CN201187165Y - 变电站复合型主变压器防火墙 - Google Patents

变电站复合型主变压器防火墙 Download PDF

Info

Publication number
CN201187165Y
CN201187165Y CNU200820034590XU CN200820034590U CN201187165Y CN 201187165 Y CN201187165 Y CN 201187165Y CN U200820034590X U CNU200820034590X U CN U200820034590XU CN 200820034590 U CN200820034590 U CN 200820034590U CN 201187165 Y CN201187165 Y CN 201187165Y
Authority
CN
China
Prior art keywords
wall
main transformer
fire
transformer
wall body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200820034590XU
Other languages
English (en)
Inventor
姜太荣
张翼虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU KENENG ELECTRIC ENGINEERING CONSULTATION Co Ltd
Original Assignee
JIANGSU KENENG ELECTRIC ENGINEERING CONSULTATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU KENENG ELECTRIC ENGINEERING CONSULTATION Co Ltd filed Critical JIANGSU KENENG ELECTRIC ENGINEERING CONSULTATION Co Ltd
Priority to CNU200820034590XU priority Critical patent/CN201187165Y/zh
Application granted granted Critical
Publication of CN201187165Y publication Critical patent/CN201187165Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

变电站复合型主变压器防火墙,包括墙体和钢管构架柱,墙体为钢筋混凝土框架结构,框架内部填充砖砌体,钢管构架柱设置在墙体上方。与现有技术相比,本实用新型防火墙下部由墙体承重防火,上部采用钢管构架柱支承主变构架进线梁,两者通过法兰有效连接,墙体采用钢筋混凝土框架,节省钢材,内部填充防火砖砌体,防火性好,整体用钢量低,造价低,造型美观,施工及安装方便,工期短,能节约较多的资源和人力成本,安全可靠。

Description

变电站复合型主变压器防火墙
技术领域
本实用新型涉及变压器防火墙,具体为一种变电站复合型主变压器防火墙。
背景技术
主变压器防火墙是变电站主变场地重要的防火设施,同时它还承担了支撑主变压器构架进线梁的作用。传统的主变压器防火墙有两种设计方法:一是先建造钢管构架柱来支撑主变构架进线梁,再在钢管构架柱外侧浇筑钢筋混凝土防火墙或砌筑砖防火墙将其包裹起来;二是采用全混凝土结构,用混凝土柱去支撑主变构架进线梁。方法一存在施工周期长、施工工序复杂、造价较高、钢管构架柱与混凝土或砖连接处易开裂等缺点,方法二存在钢材用量多、造价高等缺点。
发明内容
本实用新型要解决的问题是:现有变电站主变压器防火墙存在造价高、施工复杂、结构连接处易开裂、钢材用量多等缺点。
本实用新型的技术方案是:变电站复合型主变压器防火墙,包括墙体和钢管构架柱,墙体为钢筋混凝土框架结构,框架内部填充砖砌体,钢管构架柱设置在墙体上方。
本实用新型将墙体做为承重结构,钢管构架柱支撑主变构架进线梁,钢管构架柱通过法兰连接在墙体的钢筋混凝土框架结构上,能够保证钢管构架柱与墙体的有效连接;墙体框架结构内部填充防火砖砌体,保证防火墙的耐火性能。
与现有技术相比,本实用新型防火墙下部由墙体承重防火,上部采用钢管构架柱支承主变构架进线梁,两者通过法兰有效连接,墙体采用钢筋混凝土框架,节省钢材,内部填充防火砖砌体,防火性好,整体用钢量底,造价低,造型美观,施工及安装方便,工期短,能节约较多的资源和人力成本,安全可靠。
附图说明
图1是本实用新型安装示意图。
图2是本实用新型墙体俯视图。
图3是本实用新型墙体框架结构的柱体部分立面示意图。
图4是本实用新型墙体内部填充砖砌体的立面示意图。
图5是本实用新型钢管构架柱示意图。
图6是图5中A的局部放大图。
图7是图5中B的局部放大图。
具体实施方式
本实用新型防火墙的承重结构采用钢筋混凝土框架结构,内部填充砖砌体,框架结构柱体部分的顶部设置法兰与上部钢管构架柱连接。
下面结合附图,对本主变压器防火墙作详细说明。如图1所示,主变压器防火墙的墙体1及其上钢管构架柱2与主变构架梁3及两侧构架柱4构成了整个主变压器构架住空间体系,它提供了变电站最重要设备主变压器获取能源的通道。图2为防火墙墙体俯视图,包括钢筋混凝土框架结构5和填充的砖砌体6,墙体能够完全分隔开相邻两台主变压器,以防在万一发生火灾时不致于相互影响,保障电网的安全有效运行。图3-4是防火墙的具体构成,图3为墙体框架结构的柱体部分立面示意图,包括框架结构5,框架基础7,图4是墙体内部填充砖砌体的立面示意图,包括框架结构5,填充砖砌体6、砖砌体基础8。按国家现行荷载规范标准和上部构架梁所受电气导线张力设计钢筋混凝土框架结构及其基础,再按砌体结构设计砖砌体填充墙体,框架经计算确定后,采用钢筋混凝土现浇成型,同时在其顶部预埋连接法兰,以便后续钢管构架柱的连接,然后填充防火砖砌体,保证墙体有足够的耐火时间。图5是本实用新型钢管构架柱示意图,它是钢结构,包括钢管9,图6是图5中A的局部放大图,钢管构架柱顶部设有支撑主变构架进线梁的柱顶板11及加固柱顶板11的加劲肋10,图7是图5中B的局部放大图,采用法兰12与防火墙的钢筋混凝土框架结构5有效连接,安装拆卸方便。

