CN201195839Y - Concrete catena block net slice hanging frame - Google Patents
Concrete catena block net slice hanging frame Download PDFInfo
- Publication number
- CN201195839Y CN201195839Y CNU2008200227585U CN200820022758U CN201195839Y CN 201195839 Y CN201195839 Y CN 201195839Y CN U2008200227585 U CNU2008200227585 U CN U2008200227585U CN 200820022758 U CN200820022758 U CN 200820022758U CN 201195839 Y CN201195839 Y CN 201195839Y
- Authority
- CN
- China
- Prior art keywords
- concrete
- interlock block
- main frame
- construction
- block net
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a concrete interlock block netting hanging bent for construction industry, which is suitable for the construction sites of lands, soft foundations, shallow sea areas which adopt concrete to prefabricate interlock block nettings, concrete is hoisted to prefabricate an interlock block netting, which accelerates construction progress and construction quality, and guarantees construction security. The hanging bent comprises a main frame, a reinforced rib, a lifting ring and a suspending bolt, wherein the reinforced rib and the lifting ring are arranged in the main frame, and the suspending bolt is arranged on the periphery of the main frame. The concrete interlock block netting hanging bent can guarantee integral concrete interlock block nettings to transport and pave in sheet shapes, which accelerates the rates of placing, transferring and paving of interlock block nettings, and onerous workload of manual secondary finishing and transferring interlock blocks.
Description
Technical field
The utility model belongs to the construction tool of building trade, particularly concrete interlock block net sheet hangs framed bent, this instrument is applicable to the job site of the land of adopting concrete interlock block net sheet Ground Treatment, soft base, shallow sea area, lift concrete prefabricated interlock block net sheet, accelerating construction progress and construction quality guarantee construction safety.
Background technology
At present, the concrete interlock block is widely used in the rivers consolidated subsoil, sea wall protects beach reinforcing etc.Concrete interlock block technology is as a kind of emerging river bottom protection job practices, have prefabricated simple, easy for installation, characteristics such as low cost.Concrete interlock block net sheet is the large-scale interlock block net sheet that the little concrete block by a plurality of prefabricated ropes connects to form, and so can improve handling efficiency.General every area of concrete interlock block net sheet has 4*5 square metre, 6*6 square metre etc., because area is big, totally is the software state, and the lifting difficulty is big.The tradition hoisting method is: draw each sheet interlock block rope all around in hoist lifting hook, whole net sheet is sling.Also just become a heap shape in the time of on being placed into vehicle, transport according to modes such as construction needs entrucking or shipments.If be scattered then site operation personnel's personal safety is threatened.Stack interlock block net sheet with the hoist lifting hook lifting, it is chaotic often to cause interlock block to stack, interlaced between sheet and the sheet, is difficult to make in order when causing the secondary entrucking and laying, and has reduced work efficiency, has increased cost.During on-the-spot the laying since in the process of carrying to the destruction of interlock block net plate shape, install, connect, arrange, need the great amount of manpower resource, difficulty of construction is bigger, efficiency of construction further reduces, construction quality is difficult to guarantee especially.Concrete interlock block prefabricated construction occupied ground is big, because the every block volume that is connected is little, its prefab form turnover is many, in this case, scientifically stacks interlock block net sheet, simplification and quickening and lays the key that efficient becomes the saving cost.
Summary of the invention
The purpose of this utility model provides concrete interlock block net sheet and hangs framed bent, solves after prefabricated the finishing in the transportation the destruction of interlock block net plate shape, improves efficiency of construction.
The present technique solution can reach above-mentioned purpose: concrete interlock block net sheet hangs framed bent and comprises main frame, reinforcing rib, suspension ring and suspension bolt, is provided with reinforcing rib and suspension ring in the main frame, is provided with the suspension bolt at the periphery of main frame.
The utility model compared with prior art has following useful effect: the utility model is that framed bent is hung in special use, design size according to concrete interlock block net sheet, the weld mesh crate form is hung framed bent, adopt simple and easy suspension bolt, hang formed connected lock dog net sheet fast, guarantee that full wafer interlock block net sheet transports in the form of sheets and arranges, accelerated the speed that interlock block net sheet is put, shifted and arranges, avoided the hard work amount of artificial secondary arrangement, carrying interlock block net sheet.Reduce cost of production, guaranteed construction safety and construction quality.
Description of drawings
Fig. 1 is the vertical view of the utility model structural representation.
