CN201232182Y - 钻孔灌注桩桩底、桩侧的后压浆装置 - Google Patents

钻孔灌注桩桩底、桩侧的后压浆装置 Download PDF

Info

Publication number
CN201232182Y
CN201232182Y CNU2008200298398U CN200820029839U CN201232182Y CN 201232182 Y CN201232182 Y CN 201232182Y CN U2008200298398 U CNU2008200298398 U CN U2008200298398U CN 200820029839 U CN200820029839 U CN 200820029839U CN 201232182 Y CN201232182 Y CN 201232182Y
Authority
CN
China
Prior art keywords
reinforcing cage
grouting
pile
stake
bored pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200298398U
Other languages
English (en)
Inventor
朱新广
富成玮
黄树彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Original Assignee
Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of 17th Bureau of China's Railroad Group filed Critical Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Priority to CNU2008200298398U priority Critical patent/CN201232182Y/zh
Application granted granted Critical
Publication of CN201232182Y publication Critical patent/CN201232182Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型公开了一种钻孔灌注桩的桩底、桩侧的后压浆装置,包括在桩侧沿钢筋笼内周垂直设置的底端封口的注浆管,该注浆管下部伸出钢筋笼并开有多个注浆孔,注浆管顶端设置有可拆卸式阀门,并通过软管与压浆机联接,其特征在于:所述的注浆管为钢管,其至少设置有三根并沿钢筋笼内周均匀分布,每根钢管下部伸出钢筋笼部分的注浆孔外侧设置有压力渗浆机构。本实用新型的注浆管同时可作为检测桩身的声测管,将压浆与桩身无损检测结合起来,有效的提高了施工进度,节约了施工成本。

