CN201358455Y - Manual drainage plate inserting device for treating soft foundation by dredging and filling sludge - Google Patents

Manual drainage plate inserting device for treating soft foundation by dredging and filling sludge Download PDF

Info

Publication number
CN201358455Y
CN201358455Y CNU2009200378537U CN200920037853U CN201358455Y CN 201358455 Y CN201358455 Y CN 201358455Y CN U2009200378537 U CNU2009200378537 U CN U2009200378537U CN 200920037853 U CN200920037853 U CN 200920037853U CN 201358455 Y CN201358455 Y CN 201358455Y
Authority
CN
China
Prior art keywords
soft foundation
floating block
blowing
panel assembly
filling sludge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2009200378537U
Other languages
Chinese (zh)
Inventor
陈海波
黄家青
王海鹏
姚志宜
彭云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing R & D Tech Group Co., Ltd.
Original Assignee
NANSHUI SOIL CONSTRUCTION ENGINEERING Co JIANGSU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANSHUI SOIL CONSTRUCTION ENGINEERING Co JIANGSU filed Critical NANSHUI SOIL CONSTRUCTION ENGINEERING Co JIANGSU
Priority to CNU2009200378537U priority Critical patent/CN201358455Y/en
Application granted granted Critical
Publication of CN201358455Y publication Critical patent/CN201358455Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A manual drainage plate inserting device for treating the soft foundation through dredging and filling sludge comprises insert rods for inserting drainage plates, and is characterized in that the device is equipped with buoyant rafts formed by a plurality of floating blocks and connecting bars, and support rods for the buoyant rafts; the floating blocks are arranged into two parallel and symmetric rows at least; and the connecting bars are fixedly connected with the floating blocks in the vertical and horizontal directions. The device has a simple structure and low cost and light self-weight, is changeable in size due to random assembly according to different field situations, has strong suitability for treatment areas without cushion layers layout and power and machine hoisting, and is particularly suitable for walking and inserting plates on sludge which are dredged and filled just due to high safety, has simple and convenient operation, safety and reliability, and reduces engineering cost remarkably. Compared with the prior manual inserting plate, the device can improve the plate inserting depth, reduce the labor intensity of personnel, and improve the construction quality.

