CN106087943A - A kind of foundation stabilization equipment - Google Patents

A kind of foundation stabilization equipment Download PDF

Info

Publication number
CN106087943A
CN106087943A CN201610657276.6A CN201610657276A CN106087943A CN 106087943 A CN106087943 A CN 106087943A CN 201610657276 A CN201610657276 A CN 201610657276A CN 106087943 A CN106087943 A CN 106087943A
Authority
CN
China
Prior art keywords
plate
pressing plate
soil
force bearing
foundation stabilization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610657276.6A
Other languages
Chinese (zh)
Other versions
CN106087943B (en
Inventor
蒋琪
杨奇
吴国杰
诸燕
罗瑛
潘敏华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG QIAOXING CONSTRUCTION GROUP Co Ltd
Original Assignee
ZHEJIANG QIAOXING CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG QIAOXING CONSTRUCTION GROUP Co Ltd filed Critical ZHEJIANG QIAOXING CONSTRUCTION GROUP Co Ltd
Priority to CN201610657276.6A priority Critical patent/CN106087943B/en
Publication of CN106087943A publication Critical patent/CN106087943A/en
Application granted granted Critical
Publication of CN106087943B publication Critical patent/CN106087943B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to building field, be specifically related to a kind of foundation stabilization equipment.Including loosening device and draining board installation aiding device;Draining board installation aiding device includes that inside has the sleeve pile pipe in guide plate chamber, is positioned in the back taper pile crown bottom sleeve pile pipe, described guide plate chamber cavity wall and symmetrical is hinged with two row for the pressing plate being pressed on draining board and pressing plate are connected to the degree of tightness assembly making pressing plate rotate around pin joint;Described back taper pile crown includes that two panels local is overlapping and lower end can close or the pile crown plate of opening.Described degree of tightness assembly includes two connecting rods being arranged in respectively on two row pressing plates, is removably attachable to the synchronization connecting plate at two described connecting rod tops.The application simple in construction, low cost, easy to operate, work efficiency is high, plug steady quality, soil-entering resistance is little, simple in construction, security reliability and versatility good, applied widely, low cost, be hardly damaged, after damage, replacement cost is little.

