CN207582948U - A kind of morning tears formula superimposed sheet temporary supporting system open - Google Patents

A kind of morning tears formula superimposed sheet temporary supporting system open Download PDF

Info

Publication number
CN207582948U
CN207582948U CN201721612534.5U CN201721612534U CN207582948U CN 207582948 U CN207582948 U CN 207582948U CN 201721612534 U CN201721612534 U CN 201721612534U CN 207582948 U CN207582948 U CN 207582948U
Authority
CN
China
Prior art keywords
stupefied
tray
lower tray
superimposed sheet
supporting system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721612534.5U
Other languages
Chinese (zh)
Inventor
吕佳挺
诸纪萍
金齐伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dadongwu Group Construction Co Ltd
Original Assignee
Zhejiang Dadongwu Group Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dadongwu Group Construction Co Ltd filed Critical Zhejiang Dadongwu Group Construction Co Ltd
Priority to CN201721612534.5U priority Critical patent/CN207582948U/en
Application granted granted Critical
Publication of CN207582948U publication Critical patent/CN207582948U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pallets (AREA)

Abstract

The utility model discloses a kind of morning to tear formula superimposed sheet temporary supporting system open, including several upright bars and several and fixed horizon bar of upright bar square crossing, the top of the upright bar is equipped with top tray and lower tray, the top tray and lower tray are equipped with the adjustment structure that height can be adjusted with respect to upright bar, it is stupefied that master is equipped in the lower tray, the stupefied upper vertical intersection of the master is equipped with time stupefied, and described time stupefied to form with top tray on the horizontally-supported face of support superimposed sheet.During the utility model is poured by setting Double tray, in lifting and in-situ layer, mainly by the way that the master in lower tray is stupefied, secondary stupefied progress load transmission;After overlapping layers pours a period of time, load transmission is carried out using the draw knot force and top tray of in-situ layer and superimposed sheet, the master removed in lower tray ahead of time is stupefied, secondary stupefied, effectively realizes material quickly turnover and cross construction, improves construction efficiency.

Description

A kind of morning tears formula superimposed sheet temporary supporting system open
Technical field
The utility model is related to building construction technologies, and in particular to superimposed sheet temporary supporting system.
Background technology
Existing superimposed sheet temporary supporting system only waits for overlapping layers to pour a period of time, and overlapping layers is completely firm Gu after, support system could be removed, material turnover is slow, causes material purchases and carrying cost high, low construction efficiency.
Utility model content
Technical problem to be solved in the utility model, which is just to provide one kind, can realize that material quickly with flowing water apply by turnover The morning of work tears formula superimposed sheet temporary supporting system open.
In order to solve the above technical problems, the utility model adopts the following technical solution:A kind of morning tears formula superimposed sheet open and props up temporarily Support body system, including several upright bars and several and fixed horizon bar of upright bar square crossing, the top of the upright bar is equipped with pop-up Disk and lower tray, the top tray and lower tray are equipped with the adjustment structure that height can be adjusted with respect to upright bar, in the lower tray It is equipped with that master is stupefied, the stupefied upper vertical intersection of the master is equipped with time stupefied, and described time stupefied to form support superimposed sheet with top tray On horizontally-supported face.
Preferably, the top tray has the adjusting screw rod being inserted into upright bar, the top tray sheet at the top of adjusting screw rod Body and the adjusting nut on adjusting screw rod is screwed, pass through the adjusting to adjusting nut to adjust the height of top tray.
Preferably, the lower tray is equipped with screw shell of the threaded engagement on adjusting screw rod, at the top of screw shell Lower tray ontology, between the screw shell and lower tray ontology be equipped with stiffened panel.
Preferably, the lower tray ontology, which is detachably connected, is useful for the main stupefied positioning bolt of positioning.
Preferably, the top tray ontology and lower tray ontology are square/rectangle steel plate.
The technical solution adopted in the utility model, it is main logical during lifting and in-situ layer pour by setting Double tray Cross that master in lower tray is stupefied, secondary stupefied progress load transmission;After overlapping layers pours a period of time, in-situ layer and superimposed sheet are utilized The top tray of draw knot force and support system carries out load transmission, and the master removed in lower tray ahead of time is stupefied, secondary stupefied, effectively realizes material Quick turnover and cross construction, improve construction efficiency.
Description of the drawings
The utility model is further described with reference to the accompanying drawings and detailed description:
Fig. 1 is the cross-sectional view of the utility model;
Fig. 2 is the planar structure schematic diagram of the utility model;
Fig. 3 is top tray, lower tray and the attachment structure schematic diagram of upright bar;
Fig. 4 is the main stupefied structure diagram of lower tray support.
Specific embodiment
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the application can phase Mutually combination.The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.It is illustrative to the description only actually of at least one exemplary embodiment below, is never used as to this practicality Novel and its application or any restrictions used.Based on the embodiment in the utility model, those of ordinary skill in the art are not having All other embodiments obtained under the premise of creative work are made, shall fall within the protection scope of the present invention.
As shown in Figures 1 to 4, a kind of morning tears the superimposed sheet temporary supporting system of formula open, including several upright bars 1 and it is several with The fixed horizon bar 5 of 1 square crossing of upright bar, when mounted, cooperation tripod uses for upright bar 1, to ensure that it is convenient that the peace of upright bar 1 is torn open. Several upright bars 1 form latticed supporting rack system with several horizon bars 5, and the top of the upright bar 1 is equipped with top tray 11 and subiculum Disk 12, the top tray 11 and lower tray 12 are respectively connected with the adjustment structure that height can be adjusted with respect to upright bar, the lower tray 12 On be equipped with main stupefied 2, the upper vertical intersection of the master stupefied 2 is equipped with times stupefied 3, forms branch with top tray top surface described time stupefied 3 On the horizontally-supported face for supportting superimposed sheet 4.It is mainly stupefied 2, secondary stupefied by master in lower tray 12 during pouring in lifting and in-situ layer 3 carry out load transmission;After overlapping layers pours a period of time, using in-situ layer and superimposed sheet draw knot force and support system it is upper Pallet 11 carries out load transmission, removes the master stupefied 2, secondary stupefied 3 in lower tray 12 ahead of time, effectively realizes material quickly turnover and flowing water Construction improves construction efficiency.
The top tray 11 has the adjusting screw rod 111 being inserted into upright bar, the top tray ontology at the top of adjusting screw rod, And the adjusting nut 112 on adjusting screw rod is screwed, by the height that top tray 11 is adjusted to the adjusting of adjusting nut 112 Degree, the lower tray 12 are equipped with screw shell 121 of the threaded engagement on adjusting screw rod, the lower tray at the top of screw shell Ontology is equipped with stiffened panel 122, to enhance the structural strength of lower tray between the screw shell and lower tray ontology.
The lower tray ontology, which is detachably connected, is useful for the main stupefied positioning bolt 21 of positioning.Before laying master is stupefied, first pacify Positioning bolt 21 is filled, during dismounting, positioning bolt 21 can first be disassembled, then takes main stupefied 2 away.The top tray ontology is under Tray body is square/rectangle steel plate.
In addition to above preferred embodiment, the utility model also has other embodiments, and those skilled in the art can root It is made various changes and modifications according to the utility model, without departing from the spirit of the utility model, the utility model should all be belonged to Range as defined in the claims.

Claims (5)

1. a kind of morning tears formula superimposed sheet temporary supporting system open, including several upright bars and several and fixed water of upright bar square crossing Flat bar, it is characterised in that:The top of the upright bar is equipped with top tray and lower tray, and the top tray and lower tray are equipped with can phase The adjustment structure of height is adjusted to upright bar, is equipped with that master is stupefied in the lower tray, the stupefied upper vertical intersection of the master is equipped with It is secondary stupefied, on the described stupefied horizontally-supported face with top tray formation support superimposed sheet.
2. a kind of morning according to claim 1 tears formula superimposed sheet temporary supporting system open, it is characterised in that:The top tray tool There are the adjusting screw rod being inserted into upright bar, the top tray ontology at the top of adjusting screw rod and screw the tune on adjusting screw rod Nut is saved, by the height that top tray is adjusted to the adjusting of adjusting nut.
3. a kind of morning according to claim 2 tears formula superimposed sheet temporary supporting system open, it is characterised in that:The lower tray is set Have screw shell of the threaded engagement on adjusting screw rod, a lower tray ontology at the top of screw shell, the screw shell with Stiffened panel is equipped between lower tray ontology.
4. a kind of morning according to claim 3 tears formula superimposed sheet temporary supporting system open, it is characterised in that:The lower tray sheet Body, which is detachably connected, is useful for the main stupefied positioning bolt of positioning.
5. a kind of morning according to claim 4 tears formula superimposed sheet temporary supporting system open, it is characterised in that:The top tray sheet Body and lower tray ontology are square/rectangle steel plate.
CN201721612534.5U 2017-11-28 2017-11-28 A kind of morning tears formula superimposed sheet temporary supporting system open Active CN207582948U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721612534.5U CN207582948U (en) 2017-11-28 2017-11-28 A kind of morning tears formula superimposed sheet temporary supporting system open

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721612534.5U CN207582948U (en) 2017-11-28 2017-11-28 A kind of morning tears formula superimposed sheet temporary supporting system open

Publications (1)

Publication Number Publication Date
CN207582948U true CN207582948U (en) 2018-07-06

Family

ID=62734095

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721612534.5U Active CN207582948U (en) 2017-11-28 2017-11-28 A kind of morning tears formula superimposed sheet temporary supporting system open

Country Status (1)

Country Link
CN (1) CN207582948U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914268A (en) * 2019-04-23 2019-06-21 五冶集团上海有限公司 A kind of adjustable lowering device for precast beam installation
CN110216787A (en) * 2019-05-28 2019-09-10 美好建筑装配科技有限公司 Control the process units and technique of sandwich heat preservation single side overlapped shear wall thickness
CN113923971A (en) * 2021-10-18 2022-01-11 苏金辉 POP chip integration jig and use method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914268A (en) * 2019-04-23 2019-06-21 五冶集团上海有限公司 A kind of adjustable lowering device for precast beam installation
CN109914268B (en) * 2019-04-23 2024-06-04 五冶集团上海有限公司 Adjustable unloading device for mounting precast beam plates
CN110216787A (en) * 2019-05-28 2019-09-10 美好建筑装配科技有限公司 Control the process units and technique of sandwich heat preservation single side overlapped shear wall thickness
CN113923971A (en) * 2021-10-18 2022-01-11 苏金辉 POP chip integration jig and use method thereof

Similar Documents

Publication Publication Date Title
CN207582948U (en) A kind of morning tears formula superimposed sheet temporary supporting system open
CN102587647B (en) Early-removal formwork system for concreting of constructions comprising beams, plates and columns
CN201739731U (en) Portable adjustable bracket
CN107803918A (en) One kind experiment pours mould with adjustable beams of concrete
CN203452378U (en) Post-cast strip locating structure
CN206825658U (en) The prefabricated clipping adjustable T beams pedestal for becoming length T beams
CN209482709U (en) A kind of in-situ concrete wall subsiding crack typified form
CN207904783U (en) Rotary body device in the middle part of the pier shaft of high-altitude
CN207048321U (en) A kind of aluminum dipping form board connecting equipment
CN207110466U (en) Pulling-on piece formula aluminum alloy mould plate reinforcing member and pulling-on piece formula template system
CN206419559U (en) A kind of holder device of protection underground utilities
CN203846765U (en) Novel hollow lead screw double-adjustment knocking-down type supporting head
CN201649632U (en) Adjusting and positing frame of variable-section square column template
CN104295089A (en) Support system of cast-in-place concrete GBF honeycomb core dense-rib floor system
CN208251623U (en) A kind of concrete column form bracing system
CN207469744U (en) Platform constructing device
CN206971725U (en) Hang the erecting device of mould
CN206986732U (en) A kind of bridge pier concrete casting device
CN210086844U (en) Go up floating reinforcing bar split heads that can have enough to meet need
CN208152556U (en) A kind of branch fastener for beam slab early stripping formwork system system
CN211058303U (en) Early-dismantling formwork structure of flat slab
CN203383525U (en) Support for pouring beam slab
CN207892083U (en) Fabricated shear wall board bottom has height difference junction support system
CN203050096U (en) Adjusting device for support frame for building boards
CN206144142U (en) Arc beam support die

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant