CN201296788Y - 阴极生产装置 - Google Patents
阴极生产装置 Download PDFInfo
- Publication number
- CN201296788Y CN201296788Y CNU2008202201537U CN200820220153U CN201296788Y CN 201296788 Y CN201296788 Y CN 201296788Y CN U2008202201537 U CNU2008202201537 U CN U2008202201537U CN 200820220153 U CN200820220153 U CN 200820220153U CN 201296788 Y CN201296788 Y CN 201296788Y
- Authority
- CN
- China
- Prior art keywords
- negative electrode
- producing device
- hopper
- utility
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Carbon And Carbon Compounds (AREA)
Abstract
本实用新型公开了一种阴极生产装置,尤其是涉及炭素、铝电解行业内热串接石墨化的阴极生产装置。阴极生产装置,它包括料箱,其中料箱为两个,在料箱的两端分别设有炉头导电电极和顶推导电电极,在两个顶推导电电极之间料箱的外面设有炉尾跨接装置,顶推导电电极与炉尾顶推装置连接。本实用新型的优点效果如下:本实用新型阴极生产装置结构简单、彻底消除炉尾跨接导电电极的断裂。本实用新型装置可以降低冷却周期并减少冷却水使用量、实现单一内热串接石墨炉生产多规格阴极碳块。
Description
技术领域
本实用新型涉及一种阴极生产装置,尤其是涉及炭素、铝电解行业内热串接石墨化的阴极生产装置。
背景技术
随着我国铝电解技术发展迅速,电解槽容量已由160~180kA发展到300~400kA。由于石墨化阴极碳块具有比电阻小,抗热震性好及抗钠浸蚀高等优点而被认为大容量电解槽最佳的阴极材料。而阴极材料石墨化主要通过石墨化炉装置,采用内热串接石墨化工艺完成。尽管目前国内内热串接石墨化炉生产石墨化阴极的技术已经有了很大的进步,但国内阴极内热串接石墨化工艺方法及装置普遍存在以下问题:生产冷却周期长,喷淋冷却水使用量大;炉尾跨接导电电极在生产过程中,非常容易断裂;炉体结构复杂、维修不便;仅适合生产单一规格的石墨化阴极碳块。
实用新型内容
为解决上述技术问题本实用新型提供一种阴极生产装置,其目的是简化石墨化炉炉体结构;彻底消除炉尾跨接导电电极的断裂;降低冷却周期并消除喷淋冷却水使用;实现单一内热串接石墨炉生产多规格阴极碳块。
为达上述目的本实用新型是通过下述技术方案实现的。
阴极生产装置,包括料箱,料箱为两个,在料箱的两端分别设有炉头导电电极和顶推导电电极,在两个顶推导电电极之间料箱的外面设有炉尾跨接装置,顶推导电电极与炉尾顶推装置连接。
所述的炉头导电电极由供电机组供电。
所述的炉尾跨接装置为铜母线排结构。
本实用新型的优点效果如下:本实用新型阴极生产装置结构简单、彻底消除炉尾跨接导电电极的断裂。本实用新型装置可以降低冷却周期并减少冷却水使用量、实现单一内热串接石墨炉生产多规格阴极碳块。
附图说明
图1是本实用新型阴极生产装置的结构示意图。
图中:1.料箱;2.阴极碳块;3.炉头导电电极;4.供电机组;5.炉尾跨接装置;6.顶推导电电极;7.炉尾顶推装置。
具体实施方式
下面对本实用新型的实施例结合附图加以详细描述,但本实用新型的保护范围不受实施例所限。
如图1所示,本实用新型内热串接石墨化阴极生产装置包括料箱1,料箱1为两个,在料箱1的两端分别设有炉头导电电极3和顶推导电电极6,在两个顶推导电电极6之间料箱1的外面设有炉尾跨接装置5,炉尾跨接装置5为铜母线排结构,顶推导电电极6与炉尾顶推装置7连接;炉头导电电极3由供电机组4供电。
料箱全部由钢结构组成,也就是整个料箱制作采用钢制造。料箱宽度可调节,通过调整料箱侧壁上的可移动钢柱的位置将整个料箱的侧壁向两侧移动,从而根据阴极碳块尺寸变化,实现调整料箱宽度的改变,以调整料箱的容积。
本实用新型阴极生产装置的生产工艺如下:首先在石墨化炉两个料箱底部分层铺设一定厚度的保温料,并按照规定在铺设好的保温料上面设置石墨垫块,然后在石墨垫块上按照顺序放置焙烧阴极碳块并在碳块间安装导电连接材料,接着在焙烧阴极碳块侧面填充保温料,保温料填充到一定高度时,炉尾顶推装置对料箱内阴极碳块施加压力到工艺规定的要求压力,随后填充碳块其余侧面和顶部保温料,装炉结束;将炉头导电电极与供电机组连接并按照规定工艺供电曲线供电,对焙烧阴极块进行石墨化处理;供电到规定的要求后,停止供电并断开供电机组与炉头导电电极连接,整个石墨化炉自然冷却;冷却到规定时间后,分层抽吸填充保温料,直到石墨化阴极碳块露出要求高度,解除炉尾顶推装置施加压力,然后将所有高温石墨化阴极碳块吊运出炉。
Claims (3)
1、阴极生产装置,包括料箱,其特征在于料箱为两个,在料箱的两端分别设有炉头导电电极和顶推导电电极,在两个顶推导电电极之间料箱的外面设有炉尾跨接装置,顶推导电电极与炉尾顶推装置连接。
2、根据权利要求1所述的阴极生产装置,其特征在于所述的炉头导电电极由供电机组供电。
3、根据权利要求1所述的阴极生产装置,其特征在于所述的炉尾跨接装置为铜母线排结构。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008202201537U CN201296788Y (zh) | 2008-12-02 | 2008-12-02 | 阴极生产装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008202201537U CN201296788Y (zh) | 2008-12-02 | 2008-12-02 | 阴极生产装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201296788Y true CN201296788Y (zh) | 2009-08-26 |
Family
ID=41042762
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008202201537U Expired - Lifetime CN201296788Y (zh) | 2008-12-02 | 2008-12-02 | 阴极生产装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201296788Y (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101705505B (zh) * | 2009-11-18 | 2011-12-07 | 中国铝业股份有限公司 | 一种阴极炭块给料装置 |
CN103964423A (zh) * | 2014-05-04 | 2014-08-06 | 郴州市三晶科贸有限公司 | 人造石墨负极材料内串石墨化生产方法及其石墨化炉 |
-
2008
- 2008-12-02 CN CNU2008202201537U patent/CN201296788Y/zh not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101705505B (zh) * | 2009-11-18 | 2011-12-07 | 中国铝业股份有限公司 | 一种阴极炭块给料装置 |
CN103964423A (zh) * | 2014-05-04 | 2014-08-06 | 郴州市三晶科贸有限公司 | 人造石墨负极材料内串石墨化生产方法及其石墨化炉 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102126721B (zh) | 石墨材料的纯化和石墨化方法 | |
CN101736366B (zh) | 内热串接石墨化阴极生产工艺及其装置 | |
CN105967718B (zh) | 耐大电流镁电解用石墨阳极及其制备工艺 | |
CN103964423A (zh) | 人造石墨负极材料内串石墨化生产方法及其石墨化炉 | |
CN105845935B (zh) | 一种利用特种石墨粉制备电池石墨负极材料的方法 | |
CN201296788Y (zh) | 阴极生产装置 | |
CN101545118B (zh) | 一种降低铝电解槽铝液中水平电流的方法 | |
CN102560540B (zh) | 一种磷生铁浇铸阴极组装炭块 | |
CN116951982A (zh) | 一种电极石墨化送电曲线优化方法 | |
CN104743546B (zh) | 一种特种炭素材料内热串接石墨化生产装置 | |
CN207435031U (zh) | 用于艾奇逊型石墨化炉的匣钵坩埚 | |
CN102747385A (zh) | 一种电解槽的换极方法 | |
CN202401141U (zh) | 一种磷生铁浇铸阴极组装炭块 | |
CN203625051U (zh) | 一种内热串接石墨化生产装置 | |
CN201785196U (zh) | 真空温控调压碳化硅冶炼炉 | |
CN204778851U (zh) | 一种石墨化内串炉用导电车 | |
CN203080077U (zh) | 一种抑制角部长伸腿的铝电解槽 | |
CN108083269A (zh) | 一种石墨制品的石墨化方法及石墨化装置 | |
CN209323017U (zh) | 一种铝用平底炭碗阳极 | |
CN203807180U (zh) | 生产人造石墨负极材料的内串石墨化炉 | |
CN202322388U (zh) | 串接石墨化炉移动式整流台车 | |
CN206188399U (zh) | 一种具有可拆卸坩埚的内串石墨化炉 | |
CN207313142U (zh) | 一种u型内热串接石墨化炉 | |
CN205873910U (zh) | 一种内串石墨化炉装置 | |
CN205241802U (zh) | 一种铝电解用阴极钢棒 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20090826 Effective date of abandoning: 20081202 |