Description

A kind of foundation stabilization equipment
Technical field
The present invention relates to building field, be specifically related to a kind of foundation stabilization equipment.
Background technology
During to Soft Ground, it is essential that construction operation mechanism equipped by plate.At present, common various When construction operation mechanism construction operation equipped by the plate of form, there is inefficiency, plug quality instability, soil-entering resistance The technical problems such as greatly, structure is complicated, security reliability and poor universality, scope of application limitation are big.And existing equipment structure is multiple Miscellaneous, cost is high, and fragile, after damage, replacement cost is greatly improved.
Summary of the invention
It is an object of the invention to a kind of ground providing a kind of simple in construction for the problems referred to above, easy to operate, resistance is little Reinforcing is equipped.
The above-mentioned technical purpose of the present invention has the technical scheme that
A kind of foundation stabilization equipment, including loosening device and draining board installation aiding device;Described loosening device includes being positioned at top The force bearing plate that loosens the soil, be vertically distributed in the large knitting needle that loosens the soil loosening the soil on force bearing plate bottom surface, at least one is suspended to loosen the soil by suspension rod Below force bearing plate and be provided with multiple for the spacing godet of through hole through the large knitting needle that loosens the soil;It is provided with upper and lower in the described large knitting needle that loosens the soil The appearance of end opening fetches earth chamber, and bottom is provided with lower soil syringe needle, and the described appearance chamber lower ending opening that fetches earth is located at least partially within described lower soil pin On the inclined side of head upper end;Described draining board installation aiding device includes that inside has the sleeve pile pipe in guide plate chamber, is positioned at sleeve stake In back taper pile crown bottom pipe, described guide plate chamber cavity wall, symmetrical two row that are hinged with are for the pressing plate being pressed on draining board and pressure Plate is connected to the degree of tightness assembly making pressing plate rotate around pin joint;Described back taper pile crown includes that two panels local is overlapping and lower end can be closed Closing or the pile crown plate of opening, each column pressing plate at least includes three block pressur plates laying respectively at upper, middle and lower portion, guide plate chamber, described degree of tightness Assembly includes two connecting rods being arranged in respectively on two row pressing plates, is removably attachable to the synchronization at two described connecting rod tops even Plate, on each column pressing plate, symmetry is equipped with two connecting rods, is formed for through described row between two described connecting rods of string pressing plate The importing gap of water plate, described sleeve pile pipe top is additionally provided with pile pulling hole or is positioned at pile pulling edge in sleeve pile pipe outside wall surface.
The large knitting needle that loosens the soil of said structure both can ensure that syringe needle punching was laborsaving, ensures that chamber of fetching earth is held in punching simultaneously smooth Entering soil, also and then reduce punching resistance, loosening the soil is to loosen to coordinate to fetch earth again by this region soil layer by many punchings to realize Loosen the soil.Chamber top end opening position perforate of fetching earth can be held, after loosening device to be removed, with height in correspondence on force bearing plate of loosening the soil during design Calm the anger from top to bottom to appearance fetch earth chamber blow except soil, or directly take can be inserted into hold fetch earth chamber ear of maize insert appearance fetch earth chamber except soil.
As preferably, described guide plate chamber cavity wall offers the stair-stepping slot pressing plate that width from top to bottom reduces successively Mounting groove, is sequentially arranged in the stage of stair-stepping slot pressing plate mounting groove with the pressing plate in string, sets the most successively The hinged end width of the pressing plate put reduces successively.
As preferably, described sleeve pile pipe tip shelf is provided with the force bearing plate being positioned at above described synchronization connecting plate, described synchronization Connecting plate upper surface is posted by described force bearing plate bottom surface;Described suspension rod for be laid in loosen the soil force bearing plate edge and lower end spacing with described The screw mandrel that godet is connected, described in loosen the soil the tool female regulation conduit that force bearing plate is provided with and screw mandrel is adaptive, described ground Reinforcing equipment also includes weight bracket, described weight bracket is provided with conduit and is arranged in described supravasal described for impacting Loosen the soil force bearing plate or the weight of described force bearing plate.
