CN106087954A - A kind of draining board plugs mechanism - Google Patents

A kind of draining board plugs mechanism Download PDF

Info

Publication number
CN106087954A
CN106087954A CN201610657080.7A CN201610657080A CN106087954A CN 106087954 A CN106087954 A CN 106087954A CN 201610657080 A CN201610657080 A CN 201610657080A CN 106087954 A CN106087954 A CN 106087954A
Authority
CN
China
Prior art keywords
plate
draining board
pressing plate
pile pipe
pile crown
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610657080.7A
Other languages
Chinese (zh)
Other versions
CN106087954B (en
Inventor
杨洪忠
张俊
沈海垭
潘树良
钱卓豪
蒋琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG QIAOXING CONSTRUCTION GROUP Co Ltd
Original Assignee
ZHEJIANG QIAOXING CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG QIAOXING CONSTRUCTION GROUP Co Ltd filed Critical ZHEJIANG QIAOXING CONSTRUCTION GROUP Co Ltd
Priority to CN201610657080.7A priority Critical patent/CN106087954B/en
Publication of CN106087954A publication Critical patent/CN106087954A/en
Application granted granted Critical
Publication of CN106087954B publication Critical patent/CN106087954B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention relates to building field, be specifically related to a kind of draining board and plug mechanism.There is the sleeve pile pipe in guide plate chamber including inside, be positioned in the back taper pile crown bottom sleeve pile pipe, described guide plate chamber cavity wall and symmetrical be hinged with two row for the pressing plate being pressed on draining board and pressing plate being connected to the degree of tightness assembly making pressing plate rotate around pin joint;Described back taper pile crown includes that two panels local is overlapping and lower end can close or the pile crown plate of opening.Described degree of tightness assembly includes two connecting rods being arranged in respectively on two row pressing plates, is removably attachable to the synchronization connecting plate at two described connecting rod tops.The application simple in construction, low cost, easy to operate, work efficiency is high, plug steady quality, soil-entering resistance is little, simple in construction, security reliability and versatility good, applied widely, low cost, be hardly damaged, after damage, replacement cost is little.