Description

The artificial insert row water of blowing-filling sludge treatment of soft foundation panel assembly
Affiliated technical field
The utility model relates to the artificial insert row water of a kind of blowing-filling sludge treatment of soft foundation panel assembly, belongs to the extra large hydraulic reclamation epeirogenetic soft foundation processing technology field of enclosing.
Background technology
Enclose extra large hydraulic reclamation epeirogenetic, the significant social economic benefit is arranged, be the focus project that ocean, marine traffic engineering are built always.The soft base of hydraulic reclamation is reinforced, and is by increasing the vertical drainage passage at present mostly, again in conjunction with other technologies such as vacuum preloading, and its vertical drainage passage, what majority adopted is the method for inserting band drain in the soft base of hydraulic reclamation.At present, the method for inserting band drain in the soft base of hydraulic reclamation mainly contains two kinds, and a kind of is the machine plate, and a kind of is artificial plate.The degree of depth of blowing-filling sludge has 5~7 meters usually, what the overwhelming majority adopted is to lay bed course earlier on the mud face, again plate machinery equipment hoisting is carried out the slotting band drain of machine to bed course, its shortcoming is that the board-plugging device fuselage is heavy, need lifting operation, the bearing capacity of foundation soil that lifts the zone is had higher requirement, also need whole soft basic unit face is laid bed course, board-plugging device could be gone up the mud face, and cost is too high; If reduce cost and reduce the requirement of bed course, then safety can not get guaranteeing.The artificial band drain of inserting only limits to the shallow-layer of 2.5~4.5 meters of minorities is handled, and also needs to lay bed course or sidewalk, and artificial plate labour intensity is big, inefficiency, and also there is suitable danger simultaneously in the plate depth as shallow.
Summary of the invention
Technical problem to be solved in the utility model is, overcomes the shortcoming of prior art, and the artificial insert row water of blowing-filling sludge treatment of soft foundation panel assembly a kind of easy and simple to handle, safe and reliable is provided.
The technical scheme that its technical problem that solves the utility model adopts is as follows: the artificial insert row water of a kind of blowing-filling sludge treatment of soft foundation panel assembly, comprise the inserted link of inserting band drain, it is characterized in that having buoyant raft and the buoyant raft strut formed by some floating blocks, connecting rod, described floating block is arranged in two row of parallel symmetry at least, and connecting rod is from the fixedly connected floating block of vertical and horizontal.
In order to guarantee the degree of depth and the verticality of artificial insert row water plate, and personnel walk on buoyant raft and the safety of operation, the further technical scheme of the utility model is as follows: 1, have inserted link guide strip and guide strip support, fixedly connected with buoyant raft in guide strip support bottom, fixedlying connected with the inserted link guide strip in top, has the inserted link pilot hole on the inserted link guide strip; 2, has corresponding with the every row floating block junction plate that is layered on the floating block; 3, have corresponding with all floating blocks junction plate that is layered on the floating block, this junction plate is inserted the band drain location and is had open slot between the adjacent floating block of corresponding two row; 4, has the connection springboard between the adjacent floating block; 5, described strut bottom is dull and stereotyped, similar paddle shape.
The beneficial effects of the utility model are as follows: the artificial insert row water of this blowing-filling sludge treatment of soft foundation panel assembly is simple in structure, cheap, from heavy and light, can be according to any assembly unit of different field conditions, changeable, strong to processing region compliance, need not to lay bed course, need not power, need not mechanical hoisting, safe, be particularly suitable for walking, plate on the mud of hydraulic reclamation just, easy and simple to handle, safe and reliable, engineering cost significantly reduces.Compare with artificial plate in the past, the plate degree of depth improves, and personnel labor intensity reduces, and construction quality improves.The utility model also can doublely be done and set up hydraulic reclamation, desilting pipeline platform, vehicle, pioneer road, the job platform of artificial, small machine equipment.
Description of drawings
Fig. 1 is the artificial insert row water of the utility model blowing-filling sludge treatment of soft foundation panel assembly embodiment 1 an overall structure front view.
Fig. 2 is the artificial insert row water of the utility model blowing-filling sludge treatment of soft foundation panel assembly embodiment 2 overall structure upward views.
The specific embodiment
With reference to the accompanying drawings and in conjunction with the embodiments the utility model is described in detail.But the utility model is not limited to given example.
As depicted in figs. 1 and 2, the artificial insert row water of the utility model blowing-filling sludge treatment of soft foundation panel assembly, comprise the inserted link 3 of inserting band drain, have buoyant raft and the buoyant raft strut 4 formed by six floating blocks 6, connecting rod 5, described floating block 6 is arranged in two row of parallel symmetry, three floating blocks of every row, connecting rod 5 is from the fixedly connected floating block 6 of vertical and horizontal.
According to different field conditions, floating block quantity is the amount doesn't matter, can be arranged in three row, four row of parallel symmetry, even multiple row more, and the quantity of every row floating block also is decided according to the actual requirements.
In embodiment 1 as shown in Figure 1, this device also has inserted link guide strip 2 and guide strip support 1, fixedly connected with buoyant raft in guide strip support 1 bottom, fixedly connected with inserted link guide strip 2 in guide strip support 1 top, has inserted link pilot hole 21 on the inserted link guide strip 2, the top of inserted link 3 is spacing by inserted link pilot hole 21, and insert in the mud by the inserted link zone between the adjacent floating block of two row the bottom of inserted link 3.The effect of inserted link guide strip 2 has two: one, to the supporting role of inserted link, alleviates the labour intensity that personnel lift inserted link, and the 2nd, guarantee the degree of depth and the verticality of artificial insert row water plate.This device also has corresponding with the every row floating block junction plate 71,72 that is layered on the floating block, and the assurance personnel walk on buoyant raft and the safety of operation.Strut 4 bottoms are dull and stereotyped, similar paddle shape, and according to on-site actual situations, strut 4 both can support also and can draw.
In embodiment 2 as shown in Figure 2, this device also has corresponding with all floating blocks junction plate 7 that is layered on the floating block, and this junction plate 7 is inserted the band drain location and had open slot 8 between the adjacent floating block of corresponding two row; Have the springboard 9 of connection between the adjacent floating block, springboard 9 can move as required, is convenient to the contact of personnel between adjacent floating block.
Floating block in the utility model device can be made by light material, and connecting rod can be bamboo bar, rod or Metallic rod.Among the embodiment, floating block is made of rectangle foam core, nonwoven topping, iron frame.

