CN207001991U - Hoist device that prefabricated case roof beam of high-speed railway was used - Google Patents

Hoist device that prefabricated case roof beam of high-speed railway was used Download PDF

Info

Publication number
CN207001991U
CN207001991U CN201720567292.6U CN201720567292U CN207001991U CN 207001991 U CN207001991 U CN 207001991U CN 201720567292 U CN201720567292 U CN 201720567292U CN 207001991 U CN207001991 U CN 207001991U
Authority
CN
China
Prior art keywords
crossbeam
hoist
prefabricated case
suspension rod
roof beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720567292.6U
Other languages
Chinese (zh)
Inventor
闫继国
王海舰
王广周
陈延军
周俊清
王鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 15th Bureau Group Co Ltd
Road Bridge Construction Co Ltd of China Railway 15th Bureau Group Co Ltd
Original Assignee
China Railway 15th Bureau Group Co Ltd
Sixth Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 15th Bureau Group Co Ltd, Sixth Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd filed Critical China Railway 15th Bureau Group Co Ltd
Priority to CN201720567292.6U priority Critical patent/CN207001991U/en
Application granted granted Critical
Publication of CN207001991U publication Critical patent/CN207001991U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a hoist device that prefabricated case roof beam of high-speed railway was used, hoist and mount unit including a plurality of parallel arrangement, hoist and mount unit is including the crossbeam of seting up the hole for hoist, wear to be equipped with the jib in the crossbeam hole for hoist, it is so that establish the jib card on the crossbeam to twist on the jib top, the bottom of jib runs through on the prefabricated case roof beam the hole for hoist and extends to in the prefabricated case roof beam and twist and be equipped with the nut, the crossbeam is connected so that hoisting accessory applys the effort of lifting by crane to the crossbeam with hoisting accessory, it produces the card and establishes the effort and links as an organic whole with crossbeam and prefabricated case roof beam to twist the nut of establishing at the jib both ends that run through the crossbeam, thereby the. The utility model discloses when utilizing portal crane hoist and mount super large tonnage high-speed railway precast box roof beam, adopt the installation jib on the crossbeam, run through the reservation hole of hoist at precast box roof beam both ends through the jib to thereby the local atress of reserving the hole of hoist has replaced the whole atress of precast box roof beam and realize the whole safe hoist and mount of box roof beam.