Description

A kind of draining board plugs mechanism
Technical field
The present invention relates to building field, be specifically related to a kind of draining board and plug mechanism.
Background technology
During to Soft Ground, it is essential that construction operation mechanism equipped by plate.At present, common various When construction operation mechanism construction operation equipped by the plate of form, there is inefficiency, plug quality instability, soil-entering resistance The technical problems such as greatly, structure is complicated, security reliability and poor universality, scope of application limitation are big.And existing equipment structure is multiple Miscellaneous, cost is high, and fragile, after damage, replacement cost is greatly improved.
Summary of the invention
The draining board that it is an object of the invention to provide a kind of simple in construction for the problems referred to above, easy to operate, resistance is little is inserted If mechanism.
The above-mentioned technical purpose of the present invention has the technical scheme that
A kind of draining board plugs mechanism, has the sleeve pile pipe in guide plate chamber including inside, is positioned at the back taper stake bottom sleeve pile pipe In head, described guide plate chamber cavity wall, symmetry is hinged with two row for being connected to make pressure to the pressing plate being pressed on draining board and pressing plate The degree of tightness assembly that plate rotates around pin joint;Described back taper pile crown includes that two panels local is overlapping and lower end can close or the pile crown of opening Plate.
As preferably, described degree of tightness assembly includes two connecting rods being arranged in respectively on two row pressing plates, detachably connected Synchronization connecting plate in two described connecting rod tops.
As preferably, described sleeve pile pipe tip shelf is provided with the force bearing plate being positioned at above described synchronization connecting plate, described synchronization Connecting plate upper surface is posted by described force bearing plate bottom surface.
As preferably, described sleeve pile pipe top offers the notch for passing described draining board.
As preferably, described pile crown plate includes that bottom has pointed stake head and is positioned at the mother being provided above female groove of pointed stake head Plate and bottom have the daughter board of the positive stop strip adaptive with female groove.
The cooperation of female groove and positive stop strip makes under lower stake the power owing to upwards pushing up that mother, daughter board occlusion can not be separated, And pointed stake head is only positioned on motherboard and also ensure that lower stake is more laborsaving, convenient.
As preferably, described sleeve pile pipe is rectangular tube, and described motherboard, the both sides of daughter board are each provided with a mud guard, and The mud guard being positioned at the same side on described motherboard and daughter board has overlapping gear seam portion, outside the top of described motherboard and daughter board with Described sleeve pile pipe Basolateral is hinged, and it is right to be formed inside the top inner side of described motherboard and daughter board and described sleeve pile pipe bottom The confined planes of pressure.
As preferably, described female groove is the tipper towards daughter board opening.
As preferably, described force bearing plate is installed with up-thin-low-thick square even power platform, limit, described square even power platform bottom surface Along exceeding or described sleeve pile pipe top end face outer of aliging.
Square even power platform ensure that sleeve pile pipe uniform force when down tube.
As preferably, the lower section that described guide plate chamber cavity wall is positioned at each pressing plate hinge point is provided with limit limiting stand, Described pole limiting stand is triangle platform, described pressing plate is provided with for through described connecting rod and central shaft position along its length A word length hole in the plane being perpendicular to described draining board face, described connecting rod is provided with many groups and has two and lay respectively at institute State the limit assembly of the spacing cylinder blend stop of pressing plate top and bottom.
The setting in one word length hole make connecting rod can slide in a word length hole guarantee pressing plate smooth rotation.
As preferably, it is provided with bottom described draining board to bend to be formed in described back taper pile crown and reserves precompressed section, described stake It is provided with several higher than the position of described reserved precompressed section in head plate and enters mud embedded hole.
In sum, the method have the advantages that
1, guide plate intracavity first put into by the draining board of pre-buried length by the application, then pressing plate is pressed in center, guide plate chamber positions, Then will plug mechanism and squeeze into soil to behind precalculated position, and degree of tightness assembly be pulled up and is no longer pressed in guide plate chamber so that press plate rotary On, then the draining board to the guide plate intracavity a certain amount of length of feeding, then sleeve pile pipe is upwards pulled out, while upwards pulling out, mother and sons' plate is certainly Dynamic separation, draining board does not rewinds and stays in stake hole, and sleeve pile pipe is thoroughly extracted after stake is cheated from cutting off draining board, draining at the bottom of pile crown Plate has plugged, then backfills stake hole.The setting entering mud embedded hole can make to enter some mud bottom when lower sleeve pile pipe Amount, is pressed in reserved precompressed section, draining board bottom is carried out precompressed location, it is ensured that draining board is buried underground and required the degree of depth, the most effectively Prevent from rewinding, also can reduce resistance during lower stake simultaneously, when playing sleeve pile pipe, mother, daughter board also can be made in self gravitation and institute It is smoothly detached under the pressure of the mud entered, it is ensured that pile crown plate is opened and realized draining plate current in stake is cheated.Pressing plate is pressed in draining board and ensures Draining board installation position is accurate, prevents draining board from arbitrarily rocking displacement when plugging sleeve pile pipe or being stuck in guide plate intracavity simultaneously, Even if entering mud, it is possible to ensure that the mud that entered of sleeve pile pipe is pressed on predeterminated position, fabric swatch is precisely more convenient for budget length, saves Materials.