Claims (3)

1、变电站复合型主变压器防火墙,其特征是包括墙体和钢管构架柱,墙体为钢筋混凝土框架结构,框架内部填充砖砌体,钢管构架柱设置在墙体上方。
2、根据权利要求1所述的变电站复合型主变压器防火墙,其特征是钢管构架柱通过法兰连接在墙体的钢筋混凝土框架结构上。
3、根据权利要求1或2所述的变电站复合型主变压器防火墙,其特征是墙体框架结构内部填充防火砖砌体。
CNU200820034590XU 2008-04-28 2008-04-28 变电站复合型主变压器防火墙 Expired - Fee Related CN201187165Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820034590XU CN201187165Y (zh) 2008-04-28 2008-04-28 变电站复合型主变压器防火墙

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820034590XU CN201187165Y (zh) 2008-04-28 2008-04-28 变电站复合型主变压器防火墙

Publications (1)

Publication Number Publication Date
CN201187165Y true CN201187165Y (zh) 2009-01-28

Family

ID=40310183

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820034590XU Expired - Fee Related CN201187165Y (zh) 2008-04-28 2008-04-28 变电站复合型主变压器防火墙

Country Status (1)

Country Link
CN (1) CN201187165Y (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106368489A (zh) * 2016-10-19 2017-02-01 中国能源建设集团云南省电力设计院有限公司 一种主变压器爆炸火灾防护墙
CN106930426A (zh) * 2017-02-28 2017-07-07 中国能源建设集团浙江省电力设计院有限公司 一种主变压器u型降噪防火墙结构
CN108505777A (zh) * 2017-10-26 2018-09-07 安徽华电工程咨询设计有限公司 装配式变电站新型主变防火墙结构
CN110145047A (zh) * 2019-05-24 2019-08-20 应急管理部四川消防研究所 一种变电站防火墙封堵结构

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106368489A (zh) * 2016-10-19 2017-02-01 中国能源建设集团云南省电力设计院有限公司 一种主变压器爆炸火灾防护墙
CN106368489B (zh) * 2016-10-19 2019-03-08 中国能源建设集团云南省电力设计院有限公司 一种主变压器爆炸火灾防护墙
CN106930426A (zh) * 2017-02-28 2017-07-07 中国能源建设集团浙江省电力设计院有限公司 一种主变压器u型降噪防火墙结构
CN108505777A (zh) * 2017-10-26 2018-09-07 安徽华电工程咨询设计有限公司 装配式变电站新型主变防火墙结构
CN110145047A (zh) * 2019-05-24 2019-08-20 应急管理部四川消防研究所 一种变电站防火墙封堵结构
CN110145047B (zh) * 2019-05-24 2024-01-16 应急管理部四川消防研究所 一种变电站防火墙封堵结构

Similar Documents

Publication Publication Date Title
CN105544801A (zh) 一种预制装配式带暗支撑大板剪力墙的螺栓连接技术及施工方法
CN202831402U (zh) 一种内接圆管外套矩形钢管混凝土柱
CN101603338B (zh) 装配整体式预制混凝土剪力墙及施工方法
CN205954921U (zh) 一种新型螺栓连接的预制装配式带暗支撑大板剪力墙结构
CN105040816A (zh) 预制装配式带暗支撑叠合板式钢筋混凝土核心筒
CN103498570B (zh) 旧厂房内部加层改造结构及其施工方法
CN103603445B (zh) 一种耗能钢框架砌块填充墙
CN105064529A (zh) 一种预制装配式带暗支撑的大板剪力墙结构
CN103741842A (zh) 一种轻型装配式剪力墙结构
CN201187165Y (zh) 变电站复合型主变压器防火墙
CN103711329A (zh) 外贴钢骨混凝土框架法加固结构的方法
CN105569222A (zh) 一种预制装配式带暗支撑大板剪力墙的上下连接技术
CN207110166U (zh) 一种装配式预应力密肋楼盖复合板
CN203531178U (zh) 一种全预制剪力墙
CN205712590U (zh) 一种装配式剪力墙与预制钢管混凝土柱的连接结构
CN103122691A (zh) 塔吊标准节支承高空支模钢平台结构及施工方法
CN203684457U (zh) 一种轻型装配式剪力墙结构
CN204040555U (zh) 一种主变构架系统
CN203034799U (zh) 塔吊标准节支承高空支模钢平台结构
CN203603522U (zh) 旧厂房内部加层改造钢架混凝土结构
CN202866084U (zh) 桁架上设有地板支架的混凝土叠合楼板
CN108755955A (zh) 冷弯薄壁型钢房屋纵横墙间加强结构
CN204715764U (zh) 一种构造柱与主体结构同时施工的结构
CN204311457U (zh) 一种地铁车站基坑开挖施工用组合式支护体系
CN203603523U (zh) 旧厂房内部加层改造结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090128

Termination date: 20170428

CF01 Termination of patent right due to non-payment of annual fee