Fig. 2 is the left view of the utility model structural representation.
The specific embodiment
Below in conjunction with embodiment the utility model is done further detailed description: concrete interlock block net sheet hangs framed bent and comprises main frame 1, reinforcing rib 2, suspension ring 3 and hang bolt 4, is provided with reinforcing rib 2 and suspension ring 3 in the main frame 1, is provided with at the periphery of main frame 1 and hangs bolt 4.Main frame 1 is net structure, and reinforcing rib 2 is fixed on the main frame 1 for prismatic, adopts welding and bolt fixed mode all can.On-the-spot when using the utility model lifting concrete interlock block net sheet, the utility model over against interlock block net sheet, is hung over the rope of concrete interlock block net sheet periphery easily and to hang on the bolt 4.The wire rope of crane is worn even suspension ring 3, entirely concrete interlock block net sheet is lifted on the vehicle.After arriving the laying construction place, can with the same manner the concrete interlock block net sheet on the vehicle be lifted construction again and lay point, directly lay or transhipment again.
Claims (2)
1. concrete interlock block net sheet hangs framed bent, it is characterized in that originally hanging framed bent comprises main frame (1), reinforcing rib (2), suspension ring (3) and hangs bolt (4), be provided with reinforcing rib (2) and suspension ring (3) in the main frame (1), be provided with at the periphery of main frame (1) and hang bolt (4).
2. concrete interlock block net sheet according to claim 1 hangs framed bent, it is characterized in that main frame (1) is net structure, and reinforcing rib (2) is fixed on the main frame (1) for prismatic.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200227585U CN201195839Y (en) | 2008-05-20 | 2008-05-20 | Concrete catena block net slice hanging frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200227585U CN201195839Y (en) | 2008-05-20 | 2008-05-20 | Concrete catena block net slice hanging frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201195839Y true CN201195839Y (en) | 2009-02-18 |
Family
ID=40415474
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200227585U Expired - Fee Related CN201195839Y (en) | 2008-05-20 | 2008-05-20 | Concrete catena block net slice hanging frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201195839Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101824918B (en) * | 2009-03-04 | 2011-06-29 | 中国葛洲坝集团股份有限公司 | Construction method for dividing unit to prefabricate bearing bent frame |
-
2008
- 2008-05-20 CN CNU2008200227585U patent/CN201195839Y/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101824918B (en) * | 2009-03-04 | 2011-06-29 | 中国葛洲坝集团股份有限公司 | Construction method for dividing unit to prefabricate bearing bent frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201809036U (en) | Hanging hopper with detachable chassis | |
CN102644290A (en) | Steel cofferdam construction method suitable for deep silt-layer bridge construction in shallow sea area | |
CN102635225A (en) | Equipment hoisting platform and method for super high-rise buildings | |
CN203173684U (en) | Component for hoisting reinforcement cage | |
CN202730579U (en) | Recyclable prefabricated concrete block for hardening construction plant | |
CN201195839Y (en) | Concrete catena block net slice hanging frame | |
CN102071812B (en) | Method for vertically transporting building materials | |
CN203333143U (en) | Building construction basket | |
CN102587377B (en) | Drop hammer type pile sinking device and pile sinking method thereof | |
CN204401395U (en) | A kind of subgrade case | |
CN218029036U (en) | Protection structure for construction on inclined plate | |
CN206722431U (en) | Discharging platform for high-rise building construction | |
CN106088431B (en) | Laminated floor slab and laminated floor slab construction method for hanging | |
CN215287675U (en) | Hoisting tool for steel reinforcement cage | |
CN203064569U (en) | Waste collecting box | |
CN213265343U (en) | General stone tongs of prefabricated superimposed sheet | |
CN102839652A (en) | Steel strand cast-in-place pile and construction method thereof | |
CN202518930U (en) | Lifting appliance structure for hoisting steel reinforcement cage | |
CN205099195U (en) | Can dismantle stirrup hoist and mount cage | |
CN201686458U (en) | Movable operating platform used for quickly processing welding seam at end opening of steel box girder | |
CN206529213U (en) | A kind of quick handling apparatus of building block | |
CN212403153U (en) | Bearing device for hoisting articles at high altitude | |
CN214456152U (en) | Constructional engineering pile | |
CN213265348U (en) | Self-unloading brick hanging cage | |
CN217323021U (en) | Building block brick hoisting device for construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |