CN104005569A - 一种托梁拔柱施工方法 - Google Patents

一种托梁拔柱施工方法 Download PDF

Info

Publication number
CN104005569A
CN104005569A CN201410277963.6A CN201410277963A CN104005569A CN 104005569 A CN104005569 A CN 104005569A CN 201410277963 A CN201410277963 A CN 201410277963A CN 104005569 A CN104005569 A CN 104005569A
Authority
CN
China
Prior art keywords
post
column
crossbeam
columns
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410277963.6A
Other languages
English (en)
Inventor
谢雨田
袁树春
张红伟
戴斌雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fangda Special Steel Technology Co Ltd
Original Assignee
Fangda Special Steel Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fangda Special Steel Technology Co Ltd filed Critical Fangda Special Steel Technology Co Ltd
Priority to CN201410277963.6A priority Critical patent/CN104005569A/zh
Publication of CN104005569A publication Critical patent/CN104005569A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种托梁拔柱施工方法,分别用立柱安装于A柱和C柱的下方;利用行车梁上安装的手拉葫芦拉吊安装横梁,使横梁贯穿B柱且两端固定连接立柱的上端,横梁的两端与A柱和C柱的外周固牢;横梁与B柱连接处的上方设置有柱托,柱托与B柱固定连接;拔除B柱下方的拆除段。本发明利用预拔除柱的两侧相邻的柱做支撑柱,将二根钢大梁固定住欲拔除柱,通过设置转换构件,将荷载转移,不拆除柱上部部位,拆除柱下部位,实现对已有建筑的改造。并且不降低厂房结构的承载能力和整体刚度;节省了施工空间、施工周期短、不影响车间生产、安全可靠。