Description

A kind of hanging apparatus of high ferro prefabricated case beam
Technical field
A kind of boom hoisting is the utility model is related to, more particularly, to a kind of hanging apparatus of high ferro prefabricated case beam.
Background technology
With the continuous development of high-speed railway, 900t prefabricated box -beam construction technologies reach its maturity, box beam beam type have 32.6m and Two kinds of 24.6m, for width typically in 12m, beam body weight is no more than 900t, and box beam needs integral hoisting after the completion of beam field is prefabricated To girder carrier, the scene of setting a roof beam in place is transported to by girder carrier, is finally completed box beam erection;Because of the huge irregular, super large of its outward appearance The reasons such as weight, it can not use during gantry crane lifting box beam steel wire rope binding box beam that it is big to turn into restriction so as to cause lifting inconvenience The key of tonnage box beam lifting displacement.
Utility model content
The purpose of this utility model is to solve in the prior art because of huge irregular, the super large weight of high ferro prefabricated case beam outward appearance The reasons such as amount, the problem of steel wire rope binding box beam can not being used to cause to lift inconvenience during gantry crane lifting box beam, there is provided Yi Zhonggao The hanging apparatus of iron prefabricated case beam.
To solve the deficiency of above-mentioned technical problem, used technical scheme is the utility model:
A kind of hanging apparatus of high ferro prefabricated case beam, including some lifting elements be arrangeding in parallel, lifting elements include Crossbeam, some transverse beam lifting holes being mutually matched with hole for hoist on prefabricated case beam are offered through crossbeam, transverse beam lifting is worn in hole Provided with suspension rod, twisted on suspension rod top and be provided with nut in order to which suspension rod is fastened on crossbeam, prefabricated case beam is run through in the bottom of suspension rod Upper hole for hoist, which is extended in prefabricated case beam and twisted, is provided with nut, and crossbeam is connected with boom hoisting to be twined in order to the lifting rope of boom hoisting It is wound on crossbeam and applies lifting active force to crossbeam, the nut generation card set is twisted through the suspension rod both ends of crossbeam and is provided as firmly to Crossbeam and prefabricated case beam are connected as a single entity, and the lifting active force of crossbeam is conducted to prefabricated case beam so as to be sling.Boom hoisting is Gantry hammock.
Pad is provided with gusset between the nut and crossbeam on described suspension rod top, and suspension rod is to shoulder pole when lifting box beam with increase Shearing force.
Pad is provided with suspension rod lower bolster between the nut and prefabricated case beam of described suspension rod bottom, for increasing and box beam top plate Lifting surface area.
Described hole for hoist is provided with four.
The beneficial effects of the utility model are:The utility model utilizes gantry crane lifting super-tonnage high ferro prefabricated case beam When, using suspension rod is installed on crossbeam, the reserved hole for hoist at prefabricated case beam both ends is run through by suspension rod, to reserve the office of hole for hoist Portion's stress instead of the overall stress of prefabricated case beam so as to realize box beam integral safe hoisting;It is connected to by steel wire rope on crossbeam It instead of the problem of winding whole prefabricated case beam to solve the problems, such as to lift large-tonnage high ferro prefabricated case beam suspender, and crossbeam is installed Suspension rod lifting box beam is not easy to tilt, good integrity, safety coefficient are high, and mounting means is easily understood, and box beam, which is often held, only needs 2 operations Worker can be achieved suspension rod and couple or remove with the lifting of box beam.
Brief description of the drawings
Fig. 1 is the overall structure diagram under the utility model installment state.
Fig. 2 is the structural representation under installment state at the top of the utility model.
Diagram mark:1st, boom hoisting;2nd, crossbeam;3rd, nut;4th, suspension rod lower bolster;5th, prefabricated case beam;6th, suspension rod;7th, muscle Plate.
Embodiment
Shown in figure, embodiment is as follows:
A kind of hanging apparatus of high ferro prefabricated case beam, including some lifting elements be arrangeding in parallel, lifting elements include Crossbeam 2 is that shoulder pole shape physical dimension is 1.5m*0.6m*5m, and four and hole for hoist phase on prefabricated case beam 5 are offered through crossbeam 2 The transverse beam lifting hole mutually matched, hole site 1m*3.66m is lifted, determined according to high ferro beam type, transverse beam lifting is equipped with suspension rod in hole 6, the long 2m* φ 0.1m of suspension rod, upper and lower ends respectively have a long silkings of 0.4m, are twisted on the top of suspension rod 6 and are provided with nut 3 in order to by suspension rod 6 It is fastened on crossbeam 2, pad is provided with gusset 7 between the nut 3 and crossbeam 2, and gusset thickness is 0.2m, and the bottom of suspension rod 6 is through pre- Hole for hoist, which is extended in prefabricated case beam 5 and twisted, in box beam 5 processed is provided with nut 3, and pad is provided with and hung between this nut 3 and prefabricated case beam 5 The crossbeam 2 of bar lower bolster 4 is connected with boom hoisting 1 is wrapped on crossbeam 2 and it is applied lifting in order to the lifting rope of boom hoisting 1 Active force, the generation card of nut 3 set is twisted through the both ends of suspension rod 6 of crossbeam 2 and is provided as that crossbeam 2 and prefabricated case beam 5 firmly are linked as into one Body, the lifting active force of crossbeam 2 are conducted to prefabricated case beam 5 so as to be sling, and boom hoisting is gantry hammock.
During hoisting prefabricated box beam, first crossbeam is dropped down onto on the beam face of prefabricated case beam using straddle truck, four suspension rods pair of crossbeam The reserved hole for hoist of quasi- prefabricated case beam is fallen, and meets that suspension rod is leaked outside length in box beam beam camber, and suspension rod is first installed in box beam room Lower bolster, then suspension rod nut is tightened, it is sequentially completed the installation of 16, box beam both ends suspension rod lower bolster and nut, installation Afterwards, two straddle trucks raising can sling crossbeam simultaneously, realize that synchronous safety lifts box beam;Box beam is lifted to precalculated position, Two crossbeams fall, and operating personnel remove the nut and lower bolster of each suspension rod in beam camber, lift crossbeam, complete box beam and crossbeam Separation slinger completes.
Technical scheme and embodiment and non-limiting cited by the utility model, with the skill cited by the utility model Art scheme and embodiment are equal or effect same approach is all in the range of the utility model is protected.

