CN106087955B - A kind of reinforced soft soil ground equipment - Google Patents

A kind of reinforced soft soil ground equipment Download PDF

Info

Publication number
CN106087955B
CN106087955B CN201610657229.1A CN201610657229A CN106087955B CN 106087955 B CN106087955 B CN 106087955B CN 201610657229 A CN201610657229 A CN 201610657229A CN 106087955 B CN106087955 B CN 106087955B
Authority
CN
China
Prior art keywords
plate
soil
force bearing
bearing plate
loosens
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610657229.1A
Other languages
Chinese (zh)
Other versions
CN106087955A (en
Inventor
杨奇
汤海英
蒋琪
吴烨
林立秋
俞欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG QIAOXING CONSTRUCTION GROUP Co Ltd
Original Assignee
ZHEJIANG QIAOXING CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG QIAOXING CONSTRUCTION GROUP Co Ltd filed Critical ZHEJIANG QIAOXING CONSTRUCTION GROUP Co Ltd
Priority to CN201610657229.1A priority Critical patent/CN106087955B/en
Publication of CN106087955A publication Critical patent/CN106087955A/en
Application granted granted Critical
Publication of CN106087955B publication Critical patent/CN106087955B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to building field, and in particular to a kind of reinforced soft soil ground equipment.Mechanism is plugged including loosening device and drain bar;Drain bar plug mechanism include the internal sleeve pile pipe with guide plate chamber, the back taper pile crown positioned at sleeve pile pipe bottom, be symmetrically hinged with the guide plate chamber cavity wall two row be used for be pressed on drain bar pressing plate, the elastic component that makes pressing plate be rotated around pin joint is connected to pressing plate;The back taper pile crown includes the two panels pile crown plate that locally overlapping and lower end can close or be open.The elastic component includes two connecting rods being arranged in respectively on two row pressing plates, the synchronous connecting plate being removably attachable at the top of two connecting rods.The application is simple in construction, cost is low, easy to operate, and operating efficiency is high, plugs that small steady quality, soil-entering resistance, simple in construction, security reliability and versatility are good, applied widely, and cost is low, is hardly damaged, and replacement cost is small after damage.

