CN201409351Y - Roof greening irrigation device - Google Patents

Roof greening irrigation device Download PDF

Info

Publication number
CN201409351Y
CN201409351Y CN2009200087419U CN200920008741U CN201409351Y CN 201409351 Y CN201409351 Y CN 201409351Y CN 2009200087419 U CN2009200087419 U CN 2009200087419U CN 200920008741 U CN200920008741 U CN 200920008741U CN 201409351 Y CN201409351 Y CN 201409351Y
Authority
CN
China
Prior art keywords
roof
greening
irrigation
water
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200087419U
Other languages
Chinese (zh)
Inventor
裘锦杰
黄蕴璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No5 High School Of Shanghai
Original Assignee
No5 High School Of Shanghai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No5 High School Of Shanghai filed Critical No5 High School Of Shanghai
Priority to CN2009200087419U priority Critical patent/CN201409351Y/en
Application granted granted Critical
Publication of CN201409351Y publication Critical patent/CN201409351Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The utility model relates to a utilization device of water resources, in particular to an irrigation utilizing device of water resources for roof greening. The roof greening irrigation device comprises a greening area at the roof of a building (G), wherein a reservoir (10) is arranged at the bottom of the building (G), and the sewage pipe (8) of each house of the building (10) is collectively connected with the reservoir (10); a water pump (9) is connected with an irrigation pool (6) arranged at the roof through a pipeline (7), and a buoyancy sensor (5) is arranged in the irrigation pool (6) and is electrically connected with the start switch of the water pump (9); and the irrigation pool (6) is erected in the greening area (H) through a drip irrigation device which comprises a micro waterpump (4), a hose (3) and a plurality of drip irrigation nozzles (2) arranged on the hose (3). The utility model provides a water resources utilizing device for roof greening to achieve the purpose that greening plants at the high-rise roof are irrigated without expropriating water resources.