Description

钻孔灌注桩桩底、桩侧的后压浆装置
技术领域
本实用新型涉及一种钻孔灌注桩桩底、桩侧的后压浆装置。
背景技术
钻孔灌注桩的承载力来源于桩侧摩阻力和桩底端阻力。而桩侧摩阻力和桩底端阻力除与土层条件等有关外,还受施工工艺的影响。不同施工质量所形成的桩体,其竖向承载力相差很大。为保证灌注桩的承载力达到要求,国内部分地区使用了后压浆技术,其基本原理是通过预先设置于钢筋笼上的压浆管,在桩体达到一定强度后,向桩侧或桩底压浆,固结孔底沉渣和桩侧泥皮,并使桩底端和桩侧一定范围内的土体得到加固。这种装置结构比较复杂,且无法保障因注浆阀破裂而无法注浆的问题。
发明内容
本实用新型所需要解决的技术问题是提供一种新的钻孔灌注桩桩底、桩侧的后压浆装置,该装置将注浆与桩身无损检测联系起来,这样不但大大节约了施工成本,还提高了压浆的功效。
为达到以上目的,本实用新型是采取如下技术方案予以实现的:
一种钻孔灌注桩桩底、桩侧的后压浆装置,包括在桩侧沿钢筋笼内周垂直设置的底端封口的注浆管,该注浆管下部伸出钢筋笼并开有多个注浆孔,注浆管顶端设置有可拆卸式阀门,并通过软管与压浆机联接,其特征在于:所述的注浆管为钢管,其至少设置有三根并沿钢筋笼内周均匀分布,每根钢管下部伸出钢筋笼部分的注浆孔外侧设置有压力渗浆机构。
上述方案中,所述压力渗浆机构包括在注浆孔外侧包裹有一层弹性橡胶外衬,在弹性橡胶外衬外侧摁入大头钉,大头钉的钉身刚好穿入注浆孔内,在大头钉的钉帽外侧缠绕有紧固胶带。所述钢管底部采用封底钢板同时封口。并与桩基钢筋笼同时置入桩孔内。
本实用新型在完成钻孔后,通过在桩侧沿钢筋笼内周对称布置叁根以上钢制注浆管,在桩身混凝土灌注2~7小时之内压入清水,当桩身混凝土终凝后,注浆管同时可作为桩身完整性检测的声测管,进行桩身无损检测,然后再利用注浆管进行桩底注浆。其优点是,能够确保向桩侧、桩底压入水泥浆,同时将压浆与桩身无损检测结合起来,这样不但大大节约了施工成本,还提高了压浆的功效。
附图说明
图1为本实用新型的钻孔灌注桩桩侧、桩底的后压浆装置结构示意图。
图2为图1中注浆孔周围的结构放大示意图。
图1、图2中:1、注浆管(钢管);2、注浆孔;3、橡胶外衬;4、大头钉;5、封底钢板;6、紧固胶带;7、阀门;8、软管;9、压浆机;10、桩基钢筋笼;11、桩基混凝土(示意);12、原地面。
具体实施方式
如图1、图2所示,一种钻孔灌注桩桩侧、桩底的后压浆装置,在桩基钢筋笼10内周均匀布置三根用钢管制成的注浆管1,钢管直径大于50mm,壁厚大于3.5mm,将钢管固定在桩基钢筋笼10上,下部超出钢筋笼20cm,将钢管与桩基钢筋笼同时放入桩孔内,底部采用封底钢板5封口,保障钢管的密封。在钢管下部30cm范围内开多个注浆孔2,注浆孔2不大于4mm,间距不小于50mm。在注浆孔2外侧包裹弹性橡胶外衬3,在弹性橡胶外衬3外侧摁入大头钉4,大头钉的钉身刚好穿入注浆孔内,在大头钉4的钉帽外侧缠绕紧固胶带5,在压浆机压力作用下,弹性橡胶外衬3撑开,在大头钉位置将针孔扩大,水泥浆通过针孔位置流出注入地层,当压浆机无压力时弹性橡胶皮收缩,紧固针孔,确保地层中的水泥浆不回流。在钢管顶部设置丝扣,接上可拆卸式的阀门7,通过软管8联接阀门与压浆机9。通过压浆机9向桩底压入水泥浆。
压浆机9为普通压浆机,其压力在2~10MPa之间。水泥浆搅拌采用普通搅拌机,水泥浆为普通P.032.5水泥拌制的水泥浆,水灰比0.4~0.6之间,搅拌好以后用滤网对水泥浆进行过滤。
压浆时,在桩基混凝土11灌注2~7小时之内利用压浆机9压入清水,当压浆机压力小于0.1MPa时,进行下一根作业,直到将三根注浆管全部压通。当桩基混凝土终凝后,利用钢制注浆管2直接进行桩身无损检测,然后再利用钢制注浆管2进行桩底、桩侧注浆,压浆时每个钢管顶部接上阀门7,压浆时阀门关闭,将其中一个接上软管向桩侧、桩底压浆直到达到设计注浆量,然后对剩下的二根钢管进行压浆。

Claims (4)

1、一种钻孔灌注桩桩底、桩侧的后压浆装置,包括在桩侧沿钢筋笼内周垂直设置的底端封口的注浆管,该注浆管下部伸出钢筋笼并开有多个注浆孔,注浆管顶端设置有可拆卸式阀门,并通过软管与压浆机联接,其特征在于:所述的注浆管为钢管,其至少设置有三根并沿钢筋笼内周均匀分布,每根钢管下部伸出钢筋笼部分的注浆孔外侧设置有压力渗浆机构。
2、根据权利要求1所述的钻孔灌注桩桩底、桩侧的后压浆装置,其特征在于:所述压力渗浆机构包括在注浆孔外侧包裹有一层弹性橡胶外衬,在弹性橡胶外衬外侧摁入大头钉,大头钉的钉身刚好穿入注浆孔内,在大头钉的钉帽外侧缠绕有紧固胶带。
3、根据权利要求1所述的钻孔灌注桩桩底、桩侧的后压浆装置,其特征在于:所述钢管底部采用封底钢板同时封口。
4、根据权利要求3所述的钻孔灌注桩桩底、桩侧的后压浆装置,其特征在于:所述同时封口的钢管与桩基钢筋笼同时置入桩孔内。
CNU2008200298398U 2008-08-01 2008-08-01 钻孔灌注桩桩底、桩侧的后压浆装置 Expired - Fee Related CN201232182Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200298398U CN201232182Y (zh) 2008-08-01 2008-08-01 钻孔灌注桩桩底、桩侧的后压浆装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200298398U CN201232182Y (zh) 2008-08-01 2008-08-01 钻孔灌注桩桩底、桩侧的后压浆装置