The large knitting needle that loosens the soil is relatively thin, laborsaving convenience of punching, if multiple pine large knitting needle punching is fetched earth, is loosened the soil pre-buried district, then Squeezing in soil by thicker sleeve pile pipe, it is the most time saving and energy saving that whole operation is got off, and reduces the intensity to each parts Requirement, it is possible to make a shared weight bracket and weight can realize the punching of two covering devices.
As preferably, described sleeve pile pipe top offers the notch for passing described draining board, described notch and institute State importing interstitial site corresponding.
As preferably, described pile crown plate includes that bottom has pointed stake head and is positioned at the mother being provided above female groove of pointed stake head Plate and bottom have the daughter board of the positive stop strip adaptive with female groove.
The cooperation of female groove and positive stop strip makes under lower stake the power owing to upwards pushing up that mother, daughter board occlusion can not be separated, And pointed stake head is only positioned on motherboard and also ensure that lower stake is more laborsaving, convenient.
As preferably, described sleeve pile pipe is rectangular tube, and described motherboard, the both sides of daughter board are each provided with a mud guard, and The mud guard being positioned at the same side on described motherboard and daughter board has overlapping gear seam portion, outside the top of described motherboard and daughter board with Described sleeve pile pipe Basolateral is hinged, and it is right to be formed inside the top inner side of described motherboard and daughter board and described sleeve pile pipe bottom The confined planes of pressure.
As preferably, described female groove is the tipper towards daughter board opening.
As preferably, described force bearing plate is installed with up-thin-low-thick square even power platform, limit, described square even power platform bottom surface Along exceeding or described sleeve pile pipe top end face outer of aliging.
Square even power platform ensure that sleeve pile pipe uniform force when down tube.
As preferably, the lower section that described guide plate chamber cavity wall is positioned at each pressing plate hinge point is provided with limit limiting stand, Described pole limiting stand is triangle platform, described pressing plate is provided with for the word length hole through described connecting rod, on described connecting rod It is provided with the many groups of limit assemblies with two spacing cylinder blend stops laying respectively at described pressing plate top and bottom.
The setting in one word length hole make connecting rod can slide in a word length hole guarantee pressing plate smooth rotation.
As preferably, it is provided with bottom described draining board to bend to be formed in described back taper pile crown and reserves precompressed section, described stake It is provided with several higher than the position of described reserved precompressed section in head plate and enters mud embedded hole.
In sum, the method have the advantages that
1, the region of pre-buried draining board is first carried out punching vibrations with loosening device and takes down part soil to reach pine simultaneously by the application The purpose of soil, takes out loosening device displacement, then the draining board of pre-buried length is put into guide plate intracavity, then pressing plate is pressed in guide plate Center, chamber positions, and then will plug mechanism and squeeze into soil to behind precalculated position, and pull up degree of tightness assembly so that pressing plate turns Move and be no longer pressed on guide plate chamber, then send into the draining board of a certain amount of length to guide plate intracavity, then sleeve pile pipe is upwards pulled out, upwards While pulling out, mother and sons' plate is automatically separated, and draining board does not rewinds and stay in stake hole, and sleeve pile pipe is thoroughly extracted after stake is cheated from pile crown Draining board is cut off at the end, and draining board has plugged, then backfills stake hole.The setting entering mud embedded hole can make in lower sleeve stake Enter some mud amounts bottom during pipe, be pressed in reserved precompressed section, draining board bottom carried out precompressed location, it is ensured that draining board is buried underground Require the degree of depth, the most effectively prevent from rewinding, also can reduce resistance during lower stake simultaneously, when playing sleeve pile pipe, also can make mother, daughter board It is smoothly detached under self gravitation and the pressure of mud that entered, it is ensured that pile crown plate is opened and realized draining plate current in stake is cheated.Pressure Plate is pressed in draining board and ensure that draining board installation position is accurate, prevents draining board from arbitrarily rocking displacement when plugging sleeve pile pipe simultaneously Or it is stuck in guide plate intracavity, even if entering mud, it is possible to ensureing that the mud that sleeve pile pipe is entered is pressed on predeterminated position, fabric swatch is the most just In budget length, material saving.
2, the application simple in construction, low cost, easy to operate, work efficiency is high, plug steady quality, soil-entering resistance is little, Simple in construction, security reliability and versatility are good, applied widely, and low cost is hardly damaged, and after damage, replacement cost is little.
3, the structural stability wearing two connecting rods on each pressing plate is more preferable, and intensity is higher, and is easy to the layout of draining board. Stair-stepping slot pressing plate mounting groove is easy to the pressing plate of pressing plate, pressing plate and connecting rod insert from sleeve pile pipe top again after working good with Slot pressing plate mounting groove coordinates, and the pressing plate of different hinged places width is stuck in different stage successively, and string pressing plate can the most once Wide one-tenth is installed, and dismantles the most more convenient.
4, the large knitting needle that loosens the soil is relatively thin, laborsaving convenience of punching, if multiple pine large knitting needle punching is fetched earth, is loosened the soil pre-buried district, so After thicker sleeve pile pipe is squeezed in soil, more time saving and energy saving, thus can make to share a weight bracket and weight and can realize The punching of two covering devices.
Accompanying drawing explanation
Fig. 1 is present configuration schematic diagram;
Fig. 2 is pile crown plate structure schematic diagram;
Fig. 3 is pressing plate and bar linkage structure schematic diagram;
Fig. 4 is sleeve pile pipe structural representation one;
Fig. 5 is sleeve pile pipe structural representation two;
Fig. 6 is loosening device structural representation;
Fig. 7 is weight bracket structural representation.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in further detail.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art The present embodiment can be made after reading this specification by member as required does not has the amendment of creative contribution, but as long as at this All protected by Patent Law in the right of invention.
Embodiment one:
A kind of foundation stabilization equipment, including loosening device and draining board installation aiding device;Described loosening device includes being positioned at top The force bearing plate 201 that loosens the soil, be vertically distributed in the large knitting needle 202 that loosens the soil loosening the soil on force bearing plate bottom surface, at least one is hanged by suspension rod 203 Hang below the force bearing plate that loosens the soil and be provided with multiple spacing godet 204 for the through hole through the large knitting needle that loosens the soil;The described large knitting needle that loosens the soil Inside being provided with the appearance of upper and lower end opening to fetch earth chamber 205, bottom is provided with lower soil syringe needle 206, and described appearance fetches earth chamber lower ending opening at least office Portion is positioned on the inclined side of described lower soil syringe needle upper end;Described draining board installation aiding device includes that inside has the sleeve in guide plate chamber Pile pipe 1, it is positioned at symmetry in the back taper pile crown 2 bottom sleeve pile pipe, described guide plate chamber cavity wall and is hinged with two row for the row of being pressed in Pressing plate 9 on water plate 10 and pressing plate are connected to the degree of tightness assembly making pressing plate rotate around pin joint;Described back taper pile crown includes two Sheet local is overlapping and lower end can close or the pile crown plate of opening, and each column pressing plate at least includes laying respectively at upper, middle and lower portion, guide plate chamber Three block pressur plates, described degree of tightness assembly includes two connecting rods 3 being arranged in respectively on two row pressing plates, is removably attachable to two The synchronization connecting plate 4 at described connecting rod top, on each column pressing plate, symmetry is equipped with two connecting rods, two described connecting rods of string pressing plate it Between formed for through the importing gap of described draining board, described sleeve pile pipe top is additionally provided with pile pulling hole or is positioned at sleeve stake In pipe outside wall surface, pile pulling is along 12.
The stair-stepping slot pressing plate mounting groove 92 that width from top to bottom reduces successively is offered in the cavity wall of described guide plate chamber, It is sequentially arranged in the stage of stair-stepping slot pressing plate mounting groove with the pressing plate in string, the pressure from top to bottom set gradually The hinged end width of plate reduces successively.
