CN201386252Y - Temporary connecting device of girder section bottom plates of steel box girders of suspension bridge - Google Patents

Temporary connecting device of girder section bottom plates of steel box girders of suspension bridge Download PDF

Info

Publication number
CN201386252Y
CN201386252Y CN200920113879U CN200920113879U CN201386252Y CN 201386252 Y CN201386252 Y CN 201386252Y CN 200920113879 U CN200920113879 U CN 200920113879U CN 200920113879 U CN200920113879 U CN 200920113879U CN 201386252 Y CN201386252 Y CN 201386252Y
Authority
CN
China
Prior art keywords
plate
plates
steel case
loaded
suspension bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200920113879U
Other languages
Chinese (zh)
Inventor
廖海黎
王骑
宋晖
马存明
李明水
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN200920113879U priority Critical patent/CN201386252Y/en
Application granted granted Critical
Publication of CN201386252Y publication Critical patent/CN201386252Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to the fields of bridge engineering and disaster prevention project, and provides a temporary connecting device of girder section bottom plates of steel box girders of a suspension bridge; the two adjacent bottom plates of the steel box girders (1) are respectively provided with two bearing plates (2), and the two steel box girders (1) are connected with each other by pull rods (5) passing through the four bearing plates (2); two longitudinal linking plates (3) are respectively installed between the two bearing plates (2) of each steel box girder (1) and are respectively positioned at the left side and the right side of the pull rods (5); the pull rod (5) at the outer side of the bearing plate (2) is assembled with a force-transmission nut (4), and the pull rod (5) at the inner side of each bearing plate (2) is assembled with a force-transmission nut (8). The temporary connecting device of the girder section bottom plates of the steel box girders of the suspension bridge has the advantages of novel structure and strong bearing capacity.