Description

一种托梁拔柱施工方法
技术领域
本发明涉及建筑施工方法,特别涉及一种托梁拔柱施工方法。
背景技术
托梁拔柱是在不拆构筑物上部结构的情况下实施截除柱子的部分(或全部)的一门综合性技术。托梁拔柱是拖屋架拔柱、托梁拆墙及托梁拔柱的统称,是在不拆或少拆上部结构的情况下,实施拆除中部柱或墙的一项综合性技术。它包括:相关结构加固技术、上部结构顶升技术、断柱技术、预应力技术等,主要适合于因功能改变需要增大使用空间或改变平面布局。目前,许多单位为了适应今后进一步发展,都常常希望能抽除某些建筑物的柱或墙,以扩大其使用空间,而且在改造过程中,能不影响其结构的正常使用功能。在这种情况下,托梁拔柱与传统的大掀盖改造相比,充分显示出其对生产生活影响小、改造时间短、费用相对比较低等优点。现有的托梁拔柱法采用搭设满堂支撑的方法支撑梁和楼盖,待拆除钢柱并焊接托梁加固后,再拆除满堂支撑,完成整个加固改造。因此现有的托梁拔柱法仍然存在施工投入大、工期长、成本高的问题,已无法满足现在生活生产节奏的要求。
发明内容
本发明的目的是提供一种简便易行的施工方法,不采用满堂支撑,通过设置转换构件,将荷载转移,节省工程施工的空间、缩短施工周期,在不影响现场生产的情况下,安全可靠截除梁以下部位构造柱,实现对已有建筑的改造。
为实现上述目的,本发明采用以下技术方案,一种托梁拔柱施工方法,A柱、B柱、C柱依次排列且上方设有行车梁,B柱的下部为拆除段,其步骤如下:
1)测量A柱、B柱、C柱之间的距离、高度及外周形状,并在需要拆除的B柱下方拆除段位置作标识;
2)制作横梁、立柱和柱托;横梁的二端分别与A柱、C柱两侧的外形相对应匹配,立柱的外形分别与A柱、C柱下部相对应匹配,且高度与B柱下方拆除段相等,柱托与B柱两侧的外周形状相匹配;
3)分别将立柱安装于A柱和C柱的下部;
4)利用行车梁上安装的手拉葫芦拉吊安装横梁,使两根横梁贯穿B柱且两端固定连接A柱、C柱下部装有的立柱的上端,横梁的两端分别与A柱、C柱两侧的外周固牢;
5)两根横梁与B柱两侧连接处的上方均设置有柱托,柱托通过螺栓与B柱固定连接;
6)A柱、C柱间的横梁梁杆间固定装有斜撑;
7)拔除B柱下方的拆除段。
所述横梁为框架结构。
本发明的有益效果是,利用预拔除柱的两侧相邻的A柱和C柱做支撑柱,将两根横梁固定住欲拔除B柱,通过设置横梁、立柱和柱托转换构件,将B柱的荷载转移到A柱和C柱的上部部位,从而拆除B柱下部位拆除段,实现了对已有建筑的方便快捷的改造施工;本施工方法不降低厂房结构的承载能力和整体刚度;节省了施工空间、施工周期短、不影响车间生产、安全可靠。
附图说明    
图1是本发明的施工现场示意图。
图2是图1的侧视图。
图中:1.A柱,2.B柱,3.C柱,4.行车梁,5.横梁,6.立柱,7.柱托,8.斜撑,9.拆除段。
具体实施方式
以下结合附图和实施例对本发明作进一步说明,参见图1和图2,一种托梁拔柱施工方法,A柱1、B柱2、C柱3依次排列且上方设有行车梁,B柱2的下部为拆除段9,其步骤如下:
1)测量A柱1、B柱2、C柱3之间的距离、高度及外周形状,并在需要拆除的B柱2下方拆除段9位置作标识;
2)制作横梁5、立柱6和柱托7;横梁5的二端分别与A柱1、C柱3两侧的外形相对应匹配,立柱6的外形分别与A柱1、C柱3下部相对应匹配,且高度与B柱2下方拆除段9相等,柱托7与B柱2两侧的外周形状相匹配;
3)分别将立柱6安装于A柱1和C柱3的下部;
4)利用行车梁4上安装的手拉葫芦拉吊安装横梁5,使两根横梁5均贯穿B柱2且两端固定连接A柱1、C柱3下部装有的立柱6的上端,横梁5的两端分别与A柱1、C柱3两侧的外周固牢;
5)两根横梁5与B柱2两侧连接处的上方均设置有柱托7,柱托7通过螺栓与B柱2固定连接;
6)A柱1、C柱3间的横梁5梁杆间固定装有斜撑8;
7)拔除B柱2下方的拆除段9。
所述横梁5为框架结构。
实施例:以下列举本发明的一个较佳实施方式,一种托梁拔柱施工方法,其步骤如下:
1)A柱1、B柱2、C柱3依次排列,且B柱2的下部为拆除段9,测量A柱1、B柱2、C柱3之间的距离、高度及外周形状。采用结构钢制作好两件框架结构的横梁5、两件立柱6、一件柱托7及若干斜撑8;两件横梁5,长度为A柱1与C柱3外侧的间距;立柱6的外形分别与A柱1、C柱3下部相对应匹配,且高度与B柱2下方拆除段9相等;柱托7整体内形状与B柱2的外周形状相匹配,并分为两半对称的结构。
2)利用行车梁4安装的手拉葫芦拉吊安装横梁,将两件立柱6分别吊至A柱1及C柱3的下部位置后固定于土建基础上,并完成相关节点的焊接。安装时保证立柱6顶部表面标高与B柱下方拆除段相等。
3)将制作好的两件横梁5,分别转运到预拔B柱2两侧相关施工区域内。吊装时,利用行车协助将横梁5吊起,并利用两个10吨的手拉葫芦拉吊,将两件横梁5的两端分别固定于A柱1和C柱3下方的立柱6上定位。定位后进行相关节点焊接并保证牢固。两件横梁5分别固定好后,利用若干斜撑8将两件横梁5之间焊接牢固,形成整体结构。
4)利用水钻在横梁5上方与B柱2相对应位置的外周钻两排φ32mm以上的通孔,每排等距布置4个孔,排距为200mm,上下排等距错位,孔标高以横梁5上表面为基准向上100mm为孔中心线,将预制好的八根M30螺杆贯穿于柱托7和通孔内进行安装。螺杆安装完成后,利用环氧树脂将孔洞填实,然后将螺杆相连的柱托7横跨于横梁5上进行定位,并两侧分别利用双螺帽进行紧固,使柱托7紧贴于B柱2的两侧表面,然后将柱托7与两横梁5连接部位进行焊接牢固。
5)标识出B柱2下方拆除段9需要截断的位置,利用水钻钻一排孔(孔径已便于钻孔操作为宜,孔与孔之间相切或相交),使B柱2的拆除段9与保留部分完全脱开。利用10吨手拉葫芦固定于横梁5上,将拆除段9进行固定,再利用人工或机械方法将B柱2根部位置进行截断。截断后,松动手拉葫芦将截除的拆除段9安全放下。
6)利用钢板在B柱2断面位置进行封面,并按照B柱2外周尺寸形成盒体,在盒体内灌入灌浆料进行填充。填充料固化后,整个托梁拔柱过程完成,可以投入使用。
某钢铁公司轧钢厂弹扁线收集跨与成品跨交界柱,由于弹扁收集包装线要求改造,原有厂房柱距6米无法满足改造要求,需将两个6米柱距改造成12米跨。此柱为双列并柱组合,要求将其中一组并列组和柱拆除下部结构,施工场地狭小,而且由于生产原因施工期间无法停产或时间有限,屋盖系统负荷大,施工吊装非常困难,特研究本托梁拔柱施工方法并取得良好的效果。

