CN201250411Y - 输电线路直线塔万能基础 - Google Patents

输电线路直线塔万能基础 Download PDF

Info

Publication number
CN201250411Y
CN201250411Y CNU2008200272148U CN200820027214U CN201250411Y CN 201250411 Y CN201250411 Y CN 201250411Y CN U2008200272148 U CNU2008200272148 U CN U2008200272148U CN 200820027214 U CN200820027214 U CN 200820027214U CN 201250411 Y CN201250411 Y CN 201250411Y
Authority
CN
China
Prior art keywords
base
upright column
chuck
column
basis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008200272148U
Other languages
English (en)
Inventor
姚光森
袁春成
王炳强
孙丰满
王风伟
路新波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
ZIBO POWER SUPPLY Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZIBO POWER SUPPLY Co filed Critical ZIBO POWER SUPPLY Co
Priority to CNU2008200272148U priority Critical patent/CN201250411Y/zh
Application granted granted Critical
Publication of CN201250411Y publication Critical patent/CN201250411Y/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

本实用新型输电线路直线塔万能基础,包括基础立柱,基础立柱上部带有卡盘,顶端焊接钢圈,钢圈上焊接地脚螺栓,基础立柱底部设有底盘,其特征在于卡盘通过卡盘抱箍固定在基础立柱上,基础立柱与底座之间通过连接装置连接,所述基础立柱为离心制造的钢筋混凝土环形截面基柱,长度为2500mm,直径为400mm,主筋为Φ18×12mm,内钢箍为Φ8×6×920mm,螺旋筋为Φ6×35000mm。本实用新型为装配式基础成品,可以单项加工、分解运输,现场施工方法简单、易掌握,可以不受自然、季节、气候的影响和干扰。可用于各种直线塔,适用于各种土壤,应用范围广,造价低,工期短,技术经济效果明显。

Description

输电线路直线塔万能基础
技术领域
本实用新型属于电力工程输配电杆塔基础,特别涉及一种输电线路直线塔万能基础。
背景技术
电力工程输配电杆塔基础目前广泛使用的是大开挖混凝土浇筑基础,施工周期长,一般大于30天,占地面积大,开挖量多,从南方冰灾倒塔恢复重建的过程来看,大开挖基础严重影响抢修进度,所以大都利用原基础,但是拆除旧塔的工作量较大。装配式基础,通过水泥杆的应用,其埋入土中的根部,完全符合上拔、下压稳定和强度要求,通过内力和强度计算该基础满足倾覆稳定的和侧移稳定的要求,所以将水泥杆基础用于直线铁塔,技术成熟,但是由于线路路径复杂多变,塔型变数较大,每基塔均要计算水泥杆基础的配筋、外径、埋深、底盘的大小、卡盘是否采用,设计周期长,投资变化并不明显,缺乏适应各种地基和塔型的通用基础。
发明内容
本实用新型所要解决的技术问题是提供一种输电线路直线塔万能基础,适应各种地基和塔型,可以大大缩短工期,也有利于输电线路的事故抢修和恢复重建。
本实用新型输电线路直线塔万能基础,包括基础立柱,基础立柱上部带有卡盘,顶端焊接钢圈,钢圈上焊接地脚螺栓,基础立柱底部设有底盘,其特征在于卡盘通过卡盘抱箍固定在基础立柱上,基础立柱与底座之间通过连接装置连接,所述基础立柱为离心制造的钢筋混凝土环形截面基柱,长度为2500mm,直径为400mm,主筋为Φ18×12mm,内钢箍为Φ8×6×920mm,螺旋筋为Φ6×35000mm。
基础立柱顶端的钢圈直径为10mm,其上焊接的地脚螺栓直径为24mm,间距为240mm。
本实用新型在水泥杆装配式基础上,适当增加水泥杆基础的配筋规格,符合各种强度和稳定计算,适应各种地基和塔型的直线塔基础,解决了基础稳定计算,存在的规格不统一的问题。
本实用新型底盘型号为DP-10,适用于一般土壤,当地耐力偏低时可选用DP-12型底盘。将直线塔的塔脚板按照地脚螺栓间距240mm的尺寸进行加工,扩大了基础的使用范围,提高了基础的安全系数。
本实用新型的优点:为装配式基础成品,可以单项加工、分解运输、便于运达,现场施工方法简单、易掌握、无需进行繁琐的施工准备、材料准备。与原现场施工工艺相比免去了现场浇筑、养护、材料试品试验等技术过程;由于为专业化组合成品预制,因此与在施工现场现进行混凝土配方、钢筋尺寸现场固定焊接、模板现场安装相比可以不受自然、季节、气候的影响和干扰,尤其是在冬季和夏季;改善了因温度浇筑混凝土带来的各种材料膨胀系数的变化。
原现场浇筑的混凝土时间需要养护期夏季20天以上,冬季28天。加上模板支架安装拆卸和运输等需要增加成本和发生各种费用。本实用新型装配式基础,每基铁塔钢材用量为700公斤,开挖土方量10立方米,每基铁塔基础总造价约5000元,工期2天。可用于各种直线塔,使用于各种土壤,应用范围广,造价低,工期短,技术经济效果明显。
附图说明
图1为本实用新型的结构示意图;
图中:1基础立柱2卡盘3底盘4卡盘抱箍5连接装置6U型螺栓7钢圈8地脚螺栓9地面
具体实施方式
图1为本实用新型的实施例结构示意图。以下结合附图说明。
输电线路直线塔万能基础,基础立柱1上部固定卡盘2,卡盘2通过卡盘抱箍4固定在基础立柱1上,基础立柱顶端焊接Φ10mm钢圈7,钢圈7上焊接Φ24mm地脚螺栓8,间距为240mm。基础立柱1通过连接装置5(包括U型螺栓6)与底座3之间连接固定。基础立柱1为离心制造的钢筋混凝土环形截面基柱,长度为2500mm,直径为400mm,主筋为Φ18×12mm,内钢箍为Φ8×6×920mm,螺旋筋为Φ6×35000mm,下部留穿钉孔便于和底盘通过连接装置连接。底盘3型号为DP-10,适用于一般土壤,当地耐力偏低时可选用DP-12型底盘。
实施例:220KV双分裂导线直线塔目前应用较多,水平档距450米,垂直档距600米,土壤为软塑土,选用DP-12型底盘3,基础立柱1为离心制造的钢筋混凝土环形截面基柱,长度为2500mm,直径为400mm,主筋为Φ18×12mm,内钢箍为Φ8×6×920mm,螺旋筋为Φ6×35000mm,使用Φ22mm的U型螺栓6以及常规的连接装置5和底盘3连接;基础立柱增设1000mm卡盘2,基础立柱顶端焊接钢圈7Φ10mm,将Φ24mm的地脚螺栓8焊接在钢圈7上,间距为240mm,将直线塔的塔脚板按照地脚螺栓间距240mm的尺寸进行加工,经过倾覆稳定计算、底板侧移稳定计算以及基柱内力计算均满足要求,为此该装配式基础适用于220KV及以下直线塔,安全、经济、可靠。