2, the application simple in construction, low cost, easy to operate, work efficiency is high, plug steady quality, soil-entering resistance is little, Simple in construction, security reliability and versatility are good, applied widely, and low cost is hardly damaged, and after damage, replacement cost is little.
Accompanying drawing explanation
Fig. 1 is present configuration schematic diagram;
Fig. 2 is pile crown plate structure schematic diagram;
Fig. 3 is pressing plate and bar linkage structure schematic diagram;
Fig. 4 is sleeve pile pipe structural representation.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in further detail.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art The present embodiment can be made after reading this specification by member as required does not has the amendment of creative contribution, but as long as at this All protected by Patent Law in the right of invention.
Embodiment one:
A kind of draining board plugs mechanism, has the sleeve pile pipe 1 in guide plate chamber including inside, is positioned at the back taper stake bottom sleeve pile pipe 2, symmetrical in the cavity wall of described guide plate chamber it is hinged with two row for the pressing plate 9 being pressed on draining board 10 is connected to pressing plate Make the degree of tightness assembly that pressing plate rotates around pin joint;Described back taper pile crown includes that two panels local is overlapping and lower end can close or opening Pile crown plate.
Described degree of tightness assembly includes two connecting rods 3 being arranged in respectively on two row pressing plates, is removably attachable to two institutes State the synchronization connecting plate 4 at connecting rod top.
Described sleeve pile pipe tip shelf is provided with the force bearing plate 51 being positioned at above described synchronization connecting plate, described synchronization connecting plate upper end Face is posted by described force bearing plate bottom surface.
Described sleeve pile pipe top offers the notch 11 for passing described draining board.
The stair-stepping slot pressing plate mounting groove that width from top to bottom reduces successively is offered in the cavity wall of described guide plate chamber, with Pressing plate in string is sequentially arranged in the stage of stair-stepping slot pressing plate mounting groove, the pressing plate from top to bottom set gradually Hinged end width reduce successively.Stair-stepping slot pressing plate mounting groove is easy to the pressing plate of pressing plate, after pressing plate and connecting rod are worked good Inserting from sleeve pile pipe top and coordinate with slot pressing plate mounting groove, the pressing plate of different hinged places width is stuck in different stage successively On, string pressing plate can the widest become to install, and dismantles the most more convenient.
Described pile pulling is along for enclose the circle edge being located in sleeve pile pipe outside wall surface, and described circle is evenly equipped with several and rises and pull out along bottom Mating groove, described circle is 10-30cm along the distance to described sleeve pile pipe upper surface.
Rise pull out mating groove can promote sleeve pile pipe instrument coordinate more firm, it is simple to rise pile pipe.Circle is easy along setting top Fractureing or turn over and stick up, circle is 10-30cm along the distance to described sleeve pile pipe upper surface, both ensure that sleeve pile pipe was hardly damaged, In turn ensure that and when pulling out, had enough power to prop up stake tool.
Described pile crown plate includes that bottom has pointed stake head 211 and is positioned at motherboard 21 He being provided above female groove of pointed stake head Bottom has the daughter board 22 of the positive stop strip 221 adaptive with female groove.
Described sleeve pile pipe is rectangular tube, and described motherboard, the both sides of daughter board are each provided with a mud guard 23, and described motherboard With the mud guard being positioned at the same side on daughter board, there is overlapping gear seam portion, with described sleeve outside the top of described motherboard and daughter board Pile pipe Basolateral is hinged, and formed pressure inside the top inner side of described motherboard and daughter board and described sleeve pile pipe bottom is spacing Face 6.
Described female groove is the tipper towards daughter board opening.
Be installed with up-thin-low-thick square even power platform 7 on described force bearing plate, edge, described square even power platform bottom surface beyond or Align described sleeve pile pipe top end face outer.
The lower section being positioned at each pressing plate hinge point in the cavity wall of described guide plate chamber is provided with limit limiting stand 8, the described limit Position platform is triangle platform, described pressing plate is provided with for being located normal to through described connecting rod and central shaft along its length A word length hole 91 in the plane in described draining board face, described connecting rod is provided with many groups and has two and lay respectively at described pressing plate The limit assembly of the spacing cylinder blend stop 31 of top and bottom.
The setting in one word length hole make connecting rod can slide in a word length hole guarantee pressing plate smooth rotation.
It is provided with bottom described draining board to bend and in described back taper pile crown, forms reserved precompressed section 101, on described pile crown plate It is provided with several higher than the position of described reserved precompressed section 101 and enters mud embedded hole 24.
Guide plate intracavity first put into by the draining board of pre-buried length by the application, then pressing plate is pressed in center, guide plate chamber carry out fixed Position, then will plug mechanism and squeeze into soil to behind precalculated position, and pull up degree of tightness assembly to be no longer pressed in so that press plate rotary and lead On plate chamber, then the draining board to the guide plate intracavity a certain amount of length of feeding, then sleeve pile pipe is upwards pulled out, mothers and sons while upwards pulling out Plate is automatically separated, and draining board does not rewinds and stay in stake hole, and sleeve pile pipe is thoroughly extracted after stake is cheated from cutting off draining board at the bottom of pile crown, Draining board has plugged, then backfills stake hole.The setting entering mud embedded hole can make to enter one bottom when lower sleeve pile pipe A little mud amounts, are pressed in reserved precompressed section, draining board bottom are carried out precompressed location, it is ensured that draining board is buried underground and required the degree of depth, also Effectively prevent from rewinding, also can reduce resistance during lower stake simultaneously.