Claims (4)

  1. A kind of 1. hanging apparatus of high ferro prefabricated case beam, it is characterised in that:Including some lifting elements be arrangeding in parallel, lifting Unit includes crossbeam(2), through crossbeam(2)Offer some and prefabricated case beam(5)The transverse beam lifting that upper hole for hoist is mutually matched Hole, transverse beam lifting are equipped with suspension rod in hole(6), suspension rod(6)Twisted on top and be provided with nut(3)In order to by suspension rod(6)It is fastened on Crossbeam(2)On, suspension rod(6)Bottom run through prefabricated case beam(5)Upper hole for hoist extends to prefabricated case beam(5)It is interior and stubborn be provided with nut (3), crossbeam(2)With boom hoisting(1)Connection is in order to boom hoisting(1)Lifting rope be wrapped in crossbeam(2)Above and it is applied Active force is lifted by crane, through crossbeam(2)Suspension rod(6)Twist the nut set in both ends(3)Card is produced to be provided as crossbeam firmly(2)With it is prefabricated Box beam(5)It is connected as a single entity, crossbeam(2)Lifting active force be conducted to prefabricated case beam(5)So as to be sling.
  2. A kind of 2. hanging apparatus of high ferro prefabricated case beam according to claim 1, it is characterised in that:Described suspension rod (6)The nut on top(3)With crossbeam(2)Between pad be provided with gusset(7).
  3. A kind of 3. hanging apparatus of high ferro prefabricated case beam according to claim 1, it is characterised in that:Described suspension rod (6)The nut of bottom(3)With prefabricated case beam(5)Between pad be provided with suspension rod lower bolster(4).
  4. A kind of 4. hanging apparatus of high ferro prefabricated case beam according to claim 1, it is characterised in that:Described hole for hoist It is provided with four.
CN201720567292.6U 2017-05-22 2017-05-22 Hoist device that prefabricated case roof beam of high-speed railway was used Expired - Fee Related CN207001991U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720567292.6U CN207001991U (en) 2017-05-22 2017-05-22 Hoist device that prefabricated case roof beam of high-speed railway was used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720567292.6U CN207001991U (en) 2017-05-22 2017-05-22 Hoist device that prefabricated case roof beam of high-speed railway was used

Publications (1)

Publication Number Publication Date
CN207001991U true CN207001991U (en) 2018-02-13

Family

ID=61444710

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720567292.6U Expired - Fee Related CN207001991U (en) 2017-05-22 2017-05-22 Hoist device that prefabricated case roof beam of high-speed railway was used

Country Status (1)