Claims (2)

1、一种输电线路直线塔万能基础,包括基础立柱(1),基础立柱上部带有卡盘(2),顶端焊接钢圈(7),钢圈(7)上焊接地脚螺栓(8),基础立柱(1)底部设有底盘(3),其特征在于卡盘(2)通过卡盘抱箍(4)固定在基础立柱(1)上,基础立柱(1)与底座(3)之间通过连接装置(5)连接,所述基础立柱(1)为离心制造的钢筋混凝土环形截面基柱,长度为2500mm,直径为400mm,主筋为Φ18×12mm,内钢箍为Φ8×6×920mm,螺旋筋为Φ6×35000mm。
2、根据权利要求1所述的万能基础,其特征在于基础立柱(1)顶端的钢圈(7)直径为10mm,其上焊接的地脚螺栓(8)直径为24mm,间距为240mm。
CNU2008200272148U 2008-08-25 2008-08-25 输电线路直线塔万能基础 Expired - Lifetime CN201250411Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200272148U CN201250411Y (zh) 2008-08-25 2008-08-25 输电线路直线塔万能基础

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200272148U CN201250411Y (zh) 2008-08-25 2008-08-25 输电线路直线塔万能基础

Publications (1)

Publication Number Publication Date
CN201250411Y true CN201250411Y (zh) 2009-06-03

Family

ID=40746083

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200272148U Expired - Lifetime CN201250411Y (zh) 2008-08-25 2008-08-25 输电线路直线塔万能基础

Country Status (1)

Country Link
CN (1) CN201250411Y (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108060679A (zh) * 2017-12-11 2018-05-22 中国电力工程顾问集团西北电力设计院有限公司 一种集成化输电线路装配式基础及其施工方法
CN108343082A (zh) * 2018-02-27 2018-07-31 国网山东省电力公司泗水县供电公司 一种高压杆塔的基础施工方法
CN110909400A (zh) * 2019-10-24 2020-03-24 北京道亨时代科技有限公司 一种制作架空送电线路混凝土杆底盘、卡盘基础的方法
CN112158742A (zh) * 2020-09-28 2021-01-01 广州市鼎隆机电安装有限公司 一种机电安装用远程控制设备

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108060679A (zh) * 2017-12-11 2018-05-22 中国电力工程顾问集团西北电力设计院有限公司 一种集成化输电线路装配式基础及其施工方法
CN108343082A (zh) * 2018-02-27 2018-07-31 国网山东省电力公司泗水县供电公司 一种高压杆塔的基础施工方法
CN110909400A (zh) * 2019-10-24 2020-03-24 北京道亨时代科技有限公司 一种制作架空送电线路混凝土杆底盘、卡盘基础的方法
CN112158742A (zh) * 2020-09-28 2021-01-01 广州市鼎隆机电安装有限公司 一种机电安装用远程控制设备
CN112158742B (zh) * 2020-09-28 2021-05-11 广州市鼎隆机电安装有限公司 一种机电安装用远程控制设备

Similar Documents

Publication Publication Date Title
CN101812842B (zh) 无张力灌注桩结构
CN201546435U (zh) 螺栓固定式斜拉悬挑脚手架
US8607517B2 (en) Tower foundation
CN201250411Y (zh) 输电线路直线塔万能基础
CN107435338A (zh) 架空输电线路混凝土预制管桩承台连接装置
CN204898706U (zh) 一种钢管桩基通信杆塔结构
CN104005569A (zh) 一种托梁拔柱施工方法
CN201649071U (zh) 无张力灌注桩结构
CN202039377U (zh) 预应力钢绞线组合锚栓
CN204163095U (zh) 一种建筑基础结构及其组合构件
CN103806735A (zh) 基于对电力管网中的电杆更换方法
CN202380475U (zh) 钢筋混凝土杆与基础的连接装置
CN204385762U (zh) 一种岩石锚杆基础结构
CN108756202A (zh) 一种可循环利用的建筑悬挑脚手架固定装置和使用方法
CN201671105U (zh) 一种骨架式铁塔基础预埋件
CN206581680U (zh) 一种法兰式钢筋砼电杆
CN201459752U (zh) 电杆预制基础
CN202164622U (zh) 串接式塔机基础
CN103498573B (zh) 增设带边框钢支撑的既有框架加固方法
CN207794761U (zh) 一种大弯矩电杆
CN203022018U (zh) 填海区域厂房柱基础
CN207277864U (zh) 一种用于大型钢结构拼装的混凝土临时支撑胎架
CN205259206U (zh) 一种塔基基础
CN104532873A (zh) 一种岩石锚杆基础结构
CN216108596U (zh) 一种用于输电线路钢管杆的上部扩头灌注桩基础

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZIBO POWER SUPPLY COMPANY OF SHANDONG ELECTRIC POW

Effective date: 20130802

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: ZIBO POWER SUPPLY COMPANY OF SHANDONG ELECTRIC POWER CORPORATION

Effective date: 20130802

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: ZIBO POWER SUPPLY COMPANY OF SHANDONG ELECTRIC POW

Free format text: FORMER NAME: ZIBO POWER SUPPLY COMPANY

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 255000 ZIBO, SHANDONG PROVINCE TO: 100031 XICHENG, BEIJING

CP01 Change in the name or title of a patent holder

Address after: 100031 Xicheng District, Chang'an Avenue, No. 86,

Patentee after: State Grid Corporation of China

Patentee after: STATE GRID ZIBO POWER SUPPLY COMPANY OF SHANDONG PROVINCE

Address before: 100031 Xicheng District, Chang'an Avenue, No. 86,

Patentee before: State Grid Corporation of China

Patentee before: Zibo Power Supply Company of Shandong Electric Power Corp.

CP03 Change of name, title or address

Address after: 255000 Zhangdian City, Zibo province Beijing road and the intersection of the road north of the intersection of 100 meters

Patentee after: Zibo Power Supply Company of Shandong Electric Power Corp.

Address before: 255032 No. 61 West Village Road, Zhangdian District, Shandong, Zibo

Patentee before: Zibo Power Supply Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20130802

Address after: 100031 Xicheng District, Chang'an Avenue, No. 86,

Patentee after: State Grid Corporation of China

Patentee after: Zibo Power Supply Company of Shandong Electric Power Corp.

Address before: 255000 Zhangdian City, Zibo province Beijing road and the intersection of the road north of the intersection of 100 meters

Patentee before: Zibo Power Supply Company of Shandong Electric Power Corp.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20090603