Publications (1)

Publication Number Publication Date
CN201232182Y true CN201232182Y (zh) 2009-05-06

Family

ID=40618556

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200298398U Expired - Fee Related CN201232182Y (zh) 2008-08-01 2008-08-01 钻孔灌注桩桩底、桩侧的后压浆装置

Country Status (1)

Country Link
CN (1) CN201232182Y (zh)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102605770A (zh) * 2012-03-14 2012-07-25 中冶交通工程技术有限公司 一种用于灌注桩的后压浆装置及施工方法
CN102605790A (zh) * 2012-03-14 2012-07-25 中冶交通工程技术有限公司 用于挤扩支盘灌注桩的后压浆装置及后压浆施工方法
CN102635129A (zh) * 2012-04-11 2012-08-15 中冶交通工程技术有限公司 一种用于检测预埋在灌注桩地下的钢筋笼的方法
CN103410154A (zh) * 2013-08-23 2013-11-27 河南省纳川基础工程有限公司 高压注浆护坡小桩施工方法
US9074473B2 (en) 2011-06-07 2015-07-07 Con-Tech Systems Ltd. Hollow rebar for crosshole sonic logging access tubes and longitudinal concrete reinforcing in drilled shafts
CN105386473A (zh) * 2015-10-16 2016-03-09 浙江工业大学 基于多点顶出式传感器测量技术检测桩基后压浆质量的方法
CN105625303A (zh) * 2014-11-28 2016-06-01 大连市市政设计研究院有限责任公司 一种钻孔灌注桩后压浆工艺
CN105926690A (zh) * 2016-05-23 2016-09-07 浙江工业大学 应用硼中子寿命测井技术检测桩基后压浆质量的新方法
CN105937241A (zh) * 2016-05-31 2016-09-14 深圳市宏业基基础工程有限公司 用于钻孔灌注桩的后注浆装置以及钻孔灌注桩的桩架结构
CN105937221A (zh) * 2016-05-31 2016-09-14 深圳市宏业基基础工程有限公司 钻孔灌注桩制造方法
CN106703087A (zh) * 2016-11-30 2017-05-24 上海岩土工程勘察设计研究院有限公司 一种灌注桩桩端补注浆装置和方法
CN107642092A (zh) * 2017-09-21 2018-01-30 中建局集团第二建筑有限公司 一种桩基后压浆施工方法及后压浆装置
CN113882385A (zh) * 2021-11-19 2022-01-04 中国建筑第八工程局有限公司 一种用于注浆施工中注浆管底部的止逆装置及施工方式
CN113882363A (zh) * 2021-10-26 2022-01-04 中建三局第一建设工程有限责任公司 用于cfg桩的桩端后注浆装置、注浆方法和施工方法