Claims (8)

1, the artificial insert row water of blowing-filling sludge treatment of soft foundation panel assembly, comprise the inserted link of inserting band drain, it is characterized in that having buoyant raft and the buoyant raft strut be made up of some floating blocks, connecting rod, described floating block is arranged in two row of parallel symmetry at least, and connecting rod is from the fixedly connected floating block of vertical and horizontal.
2, the artificial insert row water of blowing-filling sludge treatment of soft foundation according to claim 1 panel assembly, it is characterized in that having inserted link guide strip and guide strip support, fixedly connected with buoyant raft in guide strip support bottom, fixedlying connected with the inserted link guide strip in top, has the inserted link pilot hole on the inserted link guide strip.
3, the artificial insert row water of blowing-filling sludge treatment of soft foundation according to claim 1 and 2 panel assembly is characterized in that having corresponding with the every row floating block junction plate that is layered on the floating block.
4, the artificial insert row water of blowing-filling sludge treatment of soft foundation according to claim 1 and 2 panel assembly, it is characterized in that having corresponding with all floating blocks junction plate that is layered on the floating block, this junction plate is inserted the band drain location and is had open slot between the adjacent floating block of corresponding two row.
5, the artificial insert row water of blowing-filling sludge treatment of soft foundation according to claim 1 and 2 panel assembly is characterized in that having the connection springboard between the adjacent floating block.
6, the artificial insert row water of blowing-filling sludge treatment of soft foundation according to claim 1 and 2 panel assembly is characterized in that described strut bottom is for dull and stereotyped.
7, the artificial insert row water of blowing-filling sludge treatment of soft foundation according to claim 1 and 2 panel assembly is characterized in that described floating block is made of rectangle core body, topping, framework.
8, the artificial insert row water of blowing-filling sludge treatment of soft foundation according to claim 1 and 2 panel assembly is characterized in that described floating block is made of foam core, nonwoven topping, iron frame.
CNU2009200378537U 2009-02-06 2009-02-06 Manual drainage plate inserting device for treating soft foundation by dredging and filling sludge Expired - Lifetime CN201358455Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2009200378537U CN201358455Y (en) 2009-02-06 2009-02-06 Manual drainage plate inserting device for treating soft foundation by dredging and filling sludge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2009200378537U CN201358455Y (en) 2009-02-06 2009-02-06 Manual drainage plate inserting device for treating soft foundation by dredging and filling sludge

Publications (1)

Publication Number Publication Date
CN201358455Y true CN201358455Y (en) 2009-12-09

Family

ID=41424216

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2009200378537U Expired - Lifetime CN201358455Y (en) 2009-02-06 2009-02-06 Manual drainage plate inserting device for treating soft foundation by dredging and filling sludge

Country Status (1)

Country Link
CN (1) CN201358455Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433868A (en) * 2011-12-26 2012-05-02 曾国海 Insert plate device capable of walking on blown-filled mud soil
CN103469787A (en) * 2012-06-08 2013-12-25 深圳市工勘岩土工程有限公司 Support structure for walking of constructors in sludge preloading processing
CN106049415A (en) * 2016-08-12 2016-10-26 浙江乔兴建设集团有限公司 Drain plate penetrating device for soft soil foundation reinforcement device
CN106087943A (en) * 2016-08-12 2016-11-09 浙江乔兴建设集团有限公司 A kind of foundation stabilization equipment
CN106088091A (en) * 2016-08-12 2016-11-09 浙江乔兴建设集团有限公司 A kind of construction equipment for consolidated subsoil
CN106088090A (en) * 2016-08-12 2016-11-09 浙江乔兴建设集团有限公司 A kind of draining board installation aiding device
CN106087955A (en) * 2016-08-12 2016-11-09 浙江乔兴建设集团有限公司 A kind of reinforced soft soil ground equipment
CN106087954A (en) * 2016-08-12 2016-11-09 浙江乔兴建设集团有限公司 A kind of draining board plugs mechanism

