CN203977297U - Wet seam hole safeguard structure between a kind of Bridge Beam - Google Patents

Wet seam hole safeguard structure between a kind of Bridge Beam Download PDF

Info

Publication number
CN203977297U
CN203977297U CN201420356791.7U CN201420356791U CN203977297U CN 203977297 U CN203977297 U CN 203977297U CN 201420356791 U CN201420356791 U CN 201420356791U CN 203977297 U CN203977297 U CN 203977297U
Authority
CN
China
Prior art keywords
backing plate
seam hole
wet
precast
wet seam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420356791.7U
Other languages
Chinese (zh)
Inventor
熊添祥
叶南杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201420356791.7U priority Critical patent/CN203977297U/en
Application granted granted Critical
Publication of CN203977297U publication Critical patent/CN203977297U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses wet seam hole safeguard structure between a kind of Bridge Beam, be located on the prefabricated case beam/Precast T-Beam with wet joint reserved steel bar, for the wet seam hole of adjacent two prefabricated case beams/Precast T-Beam place is protected, comprise: backing plate and overlay, described backing plate is separately fixed on the wet joint reserved steel bar of adjacent two prefabricated case beams/Precast T-Beam, described backing plate upper surface flushes with the beam face of prefabricated case beam/Precast T-Beam, described overlay is located on beam face and backing plate and with backing plate and is fixed, and the width of described overlay is greater than wet seam width of cave entrance; The utility model construction is simple, easy to operate, and the wet seam hole that can be less than 80cm to width between Bridge Beam is effectively protected; The utility model, under the prerequisite of guaranteeing effect, is pursued environmental protection, efficient, low consumption, makes overall plans, and the maximized green construction pattern of comprehensive benefit.

