CN203064569U - Waste collecting box - Google Patents

Waste collecting box Download PDF

Info

Publication number
CN203064569U
CN203064569U CN2012206668893U CN201220666889U CN203064569U CN 203064569 U CN203064569 U CN 203064569U CN 2012206668893 U CN2012206668893 U CN 2012206668893U CN 201220666889 U CN201220666889 U CN 201220666889U CN 203064569 U CN203064569 U CN 203064569U
Authority
CN
China
Prior art keywords
side plate
plate
chamber door
collecting tank
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012206668893U
Other languages
Chinese (zh)
Inventor
廖选茂
方春生
沈洪宇
方振亚
吕明涛
于吉圣
杨帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN2012206668893U priority Critical patent/CN203064569U/en
Application granted granted Critical
Publication of CN203064569U publication Critical patent/CN203064569U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/10Waste collection, transportation, transfer or storage, e.g. segregated refuse collecting, electric or hybrid propulsion

Landscapes

  • Refuse Receptacles (AREA)

Abstract

The utility model relates to a waste collecting box which comprises a bottom plate, a first lateral plate, a second lateral plate, a third lateral plate, a partition board plate, a first box door and a second box door. The first lateral plate, the second lateral plate, the third lateral plate, the partition board plate, the first box door and the second box door are arranged on the bottom plate and form a box-shaped structure with the bottom plate in an enclosing mode. Inside of the box-shaped structure is divided into a first box body and a second box body smaller than the first box body. According to the waste collecting box, the first box body for placing large waste and the second box body for placing small waste are arranged, the waste can be stored in a classified mode, sequential treatment can be facilitated, and more waste can be collected, so that the waste collecting box has high use efficiency in high-rise or super high-rise buildings.