Claims (10)

1. a draining board plugs mechanism, it is characterised in that: include that inside has the sleeve pile pipe (1) in guide plate chamber, is positioned at sleeve In back taper pile crown (2) bottom pile pipe, described guide plate chamber cavity wall, symmetry is hinged with two row for being pressed on draining board (10) Pressing plate (9) and pressing plate are connected to the degree of tightness assembly making pressing plate rotate around pin joint;Described back taper pile crown includes that two panels local is handed over Fold and lower end can close or the pile crown plate of opening.
The most according to claim 1, a kind of draining board plugs mechanism, it is characterised in that: described degree of tightness assembly includes two difference The connecting rod (3) being arranged on two row pressing plates, the synchronization connecting plate (4) being removably attachable to two described connecting rod tops.
The most according to claim 2, a kind of draining board plugs mechanism, it is characterised in that: described sleeve pile pipe tip shelf is provided with position Force bearing plate (51) above described synchronization connecting plate, described synchronization connecting plate upper surface is posted by described force bearing plate bottom surface.
The most according to claim 3, a kind of draining board plugs mechanism, it is characterised in that: described sleeve pile pipe top offers use In the notch (11) passing described draining board.
The most according to claim 1, a kind of draining board plugs mechanism, it is characterised in that: described pile crown plate includes that bottom has point Pile crown (211) and be positioned at the motherboard (21) being provided above female groove of pointed stake head and bottom has and the positive stop strip of female groove adaptation (221) daughter board (22).
The most according to claim 5, a kind of draining board plugs mechanism, it is characterised in that: described sleeve pile pipe is rectangular tube, institute State motherboard, the both sides of daughter board are each provided with a mud guard (23), and are positioned at the mud guard tool of the same side on described motherboard and daughter board Have overlapping gear seam portion, hinged with described sleeve pile pipe Basolateral outside the top of described motherboard and daughter board, described motherboard and The confined planes (6) to pressure is formed inside the top inner side of daughter board and described sleeve pile pipe bottom.
The most according to claim 6, a kind of draining board plugs mechanism, it is characterised in that: described female groove is towards daughter board opening Tipper.
8. require that described a kind of draining board plugs mechanism according to the arbitrary only profit of claim 3-7, it is characterised in that: described load Being installed with up-thin-low-thick square even power platform (7) on plate, edge, described square even power platform bottom surface exceeds or described sleeve stake of aliging Pipe top end face outer.
9. require that described a kind of draining board plugs mechanism according to the arbitrary only profit of claim 3-7, it is characterised in that: described guide plate The lower section being positioned at each pressing plate hinge point in the cavity wall of chamber is provided with limit limiting stand (8), and described pole limiting stand is triangle platform, It is provided with on described pressing plate for being located normal to described draining board face through described connecting rod and central shaft along its length A word length hole (91) in plane, described connecting rod is provided with many groups and has two and lay respectively at described pressing plate top and bottom The limit assembly of spacing cylinder blend stop (31).
10. require that described a kind of draining board plugs mechanism according to the arbitrary only profit of claim 3-7, it is characterised in that: described draining It is provided with bottom plate to bend in described back taper pile crown, forms reserved precompressed section (101), reserved pre-higher than described on described pile crown plate The position of pressure section (101) is provided with several and enters mud embedded hole (24).
CN201610657080.7A 2016-08-12 2016-08-12 A kind of drain bar plugs mechanism Active CN106087954B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610657080.7A CN106087954B (en) 2016-08-12 2016-08-12 A kind of drain bar plugs mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610657080.7A CN106087954B (en) 2016-08-12 2016-08-12 A kind of drain bar plugs mechanism

Publications (2)

Publication Number Publication Date
CN106087954A true CN106087954A (en) 2016-11-09
CN106087954B CN106087954B (en) 2018-01-05

Family

ID=57455474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610657080.7A Active CN106087954B (en) 2016-08-12 2016-08-12 A kind of drain bar plugs mechanism

Country Status (1)

Country Link
CN (1) CN106087954B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100713652B1 (en) * 2006-09-27 2007-05-02 주식회사 준건설 Support pressing device for drain casing of a excavator
US20090196691A1 (en) * 2008-02-01 2009-08-06 June Construction Co., Ltd Drain board installing device without anchor plate
CN201358455Y (en) * 2009-02-06 2009-12-09 江苏南水土建工程公司 Manual drainage plate inserting device for treating soft foundation by dredging and filling sludge
CN103410138A (en) * 2013-06-09 2013-11-27 浙江省围海建设集团宁波宏阳建设有限公司 Multifunctional automatic pile head for allowing plastic drainage plate to be inserted
CN204551427U (en) * 2015-02-26 2015-08-12 武汉二航路桥特种工程有限责任公司 A kind of novel plastic band drain construction equipment
CN105442525A (en) * 2015-12-31 2016-03-30 浙江宏力阳生态建设股份有限公司 Inserting mechanism for plastic drainage plate
CN206157711U (en) * 2016-08-12 2017-05-10 通州建总集团有限公司 Drain bar is inserted and is established mechanism

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100713652B1 (en) * 2006-09-27 2007-05-02 주식회사 준건설 Support pressing device for drain casing of a excavator
US20090196691A1 (en) * 2008-02-01 2009-08-06 June Construction Co., Ltd Drain board installing device without anchor plate
CN201358455Y (en) * 2009-02-06 2009-12-09 江苏南水土建工程公司 Manual drainage plate inserting device for treating soft foundation by dredging and filling sludge
CN103410138A (en) * 2013-06-09 2013-11-27 浙江省围海建设集团宁波宏阳建设有限公司 Multifunctional automatic pile head for allowing plastic drainage plate to be inserted
CN204551427U (en) * 2015-02-26 2015-08-12 武汉二航路桥特种工程有限责任公司 A kind of novel plastic band drain construction equipment
CN105442525A (en) * 2015-12-31 2016-03-30 浙江宏力阳生态建设股份有限公司 Inserting mechanism for plastic drainage plate
CN206157711U (en) * 2016-08-12 2017-05-10 通州建总集团有限公司 Drain bar is inserted and is established mechanism

Also Published As

Publication number Publication date
CN106087954B (en) 2018-01-05

Similar Documents

Publication Publication Date Title
CN207727589U (en) Internal support of foundation pit device
CN206110131U (en) Drain bar cabling device
CN206110111U (en) Drain bar during soft soil foundation reinforcement equips insert equipment of establishing
CN106049415B (en) Drain bar in a kind of reinforced soft soil ground equipment plugs equipment
CN206157711U (en) Drain bar is inserted and is established mechanism
CN106088090B (en) A kind of drain bar installation aiding device
CN208363805U (en) A kind of foundation pit edge protection fence
CN106087954A (en) A kind of draining board plugs mechanism
CN210315593U (en) Anchor rod for fixing side slope
CN205894055U (en) Foundation stabilization is with equipping
CN205894059U (en) Soft soil foundation reinforcement equips
CN108155609B (en) Node connecting component of prefabricated formula piping lane
CN207538198U (en) A kind of steel structure net rack
CN106087955A (en) A kind of reinforced soft soil ground equipment
CN107806236A (en) A kind of adjustable construction scaffold and its installation method
CN106087943A (en) A kind of foundation stabilization equipment
CN205907687U (en) Power equipment connects fixedly with boring stake
CN106088091A (en) A kind of construction equipment for consolidated subsoil
CN210220860U (en) Ruler for detecting quality of constructional engineering
CN208518318U (en) A kind of construction support plate that can quickly assemble
CN207303441U (en) A kind of socket with handset bracket
CN110965566A (en) A clay agitator for cofferdam is transferred
CN206411569U (en) A kind of computer motherboard fixing device for being easy to plug
CN221375001U (en) House survey and drawing positioning tool based on BIM
CN211203138U (en) Take piping lane support of staple bolt

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant