereof
CN208534081U (en) A kind of reconstruction structure of old building constructional column
CN206902702U (en) Mixed mud built pile
CN204875558U (en) Shaped steel runs through inside and outside compound support formula bracket system of encorbelmenting
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN105839851B (en) Using the construction method for the prefabricated frame trestle that segmentation connection is formed
CN107217790A (en) A kind of prefabricated assembling type reinforced concrete framework open tubular column and its construction method
CN207295478U (en) Steel pipe column bracket seat connection apparatus
CN206529881U (en) The constructing device of cushion cap and ground girder construction
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN206800200U (en) A kind of pier stud capping beam template support meanss
CN106499180B (en) A kind of novel exterior sheathing is reinforced and external scaffolding drawknot device and its construction method
CN210529735U (en) Building steel structure platform base
CN207513144U (en) A kind of steel fixes scaffold base device
CN208280644U (en) Open caisson and inverse device is installed as internal model

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180119

Termination date: 20180402

CF01 Termination of patent right due to non-payment of annual fee