CN203514202U - Temporary fixing device for mounting connector of large-span steel structure box type bridge - Google Patents

Temporary fixing device for mounting connector of large-span steel structure box type bridge Download PDF

Info

Publication number
CN203514202U
CN203514202U CN201320596677.7U CN201320596677U CN203514202U CN 203514202 U CN203514202 U CN 203514202U CN 201320596677 U CN201320596677 U CN 201320596677U CN 203514202 U CN203514202 U CN 203514202U
Authority
CN
China
Prior art keywords
millimeter
bolt hole
otic placode
box type
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320596677.7U
Other languages
Chinese (zh)
Inventor
宋功业
陈益清
王润
周宇
张亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Ye Qi Science Industry And Trade Co Ltd
JIANGSU GUANGYU CONSTRUCTION GROUP CO Ltd
Original Assignee
Xuzhou Ye Qi Science Industry And Trade Co Ltd
JIANGSU GUANGYU CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Ye Qi Science Industry And Trade Co Ltd, JIANGSU GUANGYU CONSTRUCTION GROUP CO Ltd filed Critical Xuzhou Ye Qi Science Industry And Trade Co Ltd
Priority to CN201320596677.7U priority Critical patent/CN203514202U/en
Application granted granted Critical
Publication of CN203514202U publication Critical patent/CN203514202U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a temporary fixing device for mounting a connector of a large-span steel structure box type bridge. The temporary fixing device comprises lug plates welded to the peripheries of box type beams 3. The distance between the connector end of the box type beams and the lug plates is 50mm, bolt holes I are formed in the lug plates, the lug plates on the mutually connected box type beams are symmetrically arranged, the corresponding plug plates are connected through connection plates cross a connecting seam of the two box type beams, bolt holes II corresponding to the bolt holes I in the plug plates are formed in the two ends of the connection plates, and bolts can be fixed. The temporary fixing device for the mounting connector of the large-span steel structure box type bridge is easy to manufacture, simple to mount, convenient and practical, can effectively solve the welding deformation problem caused by the fact that the connector of the large-span steel structure box type bridge is not firmly fixed, so that the component can meet the quality requirement of design and improve the safety factor of a high bridge.