Description

Scrap collecting tank
Technical field
The utility model relates to the realm of building construction, particularly a kind of scrap collecting tank that is applicable to that waste material shifts in high level or superelevation layer Construction of Steel Structure.
Background technology
Quick growth along with development of modernization and population, all kinds of engineering construction project scales enlarge day by day, high buildings and large mansions rise sheer from level ground to improve utilization of space, and the concrete structure use highly is limited, build so existing a lot of buildings all are steel structures.
In work progress, can produce a large amount of waste materials, as contour plate leftover pieces, peg porcelain ring and the first-class waste material of high strength bolt plum blossom.In order to ensure construction safety, need in time to clear up the waste material that produces in the work progress, allow Construction of Steel Structure carry out in order.Yet, existing scrap collecting tank exist volume waste material weight little, that can bear little, be not suitable for depositing long contour plate waste material and be not suitable for being placed on the first-class deficiency in girder steel plane than large span, service efficiency is extremely low in high level or high-rise building.In addition, existing scrap collecting tank is put big or small block waste material together, causes subsequent treatment cumbersome.
The utility model content
Technical problem to be solved in the utility model is, provide a kind of in high level or high-rise building service efficiency high and can store classifiedly the scrap collecting tank of waste material.
The utility model is achieved in that provides a kind of scrap collecting tank, comprises base plate, first side plate, second side plate, the 3rd side plate, dividing plate, first chamber door and second chamber door; Described first side plate, second side plate, the 3rd side plate, first chamber door and second chamber door are arranged on the described base plate, and surround a case shape structure with described base plate; Described dividing plate becomes first casing and second casing littler than described first casing with the internal separation of described case shape structure.
Further, described first side plate and described second side plate are arranged on the relative both sides of described base plate; Described the 3rd side plate is arranged on a side of described base plate, and between described first side plate and described second side plate; Described first chamber door is installed in rotation on a side of described base plate, and described first chamber door and described the 3rd side plate are positioned at the relative both sides of described base plate; Described dividing plate is arranged on the described base plate, and between described first side plate and described second side plate, and extends to a side at the above first chamber door place of described base plate from a side at the above the 3rd side plate place of described base plate; Described second chamber door is installed in rotation on the described base plate, and between described dividing plate and described second side plate, and described second chamber door and described the 3rd side plate are positioned at the relative both sides of described base plate.
Further, described first side plate, second side plate and dividing plate are parallel to each other.
Further, the bottom of described first chamber door and second chamber door is articulated with described base plate respectively; Described scrap collecting tank also comprises interim lock, and described interim lock is with described first chamber door and described first side plate and dividing plate locking, with described second chamber door and described second side plate and dividing plate locking.
Further, described interim lock comprises the pipe and the grooved reinforcing bar that can insert in the described pipe of paired setting; Described pipe is arranged on described first side plate and first chamber door in couples; Described pipe is arranged on described first chamber door and the dividing plate in couples; Described pipe is arranged on described second chamber door and the dividing plate in couples; Described pipe is arranged on described second chamber door and second side plate in couples.
Further, be respectively equipped with hanger on the both sides, top of described first side plate, described second side plate.
Further, described scrap collecting tank also comprises fire extinguisher, is arranged in described first side plate and described second side plate hanging ring and anti-fall rope at least one; Described fire extinguisher is installed on the described hanging ring by described anti-fall rope.
Further, described base plate comprises underframe, spreader, shore and steel plate; A plurality of described spreaders are spaced apart and arranged in the described underframe; A plurality of described shores are arranged in the described underframe with respect to described spreader inclination, and are connected with described spreader with described underframe respectively; Described steel plate is laid on described underframe, described spreader and the described shore.
Compared with prior art, scrap collecting tank in the utility model is by arranging first casing that can deposit large-scale waste material and second casing that can deposit small-sized waste material, both can realize that storing classifiedly waste material can make things convenient for follow-up processing, can collect more waste material again, make scrap collecting tank in high level or high-rise building, have higher service efficiency.
Above-mentioned explanation only is the general introduction of technical solutions of the utility model, for can clearer understanding technological means of the present utility model, and can be implemented according to the content of specification sheets, and for above-mentioned and other purposes, feature and advantage of the present utility model can be become apparent, below especially exemplified by preferred embodiment, and conjunction with figs., be described in detail as follows.
Description of drawings
Fig. 1 is the scheme drawing of scrap collecting tank among the utility model one embodiment.
Fig. 2 is the scheme drawing of the base plate of scrap collecting tank among Fig. 1.
Fig. 3 is the scheme drawing of the interim lock of scrap collecting tank among Fig. 1.
Scheme drawing when Fig. 4 lies on the girder steel plane for scrap collecting tank among Fig. 1.
Scheme drawing when Fig. 5 passes girder steel for scrap collecting tank among Fig. 1.
Fig. 6 is the scheme drawing when scrap collecting tank unloads waste material among Fig. 1.
The specific embodiment
In order to make technical problem to be solved in the utility model, technical scheme and beneficial effect clearer, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explaining the utility model, and be not used in restriction the utility model.
Figure 1 shows that the scheme drawing of scrap collecting tank 100 among the utility model one embodiment.As shown in fig. 1, scrap collecting tank 100 comprises base plate 110, first side plate 120, second side plate 130, the 3rd side plate 140, dividing plate 150, first chamber door 160, second chamber door 170 and locks 180 temporarily.Base plate 110, first side plate 120, second side plate 130, the 3rd side plate 140, first chamber door 160 and second chamber door 170 surround a case shape structure.Dividing plate 150 becomes first a bigger casing 152 and second a less casing 153 with the internal separation of this case shape structure.But first chamber door, 160 switches, first casing 152; But second chamber door, 170 switches, second casing 153.Interim lock 180 can namely cut out first chamber door 160,170 lockings of second chamber door.In one embodiment, scrap collecting tank 100 can be made by modes such as welding by 150 * 5 box pipes and riffled iron etc.