Described sleeve pile pipe tip shelf is provided with the force bearing plate 51 being positioned at above described synchronization connecting plate, described synchronization connecting plate upper end Face is posted by described force bearing plate bottom surface;Described suspension rod is connected with described spacing godet for being laid in loosen the soil force bearing plate edge and lower end Screw mandrel, described in loosen the soil the tool female regulation conduit 207 that force bearing plate is provided with and screw mandrel is adaptive, described foundation stabilization is used Equipment also includes weight bracket, described weight bracket arranges conduit 208 and is arranged in described supravasal loosen the soil described in impacting The weight 209 of force bearing plate or described force bearing plate.
Described sleeve pile pipe top offers the notch 11 for passing described draining board, between described notch and described importing Gap position is corresponding.
Described pile pulling is along for enclose the circle edge being located in sleeve pile pipe outside wall surface, and described circle is evenly equipped with several and rises and pull out along bottom Mating groove, described circle is 10-30cm along the distance to described sleeve pile pipe upper surface.
Rise pull out mating groove can promote sleeve pile pipe instrument coordinate more firm, it is simple to rise pile pipe.Circle is easy along setting top Fractureing or turn over and stick up, circle is 10-30cm along the distance to described sleeve pile pipe upper surface, both ensure that sleeve pile pipe was hardly damaged, In turn ensure that and when pulling out, had enough power to prop up stake tool.
Described pile crown plate includes that bottom has pointed stake head 211 and is positioned at motherboard 21 He being provided above female groove of pointed stake head Bottom has the daughter board 22 of the positive stop strip 221 adaptive with female groove.
Described sleeve pile pipe is rectangular tube, and described motherboard, the both sides of daughter board are each provided with a mud guard 23, and described motherboard With the mud guard being positioned at the same side on daughter board, there is overlapping gear seam portion, with described sleeve outside the top of described motherboard and daughter board Pile pipe Basolateral is hinged, and formed pressure inside the top inner side of described motherboard and daughter board and described sleeve pile pipe bottom is spacing Face 6.
Described female groove is the tipper towards daughter board opening.
Be installed with up-thin-low-thick square even power platform 7 on described force bearing plate, edge, described square even power platform bottom surface beyond or Align described sleeve pile pipe top end face outer.
The lower section being positioned at each pressing plate hinge point in the cavity wall of described guide plate chamber is provided with limit limiting stand 8, the described limit Position platform is triangle platform, described pressing plate is provided with for the word length hole 91 through described connecting rod, described connecting rod is provided with The many groups of limit assemblies with two spacing cylinder blend stops 31 laying respectively at described pressing plate top and bottom.
The setting in one word length hole make connecting rod can slide in a word length hole guarantee pressing plate smooth rotation.
It is provided with bottom described draining board to bend and in described back taper pile crown, forms reserved precompressed section 101, on described pile crown plate It is provided with several higher than the position of described reserved precompressed section 101 and enters mud embedded hole 24.
The region of pre-buried draining board is first carried out punching vibrations with loosening device and takes down part soil to reach simultaneously by the application The purpose loosened the soil, takes out loosening device displacement, then the draining board of pre-buried length puts into guide plate intracavity, then is pressed in by pressing plate and leads Ban Qiang center positions, and then will plug mechanism and squeeze into soil to behind precalculated position, and pull up degree of tightness assembly so that pressing plate Rotate and be no longer pressed on guide plate chamber, then send into the draining board of a certain amount of length to guide plate intracavity, then sleeve pile pipe is upwards pulled out, to On pull out while mother and sons' plate be automatically separated, draining board do not rewind and stay stake hole in, sleeve pile pipe thoroughly extract stake hole after from stake Draining board is cut off at the head end, and draining board has plugged, then backfills stake hole.The setting entering mud embedded hole can make at lower sleeve Enter some mud amounts bottom during pile pipe, be pressed in reserved precompressed section, draining board bottom carried out precompressed location, it is ensured that draining board is buried underground To requiring the degree of depth, the most effectively prevent from rewinding, also can reduce resistance during lower stake simultaneously.

