CN203853727U - High-speed rail support assembly structure - Google Patents
High-speed rail support assembly structure Download PDFInfo
- Publication number
- CN203853727U CN203853727U CN201420270006.6U CN201420270006U CN203853727U CN 203853727 U CN203853727 U CN 203853727U CN 201420270006 U CN201420270006 U CN 201420270006U CN 203853727 U CN203853727 U CN 203853727U
- Authority
- CN
- China
- Prior art keywords
- square tube
- party
- pipe
- positioning
- base plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
The utility model discloses a high-speed rail support assembly structure comprising a tool bottom plate, a first square tube, a second square tube, and a third square tube. The front of the third square tube is disposed on a positioning base; the rear middle of the third square tube is disposed on a third square tube positioning block; the second square tube is disposed on a second square tube positioning block; one end of the first square tube is welded on a tool bottom plate; the support bottom plate is fixedly connected to a vertical positioning side plate through positioning pins. One end of the third square tube is welded to one end of the second square tube; the other end of the second square tube is welded to the other end of the first square tube; the other end of the third square tube is a free end. The high-speed rail support assembly structure is simple in structure, convenient to mount and firm; operations are fewer for constructors; assembly efficiency is improved.
Description
Technical field
The utility model relates to the support in high ferro anchor system, is specifically related to a kind of high ferro bracket assembling structure.
Background technology
Along with the fast development of domestic high-speed railway industry, high ferro supporting industries product is tending towards standardization, modularization.For example: upper and lower conductor rail system, anchor system, fish platee, expansion pipe, elbow, protective cover etc.Yet the output of auxiliary products improves, and corresponding effective package assembly is also very important.Simple welding structure of the prior art can be divided into parts spot-welding equipment, full weld frock, general assembly and weld three parts, and tool locating is according to structural member profile.Because frock is various, welding sequence is long, and structural member profile is difficult to the problems such as control, causes support waster rate higher.
Summary of the invention
The purpose of this utility model is exactly for above-mentioned defect, and the high ferro bracket assembling structure of a kind of easy for installation, sound construction, accurate positioning is provided.
For achieving the above object, a kind of high ferro bracket assembling structure that the utility model is designed, comprises frock base plate, the first square tube, the second square tube and third party's pipe; The front portion of described third party's pipe is arranged on positioning seat, and the postmedian of described third party's pipe is arranged on third party and manages on positioning table; Described the second square tube is arranged on the second square tube positioning table; One end of described the first square tube is welded on support base plate, and described support base plate is fixedly connected on perpendicular positioning side plate by alignment pin; Wherein, one end of one end of described third party's pipe and described the second square tube welding, the other end welding of the other end of described the second square tube and described the first square tube, the other end of described third party's pipe is free end.
Further, described support base plate is also fixing by the first quick-speed jigs and described perpendicular positioning side plate location.
Further, described the second square tube is also fixing by the second quick-speed jigs and described the second square tube positioning table location.
Further, described third party pipe is also managed positioning table location by the 3rd quick-speed jigs and described third party and is fixed.
Further, a side of described the first square tube and described support base plate between be also provided with triangle stiffener location.
Further, the side plate upper end of described positioning seat is provided with oval alignment pin, and the front portion of described third party's pipe is fixing by the fastening screw and the described positioning seat location that are inserted in described oval alignment pin.
The utility model has the advantage of: its simple in structure, accurate positioning, easy for installation and firm of the utility model, reduced workmen's operation, improved the production efficiency of assembling.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model high ferro bracket assembling structure.
In figure, each parts label is as follows: frock base plate 1, the first square tube 2, the second square tube 3, third party manage 4; , perpendicular positioning side plate 5, support base plate 6, alignment pin 7, the first quick-speed jigs 8, the second square tube positioning table 9, the second quick-speed jigs 10, positioning seat 11, third party manage positioning table 12, the 3rd quick-speed jigs 13, fastening screw 14, oval alignment pin 15, triangle stiffener 16.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
High ferro bracket assembling structure as shown in Figure 1, comprises that frock base plate 1, the first square tube 2, the second square tube 3 and third party manage 4; Third party manages that 4 front portion is arranged on positioning seat 11, third party manages 4 postmedian and is arranged on third party and manages on positioning table 12, and third party manages 4 postmedian, and by the 3rd quick-speed jigs 13 and third party, to manage positioning table 12 location fixing, and the side plate upper end of positioning seat 11 is provided with oval alignment pin 15, it is fixing with positioning seat 11 location by the fastening screw 14 being inserted in oval alignment pin 15 that third party manages 4 front portion; The second square tube 3 is arranged on the second square tube positioning table 9, and the second square tube 3 is fixing by the second quick-speed jigs 10 and the second square tube positioning table 9 location; One end of the first square tube 2 is welded on support base plate 6, and support base plate 6 is fixedly connected on perpendicular positioning side plate 5 by alignment pin 7, and support base plate 6 is also fixing with perpendicular positioning side plate 5 location by two the first quick-speed jigs 8, and a side of the first square tube 2 and support base plate 6 between be also provided with triangle stiffener 16 location; Wherein, third party manages one end welding of one end of 4 and the second square tube 3, and the other end of the other end of the second square tube 3 and the first square tube 2 welds, and it is free end that third party manages 4 the other end.Its simple in structure, accurate positioning, easy for installation and firm of this package assembly, has reduced workmen's operation, has improved the production efficiency of assembling.
Claims (6)
1. a high ferro bracket assembling structure, is characterized in that: comprise frock base plate (1), the first square tube (2), the second square tube (3) and third party's pipe (4); It is upper that the front portion of described third party's pipe (4) is arranged on positioning seat (11), and the postmedian of described third party's pipe (4) is arranged on third party and manages on positioning table (12); Described the second square tube (3) is arranged on the second square tube positioning table (9); It is upper that one end of described the first square tube (2) is welded on support base plate (6), and described support base plate (6) is fixedly connected on perpendicular positioning side plate (5) by alignment pin (7); Wherein, described third party pipe one end of (4) and one end of described the second square tube (3) welding, the other end welding of the other end of described the second square tube (3) and described the first square tube (2), the other end of described third party's pipe (4) is free end.
2. high ferro bracket assembling structure according to claim 1, is characterized in that: described support base plate (6) is also fixing with described perpendicular positioning side plate (5) location by the first quick-speed jigs (8).
3. high ferro bracket assembling structure according to claim 1 and 2, is characterized in that: described the second square tube (3) is also fixing with described the second square tube positioning table (9) location by the second quick-speed jigs (10).
4. high ferro bracket assembling structure according to claim 1 and 2, is characterized in that: described third party's pipe (4) is also managed positioning table (12) location by the 3rd quick-speed jigs (13) with described third party and fixed.
5. high ferro bracket assembling structure according to claim 1 and 2, is characterized in that: between a support base plate side of described the first square tube (2) and described (6), be also provided with triangle stiffener (16) location.
6. high ferro bracket assembling structure according to claim 1 and 2, it is characterized in that: the side plate upper end of described positioning seat (11) is provided with oval alignment pin (15), the front portion of described third party's pipe (4) is fixing with described positioning seat (11) location by the fastening screw (14) being inserted in described oval alignment pin (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420270006.6U CN203853727U (en) | 2014-05-26 | 2014-05-26 | High-speed rail support assembly structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420270006.6U CN203853727U (en) | 2014-05-26 | 2014-05-26 | High-speed rail support assembly structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203853727U true CN203853727U (en) | 2014-10-01 |
Family
ID=51603606
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420270006.6U Expired - Fee Related CN203853727U (en) | 2014-05-26 | 2014-05-26 | High-speed rail support assembly structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203853727U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107309592A (en) * | 2017-08-21 | 2017-11-03 | 江苏亨通光网科技有限公司 | A kind of welding tooling platform of high integrated network rack angle bar easy to assemble |
CN112264743A (en) * | 2020-10-12 | 2021-01-26 | 咸宁新创工业设计有限公司 | Steel welding reference fixture |
-
2014
- 2014-05-26 CN CN201420270006.6U patent/CN203853727U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107309592A (en) * | 2017-08-21 | 2017-11-03 | 江苏亨通光网科技有限公司 | A kind of welding tooling platform of high integrated network rack angle bar easy to assemble |
CN112264743A (en) * | 2020-10-12 | 2021-01-26 | 咸宁新创工业设计有限公司 | Steel welding reference fixture |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103644379A (en) | Pipe fitting base | |
CN203853727U (en) | High-speed rail support assembly structure | |
CN103521986A (en) | Vehicle frame assembling table | |
CN203356924U (en) | Welding fixture | |
CN103101759B (en) | Adjustable flexible side wall clamp | |
CN204075575U (en) | A kind of standard cabinet column welding tooling of adjustable length | |
CN203292747U (en) | Multi-station welding test board locating device | |
CN203266003U (en) | Locating clamp for welding metal plate pieces through laser | |
CN202880645U (en) | Base fixing mechanism of escalator elbow | |
CN202639713U (en) | Vertical assembling and welding clamp equipment for left-right side wall frame assembly of passenger car body | |
CN104588944A (en) | Multifunctional end beam mechanical arm welding clamp | |
CN204397256U (en) | A kind of front longitudinal weld jig | |
CN205147711U (en) | Novel steel pipe welding jig | |
CN203083496U (en) | Angle rule for mounting trolley line bracket | |
CN202639725U (en) | Ox horn welding clamp for wind power generating tower | |
CN203579066U (en) | Splicing-welding and correcting tool for excavator handrail | |
CN204771312U (en) | Bearing diagonal welding testing frock reaches bearing diagonal component rather than corresponding | |
CN204657802U (en) | A kind of underframe of coach frame welding fixture | |
CN204449741U (en) | A kind of universal passenger vehicle attaches together frock | |
CN203526842U (en) | Multifunctional CCB welding fixing device | |
CN203541913U (en) | Assembly stand of electrolytic bath distributor | |
CN205096787U (en) | Floor body assembly welds clamping utensil behind auspicious wind S2 | |
CN204250902U (en) | Car body supporting and positioning mechanism | |
CN201815803U (en) | Molded piece connecting device for laser welding | |
CN204449755U (en) | A kind of seat support main body weld fixture apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180524 Address after: No. 219 Changzheng Road, Xiaogan, Hubei Province Patentee after: HUBEI SPACE DOUBLE RHOMBUS LOGISTICS TECHNOLOGY Co.,Ltd. Address before: No. 219 Changzheng Road, Xiaogan, Hubei Province Patentee before: HUBEI SPACE SANJIANG HONGLIN ELECTRONICAL AND MECHANICAL TECHNOLOGY CO.,LTD. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141001 |