Description

Wet seam hole safeguard structure between a kind of Bridge Beam
Technical field
The utility model belongs to infrastructure field, and wet seam hole safeguard structure between a kind of Bridge Beam is provided especially.
Background technology
The construction of bridge prefabrication Method for Installation is near prefabricated factory or the bridge site at convenient transportation, precasting yard to be set to carry out the prefabricated work of beam, then adopts certain erection method to install.When the precast beam of prefabricated Method for Installation construction is manufactured, a set of mould bases can repeatedly have enough to meet the need use, and the beams and slabs quality of production is good; In bridge prefabrication Method for Installation work progress, top and the bottom structure can parallel operations, and the duration is short, can effectively utilize labour, has reduced construction costs; In precast beam erection process, do not need to arrange ground support, do not affect traffic under navigation and bridge, construction safety, reliable, have good construction environment, mechanization, automaticity are high, save labour, reduce labour intensity, the reduction of erection time, in highway, railway, municipal process, use extensively.In bridge prefabrication Method for Installation work progress, beam body sets up progress usually faster than bridge deck construction, and between beam, wet seaming position and part need the formation of reserved hogging moment stretch-draw hole place to face cavity mouthful.
The seam hole protection of wetting between traditional beam is often out in the cold, is not effectively covered, and to bridge deck, construction leaves potential safety hazard.If traditional approach directly adopts veneer to cover, veneer be easily moved and hole on veneer can not bear useful load, if adopt the sealing such as steel plate portal, cost is high, unfavorable construction is unrealistic.
Utility model content
The purpose of this utility model is to provide wet seam hole safeguard structure between a kind of Bridge Beam, can effectively address the above problem.
The technical solution of the utility model is: wet seam hole safeguard structure between a kind of Bridge Beam, be located on the prefabricated case beam/Precast T-Beam 2 with wet joint reserved steel bar 1, for 3 places, adjacent two prefabricated case beams/Precast T-Beam 2 wet seam hole are protected, comprise: backing plate 5 and overlay 6, described backing plate 5 is separately fixed on the wet joint reserved steel bar 1 of adjacent two prefabricated case beams/Precast T-Beam 2, described backing plate 5 upper surfaces flush with the beam face 4 of prefabricated case beam/Precast T-Beam 2, described overlay 6 is located on beam face 4 and backing plate 5 and with backing plate 5 and is fixed, the width of described overlay 6 is greater than wet seam hole 3 width.
Preferably, described safeguard structure also comprises tied silk, and described backing plate 5 is fixed by tied silk colligation with wet joint reserved steel bar 1.
Preferably, described safeguard structure also comprises iron nail, and described overlay 6 is fixed by iron nail with backing plate 5.
Preferably, described backing plate 5 is waste and old batten.
Preferably, described overlay 6 is waste and old plank or bamboo offset plate.
The utlity model has following useful effect:
The utility model construction is simple, easy to operate, and the wet seam hole that can be less than 80cm to width between Bridge Beam is effectively protected, and can effectively cover wet seam hole, can bear actual load, ensures constructor's safety; In the utility model, overlay adopts waste and old plank or bamboo offset plate, and backing plate adopts waste and old batten, and immobilization material adopts waste and old iron nail and tied silk, under the prerequisite of guaranteeing effect, pursue environmental protection, efficient, low consumption, make overall plans, the maximized green construction pattern of comprehensive benefit.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
In figure: 1, wet joint reserved steel bar; 2, prefabricated case beam/Precast T-Beam; 3, wet seam hole; 4, beam face; 5, backing plate; 6, overlay.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in detail.
As shown in Figure 1, wet seam hole safeguard structure between a kind of Bridge Beam, be located on the prefabricated case beam/Precast T-Beam 2 with wet joint reserved steel bar 1, protect for 3 places, two prefabricated case beams/Precast T-Beam, 2 wet seam hole to adjacent, comprising: backing plate 5, overlay 6, tied silk, iron nail; Described backing plate 5 is fixed on the wet joint reserved steel bar 1 of adjacent two prefabricated case beams/Precast T-Beam 2 by tied silk colligation respectively, described backing plate 5 upper surfaces flush with the beam face 4 of prefabricated case beam/Precast T-Beam 2, described overlay 6 is located on beam face 4 and backing plate 5 and by iron nail and is fixed with backing plate 5 and fix, and the width of described overlay 6 is greater than wet seam hole 3 width.
Described backing plate 5 adopts waste and old batten, and overlay 6 adopts waste and old plank or bamboo offset plate, and tied silk, iron nail also adopt waste and old tied silk and waste and old iron nail.
When concrete enforcement, carry out according to following step:
1, prepare material: backing plate 5 is waste and old batten, and overlay 6 is waste and old plank, bamboo offset plate etc., and immobilization material is waste and old iron nail, tied silk etc.
2, preparation: select width to be not less than the overlay 6 at wet seam hole 3, longitudinal spliced seamless, attractive in appearance, waste and old iron nail is done to straight processing;
3,, for preventing waste and old plank, bamboo offset plate insufficient strength, support not yet in effect under plank or bamboo offset plate, adopts waste and old batten that wet joint reserved steel bar 1 and beam face 4 are leveled up, and along the longitudinal both sides of wet joint reserved steel bar 1, the old batten of one waste discharge is respectively set;
4, prevent cover waste and old plank, bamboo offset plate move, adopt tied silk by the two ends colligation of waste and old batten on wet joint reserved steel bar 1, then by cover waste and old plank, bamboo offset plate follow closely on waste and old batten with waste and old iron nail;
The utility model overall structure is simple, easy to operate, aesthetic in appearance, allows and does not use the workman of instrument to be difficult to mobile overlay 6, and can effectively bear human body and small-sized machine load, meets on-the-spot needs; In the time that 3 places, wet seam hole no longer need to continue sealing, directly with crow bar, waste and old plank or veneer are levered up, because waste and old batten is only with the simple colligation of tied silk, overlay 6 only uses waste and old iron nail simply fixing, levers up rear waste and scrap and still can reuse.
Above-described embodiment is only explanation technical conceive of the present utility model and feature, and its object is to allow person skilled in the art can understand content of the present utility model and implement according to this, can not limit protection domain of the present utility model with this.All equivalences of doing according to the utility model Spirit Essence change or modify, within all should being encompassed in protection domain of the present utility model.