Description

A kind of interim linkage of suspension bridge steel case beam beam section base plate
Technical field
The utility model relates to bridge engineering and the engineering field of taking precautions against natural calamities, specifically a kind of interim linkage of suspension bridge steel case beam beam section base plate.
Background technology
Suspension bridge is in when construction and close up the back in order to adjust linear needs, and usually at the interim linkage of the intersegmental employing of steel case beam beam, when not needing interim linkage, linkage can be removed.The interim linkage of steel case beam base plate is installed on the base plate of adjacent steel case beam, generally is made up of pull bar and the steel plate framework that is welded on beam section edge, thereby forms a kind of post limbs and be with setting up the beam section.When steel case beam beam section took place in opposite directions with opposing motion, the interim connector that is arranged on the case beam was converted to a power with the moment of flexure of beam section, and is born by the loaded plate that pull bar passes on the steel plate framework.The interim linkage structure of existing suspension bridge steel case beam base plate is as follows: on two adjacent steel case soffits 2 loaded plates are set respectively, two steel case beams link to each other by the pull bar that runs through 4 loaded plates, 2 vertical yoke plates are installed between 2 loaded plates on the steel case beam, its position is in the left and right sides of pull bar respectively, all is equipped with the power transmission nut on the pull bar in the loaded plate outside.Because suspension bridge is generally built in the coastal area, the big internal force of its beam section under strong wind atmosphere may cause the interim linkage of base plate to be damaged or come off, because only at loaded plate outside assembling power transmission nut, loaded plate on each steel case beam all is stressed separately, therefore there is the hypodynamic problem of carrying in the interim linkage of base plate, if under strong wind atmosphere, be damaged, the wind resistance safety of setting up steel case beam beam section will be threatened directly.
Summary of the invention
The purpose of this utility model is in order to solve the hypodynamic technical problem of carrying that the interim linkage of existing suspension bridge steel case beam beam section base plate exists, to provide a kind of supporting capacity the strong interim linkage of suspension bridge steel case beam beam section base plate.
In order to realize above-mentioned purpose, the utility model has adopted following technical scheme:
A kind of interim linkage of suspension bridge steel case beam beam section base plate, on two adjacent steel case beam base plates 2 loaded plates are set respectively, two steel case beams link to each other by the pull bar that runs through 4 loaded plates, 2 vertical yoke plates are installed between 2 loaded plates on the steel case beam, its position is in the left and right sides of pull bar respectively, all be equipped with the power transmission nut on the pull bar in the loaded plate outside, it is characterized in that all being equipped with the power transmission nut on the pull bar of described every loaded plate inboard.The power transmission nut is all assembled in both sides inside and outside loaded plate, and it is stressed to make two loaded plates to unite, and has directly improved the bearing capacity of linkage.
As preferably, all be welded with stull between the vertical yoke plate of the described pull bar left and right sides, the stull position is in the intersection of vertical yoke plate and loaded plate inside wall, the stull position also can be in the middle part of vertical yoke plate, vertical yoke plate is subjected to the big moment of flexure that loaded plate applies in the distortion of restriction loaded plate, produced bigger stress in the junction of two plates and concentrated, stull can improve the stressed of vertical yoke plate by the mode that limits its distortion, to improve the total bearing capacity of linkage.
As preferably, the junction of described vertical yoke plate and loaded plate is welded with the rib of putting more energy into, and the rib of putting more energy into can be eliminated vertical yoke plate and concentrate with the stress of loaded plate junction, improves the stress distribution of junction by the mode of reinforcement local stiffness.
Owing to adopted the interim linkage of suspension bridge steel case beam beam section base plate of above-mentioned technical scheme, had novel structure, the advantage that supporting capacity is strong.
Description of drawings
Fig. 1: the structural representation of embodiment of the present utility model.
The specific embodiment
Make a detailed explanation below in conjunction with 1 pair of specific embodiment of the present utility model of accompanying drawing.
The interim linkage of a kind of suspension bridge steel case beam beam section base plate as shown in Figure 1 is provided with 2, two steel casees of 2 loaded plates beam 1 respectively and links to each other by 1 pull bar 5 that runs through 4 loaded plates 2 respectively on two adjacent steel case beam 1 base plates.2 vertical yoke plates 3 all are installed between 2 loaded plates 2 on each steel case beam 1, and the position is in the left and right sides of pull bar 2.All be equipped with power transmission nut 4 on the pull bar 5 in every loaded plate 2 outsides, all be equipped with power transmission nut 8 on the pull bar 5 of every loaded plate 2 inboards.All be welded with stull 6 between the vertical yoke plate 3 of pull bar 5 left and right sides, stull 6 positions are in the intersection of vertical yoke plate 3 and loaded plate 2 inside walls.The junction of vertical yoke plate 3 and loaded plate 2 is welded with the rib 7 of putting more energy into.
When there is relative motion in two steel case beams 1, because on the loaded plate 21, preceding loaded plate 21 produced after the distortion before the effect of inside and outside bilateral power transmission nut 4,8, power can at first be passed to, axle power just can continue to be delivered on the loaded plate 22 of back by pull bar 5, and two loaded plates 2 are just joined together stressed jointly.The interim linkage of above-mentioned base plate has adopted the dual reinforcement measure of the stull 6 and the rib 7 of putting more energy into, vertical yoke plate 3 distortion and stressed improvement are significant, compare original member, under same function power, the member amount of deflection decrease by 55.64%, maximum stress decreases by 41.16%, vertical yoke plate 3 upper stress concentrated areas reduce, integrated stress distributes and improves, and lower stress level helps the lifting of member total bearing capacity, has also strengthened safety factor simultaneously.
The foregoing description only is a this patent embodiment preferably, and for example the position of stull 6 also can be welded on the middle part of vertical yoke plate 3, and the intersection that also can be in vertical yoke plate 3 and loaded plate 2 inside walls is to the zone between the middle part of vertical yoke plate 3.The structure that all employing the technical program are described, feature and the variation on its spiritual principle, modification all belong to the protection domain of this patent.

Claims (5)

1. the interim linkage of a suspension bridge steel case beam beam section base plate, on adjacent two steel case beams (1) base plate 2 loaded plates (2) are set respectively, two steel case beams (1) link to each other by the pull bar (5) that runs through 4 loaded plates (2), 2 vertical yoke plates (3) are installed between 2 loaded plates (2) on the steel case beam (1), its position is in the left and right sides of pull bar (5) respectively, all be equipped with power transmission nut (4) on the pull bar (5) in loaded plate (2) outside, it is characterized in that all being equipped with power transmission nut (8) on the inboard pull bar (5) of described every loaded plate (2).
2. the interim linkage of a kind of suspension bridge steel case beam beam section base plate according to claim 1 is characterized in that all being welded with stull (6) between the vertical yoke plate (3) of described pull bar (5) left and right sides.
3. the interim linkage of a kind of suspension bridge steel case beam beam section base plate according to claim 1 is characterized in that described stull (6) position is in the intersection of vertical yoke plate (3) and loaded plate (2) inside wall.
4. the interim linkage of a kind of suspension bridge steel case beam beam section base plate according to claim 1 is characterized in that described stull (6) position is in the middle part of vertical yoke plate (3).
5. the interim linkage of a kind of suspension bridge steel case beam beam section base plate according to claim 1 and 2 is characterized in that the junction of described vertical yoke plate (3) and loaded plate (2) is welded with the rib of putting more energy into (7).
CN200920113879U 2009-02-19 2009-02-19 Temporary connecting device of girder section bottom plates of steel box girders of suspension bridge Expired - Fee Related CN201386252Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920113879U CN201386252Y (en) 2009-02-19 2009-02-19 Temporary connecting device of girder section bottom plates of steel box girders of suspension bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920113879U CN201386252Y (en) 2009-02-19 2009-02-19 Temporary connecting device of girder section bottom plates of steel box girders of suspension bridge