Particularly, as shown in Figure 2, base plate 110 is roughly rectangular, and for example, in one embodiment, the length of base plate 110 can be 2m for 6m, width.Base plate 110 comprises underframe 112, spreader 113, shore 114 and steel plate 115.Underframe 112 is roughly rectangular.A plurality of spreaders 113 can be spaced apart and arranged in the underframe 112, and are roughly parallel to the Width of underframe 112, also are that spreader 113 can extend along the Width of underframe 112.A plurality of shores 114 also are connected with spreader 113 with underframe 112 respectively with respect to being arranged in the underframe 112 of spreader 113 inclinations.Steel plate 115 can be laid on underframe 112, spreader 113 and the shore 114.By spreader 113 and shore 114 are set, can increase the load-carrying capacity of scrap collecting tank 100.
First side plate 120 and second side plate 130 are arranged on the both sides of base plate 110.In one embodiment, first side plate 120 and second side plate 130 generally perpendicularly are arranged on both sides and the almost parallel each other of base plate 110.In addition, on the both sides, top of first side plate 120, second side plate 130, can be respectively equipped with hanger 190.
The 3rd side plate 140 is arranged on a side of base plate 110 and between first side plate 120 and second side plate 130, and the 3rd side plate 140 is connected with second side plate 130 with first side plate 120 respectively.In one embodiment, the 3rd side plate 140 generally perpendicularly is arranged on the base plate 110.Similar to base plate 110, also spreader and shore can be set on the 3rd side plate 140.
Dividing plate 150 is arranged on the base plate 110 and between first side plate 120 and second side plate 130, and a side at the 3rd side plate 140 places extends to opposite side relative on the base plate 110 from the base plate 110.In one embodiment, dividing plate 150 generally perpendicularly is arranged on the base plate 110, and is roughly parallel to first side plate 120.Dividing plate 150 and first side plate 120 and second side plate 130 arrange at interval, thereby form above-mentioned first casing 152 between base plate 110, first side plate 120, the 3rd side plate 140, dividing plate 150 and first chamber door 160; And between base plate 110, dividing plate 150, the 3rd side plate 140, second side plate 130 and second chamber door 170, form above-mentioned second casing 153.Dividing plate 150 distances first side plate 120 is far away and nearer apart from second side plate 130, thereby, first casing, 152 to the second casings 153 are big, make the casing 152 of winning to deposit large-scale waste materials such as rectangular contour plate waste material, interim connecting panel and horse plate, and make second casing 153 can deposit small-sized waste materials such as high strength bolt wabbler, peg porcelain ring, thereby reliable the realization stores classifiedly waste material, makes things convenient for subsequent treatment.
First chamber door 160 is installed in rotation on the base plate 110, and between first side plate 120 and dividing plate 150, and first chamber door 160 and the 3rd side plate 140 are positioned at the relative both sides of base plate 110.In one embodiment, the bottom of first chamber door 160 and base plate 110 articulate, and the both sides of first chamber door 160 are adjacent with dividing plate 150 with first side plate 120 respectively, and can lock with first side plate 120 and dividing plate 150 respectively by interim lock 180.
Second chamber door 170 is installed in rotation on the base plate 110, and between dividing plate 150 and second side plate 130, and second chamber door 170 and the 3rd side plate 140 are positioned at the relative both sides of base plate 110.In one embodiment, the bottom of second chamber door 170 and base plate 110 articulate, and the both sides of second chamber door 170 are adjacent with dividing plate 150 with second side plate 130 respectively, and can lock with second side plate 130 and dividing plate 150 respectively by interim lock 180.
Figure 3 shows that the scheme drawing of the interim lock 180 of scrap collecting tank 100 among Fig. 1.As shown in Figure 3, lock 180 comprises the pipe 182 of paired setting and can insert grooved reinforcing bar 183 in the pipe 182 temporarily.Pipe 182 can be arranged on the element that needs locking in couples, for example, pipe 182 can be arranged on first side plate 120 and first chamber door 160 in couples, in order to reinforcing bar 183 to be installed, an end that is reinforcing bar 183 is inserted into the pipe 182 that is arranged on first side plate 120, the other end is inserted into the pipe 182 that is arranged on first chamber door 160, thereby utilizes interim lock 180 with first side plate 120 and 160 lockings of first chamber door.In addition, pipe 182 can be arranged on first chamber door 160 and the dividing plate 150 in couples; Pipe 182 also can be arranged on second chamber door 170 and the dividing plate 150 in couples; Pipe 182 also can be arranged on second chamber door 170 and second side plate 130 in couples.
In addition, in order further to guarantee construction safety, on the scrap collecting tank 100 fire extinguisher 192 can be set further.At first side plate 120 and/or second side plate 130 hanging ring 195 is set, fire extinguisher 192 can be installed on the hanging ring 195 by anti-fall rope 193.
Above-mentioned is the concrete structure of scrap collecting tank 100 among the utility model one embodiment, its using method of brief description.
Fig. 4 be shown in the scheme drawing of scrap collecting tank 100 when lying on girder steel 200 planes.As shown in Figure 4, after steel rope 300 ties up on the hanger 190, by the tower crane machine scrap collecting tank 100 is lifted to girder steel 200 planes, make scrap collecting tank 100 on two girder steels 200.In work progress, scrap collecting tank 100 can be placed on intermediate floor, in order to collect up and down two-layer and place floor totally three layers waste material.In one embodiment, the waste material total weight that scrap collecting tank 100 is collected can for: the about 228kg of contour plate cutting waste material, the interim about 2073.6kg of connecting panel, weld the about 720kg of horse plate, the about 60kg of high strength bolt wabbler, the about 50kg of peg porcelain ring and the about 600kg of other waste materials, about 3731.6kg altogether, add that deadweight is about 6231.6kg, in tower crane lifting scope (12t in the high building plane).
When the girder steel on upper strata was passed through in the needs lifting, as shown in Figure 5, steel rope 300 tied up on the hanger 190, lifting scrap collecting tank 100 and half-twist, and casing is by the girder steel 200 on upper strata.
Scheme drawing when Figure 6 shows that scrap collecting tank 100 unloading waste materials.As shown in Figure 6, when lying in scrap collecting tank 100 on the ground, can unload the fire extinguisher 192 at two ends earlier, take off the reinforcing bar 183 of interim lock 180 again to open first chamber door 160 and second chamber door 170, unload two lifting ropes 300 at contiguous first chamber door 160 and second chamber door, 170 places then, lifting scrap collecting tank 100 just can unload waste material.
In sum, the scrap collecting tank 100 that the utility model embodiment provides is by arranging first casing 152 that can deposit large-scale waste material and second casing 153 that can deposit small-sized waste material, both can realize that storing classifiedly waste material can make things convenient for follow-up processing, (for example can collect more waste material again, can deposit nearly 5 tons of construction waste materials in one embodiment), make scrap collecting tank 100 in high level or high-rise building, have higher service efficiency.In addition, by interim lock 180 and a plurality of hanger 190 are set, can make lifting rope 300 be connected with the hanger 190 of scrap collecting tank 100 the same sides, thereby make scrap collecting tank 100 roll, can conveniently unload waste material.
The above only is preferred embodiment of the present utility model; not in order to limit the utility model; all any modifications of within spirit of the present utility model and principle, doing, be equal to and replace and improvement etc., all should be included within the protection domain of the present utility model.