Description

Across steel work box bridge joint head, temporary fastening device is installed greatly
Technical field
The utility model relates to the realm of building construction, is specifically related to a kind of greatly across steel work box bridge joint head installation temporary fastening device.
Background technology
Existing during greatly across steel work box bridge jiont treatment due to temporary fixed not firm, cause welding gross distortion, make member not reach the quality requirement of design.Time-proven, adopts the utility model can guarantee the quality of joint welding.
Utility model content
In order to address the above problem, the utility model proposes a kind of greatly across steel work box bridge joint head installation temporary fastening device, this fastening devices is made easily, install simple, convenient and practical, can effectively prevent due to the large fixing not firm welding deformation problem being directed at during across steel work box bridge jiont treatment, make member can reach the quality requirement of design, improve the safety factor of bridge.
The utility model solves the technical scheme that its technical problem adopts: a kind ofly across steel work box bridge joint head, temporary fastening device is installed greatly, described temporary fastening device comprises the otic placode that is welded on box beam 3 surroundings; Described otic placode is apart from 50 millimeters of the tip sides of box beam, and otic placode is provided with bolt hole I; Otic placode in two interconnective box beam is symmetrical arranged, and connected, and the bolt hole I on the corresponding otic placode in the two ends of junction plate is provided with bolt hole II between corresponding otic placode by the junction plate across two box beam connecting sewings, and available bolt is fixed.
Described otic placode is by long 100-150 millimeter, wide 60-80 millimeter, the steel plate of thick 10-16 millimeter is made, on each otic placode, be arranged with two bolt hole I, the diameter of bolt hole I is 18-22 millimeter, the center to center distance of two bolt hole I is 40-90 millimeter, and bolt hole I lays respectively at the center of otic placode width.
Described junction plate is by long 300-400 millimeter, wide 60-80 millimeter, and the steel plate of thick 16-20 millimeter is made, and respectively there is the bolt hole II of two diameter 18-22 millimeters at junction plate two ends, and the corresponding bolt hole I of described bolt hole II arranges.
Described bolt is that screw rod external diameter is the plain bolt of 16-20 millimeter, and the length of screw rod is 50-60 millimeter, is furnished with suitable hexagonal (hexagon)nut.
The beneficial effects of the utility model are: a kind of greatly across steel work box bridge joint head installation temporary fastening device, this fastening devices is made easily, install simple, convenient and practical, can effectively prevent due to the large fixing not firm welding deformation problem being directed at during across steel work box bridge jiont treatment, make member can reach the quality requirement of design, improve the safety factor of bridge.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Accompanying drawing 1 is a kind of example structure schematic diagram that temporary fastening device is installed across steel work box bridge joint head greatly.
The A-A sectional view that accompanying drawing 2 is Fig. 1.
In figure, 1. otic placode, 2. junction plate, 3. box beam, 4. bolt, 4-1. screw rod, 4-2. nut.
The specific embodiment
In the accompanying drawings, a kind of greatly across steel work box bridge joint head installation temporary fastening device, described temporary fastening device comprises the otic placode 1 that is welded on box beam 3 surroundings; Described otic placode 1 is apart from 50 millimeters of the tip sides of box beam 3, and otic placode 1 is provided with bolt hole I; Otic placode 1 in two interconnective box beam 3 is symmetrical arranged, and connected, and the bolt hole I on the corresponding otic placode in the two ends of junction plate 2 is provided with bolt hole II between corresponding otic placode 1 by the junction plate 2 across two box beam 3 connecting sewings, and available bolt 4 is fixing.
Described otic placode 1 is by long 100-150 millimeter, wide 60-80 millimeter, the steel plate of thick 10-16 millimeter is made, on each otic placode 1, be arranged with two bolt hole I, the diameter of bolt hole I is 18-22 millimeter, the center to center distance of two bolt hole I is 40-90 millimeter, and bolt hole I lays respectively at the center of otic placode 1 width.
Described junction plate 2 is by long 300-400 millimeter, wide 60-80 millimeter, and the steel plate of thick 16-20 millimeter is made, and respectively there is the bolt hole II of two diameter 18-22 millimeters at junction plate 2 two ends, and the corresponding bolt hole I of described bolt hole II arranges.
Described bolt 4 is that screw rod 4-1 external diameter is the plain bolt of 16-20 millimeter, and the length of screw rod 4-1 is 50-60 millimeter, is furnished with suitable hexagonal (hexagon)nut 4-2.
Using method of the present utility model is: while making box beam 3, first otic placode 1 is welded on to the surrounding of box beam beam body, general one side is welded two to three, carry out box beam 3 when assembled, on assembly jig, the joint of two sections of box beam 3 is aligned, beam body is set level, and with junction plate 2, across two sections of box beam 3, is connected with otic placode 1, after levelling capturing, with screw rod 4-1 and nut 4-2, fix, just can butt joint weld; After welding, reexamine relative dimensions and the welding deformation situation of beam body, confirm after qualified to unclamp bolt 4, take off junction plate 2, cutting otic placode 1, can effectively prevent welding deformation.

Claims (4)