Country Link
CN (1) CN207001991U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108981590A (en) * 2018-06-13 2018-12-11 中铁隧道集团二处有限公司 A kind of high-speed rail precast beam positioning system
CN110029582A (en) * 2019-05-16 2019-07-19 中铁十五局集团第一工程有限公司 A kind of device and method for the double sunpender synchronous tensions of bowstring arch bridge
CN111172903A (en) * 2020-01-17 2020-05-19 广东冠粤路桥有限公司 Box girder structure clamping structure and construction method thereof
CN113699891A (en) * 2021-08-27 2021-11-26 上海市基础工程集团有限公司 Processing, manufacturing and construction method of prefabricated small box girder hanging bracket
CN116750660A (en) * 2023-08-23 2023-09-15 山东兴源机械有限公司 Beam lifting machine and grabbing and lifting device thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108981590A (en) * 2018-06-13 2018-12-11 中铁隧道集团二处有限公司 A kind of high-speed rail precast beam positioning system
CN110029582A (en) * 2019-05-16 2019-07-19 中铁十五局集团第一工程有限公司 A kind of device and method for the double sunpender synchronous tensions of bowstring arch bridge
CN110029582B (en) * 2019-05-16 2024-06-11 中铁十五局集团第一工程有限公司 Device and method for synchronous tensioning of double suspenders of tied-arch bridge
CN111172903A (en) * 2020-01-17 2020-05-19 广东冠粤路桥有限公司 Box girder structure clamping structure and construction method thereof
CN113699891A (en) * 2021-08-27 2021-11-26 上海市基础工程集团有限公司 Processing, manufacturing and construction method of prefabricated small box girder hanging bracket
CN116750660A (en) * 2023-08-23 2023-09-15 山东兴源机械有限公司 Beam lifting machine and grabbing and lifting device thereof
CN116750660B (en) * 2023-08-23 2023-11-07 山东兴源机械有限公司 Beam lifting machine and grabbing and lifting device thereof

Similar Documents

Publication Publication Date Title
CN207001991U (en) Hoist device that prefabricated case roof beam of high-speed railway was used
CN101761031B (en) Continuous and perpendicular lifting apparatus for large segmental bridge floor beam
CN106744257B (en) A kind of kiloton adjustable combined sling, assemble method and the method for lifting caisson
CN204342250U (en) A kind of multi-state hoisting balance beam
CN101476287A (en) Construction method for carrying large box girder by tire type portal jib crane
CN106592962A (en) Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus
CN210914946U (en) Lifting appliance with sling tensioning device
CN206872270U (en) A kind of device of across the railway cluster lifting of large-tonnage railway single freely-supported trough girder
CN105645275B (en) Cable hoist and its construction method
CN108408667A (en) Broken line type girder truss rod piece Quick overturning device and its method for turning
CN207632359U (en) Rack slot machine shoulder pole girder deflects in the air turns over transposer
CN207581193U (en) A kind of rare earth zinc steel strand wires anchor chain type lifts by crane Wire frame
CN209039993U (en) A kind of device carrying out the tensioning of great cantilever bent cap using movable supporting frame
CN203654191U (en) Device for stay cable to be lifted on bridge
CN207142642U (en) A kind of multilayer steel plates suspender
CN207047703U (en) A kind of beam piece prestressed stretch-draw jack easy device in place
CN207277197U (en) A kind of operating platform suitable for the installation of high pier Wavelike steel webplate cantilever
CN206827922U (en) A kind of slip rope guy device on crane arm
CN206266077U (en) Sling system
CN214783820U (en) Lifting point reinforced overweight underground continuous wall reinforcement cage
CN214329956U (en) Ring rail hoisting device for curtain wall installation
CN108059088B (en) Method and device for deflection turning and transposition of carrying pole Liang Kongzhong of slot erecting machine
CN105317031B (en) A kind of ship lift main equipment room bridge main beam hanging method
CN206328690U (en) A kind of big discrepancy in elevation, large span stiff skeleton external wrapping concrete template construction equipment
CN209797252U (en) Frog air turnover device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180710

Address after: 471013 Hospital No. 2, Luoyang, Luoyang, Henan

Co-patentee after: THE ROAD-BRIDGE CONSTRUCTION COMPANY LTD. OF CHINA RAILWAY 15TH BUREAU Group

Patentee after: CHINA RAILWAY 15TH BUREAU GROUP Co.,Ltd.

Address before: 6 floor, 666 new road, Jingan District, Shanghai

Co-patentee before: THE 6TH CONSTRUCTION COMPANY LTD. OF CHINA RAILWAY 15TH BUREAU GROUP CO.,LTD.

Patentee before: CHINA RAILWAY 15TH BUREAU GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180213

Termination date: 20210522