Claims (8)

1. a scrap collecting tank comprises base plate, first side plate, second side plate and the 3rd side plate; Described first side plate, second side plate and the 3rd side plate are arranged on the described base plate, it is characterized in that, described scrap collecting tank also comprises dividing plate, first chamber door and second chamber door; Described first chamber door and second chamber door are arranged on the described base plate, and described first side plate, second side plate, the 3rd side plate, first chamber door and second chamber door surround a case shape structure with described base plate; Described dividing plate becomes first casing and second casing littler than described first casing with the internal separation of described case shape structure.
2. scrap collecting tank as claimed in claim 1 is characterized in that, described first side plate and described second side plate are arranged on the relative both sides of described base plate; Described the 3rd side plate is arranged on a side of described base plate, and between described first side plate and described second side plate; Described first chamber door is installed in rotation on a side of described base plate, and described first chamber door and described the 3rd side plate are positioned at the relative both sides of described base plate; Described dividing plate is arranged on the described base plate, and between described first side plate and described second side plate, and extends to a side at the above first chamber door place of described base plate from a side at the above the 3rd side plate place of described base plate; Described second chamber door is installed in rotation on the described base plate, and between described dividing plate and described second side plate, and described second chamber door and described the 3rd side plate are positioned at the relative both sides of described base plate.
3. scrap collecting tank as claimed in claim 2 is characterized in that, described first side plate, second side plate and dividing plate are parallel to each other.
4. scrap collecting tank as claimed in claim 2 is characterized in that, the bottom of described first chamber door and second chamber door is articulated with described base plate respectively; Described scrap collecting tank also comprises interim lock, and described interim lock is with described first chamber door and described first side plate and dividing plate locking, with described second chamber door and described second side plate and dividing plate locking.
5. scrap collecting tank as claimed in claim 4 is characterized in that, described interim lock comprises the pipe and the grooved reinforcing bar that can insert in the described pipe of paired setting; Described pipe is arranged on described first side plate and first chamber door in couples; Described pipe is arranged on described first chamber door and the dividing plate in couples; Described pipe is arranged on described second chamber door and the dividing plate in couples; Described pipe is arranged on described second chamber door and second side plate in couples.
6. scrap collecting tank as claimed in claim 2 is characterized in that, is respectively equipped with hanger on the both sides, top of described first side plate, described second side plate.
7. scrap collecting tank as claimed in claim 2 is characterized in that, described scrap collecting tank also comprises fire extinguisher, be arranged in described first side plate and described second side plate hanging ring and anti-fall rope at least one; Described fire extinguisher is installed on the described hanging ring by described anti-fall rope.
8. as any one described scrap collecting tank in the claim 1 to 7, it is characterized in that described base plate comprises underframe, spreader, shore and steel plate; A plurality of described spreaders are spaced apart and arranged in the described underframe; A plurality of described shores are arranged in the described underframe with respect to described spreader inclination, and are connected with described spreader with described underframe respectively; Described steel plate is laid on described underframe, described spreader and the described shore.
CN2012206668893U 2012-12-06 2012-12-06 Waste collecting box Expired - Lifetime CN203064569U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012206668893U CN203064569U (en) 2012-12-06 2012-12-06 Waste collecting box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012206668893U CN203064569U (en) 2012-12-06 2012-12-06 Waste collecting box

