CN201381196Y - Light hanging bracket - Google Patents

Light hanging bracket Download PDF

Info

Publication number
CN201381196Y
CN201381196Y CN200920142212U CN200920142212U CN201381196Y CN 201381196 Y CN201381196 Y CN 201381196Y CN 200920142212 U CN200920142212 U CN 200920142212U CN 200920142212 U CN200920142212 U CN 200920142212U CN 201381196 Y CN201381196 Y CN 201381196Y
Authority
CN
China
Prior art keywords
suspension bracket
hanging bracket
steel
supporting rod
light
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200920142212U
Other languages
Chinese (zh)
Inventor
刘为民
易曙青
陈仁光
罗旭
熊志勇
万鹏
邓国强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 24th Bureau Group Co Ltd
Nanchang Construction Co Ltd of China Railway Urban Construction Group Co Ltd
Original Assignee
China Railway 24th Bureau Group Co Ltd
Nanchang Construction Co Ltd of China Railway 24th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 24th Bureau Group Co Ltd, Nanchang Construction Co Ltd of China Railway 24th Bureau Group Co Ltd filed Critical China Railway 24th Bureau Group Co Ltd
Priority to CN200920142212U priority Critical patent/CN201381196Y/en
Application granted granted Critical
Publication of CN201381196Y publication Critical patent/CN201381196Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a light hanging bracket, which comprises a lower fastener. A steel pipe has one end thereof connected with the upper part of the fastener and the other end thereof transversely connected with a supporting rod, and a pulley block is arranged on the supporting rod. A double supporting type light hanging bracket comprises two triangular brackets connected by a supporting rod, and a pulley block is arranged on the supporting rod. The complete set of the installation process of the light hanging bracket is safe and reliable, so that the construction quality can be completely ensured; and the steel beam installation cost is reduced. By use of the light hanging bracket, the steel beam installation can be carried out with major structure, roof waterproofing and indoor decoration projects at the same time, so as to effectively shorten the construction period of the entire project. The steel beam installation cost is only the labor cost of operators, and the machine-shift cost for large-sized installation equipment and other costs are saved, so that the economic benefit is distinct.

Description

Light-duty suspension bracket
Technical field
The utility model relates to a kind of weight-lifting equipment, especially a kind of light-duty suspension bracket.
Background technology
Construction enterprises generally adopt heavy mechanical equipment (as tower crane, automobile crane) that cantilever steel girder is installed at present, and present technique is compared with automobile crane with tower crane, need not to consider the installation blind area of equipment and the dismounting of equipment self, only with the light-duty suspension bracket of purpose made, the mounting process that utilization one cover be connected to link up, can safety, economical, stably finish the installation of cantilever steel girder.Its action required face is little, do not need the high capacity power supply, do not need cumbersome apparatus and more workmen, and can intert with agent structure, roof waterproof, interior decoration engineering and carry out, do not influence the enforcement of overall construction schedule, to having great importance smoothly of engineering.
Summary of the invention
The purpose of this utility model is to provide a kind of light-duty suspension bracket, uses this suspension bracket to need not to consider the installation blind area of equipment and the dismounting of equipment self, only with the light-duty suspension bracket of purpose made, can safe, economical, stably finish the installation of cantilever steel girder.
The technical solution of the utility model is: a kind of light-duty suspension bracket, and this light-duty suspension bracket comprises the bottom fastener, and fastener top is connected with steel pipe, and steel pipe the other end is horizontally connected with pole, and pole is provided with assembly pulley.The another kind of double bracing type of this light-duty suspension bracket comprises two triangle supports, is provided with pole connection between the A-frame, and pole is provided with assembly pulley.
Advantage of the present utility model is: a whole set of process safety of light-duty suspension bracket installation girder steel is reliable, and construction quality can be guaranteed fully, installs for girder steel simultaneously and has realized cost degradation.Adopting the present technique girder steel to install can carry out simultaneously with agent structure, roof waterproof, interior decoration engineering etc., has effectively shortened the duration of whole engineering.Expense is operating personnel's a labour cost only, has saved the expenses such as mechanical one-shift of large-scale erecting equipment, remarkable in economical benefits.
Description of drawings
Fig. 1 is the light-duty suspension bracket single-side stand of a utility model type structural representation;
Fig. 2 is the light-duty suspension bracket double bracket of a utility model type structural representation.
The specific embodiment
A kind of light-duty suspension bracket, this light-duty suspension bracket comprises bottom fastener 1, fastener 1 can fix this suspension bracket by the mode that is enclosed within encorbelment beam or connecting element.Fastener 1 top is connected with steel pipe 2, and steel pipe 2 the other end are horizontally connected with pole 3, and pole 3 is provided with assembly pulley 4.
The another kind of double bracing shape of this light-duty suspension bracket comprises two A-frames 5 that are made of steel pipe, is provided with pole 3 between the A-frame 5 and connects, and pole 3 is provided with assembly pulley 4.
During use: to being in the tower crane blind area and influence girder steel in the zone that tower crane removes, elder generation with tower crane with the girder steel handling to roofing, with suspension bracket girder steel is moved to the installation site again and installs.
When placing girder steel, should be at the good lumps of wood of steel beam bottom pad, with moistureproof and prevent that girder steel from producing distortion because of collision.When being installed, girder steel adopt two point symmetry colligations to lift by crane installation in place.
Girder steel according to the beam of encorbelmenting earlier after linking beam, earlier the principle of high absolute altitude is installed behind the low absolute altitude.When cantilever steel girder was installed, the cantilever steel girder in the middle of installing was earlier progressively installed to both sides again.When linking beam is installed, the linking beam on the corner is installed earlier, is progressively installed to the centre again; In same striding, the linking beam that cantilever steel girder is encorbelmented and held is installed earlier, the linking beam at cantilever steel girder middle part is installed again.
The beam of encorbelmenting must consider when installing that the deadweight of linking beam and other load to the beam of the encorbelmenting displacement that end produced of encorbelmenting, suitably raising the end of encorbelmenting to eliminate the influence of various loads.
Tower crane can't be in place girder steel, after hanging on roofing, adopt double bracket type suspension bracket that it is slowly moved to the installation site.Concrete steps are: tie up girder steel, the steel rope other end of pinioning girder steel is fixed on manual hinge one end of suspension bracket, suspension bracket is placed in forward 1~2 meter, girder steel middle part, manually spurs the other end of hinge, by pulling force girder steel is moved forward, when the girder steel middle part moves to the position of suspension bracket, untie the steel rope on the hinge, again suspension bracket is put then to forward 1~2 meter, girder steel middle part, and repeated above-mentioned steps, operation and so forth, girder steel moves to the installation site the most at last.At the good steel pipe of the bottom of girder steel pad, both increased displacing force, can avoid girder steel and roofing concrete that friction takes place again and cause distortion.If need in the girder steel moving process to turn, then suspension bracket can be placed on the girder steel middle part, adopt steel rope two point symmetry colligation girder steels, the steel rope other end is fixed on the hinge of suspension bracket, and the pulling hinge makes girder steel unsettled slightly, the artificial then direction of slowly adjusting girder steel.
Suspension bracket is installed when encorbelmenting beam, suspension bracket is placed on roofing faces one meter, limit, and suspension bracket is connected and fixed by the pre-buried draw ring on steel rope and the roofing, outwards topples to avoid suspension bracket.Since when beam is encorbelmented in suspension bracket lifting steel rope can't colligation at the middle part of encorbelmenting beam, therefore, the balance for the beam that keeps encorbelmenting presses counterweight according to lever principle at the cantilever steel girder fixed end, the beam that prevents to encorbelment when mounted can't installation in position because of knockdown.
When suspension bracket is installed linking beam, adopt two single-side stand type suspension brackets to install simultaneously.Concrete steps are: tie up linking beam, suspension bracket be separately fixed at the linking beam two ends the beam of encorbelmenting face outer half meter, position, limit, linking beam is held on the interim shelf that rides over the beam of encorbelmenting, spurring hinge then makes linking beam unsettled slightly and slowly to encorbelmenting end swing, notice that therebetween artificial controlled makes linking beam it can not acutely be moved, simultaneously interim shelf is moved half meter to the end of encorbelmenting, after moving into place, shelf by manually slowly loosening hinge linking beam is reapposed on the top of the shelf again, this moment, linking beam moved half meter to the end of encorbelmenting, unclamp the firm banking of suspension bracket then, suspension bracket is moved half meter to the end of encorbelmenting again, then repeat above-mentioned steps, operation and so forth, linking beam moves to the installation site the most at last.Spur hinge at last and make linking beam unsettled, remove interim shelf, and carry out the installation in place of linking beam.