Publications (1)

Publication Number Publication Date
CN201386252Y true CN201386252Y (en) 2010-01-20

Family

ID=41578781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920113879U Expired - Fee Related CN201386252Y (en) 2009-02-19 2009-02-19 Temporary connecting device of girder section bottom plates of steel box girders of suspension bridge

Country Status (1)

Country Link
CN (1) CN201386252Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103498417A (en) * 2013-09-26 2014-01-08 宋功业 Temporary fixing device for long-span steel structure box bridge connector
CN104988844A (en) * 2015-05-19 2015-10-21 河南省交通规划勘察设计院有限责任公司 Secondary tensioning prestressed assembly-type corrugated steel web composite beam and construction method thereof
CN108708266A (en) * 2018-05-24 2018-10-26 武汉科技大学 A kind of anchoring process of landscape suspension bridge and its decorative cable
CN116927088A (en) * 2023-07-24 2023-10-24 深中通道管理中心 Suspension bridge steel box girder hoisting synchronous pairwise welding integral linear control method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103498417A (en) * 2013-09-26 2014-01-08 宋功业 Temporary fixing device for long-span steel structure box bridge connector
CN103498417B (en) * 2013-09-26 2016-08-17 江苏建筑职业技术学院 Temporary fastening device installed by large span steel structure Box Bridge joint
CN104988844A (en) * 2015-05-19 2015-10-21 河南省交通规划勘察设计院有限责任公司 Secondary tensioning prestressed assembly-type corrugated steel web composite beam and construction method thereof
CN108708266A (en) * 2018-05-24 2018-10-26 武汉科技大学 A kind of anchoring process of landscape suspension bridge and its decorative cable
CN116927088A (en) * 2023-07-24 2023-10-24 深中通道管理中心 Suspension bridge steel box girder hoisting synchronous pairwise welding integral linear control method

Similar Documents

Publication Publication Date Title
CN103195188A (en) I-shaped double-plate assembling steel structure prestressed buckling preventing support
CN111254805B (en) Steel box girder of steel structure bridge
CN201665929U (en) Metal bending energy-consumption damper capable of preventing tension and compression yield
CN201386252Y (en) Temporary connecting device of girder section bottom plates of steel box girders of suspension bridge
CN103015309A (en) Integral joint steel structure door type pier
CN201386253Y (en) Temporary connecting device of girder section top plates of steel box girders of suspension bridge
CN209874051U (en) Novel semi-rigid beam column connected node of assembled steel construction
CN201031113Y (en) Column crane type mast section
CN101775855B (en) Metal bending energy-consuming damper for preventing tension and compression and yield
CN204455858U (en) A kind of hanger of large sections steel box-girder
CN204644869U (en) Drag-line bridge tower anchoring structure
CN216428562U (en) Assembled beam column weak axis connected node
CN204738229U (en) Two bearing plate cable -stay bridge cable wire tower steel anchor case anchor structures
CN108439203B (en) Crane beam mounting structure
CN204212261U (en) Post and curved beam horizontal flexibility connection space structural system
CN209685126U (en) A kind of steel vestibule integrally promotes lifting lug device
CN202913357U (en) Conveniently maintained space truss bridge erecting machine
CN201952103U (en) Steel-bar lifting frame
CN107794814B (en) Suspension type single-rail double-line steel track beam system
CN202440963U (en) Assembly type energy consumption supporting device for buckling restrained bending resisting structure
CN104264780A (en) Column and curved beam horizontal and flexible connection space structure system
CN219840206U (en) Prefabricated steel cylinder type semi-rigid nondestructive wood structure node
CN209585061U (en) A kind of anchor ear and a kind of bracing members system
CN204112502U (en) The weak axle of H profile steel beam-post connects top and bottom angle steel connection joint
CN204738384U (en) High -rise building shock attenuation power consumption device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100120

Termination date: 20140219