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9074473B2 (en) 2011-06-07 2015-07-07 Con-Tech Systems Ltd. Hollow rebar for crosshole sonic logging access tubes and longitudinal concrete reinforcing in drilled shafts
CN102605770A (zh) * 2012-03-14 2012-07-25 中冶交通工程技术有限公司 一种用于灌注桩的后压浆装置及施工方法
CN102605790A (zh) * 2012-03-14 2012-07-25 中冶交通工程技术有限公司 用于挤扩支盘灌注桩的后压浆装置及后压浆施工方法
CN102605790B (zh) * 2012-03-14 2014-06-18 中冶交通工程技术有限公司 用于挤扩支盘灌注桩的后压浆装置及后压浆施工方法
CN102635129A (zh) * 2012-04-11 2012-08-15 中冶交通工程技术有限公司 一种用于检测预埋在灌注桩地下的钢筋笼的方法
CN102635129B (zh) * 2012-04-11 2014-09-24 中冶交通工程技术有限公司 一种用于检测预埋在灌注桩地下的钢筋笼的方法
CN103410154A (zh) * 2013-08-23 2013-11-27 河南省纳川基础工程有限公司 高压注浆护坡小桩施工方法
CN105625303A (zh) * 2014-11-28 2016-06-01 大连市市政设计研究院有限责任公司 一种钻孔灌注桩后压浆工艺
CN105386473A (zh) * 2015-10-16 2016-03-09 浙江工业大学 基于多点顶出式传感器测量技术检测桩基后压浆质量的方法
CN105926690A (zh) * 2016-05-23 2016-09-07 浙江工业大学 应用硼中子寿命测井技术检测桩基后压浆质量的新方法
CN105926690B (zh) * 2016-05-23 2018-11-13 浙江工业大学 应用硼中子寿命测井技术检测桩基后压浆质量的方法
CN105937241A (zh) * 2016-05-31 2016-09-14 深圳市宏业基基础工程有限公司 用于钻孔灌注桩的后注浆装置以及钻孔灌注桩的桩架结构
CN105937221A (zh) * 2016-05-31 2016-09-14 深圳市宏业基基础工程有限公司 钻孔灌注桩制造方法
CN106703087A (zh) * 2016-11-30 2017-05-24 上海岩土工程勘察设计研究院有限公司 一种灌注桩桩端补注浆装置和方法
CN107642092A (zh) * 2017-09-21 2018-01-30 中建局集团第二建筑有限公司 一种桩基后压浆施工方法及后压浆装置
CN113882363A (zh) * 2021-10-26 2022-01-04 中建三局第一建设工程有限责任公司 用于cfg桩的桩端后注浆装置、注浆方法和施工方法
CN113882385A (zh) * 2021-11-19 2022-01-04 中国建筑第八工程局有限公司 一种用于注浆施工中注浆管底部的止逆装置及施工方式

Similar Documents

Publication Publication Date Title
CN201232182Y (zh) 钻孔灌注桩桩底、桩侧的后压浆装置
CN201722685U (zh) 一种无粘结预应力及桩侧后注浆冲孔桩结构
CN105527384B (zh) 一种注浆模拟试验装置及其试验方法
CN102409663B (zh) 一种电化学灌浆联合浆固散体材料桩处理软基的方法
CN207739264U (zh) 一种注浆管
CN201679505U (zh) 平衡式注浆管
CN101139836A (zh) 钻孔灌注桩桩端后注浆施工方法
CN105386473A (zh) 基于多点顶出式传感器测量技术检测桩基后压浆质量的方法
CN105181463A (zh) 一种含水矸石压缩试验装置及其试验方法
CN102864777A (zh) 一种快速预应力锚杆结构及施工方法
EP2652207B1 (de) Schalungselement
SE460674B (sv) Foerfarande och anordning foer framstaellning av en komprimerande djupgrundlaeggningskonstruktion
CN205301298U (zh) 一种注浆模拟试验装置
CN208701666U (zh) 建筑基坑边坡带刺的植入式钢管锚杆
CN102660946B (zh) 一种管桩注浆桩头及其使用方法
CN207779863U (zh) 一种混凝土渗透性试验装置
CN111155519B (zh) 一种挤压套屈服锚索及其安装工艺
CN110453673B (zh) 一种墩式基础加固结构及方法
CN203440820U (zh) 一种改进的灌注桩桩端后注浆器
CN104652493B (zh) 深基坑抗浮锚索后防水施工方法
CN206289627U (zh) 一种后压浆管桩
CN201292528Y (zh) 一种注浆器
CN201474703U (zh) 一种水工隧洞固结圈承力结构
CN205638486U (zh) 一种用于控制涌突水注浆中滤排水注浆膜袋封孔结构装置
CN209308012U (zh) 一种后补灌注桩与原有基础筏板的连接结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090506

Termination date: 20130801