CN103498417B - Temporary fastening device installed by large span steel structure Box Bridge joint - Google Patents

Temporary fastening device installed by large span steel structure Box Bridge joint Download PDF

Info

Publication number
CN103498417B
CN103498417B CN201310444223.2A CN201310444223A CN103498417B CN 103498417 B CN103498417 B CN 103498417B CN 201310444223 A CN201310444223 A CN 201310444223A CN 103498417 B CN103498417 B CN 103498417B
Authority
CN
China
Prior art keywords
otic placode
millimeter
bolt hole
box beam
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310444223.2A
Other languages
Chinese (zh)
Other versions
CN103498417A (en
Inventor
宋功业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Institute of Architectural Technology
Original Assignee
Jiangsu Institute of Architectural Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Institute of Architectural Technology filed Critical Jiangsu Institute of Architectural Technology
Priority to CN201310444223.2A priority Critical patent/CN103498417B/en
Publication of CN103498417A publication Critical patent/CN103498417A/en
Application granted granted Critical
Publication of CN103498417B publication Critical patent/CN103498417B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of large span steel structure Box Bridge joint and temporary fastening device is installed, including the otic placode being welded on box beam 3 surrounding;The described otic placode tip side 50 millimeters away from box beam, and otic placode is provided with bolt hole I;Otic placode in two interconnective box beam is symmetrical arranged, connected by the connecting plate across two box beam connecting sewings between corresponding otic placode, and the bolt hole I on the two ends correspondence otic placode of connecting plate is provided with bolt hole II, available bolt is fixed, this large span steel structure Box Bridge joint is installed temporary fastening device and is made easily, install simple, convenient and practical, can effectively prevent due to the welding deformation problem being loosely directed at fixing when large span steel structure box bridge joint is installed, enable component to reach the prescription of design, improve the safety coefficient of bridge.

Description

Temporary fastening device installed by large span steel structure Box Bridge joint
Technical field
The present invention relates to the realm of building construction, be specifically related to a kind of large span steel structure Box Bridge joint and temporary fastening device is installed.
Background technology
Fix loosely due to interim when existing large span steel structure box bridge joint is installed, cause welding gross distortion, make component not reach the prescription of design.Time-proven, uses the quality that present invention can ensure that weld.
Summary of the invention
In order to solve the problems referred to above, the present invention proposes a kind of large span steel structure Box Bridge joint and installs temporary fastening device, this fixing device makes easily, install simple, convenient and practical, can effectively prevent from, due to the welding deformation problem being loosely directed at fixing when large span steel structure box bridge joint is installed, enabling component to reach the prescription of design, improving the safety coefficient of bridge.
The technical solution adopted for the present invention to solve the technical problems is: temporary fastening device installed by a kind of large span steel structure Box Bridge joint, and described temporary fastening device includes the otic placode being welded on box beam 3 surrounding;The described otic placode tip side 50 millimeters away from box beam, and otic placode is provided with bolt hole I;Otic placode in two interconnective box beam is symmetrical arranged, and is connected by the connecting plate across two box beam connecting sewings, and the bolt hole I on the two ends correspondence otic placode of connecting plate is provided with bolt hole II between corresponding otic placode, and available bolt is fixed.
Described otic placode is by long 100-150 millimeter, wide 60-80 millimeter, the steel plate of thick 10-16 millimeter is made, two bolts hole I it are arranged with on each otic placode, a diameter of 18-22 millimeter of bolt hole I, the centre-to-centre spacing of two bolts hole I is 40-90 millimeter, and bolt hole I lays respectively at the center of otic placode width.
Described connecting plate is by long 300-400 millimeter, wide 60-80 millimeter, and the steel plate of thick 16-20 millimeter is made, and connecting plate two ends are respectively arranged with the bolt hole II of two diameter 18-22 millimeters, and the corresponding bolt hole I of described bolt hole II is arranged.
Described bolt be outer screw diameter be the plain bolt of 16-20 millimeter, a length of 50-60 millimeter of screw rod, be furnished with suitable hexagonal (hexagon)nut.
The invention has the beneficial effects as follows: temporary fastening device installed by a kind of large span steel structure Box Bridge joint, this fixing device makes easily, install simple, convenient and practical, can effectively prevent due to the welding deformation problem being loosely directed at fixing when large span steel structure box bridge joint is installed, enable component to reach the prescription of design, improve the safety coefficient of bridge.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings and embodiment the invention will be further described.
Accompanying drawing 1 is the example structure schematic diagram that temporary fastening device installed by a kind of large span steel structure Box Bridge joint.
Accompanying drawing 2 is the A-A sectional view of Fig. 1.
In figure, 1. otic placode, 2. connecting plate, 3. box beam, 4. bolt, 4-1. screw rod, 4-2. nut.
Detailed description of the invention
In the accompanying drawings, temporary fastening device installed by a kind of large span steel structure Box Bridge joint, and described temporary fastening device includes the otic placode 1 being welded on box beam 3 surrounding;The described otic placode 1 tip side 50 millimeters away from box beam 3, and otic placode 1 is provided with bolt hole I;Otic placode 1 in two interconnective box beam 3 is symmetrical arranged, and is connected by the connecting plate 2 across two box beam 3 connecting sewings between corresponding otic placode 1, and the bolt hole I on the two ends correspondence otic placode of connecting plate 2 is provided with bolt hole II, and available bolt 4 is fixed.
Described otic placode 1 is by long 100-150 millimeter, wide 60-80 millimeter, the steel plate of thick 10-16 millimeter is made, two bolts hole I it are arranged with on each otic placode 1, a diameter of 18-22 millimeter of bolt hole I, the centre-to-centre spacing of two bolts hole I is 40-90 millimeter, and bolt hole I lays respectively at the center of otic placode 1 width.
Described connecting plate 2 is by long 300-400 millimeter, wide 60-80 millimeter, and the steel plate of thick 16-20 millimeter is made, and connecting plate 2 two ends are respectively arranged with the bolt hole II of two diameter 18-22 millimeters, and the corresponding bolt hole I of described bolt hole II is arranged.
Described bolt 4 be screw rod 4-1 external diameter be the plain bolt of 16-20 millimeter, a length of 50-60 millimeter of screw rod 4-1, be furnished with suitable hexagonal (hexagon)nut 4-2.
The using method of the present invention is: when making box beam 3, first otic placode 1 is welded on the surrounding of box beam beam body, general one side welding two to three, when carrying out box beam 3 assembly, being aligned by the joint of two sections of box beam 3 on assembly jig, beam body is set level, and is attached with otic placode 1 across two sections of box beam 3 with connecting plate 2, fix with screw rod 4-1 and nut 4-2 after levelling capturing, it is possible to butt joint is welded;Reexamine the relative dimensions of beam body and welding deformation situation after welding, confirm qualified after unclamp bolt 4, take off connecting plate 2, cut otic placode 1, can effectively prevent welding deformation.

Claims (2)