Description

A kind of reinforced soft soil ground equipment
Technical field
The present invention relates to building field, and in particular to a kind of reinforced soft soil ground equipment.
Background technology
During to Soft Ground, plate equipment construction operation mechanism is essential.At present, it is common various During the plate equipment construction operation mechanism construction operation of form, there is operating efficiency it is low, plug that quality is unstable, soil-entering resistance The technical problems such as greatly, complicated, security reliability and poor universality, scope of application limitation are big.And existing equipment structure is answered Miscellaneous, cost is high, and fragile, replacement cost greatly improves after damage.
The content of the invention
The purpose of the present invention is to provide a kind of soft soil foundation simple in construction, easy to operate, resistance is small regarding to the issue above Reinforce equipment.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of reinforced soft soil ground equipment, including loosening device and drain bar plug mechanism;The loosening device includes position The force bearing plate that loosens the soil in top, the large knitting needle that loosens the soil to loosen the soil on force bearing plate bottom surface is vertically distributed in, it is at least one to be suspended in midair by suspension rod It is used for the spacing godet through the through hole for the large knitting needle that loosens the soil below the force bearing plate that loosens the soil and provided with multiple;It is provided with the large knitting needle that loosens the soil The appearance of upper and lower end opening fetches earth chamber, and bottom is provided with lower native syringe needle, the appearance fetch earth chamber lower ending opening be located at least partially within it is described under On the inclined side of native syringe needle upper end;Offered on the force bearing plate that loosens the soil with the appearance fetch earth that chamber upper end open communicates except soil Hole;The drain bar plug mechanism include the internal sleeve pile pipe with guide plate chamber, the back taper pile crown positioned at sleeve pile pipe bottom, Symmetrically be hinged with the guide plate chamber cavity wall two row be used for be pressed on drain bar pressing plate, with pressing plate be connected to make pressing plate around The elastic component that pin joint rotates;The back taper pile crown includes the two panels pile crown plate that locally overlapping and lower end can close or be open.
The large knitting needle that loosens the soil of said structure can both ensure that syringe needle punching was laborsaving, and ensuring that punching, the appearance chamber that fetches earth is smooth simultaneously Enter soil, also and then reduce punching resistance, it is to loosen to coordinate again by the region soil layer by more punchings to fetch earth to realize to loosen the soil Loosen the soil.Appearance chamber top end opening position of fetching earth is corresponded on force bearing plate discharge native hole from during design loosening the soil, after loosening device to be removed, use High pressure gas fetches earth chamber air blowing except soil to appearance, or directly takes the pluggable ear of maize for holding the chamber that fetches earth to insert appearance and fetch earth chamber except soil.
Preferably, the elastic component includes two connecting rods being arranged in respectively on two row pressing plates, detachably connected Synchronous connecting plate at the top of two connecting rods.
Preferably, the sleeve pile pipe tip shelf is provided with the force bearing plate above the synchronous connecting plate, the synchronization Connecting plate upper surface is posted by the force bearing plate bottom surface;The suspension rod for be laid in loosen the soil force bearing plate edge and lower end with it is described spacing The connected screw mandrel of godet, the force bearing plate that loosens the soil are provided with the female regulation conduit of tool being adapted to screw mandrel, foundation stabilization Also include weight bracket with equipment, conduit is provided with the weight bracket and is arranged in described supravasal for impacting described loosen the soil The weight of force bearing plate or the force bearing plate, the side that the force bearing plate that loosens the soil is opened on except native hole, and except native outer end of hole is opened High-pressure air pipe is connected with mouthful.
The large knitting needle that loosens the soil is thinner, punches laborsaving convenience, if multiple loose large knitting needle punchings are fetched earth, pre- buried district is loosened the soil, then Thicker sleeve pile pipe is squeezed into soil, it is more time saving and energy saving on the contrary that whole process is got off, and reduces the intensity to each part It is required that it also may be such that shared a weight bracket and weight can realize the punching of two covering devices.
Preferably, the notch for passing the drain bar is offered at the top of the sleeve pile pipe.
Preferably, the pile crown plate includes the mother that bottom has pointed stake head and female groove is provided with above pointed stake head Plate and bottom have the daughter board for the positive stop strip being adapted to female groove.
Cause because the power pushed up upwards causes female, daughter board occlusion to separate under lower stake female groove and coordinating for positive stop strip, And pointed stake head is only positioned on motherboard and also ensure that lower stake is more laborsaving, conveniently.
Preferably, the sleeve pile pipe is rectangular tube, the motherboard, the both sides of daughter board are each provided with a mud guard, and Mud guard on the motherboard and daughter board positioned at the same side has an overlapping gear seam portion, the apical lateral of the motherboard and daughter board with The sleeve pile pipe Basolateral is hinged, the top inner side of the motherboard and daughter board and formation pair on the inside of the sleeve pile pipe bottom The confined planes of pressure.
Preferably, the female groove is the tipper towards daughter board opening.
Preferably, up-thin-low-thick square even power platform is installed with the force bearing plate, the square even power platform bottom surface side Edge exceeds or the sleeve pile pipe top end face outer of aliging.
Square even power platform ensure that sleeve pile pipe uniform force in down tube.
Preferably, limit spacing platform is provided with below each pressing plate hinge point in the guide plate chamber cavity wall, The pole limiting stand is triangle platform, is provided with the pressing plate for center axle position through the connecting rod and along its length In the word length hole in the plane perpendicular to the draining plate face, being provided with the connecting rod multigroup there are two to be located at institute respectively State the limit assembly of the spacing cylinder blend stop at the top and bottom of pressing plate.
The setting in one word length hole enables connecting rod to slide guarantee pressing plate smooth rotation in a word length hole.
Bent preferably, the drain bar bottom is provided with the reserved precompressed section of formation in the back taper pile crown, the stake Mud embedded hole is entered in position in head plate higher than the reserved precompressed section provided with several.
In summary, the invention has the advantages that:
1st, the application first with loosening device by the region of pre-buried drain bar carry out punching vibrations and meanwhile take down part soil with up to To the purpose loosened the soil, loosening device displacement is taken out, the drain bar of pre-buried length is then put into guide plate intracavitary, then pressing plate is pressed in Guide plate chamber center is positioned, and then will be plugged mechanism and be squeezed into soil to behind precalculated position, and elastic component be pulled up so that pressing Plate is rotated and is no longer pressed on guide plate chamber, then the drain bar of a certain amount of length is sent into guide plate intracavitary, then pulls out sleeve pile pipe upwards, Mother and sons' plate is automatically separated while pull out upwards, and drain bar is not rewinded and stayed in stake hole, sleeve pile pipe thoroughly extract behind stake hole from Drain bar is cut at pile crown bottom, and drain bar plugs completion, then stake hole is backfilled.The setting for entering mud embedded hole may be such that in underthrust Some mud amounts are entered in bottom when covering pile pipe, are pressed in reserved precompressed section, carry out precompressed positioning to drain bar bottom, ensure that drain bar buries Resistance when being set to and require depth, also effectively prevent from rewinding, while can also reduce lower stake, also may be such that when playing sleeve pile pipe it is female, Daughter board is smoothly detached under the pressure of self gravitation and the mud entered, is ensured that pile crown plate is opened and is realized that drain bar stream is cheated in stake It is interior.Pressing plate is pressed in drain bar and ensure that drain bar installation position is accurate, while prevents drain bar from arbitrarily being shaken when plugging sleeve pile pipe Dynamic displacement is stuck in guide plate intracavitary, even if entering mud, can also ensure that the mud that sleeve pile pipe is entered is pressed on predeterminated position, fabric swatch essence Standard is more convenient for budget length, material saving.
2nd, the application is simple in construction, cost is low, easy to operate, operating efficiency is high, it is small to plug steady quality, soil-entering resistance, Simple in construction, security reliability and versatility are good, applied widely, and cost is low, is hardly damaged, and replacement cost is small after damage.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is pile crown plate structure schematic diagram;
Fig. 3 is pressing plate and bar linkage structure schematic diagram;
Fig. 4 is sleeve pile pipe structural representation;
Fig. 5 is loosening device structural representation;
Fig. 6 is weight bracket structural representation.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art Member can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but as long as at this All protected in the right of invention by Patent Law.
Embodiment one:
A kind of reinforced soft soil ground equipment, including loosening device and drain bar plug mechanism;The loosening device includes position The force bearing plate 201 that loosens the soil in top, the large knitting needle 202 that loosens the soil to loosen the soil on force bearing plate bottom surface is vertically distributed in, it is at least one by hanging Bar 203 is suspended to below the force bearing plate that loosens the soil and is used for the spacing godet 204 through the through hole for the large knitting needle that loosens the soil provided with multiple;The pine Appearance provided with upper and lower end opening fetches earth chamber 205 in native large knitting needle, and bottom is provided with lower native syringe needle 206, described to hold the chamber lower ending opening that fetches earth It is located at least partially within the inclined side of the lower native syringe needle upper end;Offered on the force bearing plate that loosens the soil and hold the chamber that fetches earth with described What upper end open communicated removes native hole 2011;The drain bar, which plugs mechanism, to be included the internal sleeve pile pipe 1 with guide plate chamber, is located at Two row are symmetrically hinged with the back taper pile crown 2 of sleeve pile pipe bottom, the guide plate chamber cavity wall to be used for being pressed on drain bar 10 Pressing plate 9 and pressing plate are connected to the elastic component for making pressing plate be rotated around pin joint;It is locally overlapping that the back taper pile crown includes two panels And the pile crown plate that lower end can close or be open.
The elastic component includes two connecting rods 3 being arranged in respectively on two row pressing plates, is removably attachable to two institutes State the synchronous connecting plate 4 at the top of connecting rod.
The sleeve pile pipe tip shelf is provided with the force bearing plate 51 above the synchronous connecting plate, the synchronous connecting plate upper end Face is posted by the force bearing plate bottom surface;The suspension rod loosens the soil force bearing plate edge and lower end is connected with the spacing godet to be laid in Screw mandrel, the force bearing plate that loosens the soil is provided with the female regulation conduit 207 of the tool that be adapted to screw mandrel, and foundation stabilization is equipped Also include weight bracket, be provided with the weight bracket conduit 208 and be arranged in it is described it is supravasal be used to impacting described loosen the soil hold The weight 209 of power plate or the force bearing plate, the side that the force bearing plate that loosens the soil is opened on except native hole, and except native outer end of hole is opened High-pressure air pipe 2012 is connected with mouthful.
The notch 11 for passing the drain bar is offered at the top of the sleeve pile pipe.
The stair-stepping slot pressing plate mounting groove that width from top to bottom reduces successively is offered in the guide plate chamber cavity wall, together Pressing plate in one row is sequentially arranged in the stage of stair-stepping slot pressing plate mounting groove, the pressing plate from top to bottom set gradually Hinged end width reduce successively.After stair-stepping slot pressing plate mounting groove is easy to the pressing plate of pressing plate, pressing plate to be worked good with connecting rod Insertion coordinates with slot pressing plate mounting groove at the top of sleeve pile pipe again, and the pressing plate of different hinged place width is stuck in different stages successively On, a row pressing plate can be simultaneously once wide also more convenient into installation, dismounting.
Along to enclose the circle edge in sleeve pile pipe outside wall surface, the circle, which along bottom is evenly equipped with several, to be risen and pulls out for the pile pulling Mating groove, the circle are 10-30cm along the distance to the sleeve pile pipe upper surface.
Rise pull out mating groove can promote sleeve pile pipe instrument coordinate it is more firm, be easy to pile pipe.Circle is easy along top is set Fractureing or turn over and stick up, circle is 10-30cm along the distance to the sleeve pile pipe upper surface, both ensure that sleeve pile pipe was hardly damaged, In turn ensure that has enough power branch stake tools when pulling out.
The pile crown plate includes the He of motherboard 21 that bottom has pointed stake first 211 and female groove is provided with above pointed stake head Bottom has the daughter board 22 for the positive stop strip 221 being adapted to female groove.
The sleeve pile pipe is rectangular tube, and the motherboard, the both sides of daughter board are each provided with a mud guard 23, and the motherboard There is overlapping gear seam portion, apical lateral and the sleeve of the motherboard and daughter board with the mud guard for being located at the same side on daughter board Pile pipe Basolateral is hinged, and the top inner side of the motherboard and daughter board on the inside of the sleeve pile pipe bottom with forming to the spacing of pressure Face 6.
The female groove is the tipper towards daughter board opening.
Be installed with up-thin-low-thick square even power platform 7 on the force bearing plate, the square even power platform bottom surface edge exceed or Align the sleeve pile pipe top end face outer.
In the guide plate chamber cavity wall limit spacing platform 8, the limit are provided with below each pressing plate hinge point Position platform is triangle platform, is provided with the pressing plate and is located normal to for central shaft through the connecting rod and along its length A word length hole 91 in the plane of the draining plate face, being provided with the connecting rod multigroup there are two to be located at the pressing plate respectively The limit assembly of the spacing cylinder blend stop 31 of top and bottom.
The setting in one word length hole enables connecting rod to slide guarantee pressing plate smooth rotation in a word length hole.
The drain bar bottom, which is provided with, to be bent in the reserved precompressed section 101 of formation in the back taper pile crown, the pile crown plate Mud embedded hole 24 is entered in position higher than the reserved precompressed section 101 provided with several.
The region of pre-buried drain bar is first carried out punching vibrations with loosening device while takes down part soil to reach by the application The purpose loosened the soil, loosening device displacement is taken out, the drain bar of pre-buried length is then put into guide plate intracavitary, then pressing plate is pressed in and led Plate chamber center is positioned, and then will be plugged mechanism and be squeezed into soil to behind precalculated position, elastic component is pulled up so that pressing plate Rotation is no longer pressed on guide plate chamber, then the drain bar of a certain amount of length is sent into guide plate intracavitary, then pulls out sleeve pile pipe upwards, to On while pull out mother and sons' plate be automatically separated, drain bar is not rewinded and stayed in stake hole, and sleeve pile pipe is thoroughly extracted behind stake hole from stake Drain bar is cut at head bottom, and drain bar plugs completion, then stake hole is backfilled.The setting for entering mud embedded hole may be such that in lower sleeve Some mud amounts are entered in bottom during pile pipe, are pressed in reserved precompressed section, carry out precompressed positioning to drain bar bottom, ensure that drain bar is buried Resistance when to depth is required, also effectively preventing from rewinding, while can also reduce lower stake.

Claims (8)

  1. A kind of 1. reinforced soft soil ground equipment, it is characterised in that:Mechanism is plugged including loosening device and drain bar;The dress that loosens the soil Put including the force bearing plate that loosens the soil positioned at top(201), vertically it is distributed in the large knitting needle that loosens the soil to loosen the soil on force bearing plate bottom surface(202), extremely Few one passes through suspension rod(203)It is suspended to below the force bearing plate that loosens the soil and is used for provided with multiple through the spacing of the through hole for the large knitting needle that loosens the soil Godet(204);The appearance provided with upper and lower end opening in large knitting needle of loosening the soil fetches earth chamber(205), bottom is provided with lower native syringe needle(206), The chamber lower ending opening that fetches earth that holds is located at least partially within the inclined side of the lower native syringe needle upper end;It is described to loosen the soil on force bearing plate Offer and remove native hole with what the appearance fetched earth that chamber upper end open communicates(2011);The drain bar plugs mechanism to be had including inside The sleeve pile pipe of guide plate chamber(1), back taper pile crown positioned at sleeve pile pipe bottom(2), be symmetrically hinged with the guide plate chamber cavity wall Two arrange for being pressed in drain bar(10)On pressing plate(9)And pressing plate is connected to make pressing plate be rotated around pin joint elastic group Part;The back taper pile crown includes the two panels pile crown plate that locally overlapping and lower end can close or be open;The elastic component includes two Bar is arranged in the connecting rod on two row pressing plates respectively(3), the synchronous connecting plate that is removably attachable at the top of two connecting rods(4); The pile crown plate, which includes bottom, has pointed stake head(211)And the motherboard of female groove is provided with above pointed stake head(21)And bottom With the positive stop strip being adapted to female groove(221)Daughter board(22).
  2. A kind of 2. reinforced soft soil ground equipment according to claim 1, it is characterised in that:The sleeve pile pipe tip shelf is provided with Force bearing plate above the synchronous connecting plate(51), the synchronous connecting plate upper surface is posted by the force bearing plate bottom surface;It is described Suspension rod is to be laid in the screw mandrel that force bearing plate edge and lower end are connected with the spacing godet that loosens the soil, and the force bearing plate that loosens the soil is provided with The female regulation conduit of tool being adapted to screw mandrel(207), foundation stabilization, which is used to equip, also includes weight bracket, on the weight bracket It is provided with conduit(208)Be arranged in the supravasal weight for being used to impact loosen the soil force bearing plate or the force bearing plate (209), it is described except native hole is opened on the side of the force bearing plate that loosens the soil, and remove and be connected with high-pressure air pipe in native outer end of hole opening (2012).
  3. A kind of 3. reinforced soft soil ground equipment according to claim 2, it is characterised in that:Offered at the top of the sleeve pile pipe For passing the notch of the drain bar(11).
  4. A kind of 4. reinforced soft soil ground equipment according to claim 1, it is characterised in that:The sleeve pile pipe is rectangular tube, The motherboard, the both sides of daughter board are each provided with a mud guard(23), and positioned at the mud guard of the same side on the motherboard and daughter board With overlapping gear seam portion, the apical lateral of the motherboard and daughter board is hinged with the sleeve pile pipe Basolateral, the motherboard Top inner side with daughter board is with forming the confined planes to pressure on the inside of the sleeve pile pipe bottom(6).
  5. A kind of 5. reinforced soft soil ground equipment according to claim 4, it is characterised in that:The female groove is towards daughter board opening Tipper.
  6. A kind of 6. reinforced soft soil ground equipment according to Claims 2 or 3, it is characterised in that:It is installed with the force bearing plate Up-thin-low-thick square even power platform(7), the square even power platform bottom surface edge exceeds or alignd outside the sleeve pile pipe top end face Edge.
  7. A kind of 7. reinforced soft soil ground equipment according to Claims 2 or 3, it is characterised in that:The guide plate chamber cavity wall is upper Limit spacing platform is provided with below each pressing plate hinge point(8), the limit spacing platform is triangle platform, the pressing plate On be provided with and be located normal to for central shaft through the connecting rod and along its length in the plane of the draining plate face One word length hole(91), multigroup there are two spacing cylinders at the top and bottom of the pressing plate respectively are provided with the connecting rod Blend stop(31)Limit assembly.
  8. A kind of 8. reinforced soft soil ground equipment according to claim 2-5 any claims, it is characterised in that:The row Water plate bottom, which is provided with, to be bent in the reserved precompressed section of formation in the back taper pile crown(101), it is reserved higher than described on the pile crown plate Precompressed section(101)Position enter mud embedded hole provided with several(24).
CN201610657229.1A 2016-08-12 2016-08-12 A kind of reinforced soft soil ground equipment Active CN106087955B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610657229.1A CN106087955B (en) 2016-08-12 2016-08-12 A kind of reinforced soft soil ground equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610657229.1A CN106087955B (en) 2016-08-12 2016-08-12 A kind of reinforced soft soil ground equipment

Publications (2)

Publication Number Publication Date
CN106087955A CN106087955A (en) 2016-11-09
CN106087955B true CN106087955B (en) 2018-01-05

Family

ID=57456496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610657229.1A Active CN106087955B (en) 2016-08-12 2016-08-12 A kind of reinforced soft soil ground equipment

Country Status (1)

Country Link
CN (1) CN106087955B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090196691A1 (en) * 2008-02-01 2009-08-06 June Construction Co., Ltd Drain board installing device without anchor plate
CN201358455Y (en) * 2009-02-06 2009-12-09 江苏南水土建工程公司 Manual drainage plate inserting device for treating soft foundation by dredging and filling sludge
CN103410138A (en) * 2013-06-09 2013-11-27 浙江省围海建设集团宁波宏阳建设有限公司 Multifunctional automatic pile head for allowing plastic drainage plate to be inserted
CN204551427U (en) * 2015-02-26 2015-08-12 武汉二航路桥特种工程有限责任公司 A kind of novel plastic band drain construction equipment
CN105442525A (en) * 2015-12-31 2016-03-30 浙江宏力阳生态建设股份有限公司 Inserting mechanism for plastic drainage plate
CN205894059U (en) * 2016-08-12 2017-01-18 浙江乔兴建设集团有限公司 Soft soil foundation reinforcement equips

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100713652B1 (en) * 2006-09-27 2007-05-02 주식회사 준건설 Support pressing device for drain casing of a excavator

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090196691A1 (en) * 2008-02-01 2009-08-06 June Construction Co., Ltd Drain board installing device without anchor plate
CN201358455Y (en) * 2009-02-06 2009-12-09 江苏南水土建工程公司 Manual drainage plate inserting device for treating soft foundation by dredging and filling sludge
CN103410138A (en) * 2013-06-09 2013-11-27 浙江省围海建设集团宁波宏阳建设有限公司 Multifunctional automatic pile head for allowing plastic drainage plate to be inserted
CN204551427U (en) * 2015-02-26 2015-08-12 武汉二航路桥特种工程有限责任公司 A kind of novel plastic band drain construction equipment
CN105442525A (en) * 2015-12-31 2016-03-30 浙江宏力阳生态建设股份有限公司 Inserting mechanism for plastic drainage plate
CN205894059U (en) * 2016-08-12 2017-01-18 浙江乔兴建设集团有限公司 Soft soil foundation reinforcement equips

Also Published As

Publication number Publication date
CN106087955A (en) 2016-11-09

Similar Documents

Publication Publication Date Title
CN106087955B (en) A kind of reinforced soft soil ground equipment
CN206110131U (en) Drain bar cabling device
CN205894059U (en) Soft soil foundation reinforcement equips
CN106088091B (en) A kind of construction equipment for consolidated subsoil
CN206110111U (en) Drain bar during soft soil foundation reinforcement equips insert equipment of establishing
CN106087943B (en) A kind of foundation stabilization equipment
CN205894055U (en) Foundation stabilization is with equipping
CN205894072U (en) A construction is equipped for reinforcing ground
CN106049415B (en) Drain bar in a kind of reinforced soft soil ground equipment plugs equipment
CN212753541U (en) Green engineering is with ecological frame of afforestation
CN106088090B (en) A kind of drain bar installation aiding device
CN206157711U (en) Drain bar is inserted and is established mechanism
CN208304337U (en) A kind of tunnel boring construction equipment
CN106087954B (en) A kind of drain bar plugs mechanism
CN208322637U (en) A kind of constructing tunnel ancillary technique equipment
CN208039262U (en) A kind of anti-drop device of shallow foundation hole support plate
CN108237392A (en) A kind of constructing tunnel ancillary technique equipment
CN208370174U (en) A kind of pit-picker for transplanting tree
CN207460997U (en) Trees reinforced liner
CN207303836U (en) A kind of transmission circuit insulator string " R " sells pin pulling clamp
CN110965566A (en) A clay agitator for cofferdam is transferred
CN207118371U (en) Ornamental plant climbing frame
CN112392055A (en) Embedded fixed inserted bar suitable for ground bank protection is used
CN206212629U (en) Gardens inventionseed planters
CN204645641U (en) Construction formwork is to drawing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant