CN201169735Y - Temporary cover board for cap digging method construction - Google Patents
Temporary cover board for cap digging method construction Download PDFInfo
- Publication number
- CN201169735Y CN201169735Y CNU200820056262XU CN200820056262U CN201169735Y CN 201169735 Y CN201169735 Y CN 201169735Y CN U200820056262X U CNU200820056262X U CN U200820056262XU CN 200820056262 U CN200820056262 U CN 200820056262U CN 201169735 Y CN201169735 Y CN 201169735Y
- Authority
- CN
- China
- Prior art keywords
- cover plate
- plate
- plate body
- construction
- method construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a temporary cover plate used for construction by a cover-cut method, which is characterized in that a plate body can be a solid core plate or a hollow core plate, the hollow core plate is provided with a long hole, the surface of the plate body is covered with concrete and an asphalt layer. The temporary cover plate overcomes the disadvantage that a crest slab is utilized as a main force bearing structure during the construction in the cover-cut method further to cause the damage of the crest slab, and has an advantage over the safety; the temporary cover plate has unified specification, convenient manufacturing, transportation and assembly, and has more competitive power in appearance and practicability; and the temporary cover plate can be recovered and utilized for a plurality of times, and is more economical.
Description
Technical field:
The present invention relates to the technical field of cap excavation method structure construction, specifically a kind of a kind of interim cover plate that when cap excavation method construction underground structure, uses.
Background technology:
Build fairly large underground constructions such as subway station, underground passage or underground parking in the business district of prosperity, fluting open-cut method can be disturbed traffic over a long time, influence city appearance environment, and is worthless often; And the hidden construction process construction period is longer, and settlement of stratum is big to the adjacent building Influence on security, construction costs is also very high, is not optimum job practices equally.In this case, build earlier the top board of underground structure, then under the screening of top board safety, successfully build underground structure other parts ground cap excavation method often becomes a kind of the best because of safety, suitable and moderate ground construction cost job practices.
But cap excavation method is built earlier the top board of underground structure, and afterwards with the platform of top board as construction or traffic above-ground, often the top board injury to underground structure is very big, the normal use after having influence on top board and building up.
Summary of the invention:
The purpose of this utility model is to provide a kind of interim cover plate that is used for the cap excavation method construction, it can guarantee that underground permanent structure top board is injury-free in work progress, and after construction was finished, interim cover plate can be recycled, save cost greatly, reduced construction costs.
To achieve these goals, technical scheme of the present invention is: a kind of interim cover plate that is used for the cap excavation method construction, and it mainly comprises plate body, it is characterized in that: plate body can be solid slab or hollowcore slab, the hollowcore slab place is provided with slotted hole, and the plate body surface is covered with concrete, bitumen layer.
The utility model discloses a kind of interim cover plate that is used for cap excavation method construction, thus its overcome utilize in the cap excavation method top board as construction period main force structure cause the shortcoming of top board damage, aspect safety, have more advantage; Substitution plate gauge lattice are unified, make things convenient for manufacturing, transportation and assembly unit, and are more competitive on aesthetic property, practicality; It can reclaim, repeatedly utilize, and has more economy.
Description of drawings:
Fig. 1 is the structural representation of the utility model one embodiment.
Fig. 2 is the structural representation of another embodiment of the utility model.
The specific embodiment:
With reference to the accompanying drawings, the utility model further is described
The utility model is a kind of interim cover plate that is used for the cap excavation method construction, it mainly comprises card body 1, it is different from prior art and is: plate body 1 can be solid slab or hollowcore slab, the hollowcore slab place is provided with slotted hole 2, the pass of slotted hole 2 can be square, circular, plate body 1 can be concrete material, aluminum alloy material, steel matter, the size of plate body can be long 8000mm * wide 1000mm * high 400mm or long 4400mm * wide 1250mm * high 400mm, its specification adopts international road assembling board size, also can work out suitable specification according to concrete engineering, plate body 1 surface is covered with the 1-100mm concrete, 1-50mm pitch.
The utility model is prefabricated in advance, can splice fast, compare with the construction concrete roof, do not need concrete curing time, can recover the normal operation of traffic above-ground quickly, guarantee that underground permanent structure top board is injury-free, and after construction was finished, interim cover plate can be recycled, save cost greatly, reduced construction costs.
The adoptable concrete grade of concrete slab is C30~C50, and reinforcing bar is HRB335, HRB400, RRB400 and prestressed reinforcement.
Steel can adopt Q235 steel, Q345 steel, Q390 steel and Q420 steel.
Claims (5)
1, a kind of interim cover plate that is used for the cap excavation method construction, it mainly comprises plate body (1), it is characterized in that: plate body (1) can be solid slab or hollowcore slab, and the hollowcore slab place is provided with slotted hole (2), and plate body (1) surface is covered with concrete, bitumen layer.
2, according to a kind of interim cover plate that is used for the cap excavation method construction described in the claim 1, it is characterized in that: the pass of slotted hole (2) can be square, circular.
3, according to a kind of interim cover plate that is used for the cap excavation method construction described in the claim 1, it is characterized in that: plate body (1) can be concrete material, aluminum alloy material, steel matter.
4, according to a kind of interim cover plate that is used for the cap excavation method construction described in the claim 2, it is characterized in that: the size of plate body can be long 8000mm * wide 1000mm * high 400mm or long 4400mm * wide 1250mm * high 400mm.
5, according to a kind of interim cover plate that is used for the cap excavation method construction described in the claim 1, it is characterized in that: plate body (1) surface is covered with 1-100mm concrete, 1-50mm pitch.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200820056262XU CN201169735Y (en) | 2008-03-14 | 2008-03-14 | Temporary cover board for cap digging method construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200820056262XU CN201169735Y (en) | 2008-03-14 | 2008-03-14 | Temporary cover board for cap digging method construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201169735Y true CN201169735Y (en) | 2008-12-24 |
Family
ID=40208787
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU200820056262XU Expired - Fee Related CN201169735Y (en) | 2008-03-14 | 2008-03-14 | Temporary cover board for cap digging method construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201169735Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102877391A (en) * | 2012-09-28 | 2013-01-16 | 中国建筑第六工程局有限公司 | Temporary channel anti-skidding road surface for foundation pit excavation and construction method of temporary channel anti-skidding road surface |
CN104313972A (en) * | 2014-10-24 | 2015-01-28 | 邱定武 | Temporary parking lot |
-
2008
- 2008-03-14 CN CNU200820056262XU patent/CN201169735Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102877391A (en) * | 2012-09-28 | 2013-01-16 | 中国建筑第六工程局有限公司 | Temporary channel anti-skidding road surface for foundation pit excavation and construction method of temporary channel anti-skidding road surface |
CN104313972A (en) * | 2014-10-24 | 2015-01-28 | 邱定武 | Temporary parking lot |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104213514B (en) | A kind of earthing corrugated steel-concrete combination arch bridge add strong method | |
CN102002956B (en) | Multi-level fully-closed reinforcement technology of exposed fault zone of excavated side slope | |
CN103469814A (en) | Novel barricade supporting structure for road or river bank dam and construction method thereof | |
CN111910660A (en) | Ultrahigh slope supporting structure and construction method thereof | |
CN102650127A (en) | Precast U-shaped plate pile with mixed structure of steel and concrete | |
CN204475361U (en) | Prestressed damping formula Tyre structure ground | |
CN113005926A (en) | Construction method of mountain area abrupt slope pier reinforcing device | |
CN201169735Y (en) | Temporary cover board for cap digging method construction | |
CN204662494U (en) | Highway retaining wall reinforced structure | |
CN104947662B (en) | A kind of soil-nail wall support system based on the recyclable technique of assembled | |
CN102116036B (en) | Method for constructing underground large building by combining top-down construction method technology with sequence construction method technology | |
CN103437353A (en) | Cast-in-situ light foam concrete reinforcing method based on anchor bolt support | |
RU2405081C1 (en) | Method of repair of road surfacing | |
CN204676533U (en) | A kind of soil-nail wall support system based on the recyclable technique of assembling | |
CN204849649U (en) | Guardrail | |
CN203977297U (en) | Wet seam hole safeguard structure between a kind of Bridge Beam | |
CN204435389U (en) | A kind of assembled lattice unit for pattern foundation pit supporting structure | |
CN204112858U (en) | The prefabricated enclosure wall of a kind of prestressed concrete | |
CN204436418U (en) | Lid digs top board structure that is prefabricated in subway station and cast-in-place combination | |
CN102817352B (en) | Impact rolling method of liquefiable soil foundation with high water content | |
JP7084712B2 (en) | Steel foundation members for road guard fences, road guard fences, and their construction methods | |
CN102121248A (en) | Method for reinforcing and fixing sloping surface of prestressed anchorage element | |
CN205046869U (en) | A prevent wind reinforced structure that is used for earth interim board house on ground | |
CN216712794U (en) | Protective structure of temporary traffic hole entrance to a cave | |
CN203821426U (en) | Novel inclined column pitched roof extension board-pile composite foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081224 Termination date: 20170314 |
|
CF01 | Termination of patent right due to non-payment of annual fee |