Publications (1)

Publication Number Publication Date
CN203064569U true CN203064569U (en) 2013-07-17

Family

ID=48763385

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012206668893U Expired - Lifetime CN203064569U (en) 2012-12-06 2012-12-06 Waste collecting box

Country Status (1)

Country Link
CN (1) CN203064569U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108163423A (en) * 2018-02-27 2018-06-15 南京工业职业技术学院 A kind of skyscraper refuse collection device
CN113697310A (en) * 2021-09-06 2021-11-26 中建八局第一建设有限公司 Bucket type steel bar waste recovery box and use method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108163423A (en) * 2018-02-27 2018-06-15 南京工业职业技术学院 A kind of skyscraper refuse collection device
CN113697310A (en) * 2021-09-06 2021-11-26 中建八局第一建设有限公司 Bucket type steel bar waste recovery box and use method thereof

Similar Documents

Publication Publication Date Title
CN104790675B (en) Reinforced concrete block masonry structure assemblage construction method
CN201809036U (en) Hanging hopper with detachable chassis
CN203064569U (en) Waste collecting box
CN207001991U (en) A kind of hanging apparatus of high ferro prefabricated case beam
CN210914946U (en) Lifting appliance with sling tensioning device
CN203080770U (en) Profiled steel sheet and concrete composite floor
CN203229310U (en) Loading and transporting lifting appliance for steel truss floor bearing plate
CN201598864U (en) Steel bar prefabricated member of large low-temperature storage tank wall body
CN108412099A (en) Bar connecting formula concrete prefabricated board and connection method are buried after through thickness
CN204662706U (en) Energy-saving heat preserving light cement prefabricated component construction wall
CN206562782U (en) Glomeration builds self-tightening type block masonry wall binding apparatus
CN203640155U (en) Truss concrete superposed beam
CN214783820U (en) Lifting point reinforced overweight underground continuous wall reinforcement cage
CN207671531U (en) A kind of building block lifting cage
CN202688882U (en) Cofferdam lowering positioning platform for double-wall steel cofferdam construction of deep-water bridge pier
CN214059608U (en) PC superimposed sheet transportation frame hoist
CN108792924A (en) A kind of steel bar positioning frame
CN208394614U (en) A kind of steel bar positioning frame
CN106760570A (en) Glomeration builds self-tightening type block masonry wall binding apparatus
CN206104558U (en) A device for changing width heavy plate mill hydraulic pressure AGC jar
CN204491840U (en) A kind of being convenient to is installed and the space frame formula self-contained flat be connected
CN201195839Y (en) Concrete catena block net slice hanging frame
CN201367671Y (en) Prestressed reinforced concrete double-T plate
CN217921004U (en) Quick hoist and mount system of superimposed sheet
CN205777582U (en) A kind of concrete pier base moulding bed assembled for large-scale steel structure body

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Novel waste collecting box

Effective date of registration: 20180129

Granted publication date: 20130717

Pledgee: Bank of Beijing Limited by Share Ltd. Shenzhen branch

Pledgor: China Construction Steel Structure Corp.,Ltd.

Registration number: 2018440020010

PE01 Entry into force of the registration of the contract for pledge of patent right
CP03 Change of name, title or address

Address after: 3801, 38 / F, China Construction Science and engineering building, No. 3331, Weilan Coast Community Central Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Engineering Group Co.,Ltd.

Address before: 518040 Futian District, Shenzhen, Guangdong, Che Kung Temple, 17-19 Lane eight Tien eight building

Patentee before: China Construction Steel Structure Corp.,Ltd.

CP03 Change of name, title or address
CX01 Expiry of patent term

Granted publication date: 20130717

CX01 Expiry of patent term
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20221207

Granted publication date: 20130717

Pledgee: Bank of Beijing Limited by Share Ltd. Shenzhen branch

Pledgor: China Construction Steel Structure Corp.,Ltd.

Registration number: 2018440020010

PC01 Cancellation of the registration of the contract for pledge of patent right