Description

A kind of roof greening irrigation device
(1) technical field
The utility model is a kind of use device of water resource, particularly relates to a kind of roof greening water resource that is used for and irrigates the device that utilizes.
(2) background technology
The rapid economic development in Shanghai, per capita green area to 2006 will reach 11.5 square metres the end of the year, but still more much lower than the Warsaw, POL that per capita green area is the highest in the world.Municipal government also developed the urban green space energetically in nearly 2 years, and the city green areas of average per-person share increase year by year.But because the soil is limited in the urban district, developing a greenery patches needs a large amount of expropriations of land, and it is more and more difficult to increase green coverage in the urban district.High building stands in great numbers in the urban district, and skyscraper is very many.Therefore, utilize the site area on the high buildings and large mansions of urban district to increase greening, do not lose and a kind ofly not only utilized idle area space, but also increased the good plan that greening improves people's living conditions and environment.
Greening, plantation plant are to be unable to do without water, yet water is human and all biological indispensable important substance of depending on for existence, also be the irreplaceable very valuable natural resources of industrial and agricultural production, economic development and enhancement of environment, same soil, the energy etc. constitute the primary condition of human economy and social development.Development and national economy and human living standard's raising significantly is subjected to the restriction of water resource state.For a long time, because the shortage of serious ecology, environmental hazard and the water resource that unreasonable development and utilization caused of water resource, more and more be subjected to the extensive concern of international water resource and environmental area.
Relatively abundant on China freshwater resources surface, belong to abundance of water country.But China's population cardinal sum arable area radix is big, with relative being much smaller of the average water resources quantity of per hectare land area, stipulates 1700m per capita according to the United Nations per capita 3Be serious water shortage line, 1000m per capita 3Minimum for survival standard, China has been in serious lack of water edge, China have at present 15 provinces per capita the water yield be lower than the serious water shortage line.Shortage of water resources, imbalance between supply and demand are outstanding, the seriously polluted restriction of water China's water resources development and utilization and national economy sustainable development.
Based on the present situation that water resource faced, development trend from future, because society constantly increases the demand of water, and the available water resource that natural world can provide has certain limit, outstanding imbalance between supply and demand makes water resource become the important restraining factors of the national economic development.Be accompanied by becoming increasingly conspicuous of water resources problems; the key of water resource utilization and protection is the correct evaluation of water resource quantity and quality; effective enforcement of the rational deployment of the reasonable analysis of the equilibrium of supply and demand, water resources development and utilization engineering, water-saving technology and measure; realization prevents, controls and administer water and pollutes; alleviate the pressure of shortage of water resources, realize effective protection, sustainable utilization and the benign cycle of water resource.
Rational development of water resources utilizes, and effectively protection is to keep sustainable utilization of water resource with management, realizes the eucyclic principal security of water resource, also is to keep social progress, the key point of national economy sustainable development.
Add up according to investigations, Berlin, Germany has been built first ecological building.Except that other facility, be provided with water receiver on the roof, the rainwater of collecting and storing with its waters the meadow on roof, and the water that permeates down from the meadow is got back to holder again, flows to each lavatory flushing toilet of building then.Weather around the meadow of roof and the water receiver energy minor betterment building reduces the temperature fluctuation in the building.
This method has solved a certain amount of green area irrigation water.But facts have proved that the water yield that only relies on rainfall is to be not enough to provide and to keep plant growing institute water requirement, especially the roof greening soil horizon is thinner, and the soil moisture conservation water retention capacity is relatively poor, and only rainwater can not keep plant normal growth.People had both wished that the vegetation on the roof flourished, and the effect of play protection, beautifying the environment does not wish that again roof plant and people strive water, the water resource of consume valuable.
(3) utility model content
The purpose of this utility model provides roof greening water resource use device, makes both to have reached the irrigation Green Roof Plants, does not encroach on the purpose of water resource again.
The purpose of this utility model is solved by following technical scheme:
A kind of roof greening irrigation device comprises the greening on roof, building, it is characterized in that:
In the bottom in building one cistern is set, concentrates by the downcomer at each family, building to connect cistern;
Connect the pond of pouring water that is arranged on the roof by the road by suction pump;
In the described pond of pouring water, the buoyancy sensor is set, is electrically connected the starting switch of suction pump.
The pond of pouring water is erected in the greening through flexible pipe and drip irrigation appliance.
Described drip irrigation appliance for by micro pump through flexible pipe and be installed in most drip irrigation shower nozzles on the flexible pipe.
The starting switch of described micro pump is electrically connected with humidity sensor in being embedded in greening.
The pressure of described micro pump is 0.2 to 0.5 kg/cm.
Porch at described suction pump or micro pump is provided with screen pack respectively.
The beneficial effects of the utility model: adopt the technical program, plant landscape on the roof, building is except that the water of accepting natural precipitation, by the humidity sensor monitoring soil moisture that is embedded in the soil, when needs are irrigated, open micro pump, starting drip irrigation appliance pours water to plant, the water of system all comes from the sanitary sewage that the building produces, with water pumper the water in the cistern is extracted on the big roof step by step again, through being conducting to the cistern on the roof after the filter screen preliminary purification, come the green plants on the enlarging flooring is irrigated, the water yield in the buoyancy sensor monitoring pool in the cistern, whether the decision suction pump starts.
The technical program implementation procedure can be progressively to reconstruct the old building in existing city, on the basic structure basis of invariable of building, the building flooring is extended, plantation greening on the flooring of enlarging, make that these greenings can normal growth, so both increase city's green areas, do not taken the land area of too much inner city again.Can the unified planning design-build when newly-built building.
The technical program provides a kind of roof greening water resource use device, makes both to have reached the irrigation Green Roof Plants, does not does not occupy the purpose of water resource again.
(4) description of drawings
Fig. 1 is the configuration-system figure of a kind of roof greening irrigation device of the utility model.
Among the figure, the 1st, humidity sensor, the 2nd, the drip irrigation shower nozzle, the 3rd, flexible pipe, the 4th, micro pump, the 5th, the buoyancy sensor, the 6th, the pond of pouring water, the 7th, pipeline, the 8th, downcomer, the 9th, suction pump, the 10th, cistern, H are greenings, G is the building.
(5) specific implementation method
Further describe structure of the present utility model below in conjunction with accompanying drawing.
A kind of roof greening irrigation device comprises the greening on G roof, building, and a cistern 10 is set in the bottom of building G, is concentrated by the downcomer 8 at 10 each family, building to connect cistern 10; Be arranged on the pond 6 of pouring water on roof by suction pump 97 connections by the road; In the described pond 6 of pouring water, buoyancy sensor 5 is set, is electrically connected the starting switch of suction pump 9.Water after the life washing that described downcomer 8 is each family of G, building, non-cesspool sewage.
The pond 6 of pouring water is erected among the greening H through flexible pipe 3 and drip irrigation appliance.Drip irrigation appliance for by micro pump 4 through flexible pipe 3 and be installed in most drip irrigation shower nozzles 2 on the flexible pipe 3.In greening H, bury humidity sensor 1 underground, be electrically connected the starting switch of micro pump 4.The pressure of micro pump 4 is 0.2 to 0.5 kg/cm.
Porch at described suction pump 9 and micro pump 4 is provided with screen pack respectively.
The technical program provides a kind of roof greening water resource use device, makes both to have reached the irrigation Green Roof Plants, does not does not occupy the purpose of water resource again.

Claims (7)

1. a roof greening irrigation device comprises the greening (H) on roof, building (G), it is characterized in that:
The bottom of (G) is provided with a cistern (10) in the building, is concentrated by the downcomer (8) at each family, building (10) to connect cistern (10);
Be arranged on the pond of pouring water (6) on roof by suction pump (9) (7) connection by the road;
Buoyancy sensor (5) is set in the described pond of pouring water (6), is electrically connected the starting switch of suction pump (9).
2. irrigation device according to claim 1, the pond (6) that it is characterized in that pouring water is erected in the greening (H) through drip irrigation appliance.
3. irrigation device according to claim 2, it is characterized in that described drip irrigation appliance for by micro pump (4) through flexible pipe (3) and be installed in most drip irrigation shower nozzles (2) on the flexible pipe (3).
4. irrigation device according to claim 3 is characterized in that the starting switch of described micro pump (4) is electrically connected with humidity sensor (1) in being embedded in greening (H).
5. according to claim 3 or 4 described irrigation devices, the pressure that it is characterized in that described micro pump (4) is 0.2 to 0.5 kg/cm.
6. irrigation device according to claim 1 is characterized in that in the porch of described suction pump (9) screen pack being set.
7. according to claim 3 or 4 described irrigation devices, it is characterized in that screen pack being set in the porch of described micro pump (4).
CN2009200087419U 2008-10-24 2009-03-16 Roof greening irrigation device Expired - Fee Related CN201409351Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200087419U CN201409351Y (en) 2008-10-24 2009-03-16 Roof greening irrigation device

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN200820154438.5 2008-10-24
CN200820154438 2008-10-24
CN2009200087419U CN201409351Y (en) 2008-10-24 2009-03-16 Roof greening irrigation device

Publications (1)

Publication Number Publication Date
CN201409351Y true CN201409351Y (en) 2010-02-24

Family

ID=41711245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200087419U Expired - Fee Related CN201409351Y (en) 2008-10-24 2009-03-16 Roof greening irrigation device

Country Status (1)

Country Link
CN (1) CN201409351Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101911907A (en) * 2010-07-12 2010-12-15 中国农业科学院农田灌溉研究所 Roof greening and water feeding system
CN102696455A (en) * 2012-06-22 2012-10-03 温晓慧 Roof greening and watering system of high-rise building
CN102877659A (en) * 2012-10-16 2013-01-16 邝成子 Energy-saving emission reduction building green ecological system construction method and system
CN106804392A (en) * 2017-02-14 2017-06-09 北京建筑大学 Green Roof irrigation method, control device and system based on weighted average humidity
CN111424892A (en) * 2020-04-27 2020-07-17 宁夏大学 Building top surface rainwater collecting and utilizing device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101911907A (en) * 2010-07-12 2010-12-15 中国农业科学院农田灌溉研究所 Roof greening and water feeding system
CN102696455A (en) * 2012-06-22 2012-10-03 温晓慧 Roof greening and watering system of high-rise building
CN102877659A (en) * 2012-10-16 2013-01-16 邝成子 Energy-saving emission reduction building green ecological system construction method and system
CN102877659B (en) * 2012-10-16 2015-08-19 邝成子 A kind of energy-saving and emission-reduction building green ecological system construction method and system
CN106804392A (en) * 2017-02-14 2017-06-09 北京建筑大学 Green Roof irrigation method, control device and system based on weighted average humidity
CN106804392B (en) * 2017-02-14 2020-09-04 北京建筑大学 Green roof irrigation method, control device and system based on weighted average humidity
CN111424892A (en) * 2020-04-27 2020-07-17 宁夏大学 Building top surface rainwater collecting and utilizing device

Similar Documents

Publication Publication Date Title
CN105625502A (en) System for collecting, purifying and utilizing rainwater by using solar energy
CN202000396U (en) Rainwater utilization device
CN107816082A (en) A kind of sponge roof rainwater collection reutilization system
CN202577790U (en) Roof greening structure
CN201409351Y (en) Roof greening irrigation device
CN201972229U (en) Residential rainwater comprehensive utilization system device
CN203487719U (en) Rainwater collection, greening and thermal insulation roof
CN107347591A (en) A kind of urban landscape or ecological garden greening system
CN205259345U (en) Greenery patches rain sewage's system of recycling
CN106613749B (en) Farmland rainwater collection, storage, drainage and irrigation-saving system
CN210395880U (en) Take afforestation roof structure that rainwater was collected
CN201962720U (en) Rainwater utilization system
CN110226379A (en) The saline and alkaline region water resource of the automatic dripping irrigation of the structure containing terraced fields, which is regulated and stored, utilizes system
CN207645999U (en) A kind of resident living area initial rainwater runoff intercepts, purification equipment
CN207092244U (en) One kind is on urban rainwater recycling device
CN105756295B (en) A kind of Rainwater Resources in Urban Area reutilization system based on pelelith
CN205935139U (en) Purification utilization system is collected to solar energy power generation's rainwater
CN209268252U (en) Automate water collecting irrigation system
CN105464190A (en) Green space rain sewage reuse system
CN202324066U (en) Permeation utilization system for drained water of perforated roof rain pipe
CN202214759U (en) Building rainwater collection and utilization system
CN104594467A (en) Water reuse greenbelt watering device in siphon type office building
CN111072148A (en) Environment-friendly balcony wetland water treatment system
CN108331269A (en) A kind of Implant cave dwelling roof structure and construction method
CN107842089A (en) A kind of water resources circulation system based on green building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100224

Termination date: 20110316