1. across steel work box bridge joint head, a temporary fastening device is installed greatly, is it is characterized in that: comprise the otic placode (1) that is welded on box beam (3) surrounding; Described otic placode (1) is apart from 50 millimeters of the tip sides of box beam (3), and otic placode (1) is provided with bolt hole I; Otic placode (1) in two interconnective box beam (3) is symmetrical arranged, between corresponding otic placode (1), by the junction plate (2) across two box beam (3) connecting sewing, connected, and the bolt hole I on the corresponding otic placode in the two ends of junction plate (2) is provided with bolt hole II, and available bolt (4) is fixing.
2. a kind of greatly across steel work box bridge joint head installation temporary fastening device according to claim 1, it is characterized in that: described otic placode (1) is by long 100-150 millimeter, wide 60-80 millimeter, the steel plate of thick 10-16 millimeter is made, on each otic placode (1), be arranged with two bolt hole I, the diameter of bolt hole I is 18-22 millimeter, and the center to center distance of two bolt hole I is 40-90 millimeter, and bolt hole I lays respectively at the center of otic placode (1) width.
3. a kind of greatly across steel work box bridge joint head installation temporary fastening device according to claim 1, it is characterized in that: described junction plate (2) is by long 300-400 millimeter, wide 60-80 millimeter, the steel plate of thick 16-20 millimeter is made, respectively there is the bolt hole II of two diameter 18-22 millimeters at junction plate (2) two ends, and the corresponding bolt hole I of described bolt hole II arranges.
4. a kind of greatly across steel work box bridge joint head installation temporary fastening device according to claim 1, it is characterized in that: described bolt (4) is that screw rod (4-1) external diameter is the plain bolt of 16-20 millimeter, the length of screw rod (4-1) is 50-60 millimeter, is furnished with suitable hexagonal (hexagon)nut (4-2).
CN201320596677.7U 2013-09-26 2013-09-26 Temporary fixing device for mounting connector of large-span steel structure box type bridge Expired - Fee Related CN203514202U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320596677.7U CN203514202U (en) 2013-09-26 2013-09-26 Temporary fixing device for mounting connector of large-span steel structure box type bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320596677.7U CN203514202U (en) 2013-09-26 2013-09-26 Temporary fixing device for mounting connector of large-span steel structure box type bridge

Publications (1)

Publication Number Publication Date
CN203514202U true CN203514202U (en) 2014-04-02

Family

ID=50373157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320596677.7U Expired - Fee Related CN203514202U (en) 2013-09-26 2013-09-26 Temporary fixing device for mounting connector of large-span steel structure box type bridge

Country Status (1)

Country Link
CN (1) CN203514202U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103498417A (en) * 2013-09-26 2014-01-08 宋功业 Temporary fixing device for long-span steel structure box bridge connector

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103498417A (en) * 2013-09-26 2014-01-08 宋功业 Temporary fixing device for long-span steel structure box bridge connector
CN103498417B (en) * 2013-09-26 2016-08-17 江苏建筑职业技术学院 Temporary fastening device installed by large span steel structure Box Bridge joint

Similar Documents

Publication Publication Date Title
CN103498417A (en) Temporary fixing device for long-span steel structure box bridge connector
CN205348573U (en) Modularization steel pipe truss
US20130236245A1 (en) Frame assembly base for frame structures
CN203967521U (en) A kind of multifunctional frame frame connector
CN204737609U (en) European style hoist girder connection structure
CN203514202U (en) Temporary fixing device for mounting connector of large-span steel structure box type bridge
CN202064454U (en) Connecting element for building and beam column building structure system adopting same
CN203062189U (en) Adjusting device for butting installation of oxygen pipeline
CN204264270U (en) A kind of auxiliary frame structure
CN209482483U (en) A kind of assembled quadrate steel pipe column channel steel connection bean column node
CN203343638U (en) Welding support capable of controlling welding of motor in multiple directions
CN203543973U (en) Door splicing structure for passenger train
CN212053705U (en) Corner external corner connecting piece of horizontal truss
CN210798459U (en) Through-type steel pipe pole cross arm connection structure
CN207834383U (en) Module installation side frame of bolt pre-pressure
CN201980865U (en) Detachable temporary stop buffer used for suspending monorail crane
CN202540273U (en) Support for inclined stay bar
CN203806972U (en) Connection structure of crane beam and steel column
CN205769994U (en) A kind of truss attachment structure of helicopter platform
CN217362151U (en) Frame fast assembly structure
CN221420514U (en) Wall-attached connecting piece for outer frame steel column tower crane of high-rise building
CN204646890U (en) Photovoltaic bracket multipurpose connects pipe box
CN203271574U (en) Ladder supporting frame
CN204435561U (en) A kind of steel structure connecting device
CN212277871U (en) Wire clamp for changing four-split wire into one-split wire

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140402

CF01 Termination of patent right due to non-payment of annual fee