Claims (2)

1, a kind of light-duty suspension bracket is characterized in that: this light-duty suspension bracket comprises the bottom fastener, and fastener top is connected with steel pipe, and steel pipe the other end is horizontally connected with pole, and pole is provided with assembly pulley.
2, a kind of light-duty suspension bracket is characterized in that: this light-duty suspension bracket comprises two triangle supports, is provided with pole connection between the A-frame, and pole is provided with assembly pulley.
CN200920142212U 2009-04-03 2009-04-03 Light hanging bracket Expired - Fee Related CN201381196Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920142212U CN201381196Y (en) 2009-04-03 2009-04-03 Light hanging bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920142212U CN201381196Y (en) 2009-04-03 2009-04-03 Light hanging bracket

Publications (1)

Publication Number Publication Date
CN201381196Y true CN201381196Y (en) 2010-01-13

Family

ID=41524672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920142212U Expired - Fee Related CN201381196Y (en) 2009-04-03 2009-04-03 Light hanging bracket

Country Status (1)

Country Link
CN (1) CN201381196Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103922249A (en) * 2013-01-14 2014-07-16 国家电网公司 Hanger
CN104652833A (en) * 2014-12-28 2015-05-27 中国二冶集团有限公司 Manufacturing method for fixing device for pulleys for installation and lifting of purlines of steel structure factory building

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103922249A (en) * 2013-01-14 2014-07-16 国家电网公司 Hanger
CN103922249B (en) * 2013-01-14 2016-08-24 国家电网公司 Suspension bracket
CN104652833A (en) * 2014-12-28 2015-05-27 中国二冶集团有限公司 Manufacturing method for fixing device for pulleys for installation and lifting of purlines of steel structure factory building

Similar Documents

Publication Publication Date Title
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN201433079Y (en) High-altitude inclined supporting wire lifting device for construction curtain wall
CN201458596U (en) Crane with self-dismounting device
CN103086279B (en) Vertical transportation construction method for building construction
CN101177959A (en) Curtain wall unit hanging equipment and construction method thereof
CN106698208B (en) A kind of hanging device and hanging method for being transported outside high-rise building
CN204899238U (en) Unitized curtain wall plate hoist device
CN104863362A (en) Construction process for arched cylindrical-shaped latticed shell provided with arched steel grid jig frame by adopting slippage installation
CN205077878U (en) Unit type curtain plate hoisting device
CN205387439U (en) Mast hoisting accessory
CN102493666A (en) High-altitude translation installation and construction method for super-large super-heavy member
CN201381196Y (en) Light hanging bracket
CN106185677A (en) A kind of hoisting mechanism and the jacking system of large-sized structural parts based on this mechanism
CN102061810B (en) Construction method of safe flat net positioned on periphery of building
CN104153586A (en) Construction method for installing purline through suspension cable cranes
CN212251443U (en) Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device
CN210635627U (en) Large-scale lifting machine for outer wall decoration
CN102372228B (en) Translational installation method for large-span crane beam
CN102383613B (en) Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN201825635U (en) Hoisting structure of power station boiler
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN103982046A (en) Lifting and installation method of buckling restrained braces
CN104404923A (en) Arch dam bracket template device and construction method based on arch dam bracket template device
CN204252082U (en) Arch dam bracket plate device
CN204530506U (en) End bay closing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 200071 Shanghai City Road 2

Patentee after: China Railway 24th Bureau Group Co., Ltd.

Patentee after: THE NANCHANG CONSTRUCTION CO., LTD.OF CHINA RAILWAY URBAN CONSTRUCTION GROUP

Address before: 200071 Shanghai City Road 2

Patentee before: China Railway 24th Bureau Group Co., Ltd.

Patentee before: China Railway 24th Bureau Group Nanchang Construction Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100113

Termination date: 20180403

CF01 Termination of patent right due to non-payment of annual fee