Claims (2)

1.一种托梁拔柱施工方法,A柱、B柱、C柱依次排列且上方设有行车梁,B柱的下部为拆除段,其特征在于,其步骤如下:
1)测量A柱、B柱、C柱之间的距离、高度及外周形状,并在需要拆除的B柱下方拆除段位置作标识;
2)制作横梁、立柱和柱托;横梁的二端分别与A柱、C柱两侧的外形相对应匹配,立柱的外形分别与A柱、C柱下部相对应匹配,且高度与B柱下方拆除段相等,柱托与B柱两侧的外周形状相匹配;
3)分别将立柱安装于A柱和C柱的下部;
4)利用行车梁上安装的手拉葫芦拉吊安装横梁,使两根横梁贯穿B柱且两端固定连接A柱、C柱下部装有的立柱的上端,横梁的两端分别与A柱、C柱两侧的外周固牢;
5)两根横梁与B柱两侧连接处的上方均设置有柱托,柱托通过螺栓与B柱固定连接;
6)A柱、C柱间的横梁梁杆间固定装有斜撑;
7)拔除B柱下方的拆除段。
2.根据权利要求1所述的托梁拔柱施工方法,其特征在于,所述横梁为框架结构。
CN201410277963.6A 2014-06-20 2014-06-20 一种托梁拔柱施工方法 Pending CN104005569A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410277963.6A CN104005569A (zh) 2014-06-20 2014-06-20 一种托梁拔柱施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410277963.6A CN104005569A (zh) 2014-06-20 2014-06-20 一种托梁拔柱施工方法

Publications (1)

Publication Number Publication Date
CN104005569A true CN104005569A (zh) 2014-08-27

Family

ID=51366453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410277963.6A Pending CN104005569A (zh) 2014-06-20 2014-06-20 一种托梁拔柱施工方法

Country Status (1)