1. a temporary fastening device installed by large span steel structure Box Bridge joint, it is characterized in that: include being welded on the otic placode (1) of box beam (3) surrounding;The described otic placode (1) tip side 50 millimeters away from box beam (3), and otic placode (1) is provided with bolt hole I;Otic placode (1) in two interconnective box beam (3) is symmetrical arranged, connected by the connecting plate (2) across two box beam (3) connecting sewing between corresponding otic placode (1), and the bolt hole I on the two ends correspondence otic placode of connecting plate (2) is provided with bolt hole II, fix with bolt (4);Described otic placode (1) is by long 100-150 millimeter, wide 60-80 millimeter, the steel plate of thick 10-16 millimeter is made, two bolts hole I it are arranged with on each otic placode (1), a diameter of 18-22 millimeter of bolt hole I, the centre-to-centre spacing of two bolts hole I is 40-90 millimeter, and bolt hole I lays respectively at the center of otic placode (1) width;Described connecting plate (2) is by long 300-400 millimeter, wide 60-80 millimeter, and the steel plate of thick 16-20 millimeter is made, and connecting plate (2) two ends are respectively arranged with the bolt hole II of two diameter 18-22 millimeters, and the corresponding bolt hole I of described bolt hole II is arranged;When making box beam (3), first otic placode (1) is welded on the surrounding of box beam beam body, one side welding two to three;When carrying out box beam (3) assembly, the joint of two sections of box beam (3) is aligned by assembly jig, beam body is set level, it is attached with otic placode (1) across two sections of box beam (3) with connecting plate (2), welds with screw rod (4-1) and the fixing butt joint of nut (4-2) of bolt (4) after levelling capturing;The size welding complete confirmation beam body is qualified with welding deformation situation, unclamps bolt (4), takes off connecting plate (2), cutting otic placode (1), can effectively prevent welding deformation.
The most according to claim 1, temporary fastening device installed by a kind of large span steel structure Box Bridge joint, it is characterized in that: described bolt (4) be screw rod (4-1) external diameter be the plain bolt of 16-20 millimeter, the a length of 50-60 millimeter of screw rod (4-1), is furnished with suitable hexagonal (hexagon)nut (4-2).
CN201310444223.2A 2013-09-26 2013-09-26 Temporary fastening device installed by large span steel structure Box Bridge joint Active CN103498417B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310444223.2A CN103498417B (en) 2013-09-26 2013-09-26 Temporary fastening device installed by large span steel structure Box Bridge joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310444223.2A CN103498417B (en) 2013-09-26 2013-09-26 Temporary fastening device installed by large span steel structure Box Bridge joint

Publications (2)

Publication Number Publication Date
CN103498417A CN103498417A (en) 2014-01-08
CN103498417B true CN103498417B (en) 2016-08-17

Family

ID=49863667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310444223.2A Active CN103498417B (en) 2013-09-26 2013-09-26 Temporary fastening device installed by large span steel structure Box Bridge joint

Country Status (1)

Country Link
CN (1) CN103498417B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107097074A (en) * 2017-06-19 2017-08-29 天津吉森机电设备工程有限公司 A kind of swivel joint apparatus for welding and positioning and localization method
CN109722990A (en) * 2017-10-31 2019-05-07 中国二十冶集团有限公司 The splicing positioning device and its application method waterborne of bridge ultra-wide steel box-girder component
CN110842384B (en) * 2019-11-13 2021-10-12 重庆交通建设(集团)有限责任公司 On-site connection process of steel box girder
CN111733704B (en) * 2020-07-08 2021-05-14 中交投资项目管理有限公司 Installation and construction method for steel structure bridge truss
CN111691318B (en) * 2020-07-10 2021-10-22 倪水木 Steel structure bridge reinforcing treatment method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201386252Y (en) * 2009-02-19 2010-01-20 西南交通大学 Temporary connecting device of girder section bottom plates of steel box girders of suspension bridge
KR101038013B1 (en) * 2010-03-09 2011-05-30 산이건설 주식회사 Main girder combining structure of temporary birdge
CN103276662A (en) * 2013-05-13 2013-09-04 中交第二航务工程局有限公司 Large-cantilever steel web spinal box beam segment and construction technology
CN103290778A (en) * 2013-05-21 2013-09-11 北京交通大学 Method of improving bearing capacity of steel box girder joint
CN203514202U (en) * 2013-09-26 2014-04-02 江苏广宇建设集团有限公司 Temporary fixing device for mounting connector of large-span steel structure box type bridge

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201386252Y (en) * 2009-02-19 2010-01-20 西南交通大学 Temporary connecting device of girder section bottom plates of steel box girders of suspension bridge
KR101038013B1 (en) * 2010-03-09 2011-05-30 산이건설 주식회사 Main girder combining structure of temporary birdge
CN103276662A (en) * 2013-05-13 2013-09-04 中交第二航务工程局有限公司 Large-cantilever steel web spinal box beam segment and construction technology
CN103290778A (en) * 2013-05-21 2013-09-11 北京交通大学 Method of improving bearing capacity of steel box girder joint
CN203514202U (en) * 2013-09-26 2014-04-02 江苏广宇建设集团有限公司 Temporary fixing device for mounting connector of large-span steel structure box type bridge

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
超高层钢梁-钢管砼柱框架-砼核心筒结构工程钢结构节点施工;陈荣春等;《建筑安全》;20101231(第5期);第23页第2.3.1节"临时连接板安装"、第2.3.2节"将上下柱接头现场焊接"及图3 *

Also Published As

Publication number Publication date
CN103498417A (en) 2014-01-08

Similar Documents

Publication Publication Date Title
CN103498417B (en) Temporary fastening device installed by large span steel structure Box Bridge joint
US20130236245A1 (en) Frame assembly base for frame structures
CN205096783U (en) H -beam location frock
CN203514202U (en) Temporary fixing device for mounting connector of large-span steel structure box type bridge
CN102790257A (en) Large-scale high-accuracy parabolic offset antenna
CN101799109B (en) Flexible joint and flexible connecting device
CN203343638U (en) Welding support capable of controlling welding of motor in multiple directions
CN204209329U (en) A kind of garbage truck butt buster structure frock
CN203125010U (en) Welding operation tooling applied to H-shaped structural parts
CN204728217U (en) The assembled positioning plate device of steel box girder segment
CN210649137U (en) Be used for accurate adjusting device of on-spot welding seam groove root clearance surplus
CN103618253B (en) Iron tower operation turns to combination unit
CN203853727U (en) High-speed rail support assembly structure
CN206556612U (en) A kind of device for installing fiber Bragg grating type inclinometer on timber structure
CN202540273U (en) Support for inclined stay bar
CN203715127U (en) General safety rod system for tower crane attaching device
CN202271127U (en) Paired welding tooling for generator base zinc-plated pieces of wind power equipment
CN201680129U (en) Flexible joint and flexible connection device
CN205772901U (en) A kind of conduction rack
CN204572674U (en) A kind of crack resistence project-welding nut structure
CN203791893U (en) Adjustable assembly positioning device for center sill connecting plate
CN204020779U (en) A kind of rear bumper mounting bracket and rear bumper assembly
CN204333846U (en) A kind of 110kV Power Transmission Line GIS equipment bus tube supporting device
CN203427706U (en) Support for automobile fuse box
CN215658648U (en) Welding pre-fixing rack structure and welding pre-fixing rack device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160622

Address after: 221000 Jiangsu province Xuzhou city Copper Mt. District School Road No. 26

Applicant after: Jiangsu Institute of Architectural Technology

Address before: 221700 science and technology transformation center, middle section of Zhongyang Road, Xuzhou, Jiangsu, Fengxian County

Applicant before: Song Gongye

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181204

Address after: 233010 Pioneering Building 316, Huineng Small and Micro Enterprises Pioneering Center, 1750 Shengli West Road, Yuhui District, Bengbu City, Anhui Province

Patentee after: Bengbu Dingrong Science and Technology Information Consulting Co., Ltd.

Address before: No. 26 Xueyuan Road, Tongshan New District, Xuzhou City, Jiangsu Province, 221000

Patentee before: Jiangsu Institute of Architectural Technology

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190107

Address after: No. 26, Xue Yuan Road, Quanshan District, Xuzhou, Jiangsu

Patentee after: Jiangsu Institute of Architectural Technology

Address before: 233010 Pioneering Building 316, Huineng Small and Micro Enterprises Pioneering Center, 1750 Shengli West Road, Yuhui District, Bengbu City, Anhui Province

Patentee before: Bengbu Dingrong Science and Technology Information Consulting Co., Ltd.

TR01 Transfer of patent right