Claims (5)

1. wet seam hole safeguard structure between a Bridge Beam, be located on the prefabricated case beam/Precast T-Beam (2) with wet joint reserved steel bar (1), for the wet seam hole (3) of adjacent two prefabricated case beams/Precast T-Beam (2) is located to protect, it is characterized in that, comprise: backing plate (5) and overlay (6), described backing plate (5) is separately fixed on the wet joint reserved steel bar (1) of adjacent two prefabricated case beams/Precast T-Beam (2), described backing plate (5) upper surface flushes with the beam face (4) of prefabricated case beam/Precast T-Beam (2), beam face (4) is located at by described overlay (6) and backing plate (5) above and with backing plate (5) is fixed, the width of described overlay (6) is greater than wet seam hole (3) width.
2. according to wet seam hole safeguard structure between a kind of Bridge Beam claimed in claim 1, it is characterized in that, described safeguard structure also comprises tied silk, and described backing plate (5) is fixed by tied silk colligation with wet joint reserved steel bar (1).
3. according to wet seam hole safeguard structure between a kind of Bridge Beam described in claim 1 or 2, it is characterized in that, described safeguard structure also comprises iron nail, and described overlay (6) is fixed by iron nail with backing plate (5).
4. according to wet seam hole safeguard structure between a kind of Bridge Beam claimed in claim 1, it is characterized in that, described backing plate (5) is waste and old batten.
5. according to wet seam hole safeguard structure between a kind of Bridge Beam claimed in claim 1, it is characterized in that, described overlay (6) is waste and old plank or bamboo offset plate.
CN201420356791.7U 2014-06-30 2014-06-30 Wet seam hole safeguard structure between a kind of Bridge Beam Expired - Fee Related CN203977297U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420356791.7U CN203977297U (en) 2014-06-30 2014-06-30 Wet seam hole safeguard structure between a kind of Bridge Beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420356791.7U CN203977297U (en) 2014-06-30 2014-06-30 Wet seam hole safeguard structure between a kind of Bridge Beam

Publications (1)

Publication Number Publication Date
CN203977297U true CN203977297U (en) 2014-12-03

Family

ID=51974755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420356791.7U Expired - Fee Related CN203977297U (en) 2014-06-30 2014-06-30 Wet seam hole safeguard structure between a kind of Bridge Beam

Country Status (1)

Country Link
CN (1) CN203977297U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004822A (en) * 2019-04-23 2019-07-12 中铁十五局集团第五工程有限公司 The wet seam of precast concrete beam connects design
CN114310099A (en) * 2021-11-29 2022-04-12 上海江南长兴造船有限责任公司 Portable all-position welding trolley auxiliary device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004822A (en) * 2019-04-23 2019-07-12 中铁十五局集团第五工程有限公司 The wet seam of precast concrete beam connects design
CN114310099A (en) * 2021-11-29 2022-04-12 上海江南长兴造船有限责任公司 Portable all-position welding trolley auxiliary device

Similar Documents

Publication Publication Date Title
CN103912011B (en) The prefabricated assembled underground structure of open cut
CN101761092B (en) Construction method of movable side wall of large overall template of large-span deep foundation pit
CN202227284U (en) Bridge widening split joint structure
CN109235499A (en) A kind of open cut hypogee Standard formula construction method
CN106760110A (en) Based on BIM profiled sheet armored concrete hollow sandwich floor construction engineering methods
CN106869169B (en) A kind of three-dimensional interval construction method of underground pipe gallery warehouse
CN105672144B (en) A kind of medium-small span bridges are reinforced with spelling wide structure and its construction method
CN203977297U (en) Wet seam hole safeguard structure between a kind of Bridge Beam
CN106978909A (en) A kind of method that beams of concrete is connected with profile steel concrete column joint reinforcing bar
CN204803760U (en) Letter zhi gang - concrete composite truss bridge construction support system
CN103967332B (en) The construction method of a kind of building site enclosing
CN204282399U (en) A kind of subway space enclosing structure
CN103590599A (en) Self-compaction mode locking device and using method
CN205934687U (en) Antinode worker roof beam - steel concrete roof - external prestress combination T type simple beam
CN206090617U (en) Novel assembled piping lane
CN203685271U (en) Subway underground excavation interval tunnel reserved passage protection structure
CN203603525U (en) Reinforcing structure with clamp plate girder and clamp plate column externally arranged for stone structure
CN103498572B (en) The construction method of the additional clamping plate beam of stone structure and clamping plate post ruggedized construction
CN205348214U (en) Column formula reinforced concrete and shaped steel hybrid portal crane basis
CN202849937U (en) Height marking belt
CN205224281U (en) Connection structure of precast floor plank and girder steel
CN204326101U (en) The prefabricated assembled underground structure of open cut
CN207775647U (en) Concrete road surface component can be had enough to meet the need
CN201169735Y (en) Temporary cover board for cap digging method construction
CN202323748U (en) High-strength side wall plate used for bridge guardrail construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141203

Termination date: 20160630