Country Link
CN (1) CN104005569A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678423A (zh) * 2018-08-06 2018-10-19 建研科技股份有限公司 钢筋混凝土结构逆向拆除竖向转换支撑结构
CN109537929A (zh) * 2018-11-30 2019-03-29 北京市建筑工程研究院有限责任公司 抽柱改造用加固装置及加固方法
CN109838114A (zh) * 2019-04-01 2019-06-04 吉林建筑大学 钢筋混凝土结构逆向拆除临时支撑转换装置及其操作方法
CN110004937A (zh) * 2019-03-19 2019-07-12 上海申元岩土工程有限公司 一种基坑工程中立柱与支撑梁、板交接处节点结构
CN111764684A (zh) * 2020-08-10 2020-10-13 中国建筑第八工程局有限公司 厂房屋架保护性拆除的施工方法
CN112942885A (zh) * 2021-02-03 2021-06-11 浙江大陆建筑特种工程有限公司 一种建筑加固结构及其加固方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH116310A (ja) * 1997-06-18 1999-01-12 Ohbayashi Corp 多層階建物の解体方法
CN102808526A (zh) * 2011-06-01 2012-12-05 永升建设集团有限公司 钢筋混凝土框架梁无损拆除施工方法
CN103015743A (zh) * 2012-12-01 2013-04-03 中国建筑第七工程局有限公司 一种钢结构托梁拔柱施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH116310A (ja) * 1997-06-18 1999-01-12 Ohbayashi Corp 多層階建物の解体方法
CN102808526A (zh) * 2011-06-01 2012-12-05 永升建设集团有限公司 钢筋混凝土框架梁无损拆除施工方法
CN103015743A (zh) * 2012-12-01 2013-04-03 中国建筑第七工程局有限公司 一种钢结构托梁拔柱施工方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
丁丽萍: "钢结构厂房托梁拔柱改造技术与安全管理研究", 《中国博士学位论文全文数据库工程科技II辑》 *
罗志祥等: "工业厂房改造中的托梁拔柱加固设计", 《四川建筑》 *
董志刚: "单层工业厂房扩建改造托梁拔柱施工", 《黑龙江冶金》 *
黎伟: "不规则柱距厂房托梁拔柱", 《工业建筑》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678423A (zh) * 2018-08-06 2018-10-19 建研科技股份有限公司 钢筋混凝土结构逆向拆除竖向转换支撑结构
CN108678423B (zh) * 2018-08-06 2023-12-08 中建研科技股份有限公司 钢筋混凝土结构逆向拆除竖向转换支撑结构
CN109537929A (zh) * 2018-11-30 2019-03-29 北京市建筑工程研究院有限责任公司 抽柱改造用加固装置及加固方法
CN109537929B (zh) * 2018-11-30 2021-04-20 北京市建筑工程研究院有限责任公司 抽柱改造用加固装置及加固方法
CN110004937A (zh) * 2019-03-19 2019-07-12 上海申元岩土工程有限公司 一种基坑工程中立柱与支撑梁、板交接处节点结构
CN110004937B (zh) * 2019-03-19 2023-12-29 上海申元岩土工程有限公司 一种基坑工程中立柱与支撑梁、板交接处节点结构
CN109838114A (zh) * 2019-04-01 2019-06-04 吉林建筑大学 钢筋混凝土结构逆向拆除临时支撑转换装置及其操作方法
CN109838114B (zh) * 2019-04-01 2024-01-26 吉林建筑大学 钢筋混凝土结构逆向拆除临时支撑转换装置及其操作方法
CN111764684A (zh) * 2020-08-10 2020-10-13 中国建筑第八工程局有限公司 厂房屋架保护性拆除的施工方法
CN111764684B (zh) * 2020-08-10 2021-11-09 中国建筑第八工程局有限公司 厂房屋架保护性拆除的施工方法
CN112942885A (zh) * 2021-02-03 2021-06-11 浙江大陆建筑特种工程有限公司 一种建筑加固结构及其加固方法

Similar Documents

Publication Publication Date Title
CN104005569A (zh) 一种托梁拔柱施工方法
CN109914244B (zh) 一种适用于高塔钢混结合横梁钢结构安装及底、顶板混凝土浇筑的弱支架系统及其操作方法
CN201546435U (zh) 螺栓固定式斜拉悬挑脚手架
CN201614738U (zh) 一种钢骨混凝土转换梁模板组合支撑装置
CN104695336B (zh) 双层现浇梁先上后下支架施工方法
CN104389419A (zh) 悬挑支模平台安装结构及施工方法
CN102277980B (zh) 一种单层工业厂房屋盖整体顶升的装置及其施工方法
CN106368430A (zh) 一种铝模板安装工艺
CN103452350B (zh) 装配式电子厂房及其施工方法
CN207268073U (zh) 新型柔性支模承重架
CN105780922A (zh) 大跨度型钢混凝土转换桁架分段吊装支模体系施工方法
CN202945798U (zh) 一种悬挑式脚手架角部装置
CN205636503U (zh) 一种箱梁侧模滑移装置
CN102777050B (zh) 大跨度管桁架屋面梁的组拼胎架
CN110409318A (zh) 一种大跨度简支钢混结合梁拼装架设方法
CN107165056B (zh) 用于悬臂盖梁混凝土浇筑的抗倾覆钢棒支架及其安装方法
CN102691267A (zh) 一种外置整体操作平台高墩施工方法
CN102953344B (zh) 爬锥式三角悬臂支架
CN211229458U (zh) 一种用于圆柱墩混凝土浇筑施工的作业平台
CN203603542U (zh) 装配式电子厂房
CN106320699A (zh) 桁架式模板支架体系的快速拆装方法
CN109944164A (zh) 自升式空心薄壁墩辊模系统及其施工方法
CN215629471U (zh) 一种桥梁悬臂结构无牛腿铰接式托架支撑装置
CN102155095A (zh) 大型冶金工业厂房钢骨混凝土钢筋的布置方法
CN106499188B (zh) 楼板内爬式液压布料机爬升支撑系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140827