Claims (10)

1. a foundation stabilization equipment, it is characterised in that: include loosening device and draining board installation aiding device;Described loosening device Including being positioned at the force bearing plate that loosens the soil (201) at top, vertically it is distributed in the large knitting needle that loosens the soil (202) loosened the soil on force bearing plate bottom surface, at least One is suspended to loosen the soil below force bearing plate by suspension rod (203) and is provided with multiple for leading through the spacing of through hole of the large knitting needle that loosens the soil Dish (204);Being provided with the appearance of upper and lower end opening in the described large knitting needle that loosens the soil to fetch earth chamber (205), bottom is provided with lower soil syringe needle (206), institute State hold fetch earth chamber lower ending opening be located at least partially within described lower soil syringe needle upper end inclined side on;Described draining board installation aiding device There is the sleeve pile pipe (1) in guide plate chamber including inside, be positioned at the back taper pile crown (2) bottom sleeve pile pipe, described guide plate chamber cavity wall Upper symmetry is hinged with two row for being connected to make pressing plate around pin joint to the pressing plate (9) being pressed on draining board (10) and pressing plate The degree of tightness assembly rotated;Described back taper pile crown includes that two panels local is overlapping and lower end can close or the pile crown plate of opening, each column pressure Plate at least includes three block pressur plates laying respectively at upper, middle and lower portion, guide plate chamber, and described degree of tightness assembly includes that two are arranged in two respectively Connecting rod (3) on row pressing plate, it is removably attachable to the synchronization connecting plate (4) at two described connecting rod tops, symmetrical on each column pressing plate It is equipped with two connecting rods, is formed for the importing gap through described draining board, institute between two described connecting rods of string pressing plate State sleeve pile pipe top be additionally provided with pile pulling hole or be positioned at pile pulling edge (12) in sleeve pile pipe outside wall surface.
The most according to claim 1, a kind of foundation stabilization is equipped, it is characterised in that: offer in the cavity wall of described guide plate chamber by Up to descend stair-stepping slot pressing plate mounting groove (92) that width reduces successively, be sequentially arranged at ladder with the pressing plate in string In the stage of the slot pressing plate mounting groove of shape, the hinged end width of the pressing plate from top to bottom set gradually reduces successively.
A kind of foundation stabilization equipment, it is characterised in that: described sleeve pile pipe tip shelf is provided with position Force bearing plate (51) above described synchronization connecting plate, described synchronization connecting plate upper surface is posted by described force bearing plate bottom surface;Described hang Bar is to be laid in the screw mandrel that loosen the soil force bearing plate edge and lower end are connected with described spacing godet, described in loosen the soil force bearing plate be provided with The tool female regulation conduit (207) that screw mandrel is adaptive, described foundation stabilization equipment also includes weight bracket, described weight bracket On be provided with conduit (208) and be arranged in described supravasal force bearing plate or the weight of described force bearing plate of loosening the soil described in impact (209).
A kind of foundation stabilization equipment, it is characterised in that: described sleeve pile pipe top offers use In passing the notch (11) of described draining board, described notch is corresponding with described importing interstitial site.
A kind of foundation stabilization equipment, it is characterised in that: described pile crown plate includes that bottom has point Pile crown (211) and be positioned at the motherboard (21) being provided above female groove of pointed stake head and bottom has and the positive stop strip of female groove adaptation (221) daughter board (22).
A kind of foundation stabilization equipment, it is characterised in that: described sleeve pile pipe is rectangular tube, institute State motherboard, the both sides of daughter board are each provided with a mud guard (23), and are positioned at the mud guard tool of the same side on described motherboard and daughter board Have overlapping gear seam portion, hinged with described sleeve pile pipe Basolateral outside the top of described motherboard and daughter board, described motherboard and The confined planes (6) to pressure is formed inside the top inner side of daughter board and described sleeve pile pipe bottom.
A kind of foundation stabilization equipment, it is characterised in that: described female groove is towards daughter board opening Tipper.
8. require described a kind of foundation stabilization equipment according to the arbitrary only profit of claim 3-7, it is characterised in that: described load Being installed with up-thin-low-thick square even power platform (7) on plate, edge, described square even power platform bottom surface exceeds or described sleeve stake of aliging Pipe top end face outer.
9. require described a kind of foundation stabilization equipment according to the arbitrary only profit of claim 3-7, it is characterised in that: described guide plate The lower section being positioned at each pressing plate hinge point in the cavity wall of chamber is provided with limit limiting stand (8), and described pole limiting stand is triangle platform, It is provided with on described pressing plate for the word length hole (91) through described connecting rod, described connecting rod is provided with many groups there are two points It is not positioned at the limit assembly of the spacing cylinder blend stop (31) of described pressing plate top and bottom.
10. require described a kind of foundation stabilization equipment according to the arbitrary only profit of claim 3-7, it is characterised in that: described draining It is provided with bottom plate to bend in described back taper pile crown, forms reserved precompressed section (101), reserved pre-higher than described on described pile crown plate The position of pressure section (101) is provided with several and enters mud embedded hole (24).
CN201610657276.6A 2016-08-12 2016-08-12 A kind of foundation stabilization equipment Active CN106087943B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610657276.6A CN106087943B (en) 2016-08-12 2016-08-12 A kind of foundation stabilization equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610657276.6A CN106087943B (en) 2016-08-12 2016-08-12 A kind of foundation stabilization equipment

