CN207582948U - A kind of morning tears formula superimposed sheet temporary supporting system open - Google Patents

A kind of morning tears formula superimposed sheet temporary supporting system open Download PDF

Info

Publication number
CN207582948U
CN207582948U CN201721612534.5U CN201721612534U CN207582948U CN 207582948 U CN207582948 U CN 207582948U CN 201721612534 U CN201721612534 U CN 201721612534U CN 207582948 U CN207582948 U CN 207582948U
Authority
CN
China
Prior art keywords
stupefied
tray
lower tray
superimposed sheet
supporting system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721612534.5U
Other languages
Chinese (zh)
Inventor
吕佳挺
诸纪萍
金齐伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dadongwu Group Construction Co Ltd
Original Assignee
Zhejiang Dadongwu Group Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dadongwu Group Construction Co Ltd filed Critical Zhejiang Dadongwu Group Construction Co Ltd
Priority to CN201721612534.5U priority Critical patent/CN207582948U/en
Application granted granted Critical
Publication of CN207582948U publication Critical patent/CN207582948U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pallets (AREA)

Abstract

The utility model discloses a kind of morning to tear formula superimposed sheet temporary supporting system open, including several upright bars and several and fixed horizon bar of upright bar square crossing, the top of the upright bar is equipped with top tray and lower tray, the top tray and lower tray are equipped with the adjustment structure that height can be adjusted with respect to upright bar, it is stupefied that master is equipped in the lower tray, the stupefied upper vertical intersection of the master is equipped with time stupefied, and described time stupefied to form with top tray on the horizontally-supported face of support superimposed sheet.During the utility model is poured by setting Double tray, in lifting and in-situ layer, mainly by the way that the master in lower tray is stupefied, secondary stupefied progress load transmission;After overlapping layers pours a period of time, load transmission is carried out using the draw knot force and top tray of in-situ layer and superimposed sheet, the master removed in lower tray ahead of time is stupefied, secondary stupefied, effectively realizes material quickly turnover and cross construction, improves construction efficiency.

Description

一种早拆式叠合板临时支撑体系A temporary support system for early demolition laminated slabs

技术领域technical field

本实用新型涉及建筑施工技术,具体涉及叠合板临时支撑体系。The utility model relates to building construction technology, in particular to a temporary support system for laminated slabs.

背景技术Background technique

现有的叠合板临时支撑体系,只有等待叠合层浇筑一段时间,并且叠合层完全牢固后,才能拆除支撑体系,材料周转慢,造成材料采购及存储成本高,施工效率低。The existing temporary support system for laminated slabs can only be removed after the laminated layer is poured for a period of time and the laminated layer is completely firm. The material turnover is slow, resulting in high material procurement and storage costs and low construction efficiency.

实用新型内容Utility model content

本实用新型所要解决的技术问题就是提供一种可以实现材料快速周转与流水施工的早拆式叠合板临时支撑体系。The technical problem to be solved by the utility model is to provide a temporary support system for early dismantling laminated slabs that can realize rapid turnover of materials and flow construction.

为解决上述技术问题,本实用新型采用如下技术方案:一种早拆式叠合板临时支撑体系,包括若干立杆以及若干与立杆垂直交叉固定的水平杆,所述立杆的顶部设有上托盘和下托盘,所述上托盘和下托盘均设有可相对立杆调节高度的调节结构,所述下托盘上铺设有主楞,所述主楞的上方垂直交叉铺设有次楞,所述次楞与上托盘形成支撑叠合板的水平支撑面上。In order to solve the above-mentioned technical problems, the utility model adopts the following technical scheme: an early-detachable laminated slab temporary support system, including several vertical rods and several horizontal rods perpendicular to the vertical rods, and the top of the vertical rods is provided with an upper Tray and lower tray, the upper tray and the lower tray are equipped with an adjustment structure that can adjust the height relative to the vertical pole, the lower tray is laid with a main flute, and the upper side of the main flute is vertically cross-laid with a secondary flute. The second flute and the upper pallet form a horizontal support surface for supporting the laminated board.

优选的,所述上托盘具有插入立杆内的调节螺杆、设于调节螺杆顶部的上托盘本体,以及旋合在调节螺杆上的调节螺母,通过对调节螺母的调节来调节上托盘的高度。Preferably, the upper tray has an adjusting screw inserted into the vertical rod, an upper tray body arranged on the top of the adjusting screw, and an adjusting nut screwed on the adjusting screw, and the height of the upper tray can be adjusted by adjusting the adjusting nut.

优选的,所述下托盘设有螺纹旋合在调节螺杆上的螺纹套筒、设于螺纹套筒顶部的下托盘本体,所述螺纹套筒与下托盘本体之间设有加筋板。Preferably, the lower tray is provided with a threaded sleeve threaded on the adjusting screw, and a lower tray body arranged on the top of the threaded sleeve, and a stiffened plate is provided between the threaded sleeve and the lower tray body.

优选的,所述下托盘本体可拆卸连接有用于定位主楞的定位螺栓。Preferably, the lower pallet body is detachably connected with positioning bolts for positioning the main flute.

优选的,所述上托盘本体和下托盘本体均为正方形/矩形钢板。Preferably, both the upper tray body and the lower tray body are square/rectangular steel plates.

本实用新型采用的技术方案,通过设置双托盘,在吊装及现浇层浇筑期间,主要通过下托盘上的主楞、次楞进行荷载传递;待叠合层浇筑一段时间后,利用现浇层与叠合板的拉结力及支撑体系的上托盘进行荷载传递,提早拆除下托盘上的主楞、次楞,有效实现材料快速周转与流水施工,提高施工效率。The technical solution adopted by the utility model, by setting up double trays, during the hoisting and pouring of the cast-in-place layer, the load is mainly transmitted through the main corrugated and secondary corrugated on the lower tray; With the tie force of the laminated slab and the upper pallet of the support system, the load is transmitted, and the main corrugated and secondary corrugated on the lower pallet are removed in advance, so as to effectively realize the rapid turnover of materials and flow construction, and improve the construction efficiency.

附图说明Description of drawings

下面结合附图和具体实施方式对本实用新型作进一步描述:Below in conjunction with accompanying drawing and specific embodiment the utility model is further described:

图1是本实用新型的剖面结构示意图;Fig. 1 is the sectional structural representation of the utility model;

图2是本实用新型的平面结构示意图;Fig. 2 is a schematic diagram of the plane structure of the utility model;

图3是上托盘、下托盘与立杆的连接结构示意图;Fig. 3 is a schematic diagram of the connection structure of the upper tray, the lower tray and the vertical rod;

图4是下托盘支撑主楞的结构示意图。Fig. 4 is a schematic diagram of the structure of the lower tray supporting the main flute.

具体实施方式Detailed ways

需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。下面将参考附图并结合实施例来详细说明本实用新型。It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The utility model will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。以下对至少一个示例性实施例的描述实际上仅仅是说明性的,决不作为对本实用新型及其应用或使用的任何限制。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. The following description of at least one exemplary embodiment is merely illustrative in nature, and in no way serves as any limitation of the invention and its application or use. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

如图1至图4所示,一种早拆式的叠合板临时支撑体系,包括若干立杆1以及若干与立杆1垂直交叉固定的水平杆5,立杆1在安装时,配合三脚架使用,以保证立杆1安拆便捷。若干立杆1与若干水平杆5形成网格状支撑架体系,所述立杆1的顶部设有上托盘11和下托盘12,所述上托盘11和下托盘12均连接有可相对立杆调节高度的调节结构,所述下托盘12上铺设有主楞2,所述主楞2的上方垂直交叉铺设有次楞3,所述次楞3与上托盘顶面形成支撑叠合板4的水平支撑面上。在吊装及现浇层浇筑期间,主要通过下托盘12上的主楞2、次楞3进行荷载传递;待叠合层浇筑一段时间后,利用现浇层与叠合板的拉结力及支撑体系的上托盘11进行荷载传递,提早拆除下托盘12上的主楞2、次楞3,有效实现材料快速周转与流水施工,提高施工效率。As shown in Figures 1 to 4, an early-detachable laminated slab temporary support system includes several vertical poles 1 and several horizontal poles 5 that are vertically intersected with the vertical poles 1. When the vertical poles 1 are installed, they are used with a tripod. , to ensure that the pole 1 is conveniently installed and disassembled. Several vertical poles 1 and several horizontal poles 5 form a grid-shaped support frame system, and the top of the vertical poles 1 is provided with an upper tray 11 and a lower tray 12, and the upper tray 11 and the lower tray 12 are connected with opposite vertical poles. The adjustment structure for adjusting the height, the main flute 2 is laid on the lower tray 12, and the secondary flute 3 is laid vertically on the top of the main flute 2, and the secondary flute 3 and the top surface of the upper tray form a level supporting the laminated board 4. supporting surface. During hoisting and pouring of the cast-in-place layer, the load is transmitted mainly through the main flute 2 and the secondary flute 3 on the lower pallet 12; after the superimposed layer is poured for a period of time, the tie force and support system of the cast-in-place layer and the superimposed slab are used The upper tray 11 on the upper tray 11 performs load transmission, and the main flute 2 and the secondary flute 3 on the lower tray 12 are removed in advance, so as to effectively realize rapid material turnover and flow construction, and improve construction efficiency.

所述上托盘11具有插入立杆内的调节螺杆111、设于调节螺杆顶部的上托盘本体,以及旋合在调节螺杆上的调节螺母112,通过对调节螺母112的调节来调节上托盘11的高度,所述下托盘12设有螺纹旋合在调节螺杆上的螺纹套筒121、设于螺纹套筒顶部的下托盘本体,所述螺纹套筒与下托盘本体之间设有加筋板122,以增强下托盘的结构强度。The upper tray 11 has an adjusting screw 111 inserted into the vertical rod, an upper tray body located on the top of the adjusting screw, and an adjusting nut 112 screwed on the adjusting screw. By adjusting the adjusting nut 112, the upper tray 11 is adjusted. height, the lower tray 12 is provided with a threaded sleeve 121 threaded on the adjusting screw, and a lower tray body located on the top of the threaded sleeve, and a stiffened plate 122 is arranged between the threaded sleeve and the lower tray body , to enhance the structural strength of the lower tray.

所述下托盘本体可拆卸连接有用于定位主楞的定位螺栓21。在铺设主楞前,先安装定位螺栓21,拆卸时,可以将定位螺栓21先拆卸下来,再取走主楞2。所述上托盘本体和下托盘本体均为正方形/矩形钢板。The lower pallet body is detachably connected with positioning bolts 21 for positioning the main flute. Before laying the main flute, the positioning bolts 21 are first installed. When dismounting, the positioning bolts 21 can be disassembled first, and then the main flute 2 can be taken away. Both the upper tray body and the lower tray body are square/rectangular steel plates.

除上述优选实施例外,本实用新型还有其他的实施方式,本领域技术人员可以根据本实用新型作出各种改变和变形,只要不脱离本实用新型的精神,均应属于本实用新型权利要求书中所定义的范围。In addition to the above-mentioned preferred embodiment, the utility model also has other embodiments, and those skilled in the art can make various changes and deformations according to the utility model, as long as they do not depart from the spirit of the utility model, all should belong to the claims of the utility model The range defined in .

Claims (5)

1. a kind of morning tears formula superimposed sheet temporary supporting system open, including several upright bars and several and fixed water of upright bar square crossing Flat bar, it is characterised in that:The top of the upright bar is equipped with top tray and lower tray, and the top tray and lower tray are equipped with can phase The adjustment structure of height is adjusted to upright bar, is equipped with that master is stupefied in the lower tray, the stupefied upper vertical intersection of the master is equipped with It is secondary stupefied, on the described stupefied horizontally-supported face with top tray formation support superimposed sheet.
2. a kind of morning according to claim 1 tears formula superimposed sheet temporary supporting system open, it is characterised in that:The top tray tool There are the adjusting screw rod being inserted into upright bar, the top tray ontology at the top of adjusting screw rod and screw the tune on adjusting screw rod Nut is saved, by the height that top tray is adjusted to the adjusting of adjusting nut.
3. a kind of morning according to claim 2 tears formula superimposed sheet temporary supporting system open, it is characterised in that:The lower tray is set Have screw shell of the threaded engagement on adjusting screw rod, a lower tray ontology at the top of screw shell, the screw shell with Stiffened panel is equipped between lower tray ontology.
4. a kind of morning according to claim 3 tears formula superimposed sheet temporary supporting system open, it is characterised in that:The lower tray sheet Body, which is detachably connected, is useful for the main stupefied positioning bolt of positioning.
5. a kind of morning according to claim 4 tears formula superimposed sheet temporary supporting system open, it is characterised in that:The top tray sheet Body and lower tray ontology are square/rectangle steel plate.
CN201721612534.5U 2017-11-28 2017-11-28 A kind of morning tears formula superimposed sheet temporary supporting system open Expired - Fee Related CN207582948U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721612534.5U CN207582948U (en) 2017-11-28 2017-11-28 A kind of morning tears formula superimposed sheet temporary supporting system open

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721612534.5U CN207582948U (en) 2017-11-28 2017-11-28 A kind of morning tears formula superimposed sheet temporary supporting system open

Publications (1)

Publication Number Publication Date
CN207582948U true CN207582948U (en) 2018-07-06

Family

ID=62734095

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721612534.5U Expired - Fee Related CN207582948U (en) 2017-11-28 2017-11-28 A kind of morning tears formula superimposed sheet temporary supporting system open

Country Status (1)

Country Link
CN (1) CN207582948U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914268A (en) * 2019-04-23 2019-06-21 五冶集团上海有限公司 A kind of adjustable lowering device for precast beam installation
CN110216787A (en) * 2019-05-28 2019-09-10 美好建筑装配科技有限公司 Control the process units and technique of sandwich heat preservation single side overlapped shear wall thickness
CN113923971A (en) * 2021-10-18 2022-01-11 苏金辉 POP chip integration jig and use method thereof
CN118653666A (en) * 2024-06-28 2024-09-17 中国五冶集团有限公司 An early dismantling formwork system suitable for composite panels and a method of use thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914268A (en) * 2019-04-23 2019-06-21 五冶集团上海有限公司 A kind of adjustable lowering device for precast beam installation
CN109914268B (en) * 2019-04-23 2024-06-04 五冶集团上海有限公司 Adjustable unloading device for mounting precast beam plates
CN110216787A (en) * 2019-05-28 2019-09-10 美好建筑装配科技有限公司 Control the process units and technique of sandwich heat preservation single side overlapped shear wall thickness
CN113923971A (en) * 2021-10-18 2022-01-11 苏金辉 POP chip integration jig and use method thereof
CN118653666A (en) * 2024-06-28 2024-09-17 中国五冶集团有限公司 An early dismantling formwork system suitable for composite panels and a method of use thereof

Similar Documents

Publication Publication Date Title
CN106065681B (en) It is a kind of based on BIM technology overall assembled building in superimposed sheet hoard strip construction method
CN104929290B (en) Large-span steel-reinforced concrete orthogonal-diagonal lattice hollow floor system and preparation method thereof
CN106049732B (en) A kind of two-way laminated floor slab of honeycomb hole profiled sheet
CN106193589B (en) Concrete superelevation heavy type beam and overlapping board combining structure method for supporting
CN110552502A (en) Construction method of C-shaped stock yard intermediate retaining wall overhanging platform
CN110644663B (en) Assembled coincide floor
CN106522282A (en) Liftable post-cast strip template structure and system and construction method thereof
CN202831751U (en) Two-way dense rib type storage pocket barricade
CN219080981U (en) Non-support fixing device for post-pouring strip of superimposed sheet
CN209482709U (en) A kind of in-situ concrete wall subsiding crack typified form
CN104878926B (en) One kind hangs template system construction method and can have enough to meet the need rest
CN207405882U (en) A kind of steel bar positioning frame
CN205134664U (en) A upper and lower double -deck concrete slab structure for girder steel
CN204876339U (en) A a superimposed sheet supporting beam for steel construction building
CN206070570U (en) A kind of building structure
CN110126063A (en) A kind of tower crane counterweight producing device
CN105971176B (en) Thin-wall steel tube rib hollow concrete superimposed sheet, floor, building and manufacture method
CN107165280A (en) A kind of large span open-spandrel sandwich board stay in place form support system and construction method
CN210002661U (en) drop plate connection structure
CN202031323U (en) Multifunctional reinforcing plate of reinforced concrete early-disassembled beam template system
CN209989660U (en) Interim ground facility
CN114687550A (en) Post-cast strip construction method
CN202787992U (en) Constructional column top concrete pouring structure
CN207244960U (en) A kind of Prefabricated stacking floor with tool-typed formwork for being used to drop plate region
CN207392744U (en) Prefabricated concrete structure primary-secondary beam connecting integration support system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180706