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433868A (en) * 2011-12-26 2012-05-02 曾国海 Insert plate device capable of walking on blown-filled mud soil
CN102433868B (en) * 2011-12-26 2014-05-14 曾国海 Insert plate device capable of walking on blown-filled mud soil
CN103469787A (en) * 2012-06-08 2013-12-25 深圳市工勘岩土工程有限公司 Support structure for walking of constructors in sludge preloading processing
CN106088090A (en) * 2016-08-12 2016-11-09 浙江乔兴建设集团有限公司 A kind of draining board installation aiding device
CN106087943A (en) * 2016-08-12 2016-11-09 浙江乔兴建设集团有限公司 A kind of foundation stabilization equipment
CN106088091A (en) * 2016-08-12 2016-11-09 浙江乔兴建设集团有限公司 A kind of construction equipment for consolidated subsoil
CN106049415A (en) * 2016-08-12 2016-10-26 浙江乔兴建设集团有限公司 Drain plate penetrating device for soft soil foundation reinforcement device
CN106087955A (en) * 2016-08-12 2016-11-09 浙江乔兴建设集团有限公司 A kind of reinforced soft soil ground equipment
CN106087954A (en) * 2016-08-12 2016-11-09 浙江乔兴建设集团有限公司 A kind of draining board plugs mechanism
CN106087943B (en) * 2016-08-12 2018-01-05 浙江乔兴建设集团有限公司 A kind of foundation stabilization equipment
CN106088090B (en) * 2016-08-12 2018-01-05 浙江乔兴建设集团有限公司 A kind of drain bar installation aiding device
CN106087954B (en) * 2016-08-12 2018-01-05 浙江乔兴建设集团有限公司 A kind of drain bar plugs mechanism
CN106087955B (en) * 2016-08-12 2018-01-05 浙江乔兴建设集团有限公司 A kind of reinforced soft soil ground equipment
CN106088091B (en) * 2016-08-12 2018-01-26 通州建总集团有限公司 A kind of construction equipment for consolidated subsoil
CN106049415B (en) * 2016-08-12 2018-02-09 通州建总集团有限公司 Drain bar in a kind of reinforced soft soil ground equipment plugs equipment

Similar Documents

Publication Publication Date Title
CN201358455Y (en) Manual drainage plate inserting device for treating soft foundation by dredging and filling sludge
CN106926989B (en) A kind of combined simple ocean platform and its construction method
CN107794942B (en) Construction method of underpass riverbed comprehensive pipe gallery structure
CN202117068U (en) Micropile plate-type composite foundation
CN103786842A (en) Floating building structure and construction method
CN203939028U (en) Portable marine piling position-limited rack
CN201339195Y (en) Cofferdam structure
CN104480907B (en) The box checkdam of a kind of hydraulic liftable
CN101929149A (en) Shallow sea pile foundation concrete oil drilling and producing platform
CN111636404A (en) Construction method of offshore wind power compacted sand pile foundation bed
CN203741852U (en) Tubular groundwater drainage and seepage blind ditch
CN201176597Y (en) Sinking well structure
CN204000471U (en) Error-correction structure for soft clay area operation ballastless track of high-speed railway roadbed
CN202850038U (en) Ecological composite slope protection plate and slope protective structure
CN204849818U (en) Assembled retaining wall
CN202131602U (en) Steel sheet pile cofferdam structure
CN202626936U (en) Semi-separating type reverse-L shaped breast wall and harbor seawall constructed by adopting breast wall
CN101614007B (en) Plate inserting device for silt consolidation
CN204326024U (en) The box checkdam of a kind of hydraulic liftable
CN203066097U (en) Piled raft foundation structure of stub-type pile bearing platform structure
CN203334347U (en) Box culvert type outfall structure
CN202627019U (en) Balance weight type reinforced earth-retaining wall
CN104074374B (en) There is the breast wall type super-large water tank without stake shallow foundation float Structure
CN206616570U (en) A kind of antiseepage water-retaining cofferdam structure
CN201605537U (en) Jacking device of simply supported plate on retaining wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NANJING R+D CONSTRUCTION TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: NANSHUI SOIL CONSTRUCTION ENGINEERING CO., JIANGSU

Effective date: 20120806

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120806

Address after: 1122, room 223, 210029 Guangzhou Road, Jiangsu, Nanjing

Patentee after: Nanjing R & D Tech Group Co., Ltd.

Address before: 210029 Guangzhou Road, Jiangsu, China, No. 223, No.

Patentee before: Nanshui Soil Construction Engineering Co., Jiangsu

CX01 Expiry of patent term

Granted publication date: 20091209

CX01 Expiry of patent term