Publications (2)

Publication Number Publication Date
CN106087943A true CN106087943A (en) 2016-11-09
CN106087943B CN106087943B (en) 2018-01-05

Family

ID=57456673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610657276.6A Active CN106087943B (en) 2016-08-12 2016-08-12 A kind of foundation stabilization equipment

Country Status (1)

Country Link
CN (1) CN106087943B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100713652B1 (en) * 2006-09-27 2007-05-02 주식회사 준건설 Support pressing device for drain casing of a excavator
US20090196691A1 (en) * 2008-02-01 2009-08-06 June Construction Co., Ltd Drain board installing device without anchor plate
CN201358455Y (en) * 2009-02-06 2009-12-09 江苏南水土建工程公司 Manual drainage plate inserting device for treating soft foundation by dredging and filling sludge
CN103410138A (en) * 2013-06-09 2013-11-27 浙江省围海建设集团宁波宏阳建设有限公司 Multifunctional automatic pile head for allowing plastic drainage plate to be inserted
CN204551427U (en) * 2015-02-26 2015-08-12 武汉二航路桥特种工程有限责任公司 A kind of novel plastic band drain construction equipment
CN105442525A (en) * 2015-12-31 2016-03-30 浙江宏力阳生态建设股份有限公司 Inserting mechanism for plastic drainage plate
CN205894055U (en) * 2016-08-12 2017-01-18 浙江乔兴建设集团有限公司 Foundation stabilization is with equipping

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100713652B1 (en) * 2006-09-27 2007-05-02 주식회사 준건설 Support pressing device for drain casing of a excavator
US20090196691A1 (en) * 2008-02-01 2009-08-06 June Construction Co., Ltd Drain board installing device without anchor plate
CN201358455Y (en) * 2009-02-06 2009-12-09 江苏南水土建工程公司 Manual drainage plate inserting device for treating soft foundation by dredging and filling sludge
CN103410138A (en) * 2013-06-09 2013-11-27 浙江省围海建设集团宁波宏阳建设有限公司 Multifunctional automatic pile head for allowing plastic drainage plate to be inserted
CN204551427U (en) * 2015-02-26 2015-08-12 武汉二航路桥特种工程有限责任公司 A kind of novel plastic band drain construction equipment
CN105442525A (en) * 2015-12-31 2016-03-30 浙江宏力阳生态建设股份有限公司 Inserting mechanism for plastic drainage plate
CN205894055U (en) * 2016-08-12 2017-01-18 浙江乔兴建设集团有限公司 Foundation stabilization is with equipping

Also Published As

Publication number Publication date
CN106087943B (en) 2018-01-05

Similar Documents

Publication Publication Date Title
CN207727589U (en) Internal support of foundation pit device
CN206091914U (en) Tunnel porthole cleaning device
CN109208615A (en) A kind of groove notch supporting construction, construction method and groove pouring procedure
CN206328741U (en) A kind of static sounding protection equipment
CN206110131U (en) Drain bar cabling device
CN205894055U (en) Foundation stabilization is with equipping
CN206110111U (en) Drain bar during soft soil foundation reinforcement equips insert equipment of establishing
CN106087943A (en) A kind of foundation stabilization equipment
CN205894072U (en) A construction is equipped for reinforcing ground
CN205894059U (en) Soft soil foundation reinforcement equips
CN106049415B (en) Drain bar in a kind of reinforced soft soil ground equipment plugs equipment
CN106088090A (en) A kind of draining board installation aiding device
CN106088091A (en) A kind of construction equipment for consolidated subsoil
CN106087955A (en) A kind of reinforced soft soil ground equipment
CN103321573B (en) Rectangular hole drilling machine
CN208039262U (en) A kind of anti-drop device of shallow foundation hole support plate
CN204443423U (en) A kind of auxiliary body of agriculture and forestry
CN206157711U (en) Drain bar is inserted and is established mechanism
CN210978734U (en) Supporting device for laying water conservancy and hydropower pipelines
CN208996734U (en) Reduced scale experimental rig in a kind of shallow tunnel shield driving room
CN106087954A (en) A kind of draining board plugs mechanism
CN208370174U (en) A kind of pit-picker for transplanting tree
CN211203138U (en) Take piping lane support of staple bolt
CN109281677A (en) Reduced scale experimental rig in a kind of shallow tunnel shield driving room
CN206034476U (en) Big board of transmission line basis construction equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant